SF30Amd 0001.pdf
PDF 35 KB Posted
- Attached to
- RENOVATE ARMORY VENTILATION AT ISC MIAMI, FL Federal contract opportunity
- Solicitation number
- HSCG82-10-B-PMVA06
About this file
AMENDMENT 0001 - SF30
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Scanned001.PDF | ||
| IFB.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
PAGE OF PAGES
1 1
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
11/12/09
4. REQUISITION/PURCHASE REQ. NO.
2410820PMVA06
5. PROJECT NO. (If applicable)
386198
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
Contracting Officer USCG Civil Engineering Unit Miami 15608 SW 117th Avenue Miami, Florida 33177-1630
SAME AS BLOCK 6
9A. AMENDMENT OF SOLICITATION NO.
HSCG82-10-B-PMVA06
9B. DATED (SEE ITEM 11)
14 October 2009
10A. MODIFICATION OF CONTRACT/ORDER NO.
8. NAME AND ADDRESS OF CONTRACTOR (NO., STREET, COUNTY, STATE AND ZIP CODE)
Prospective bidder
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE REFERENCED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET
FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (SPECIFY TYPE OF MODIFICATION AND AUTHORITY)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment 0001 is issued to provide Appendix A – Reference Photographs that were missing in the original specifications.
Clarifications: Question – Regarding the roof flashing, Will an abatement contractor be required for the removal of asbestos or will a roofer with qualifications be acceptable? Answer: Roofer with qualifications will be acceptable.
Question from electrical contractor: On a typical installation, we are responsible for bringing the electrical service conductors to the FPL transformer for FPL to connect. Basically we are not allowed in their transformers. Is FPL going to make these connections for the Armory or are the base electricians? Answer: The USCG currently has ownership of the existing 150kVA, 208Y/120V, three-phase pad mounted service transformer. FPL does not own the transformer. The bidding contractor shall terminate the new service cables on the secondary bus lugs of the existing transformer, under the direct supervision and scheduling/coordination of the unit facility engineer as indicated on the drawings.
Bid Due date remains the same: November 17, 2009 at 2:00 p.m. local time Miami, Florida.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or Print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
DEBORAH J. BOYDSTON
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED
16B UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540-01-152-8070 STANDARD FORM 30 (Rev. 10-83) PREVIOUS EDITION UNUSABLE Prescribed by GSA
FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
File details come from the government source that posted it. Updated .