RENOVATE ARMORY VENTILATION AT ISC MIAMI, FL Federal contract opportunity
Solicitation number
HSCG82-10-B-PMVA06
Issued by
Department of Homeland Security US Coast Guard

About this file

AMENDMENT 0001 - SF30

View the file

Other files for this federal contract opportunity

Other files attached to RENOVATE ARMORY VENTILATION AT ISC MIAMI, FL, newest first.
File Type Posted
Scanned001.PDF PDF
IFB.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

PAGE OF PAGES

1 1

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

11/12/09

4. REQUISITION/PURCHASE REQ. NO.

2410820PMVA06

5. PROJECT NO. (If applicable)

386198

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

Contracting Officer USCG Civil Engineering Unit Miami 15608 SW 117th Avenue Miami, Florida 33177-1630

SAME AS BLOCK 6

9A. AMENDMENT OF SOLICITATION NO.

HSCG82-10-B-PMVA06

9B. DATED (SEE ITEM 11)

14 October 2009

10A. MODIFICATION OF CONTRACT/ORDER NO.

8. NAME AND ADDRESS OF CONTRACTOR (NO., STREET, COUNTY, STATE AND ZIP CODE)

Prospective bidder

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE REFERENCED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET

FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (SPECIFY TYPE OF MODIFICATION AND AUTHORITY)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amendment 0001 is issued to provide Appendix A – Reference Photographs that were missing in the original specifications.

Clarifications: Question – Regarding the roof flashing, Will an abatement contractor be required for the removal of asbestos or will a roofer with qualifications be acceptable? Answer: Roofer with qualifications will be acceptable.

Question from electrical contractor: On a typical installation, we are responsible for bringing the electrical service conductors to the FPL transformer for FPL to connect. Basically we are not allowed in their transformers. Is FPL going to make these connections for the Armory or are the base electricians? Answer: The USCG currently has ownership of the existing 150kVA, 208Y/120V, three-phase pad mounted service transformer. FPL does not own the transformer. The bidding contractor shall terminate the new service cables on the secondary bus lugs of the existing transformer, under the direct supervision and scheduling/coordination of the unit facility engineer as indicated on the drawings.

Bid Due date remains the same: November 17, 2009 at 2:00 p.m. local time Miami, Florida.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or Print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

DEBORAH J. BOYDSTON

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED

16B UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C. DATE SIGNED

NSN 7540-01-152-8070 STANDARD FORM 30 (Rev. 10-83) PREVIOUS EDITION UNUSABLE Prescribed by GSA

FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

File details come from the government source that posted it. Updated .