File Type Posted
COMBINED_SYNOPSIS_rev051917__AHI_WPB87364.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC AHI (WPB 87364)

SPECIFICATION FOR UNPLANNED DRYDOCK REPAIRS

FY2017

Developed By: Sean D Erickson (Rev-1, 11 May 2017)

TABLE OF CONTENTS

iiiRevisions Record ivConsolidated List of References viConsolidated List of Government-furnished Property viiiConsolidated List of Critical Inspection Items ixPrincipal Characteristics

1General Requirements

11WORK ITEM 1: Drydock

16WORK ITEM 2: Temporary Services, Provide - Cutter

19WORK ITEM 3: Propellers, Renew

23WORK ITEM 4: Main Engine/Reduction Gear, Port, Realign

27WORK ITEM 5: Propulsion Shaft, Remove, Inspect and Reinstall

46WORK ITEM 6: Intermediate Water-Lubricated Propulsion Shaft Bearing, Port, Renew

49WORK ITEM 7: Aft Water-Lubricated Propulsion Shaft Bearing, Renew

Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE
REV#
WORK ITEM#
CHANGES MADE

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

Consolidated List of References

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.

All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:

· MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm

· Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp

· Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws:: www.gpoaccess.gov The Government is aware of the following internet web links where contractors may procure commercial specifications:

· American Welding Society (AWS): http://www.awspubs.com/index.php

· ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/

· NFPA: http://www.nfpa.org

· SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace

COAST GUARD DRAWINGS

Coast Guard Drawing 87 WPB 085-011, Rev C, Lifting Slings

Coast Guard Drawing 87 WPB 085-012, Rev A, Lifting Cradle

Coast Guard Drawing 87 WPB 085-013, Rev B, Docking Plan

Coast Guard Drawing 87 WPB 182-001, Rev C, Main Engine & Generator Foundations

Coast Guard Drawing 87 WPB 243-001, Rev M, Propulsion Shaft Details

Coast Guard Drawing 87 WPB 243-050, Rev -, Propulsion Shaft: Single Sheet Detail

Coast Guard Drawing 87 WPB 245-003, Rev A, Propeller Details

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual

Coast Guard Technical Publication (TP) 4593D, July 2011, SWBS 243, Manufacturer's Instruction Book, 87' WPB Propulsion Shaft Seal - Type F.S.E.

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2014, Drydocking

Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2014, Temporary Services

OTHER REFERENCES

Bollinger Shipyard, USCG CPB Project MTU-FA 771903, 07 Feb 2000, Engine/Gearbox Plant Alignment Instructions 8V396 TE94/Flange mounted BW 255

Bollinger Shipyard, USCG CPB Project MTU-FA 771903, 07 Feb 2000, Engine/Gearbox Plant Alignment Instructions 8V396 TE94/Flange Mounted BW 255

Consolidated List of Government-furnished Property

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK ITEM
MTI
ITEM DESCRIPTION
NSN/PN
QTY
ESTIMATED COST

($/Unit)

1
Y
*Transducer Cover Plate
N/A
2 ea.
50.00
3
Y
Port Propeller (LH)
PN: 706-3350.00 LH NSN: 2010-01-459-0421
1 ea.
9542.05
3
N
*Propeller Nut Wrench
N/A
1 ea.
200.00
3
N
Propeller Nut
PN: 5317350 NSN: 2010-01-458-9217
1 ea.
322.07
3
N
Propeller Nut, Locking
PN: 5317355 NSN: 5310-01-458-9125
1 ea.
285.10
3
N
Anode, Propeller Nut
PN: 87WPB243001ITEM39 NSN: 5342-01-481-8403
1 ea.
153.06
4
Y
*Alignment kit
N/A
1 ea.
$5000.00
5
Y
**Propeller Shaft
NSN: 2010-01-458-9175
1 ea.
10195.95
5
N
Type FSE Face (solid)
PN: H75440-01-6 NSN: 2040-01-642-6640
1 ea.
2636.00
5
N
Type FSE Seat (solid)
PN: H75440-01-7 NSN: 2040-01-643-1801
1 ea.
2675.00
5
N
Type FSE Seal Cup (split)
PN: H75440-01-1-3 NSN: 3120-01-521-2390
1 ea.
263.70
5
N
Type FSE O-Cord
PN: H75440-01-1-4 NSN: 3120-01-521-2268
1 ea.
167.60
5
N
Type FSE Emergency Seal
PN: H75440-01-3-6 NSN: 5330-01-521-4855
1 ea.
411.29
5
N
**Shaft Seal Bellow
PN: H75440-01-2-1

NSN: 5340-01-521-3573

1 ea.
470.00
5
N
*Compression Tool Assembly
N/A
1 ea.
200.00
5
N
*Alignment Kit
N/A
1 set
5,000.00
5
Y
*Propeller Nut Wrench
N/A
1 ea.
200.00
5
Y
*Pilot Nut
NSN: 2010-01-276-3952
1 ea.
795.33
6
N
**Thordon bearing, Grade Orange

(5.5" OD x 4" ID x 7.87" (200mm) LG)

PN: F54615-02-8-1 NSN: 3120-21-914-2012
1 ea.
519.08
7
N
**Thordon bearing, Grade Orange

(5.5" OD x 4" ID x 11.41" (290mm) LG)

PN: F54615-02-8-0 NSN: 3120-21-914-2011
1 ea.
564.68

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter

Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):

Work Item
Title
1
Drydock
5
Propulsion Shaft, Remove, Inspect and Reinstall

Principal Characteristics

87' WPB

Physical

Length overall
87'
Length between perpendiculars
81' 7"
Depth
10' 11"
Maximum beam
19.4'
Draft, mean to design waterline
5' 9"
Height of highest projection
50.2'
Full load displacement
93.5 long tons
Minimum operating displacement
83.9 long tons
Displacement, light ship
77.9 long tons
Framing
Longitudinal
Bulkheads
Four watertight bulkheads located below the Main Deck
Anchor
40 lb Fortress with 480 ft. 3 strand 5/8" dia. Line stayset

Hull

Hull/main weatherdeck material
ABS Grade AH 36
Superstructure
5086 Aluminum

Machinery

Main propulsion
Two MTU 8V396TE94, sequential turbo-charged diesels
Reduction gears
Two ZF Type BW 255
Propulsion shaft
Two AQUAMET 22, 101.6mm
Shaft diameter
4"
Shaft seal
Two John Crane mechanical seals
Shaft bearing, intermediate
Thordon Elastomeric Bearing
Shaft bearing, aft
Thordon Elastomeric Bearing
Number of propellers
2
Number of blades
5
Diameter of propeller
1040mm
Pitch
1230 mm fixed
Shaft RPM
828
Rudders
Two 316L Stainless Steel
Ship's service generators
Two Man Model D08241F01 diesel with Stanford 60KW Generator

Tank Capacities

3-9-1-f (fuel oil)
1402 gal
3-9-2-f (fuel oil)
1402 gal
3-12-2-f (waste oil)
86 gal
3-12-1-f (oily water)
86 gal
3-7-0-q (sewage collection)
352 gal
3-7-1-q (grey water)
52 gal
3-12-1-w (fresh water)
200 gal
3-12-2-w (fresh water)
200 gal

00000_1216_FLT

REC_00000_FLT_Commercial Project @ Contractor’ Facility (1212)

General Requirements

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed at a commercial contractor’s facility for Coast Guard vessels.

1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.

2. REFERENCES

Coast Guard Drawings

None

Coast Guard Publications

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

Other References

None

3. REQUIREMENTS

3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.

NOTE

The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.

3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.

3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).

3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).

NOTE

Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.

3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.

3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:

3.5.1 Contractor operated (non USCG) facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.

3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.

3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.

3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix A, Requirements For Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.

3.6 Local Policy. None.

3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:

3.7.1 SFLC Standard Specification 6310, Requirements for Preservation of Ship Structures.

3.7.1.1 SFLC Std Spec 6310, page C-2, Section C1.5.1. Change from "lead-containing paint as 0.06%" to "lead-containing paint as 0.009%".

3.7.1.2 SFLC Std Spec 6310, page 4, Section 2 References, Group- Other References. Add “The Society for Protective Coatings (SSPC) Paint Application Guide No. 11, 2008, Protecting Edges, Crevices, and Irregular Steel Surfaces by Stripe Coating”

3.7.1.3 SFLC Std Spec 6310, page Appendix C-6, add "Hempel Hempadur Multi-Strength GF 35870" with FED-STD-595 color "Black/Red" under ANTI-ABRASION COATING, ICE BREAKING CAPABLE VESSELS, <235’.

3.7.1.4 Standard Spec 6310, page Appendix A-7, Under "UNDERWATER (U/W) BODY/BOOT-TOP", Add line Column 1: Option for U/W Body and Boot-Top, Steel Hulls, <154', in Salt Water. Column 2: Blank. Column 3: SSPC-SP 10/NACE NO. 2 using grit conforming to MIL-A-22262 / (1.5-3.5) - or - SSPC-SP WJ-2(M)/NACE WJ-2(M). Columns 4 and 5: Same as "U/W Body and Boot-Top, Aluminum Hull, High Speed (>30 knots)".

3.7.2 SFLC Standard Specification 0000 General Requirements.

3.7.2.1 SFLC Std Spec 0000, paragraph 1.3 ‘Acronyms and term definitions’, page 5, “PCL (Paint Containing Lead)” definition replaced by, “Any paint or coating containing lead in excess of 0.009 percent by weight (1.0 mg/cm2 or 90 ppm). Lead Based Paint (LBP) is an interchangeable term with PCL.”

3.7.2.2 Change Std Spec 0000 paragraph 3.2.4.2.3(QP 1 inspector or tech rep duties) bullet, “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.19 of SFLC Std Spec 6310 (Critical drying time requirements)).” to “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.17 of SFLC Std Spec 6310 (Critical drying time requirements)).”

4. NOTES

4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (incl. frame #’s)
Area (sqft)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

Verify equipment setup, blast media, and surface preparation methods match designated test coupon.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).

Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.

Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Ensure that system cure is in accordance with manufacturer's recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of the following events:

Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-2 - QUALITY ASSURANCE INSPECTION FORM

(ENVIRONMENTAL READINGS)

Vessel Name
Hull #
Work Item #
Work Item Title

Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.

DATE & TIME
ACTIVITY (Surface preparation, primer coat, barrier coat, top coat, etc…)
LOCATION (Frame & Deck, relation to equipment, etc.)
TEMPERATURE
% REL. HUMID-ITY
DEW PT.
SURFACE
AMBIENT
ΔT

| DP - Surface |

Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-3a - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (incl. frame #’s)
Area (sqft)
SURFACE PREPARATION METHOD
PROFILE ACHIEVED (mils)
Min
Max
Mean

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area)

Brush-blasting (non-metallic substrate)

Abrasive Manufacturer:

Abrasive Sieve Size:

Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.

Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here

Reading (mils):

Reading (mils):

Reading (mils):

Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here

Reading (mils):

Reading (mils):

Reading (mils):

Place Surface Profile

Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here

Reading (mils):

Reading (mils):

Reading (mils):

Place Surface Profile

Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here

Reading (mils):

Reading (mils):

Reading (mils):

Place Surface Profile

Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here

Reading (mils):

Reading (mils):

Reading (mils):

Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings:

Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-3b - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (incl. frame #’s)
Area (sqft)
SURFACE PREPARATION METHOD
PROFILE ACHIEVED (mils)
Min
Max
Mean

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area)

Brush-blasting (non-metallic substrate)

Abrasive Manufacturer:

Abrasive Sieve Size:

Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Mean Reading (mils)

Mean Reading (mils) IAW ASTM DD4417).

Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-4 - QUALITY ASSURANCE INSPECTION FORM

(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (incl. frame #’s)
Area (sqft)

SOLUBLE SALT CONDUCTIVITY Measurements IAW SSPC-GUIDE 15.

Date
Test Locations
Conductivity (Microsiemens/CM)
Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-5 - QUALITY ASSURANCE DATA FORM

(COATING THICKNESS)

(Use one sheet for each sequence)

Vessel Name
Hull #
Work Item #
Work Item Title
Coating Mfg
Product Name
Batch #
Induction Time
Coating System Sequence (Primer/Touchup/3rd Coat, etc.)

Dry Film Thickness (DFT) Measurements IAW SSPC-PA 2.

SPOT
1
2
3
4
5
AVERAGE VALUE

*BASE METAL READING (BMR) Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.

Location (Frame Reference):

SPOT
1
2
3
4
5
Overall Avg. DFT
ADJUSTMENTS
Avg. BMR
Deviation
Before Adjustments
After Adjustments

Avg.

Location (Frame Reference):

SPOT
1
2
3
4
5
Overall Avg. DFT
ADJUSTMENTS
Avg. BMR
Deviation
Before Adjustments
After Adjustments

Avg.

Location (Frame Reference):

SPOT
1
2
3
4
5
Overall Avg. DFT
ADJUSTMENTS
Avg. BMR
Deviation
Before Adjustments
After Adjustments

Avg.

Application Method (Airless, Conventional Spray, Rolled)
Average DFT
Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

86340_0316_FLT

REC_86340_FLT_87 WPB (ALL) (1214)

WORK ITEM 1: Drydock

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to drydock the vessel, undock the vessel, and perform various drydocking-related tasks.

1.2 Government-furnished property.

MTI
ITEM DESCRIPTION
NSN/PN
QTY
ESTIMATED COST

($/UNIT)

Y
*Transducer Cover Plate
N/A
2 ea.
50.00

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

2. REFERENCES

Coast Guard Drawings

Coast Guard Drawing 87 WPB 085-011, Rev C, Lifting Slings Coast Guard Drawing 87 WPB 085-012, Rev A, Lifting Cradle Coast Guard Drawing 87 WPB 085-013, Rev B, Docking Plan

Coast Guard Publications

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2014, Drydocking

Other References

None.

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).

3.2 Key personnel. The Contractor shall determine key personnel and require their presence during all drydocking phases.

3.3 Docking requirements. The Contractor shall perform drydock and undock in accordance with SFLC Std Spec 8634, using Coast Guard Drawings 87 WPB 085-011, 87 WPB 085-012, and 87 WPB 085-013 for guidance.

3.4 Cutter conditions. The Contractor shall use the Full Load Condition, listed below for purposes of performing Pre-Award calculations as described in Appendix A (Requirements for Calculations) of SFLC Std Spec 8634.

· Displacement (LT): 90.39.

· VCG (FT ABL): 7.62.

· LCG (FT aft of Frame Zero): 51.96.

· Length (Molded) (FT): 86.92.

· Length of supported keel (FT): 61.05 (Position 1)

· Length of supported keel (FT): 50.88 (Position 2)

3.4.1 Cable, sling, or strap tension calculation. If the Contractor plans to use a vertical lift, crane, or travel/mobile lift to haul out the vessel, the Contractor shall submit the cable, sling, or strap tension calculation specified in Table A1 and paragraph A2.7.2.7 of SFLC Std Spec 8634 with the Pre-Award calculations, using the loading condition specified in paragraph 3.2.1.

3.4.2 Blocking. The Contractor shall facilitate docking the vessel in block position 2 by arranging keel and side blocks and ensuring minimum block heights as shown on the vessel's docking plan. Contractor's use of a cradle, built to Coast Guard Drawing 87 WPB 085-12, shall require the fitting of keel blocks with soft wood wedges, based on the docking positions noted in Coast Guard Drawing 87 WPB 085-013, after lifting.

Table 1 - Blocking

Pos. #
Block Height Above Docking Facility Deck
Steel Plate
Situation

Awareness

Fin Stabilizers
Additional
Minimum
Rudder Removal
Propeller Removal
2
48"
NA
NA
NA
NA
NA
None

3.5 Pre-award calculations. The Contractor shall provide to the KO a set of pre‑award calculations, as described in SFLC Std Spec 8634 Appendix A.

3.5.1 The Contractor shall provide vertical side/bilge block offsets for any side blocks placed in a location where vertical offsets are not already defined by the docking plan.

3.5.2 The Contractor shall submit an alternate blocking arrangement, as part of the pre-award calculation submission, to compensate for any changes from the docking plan.

NOTE

1. The USCG has established several approved alternate docking plans for each vessel-class, to facilitate complete access to the entire U/W body structure, for periodic comprehensive inspection and/or 100% preservation. This inspection and preservation pattern and periodicity is a configuration management concern that is a vital requirement of the contract. Intention to deviate from these plans (fewer blocks, block spacing, additional blocks, etc) shall be identified on pre-award calculations (Paragraph 3.5.2); an alternate docking plan and mitigation strategy shall be provided to maintain preservation and inspection configuration.

2. Pre-award calculations may be deemed unsatisfactory - and may adversely affect contract award if they are submitted with the following detrimental factors:

a. No methods have been proposed that meet the requirements for the specified docking plan.

b. Proposed block shifting or fleeting risk-mitigating plan may result in delays in period of performance.

c. Proposed alternate docking plan violates USCG configuration management policies."

3.6 Unplanned availability: Underwater body cleaning-removal of marine growth. Within four hours after the vessel has been docked, the Contractor shall start cleaning the entire underwater hull from the upper edge of the boot top down, including sea chest gratings, sea chest interiors, fairwaters, rope guards, rudder, shaft strut, z-drive, thruster tunnel, and zinc anodes, as applicable. The Contractor shall remove all marine growth, fouling, salt, and dirt from the underwater hull by High Pressure Fresh Water Wash, using a minimum pressure at the nozzle of 3,500 psi and maximum pressure of 7,000 psi. Complete the hull cleaning before marine growth hardens. Removal of gratings is not required. Do not use chemical additives in the freshwater wash. Take extreme care to avoid damaging or removing existing intact underwater body coating. Conduct the work in this paragraph in lieu of the work described in SFLC Std Spec 8634 paragraphs 3.4.4.1 and 3.4.4.2.

3.7 Fuel offloading. The Contractor shall be aware that fuel offloading is mandatory to drydock the vessel.

3.7.1 Fuel offloading exception. The Contractor shall remove and dispose of up to 3000 gallons of fuel from the vessel.

3.8 Fleeting. Not required.

3.9 Additional requirements.

3.9.1 The Contractor shall drydrock the cutter with all tanks empty.

3.9.2 The Contractor shall empty all tanks in order to fulfill the drydock requirements, shown on Coast Guard Drawing 87 WPB 085-013. Dispose of all fluids in accordance with Federal, State, and local regulations.

3.9.2.1 Dirty oil and oily water. The Contractor shall remove and dispose of up to 85 gallons of dirty oil and up to 85 gallons of oily water from the vessel.

3.9.2.2 Sewage and grey water. The Contractor shall remove and dispose of up to 363 gallons of sewage and up to 55 gallons of grey water from the vessel.

3.10 Inaccessible voids.

3.10.1 Inaccessible void inspections. In the presence of the Coast Guard Inspector, the contractor shall accomplish the following tasks for all non-accessible voids and submit a CIR:

3.10.1.1 Remove and dispose of the existing drain plugs.

3.10.1.2 Submit a CIR noting any liquids draining from any of the voids – indicating the presence of a leak.

3.10.1.3 Dispose of any drained liquids in accordance with all federal, state, and local laws and regulations.

CAUTION

Some liquids that are drained may be classified as hazardous materials or hazardous waste depending on state and local regulations. The vessel environmental coordinator may assist with determination of waste category.

3.10.2 Plug renewal. Upon completion of all work on appendages, the Contractor shall accomplish the following task:

3.10.2.1 Chase the hull inserts threads of all plugs.

3.10.2.2 Install new stainless steel, Type 316, or Monel drain plugs, in place of original plugs.

3.10.2.3 Coat new plugs prior to installation with a sealing and locking compound conforming to ASTM D5363-AN0123 or a flexible joint compound conforming to MIL-S-45180, Type II.

4. NOTES

4.1 Arrival conditions. The COR will advise the Contractor of the actual tank and draft readings when the vessel arrives, and will discuss with the Contractor any liquid loading changes necessary.

86350_1114_FLT

REC_86350_FLT_87 WPB (ALL) (1213)

WORK ITEM 2: Temporary Services, Provide - Cutter

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to provide temporary services to the Cutter, during the performance of this availability.

1.2 Government-furnished property.

None.

2. REFERENCES

Coast Guard Drawings

None

Coast Guard Publications

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2014, Temporary Services

Other References

None

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).

3.2 Temporary service particulars. The Contractor shall provide the below listed temporary services, in accordance with SFLC Std Spec 8635.

TABLE 1 - Service Selection

*SUB-PARAGRAPH
TITLE
y/n
3.3.1
Office space
Y
3.3.2
Telephone
Y
3.3.3
Parking
Y
3.3.4
Duty section berthing: __ male, __ female. Duty section berthing shall be provided for {Note: Choose one and delete the rest: (1) The entire duration of the availability, (2) during disruption of berthing areas or (3) ______ days}
N
3.3.5
Electrical power (including all requirements in associated sub-paragraphs)
Y
3.3.6
Hull grounding straps (not applicable when cutter is waterborne)
N
3.3.7
Compressed air (including all requirements in associated sub-paragraphs)
N
3.3.8
Hazardous material/hazardous waste disposal
Y
3.3.9
Heavy lift equipment: 2 day’s
Y
3.3.10
Water supply
3.3.10.1
Potable water: Unlimited
Y
3.3.10.2
Hot-circulating water
N
3.3.10.3
Cooling water
N
3.3.10.4
Firemain system (including all requirements in associated sub-paragraphs)
Y
3.3.11
Steam (including all requirements in associated sub-paragraphs)
N
3.3.12
Refuse disposal
Y
3.3.13
Sewage and grey water disposal (including all requirements in associated sub-paragraphs)
Y
3.3.14
Storage – General (including all requirements in associated sub-paragraphs):
3.3.14
Dry stores.
N
3.3.14
Paint and flammable stores.
Y
3.3.14
Refrigerated stores.
N
3.3.15
Small boat storage (including all requirements in associated sub-paragraphs)
Y

*Each sub-paragraph number relates directly to the identical sub-paragraph number in SFLC Std Spec 8635.

TABLE 2 - Hazardous waste disposal – LIQUIDS (Gallons)

PAINT THINNERS
ENGINE COOLANT
BILGE WATER
10
10
10

TABLE 3 - HazaRdous waste disposal – solids

OILY FILTERS
OILY RAGS

(LBS)

EMPTY 1-GAL CONTAINER*
EMPTY 5-GAL CONTAINER*
EMPTY 55-GAL CONTAINER*
4
4
1
1
1

*Previously housed hazardous materials.

3.2 Extended temporary services. If the performance period of the contract is extended by the KO, the contractor shall continue to provide all temporary services as specified herein for the extension period.

4. NOTES

This section is not applicable to this work item.

24503_MWS_0816_87WPB

WORK ITEM 3: Propellers, Renew

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to renew the port propeller.

1.2 Government-furnished property.

MTI
ITEM DESCRIPTION
NSN/PN
QTY
ESTIMATED COST

($/UNIT)

Y
Port Propeller (LH)
PN: 706-3350.00 LH

NSN: 2010-01-459-0421

1 ea.
9542.05
N
*Propeller Nut Wrench
N/A
1 ea.
200.00
N
Propeller Nut
PN: 5317350

NSN: 2010-01-458-9217

1 ea.
322.07
N
Propeller Nut, Locking
PN: 5317355

NSN: 5310-01-458-9125

1 ea.
285.10
N
Anode, Propeller Nut
PN: 87WPB243001ITEM39

NSN: 5342-01-481-8403

1 ea.
153.06

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

Coast Guard Drawings

Coast Guard Drawing 87 WPB 243-001, Rev M, Propulsion Shaft Details

Coast Guard Drawing 87 WPB 245-003, Rev A, Propeller Details

Coast Guard Publications

None

Other References

None

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:

· Fairing plate.

· Rudder.

3.1.5 Propeller handling. Propellers shall not be lifted by a single blade at any time and shall be lifted as close to the blade roots as physically possible.

CAUTION

Incidental propeller impact by any object, and/or blade contact with the ground, is strictly prohibited. These incidents shall be reported to the Coast Guard Inspector immediately via CFR.

3.2 Renewal particulars. The Contractor shall renew the designated propeller as follows while using Coast Guard Drawings 87 WPB 243-001 and 87 WPB 245-003 as guidance:

3.2.1 Government-furnished propellers and crates inspections. The Contractor shall accomplish the following:

3.2.1.1 Upon receipt of the crate Government-furnished propellers, conduct crate inspections and report any notable crate damage. Submit a CFR.

3.2.1.2 When removing the propellers from the crates, conduct a visual inspection of the propeller protection and strippable compound. Immediately report all discrepancies (i.e., damaged and/or missing strippable compound, damaged edge guards, missing accessories, etc.) to the Coast Guard Inspector. Submit a CFR.

NOTES

Do not remove any propeller protection without KO permission prior to blue fitting and installation.

When blue fitting, only a minimum amount of protection shall be removed to facilitate fitting.

Only once installed upon the cutter shall all other protection be removed.

3.2.2 Existing propeller removals.

3.2.2.1 Remove the existing propellers.

3.2.2.2 The Contractor shall repackage the MTI propeller, using the existing propeller container, mounting plate, edge guards, and hardware, with exception of the strippable compound, in the same manner the new GFP propeller was received.

3.2.3 Propeller installation. The Contractor shall abide by and accomplish the following:

WARNINGS!

Do not machine the shaft tapers.

The propellers are fastened to steel plates at the bottom of the containers. Do not lift the propellers unless completely detached from the shipping containers.

NOTE

It is prohibited to use grease, oil, or other substances on the taper to help drive the propellers.

3.2.3.1 Hand clean the new propeller hub bore and shaft taper to remove all foreign particles for a clean metal-to-metal fit.

3.2.3.2 Verify hub fits in the presence of the COR and with the keys in place, carefully check the fits of the propeller hub bores to the shaft tapers by applying Prussian blue to the shaft tapers. Submit a CFR.

3.2.3.2.1 80 percent contact over the taper area, with a slightly heavier fit on the larger end, is required. Do not heat the shaft tapers to compensate for a poor fit.

3.2.3.2.2 If the fit is less than 80 percent, hand stone the propeller hub bores, as required, to achieve 80 percent contact over taper surfaces.

WARNING

Do not machine the shaft taper.

3.2.3.3 Hand clean the new propeller hub bores and shaft tapers to remove all foreign particles for a clean metal-to-metal fit. Install the new propellers onto the propulsion shafts. After the propellers are installed on the tapers, install the propeller nuts. Using the propeller nuts, drive the propellers onto the tapers.

3.2.3.4 Lock each propeller nut in place with new Contractor-furnished, stainless steel 3/8” x 6” cotter pins.

3.2.3.5 Reinstall the fairing plates as shown on Coast Guard Drawing 87 WPB 243-001.

3.2.3.6 Renew the propeller nut anodes with the Government-furnished propeller nut anodes.

3.3 Testing. During sea trials verify that there is neither abnormal vibration nor problems with making rated speed. Submit CFR.

4. NOTES

This section is not applicable to this work item.

23320_FJL_0417_87364

WORK ITEM 4: Main Engine/Reduction Gear, Port, Realign

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to realign the port main diesel engine and its corresponding reduction gear assembly to the propeller shaft.

1.2 Government-furnished property.

MTI
ITEM DESCRIPTION
NSN/PN
QTY
ESTIMATED COST

($/UNIT)

Y
*Alignment kit
N/A
1 ea.
$5000.00

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

Coast Guard Drawings

Coast Guard Drawing 87 WPB 182-001, Rev C, Main Engine & Generator Foundations

Coast Guard Drawing 87 WPB 243-001, Rev M, Propulsion Shaft Details Coast Guard Publications

None

Other References

Bollinger Shipyard, USCG CPB Project MTU-FA 771903, 07 Feb 2000, Engine/Gearbox Plant Alignment Instructions 8V396 TE94/Flange Mounted BW 255

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech rep.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).

3.1.5 Personnel qualification. The Contractor shall ensure that the shaft alignment is performed under the direct supervision of personnel experienced in and regularly engaged in shaft and engine alignment. Personnel performing alignment work shall be:

· familiar with manufacturer's alignment techniques and be able to assist with proper bearing and shaft alignment;

· able to comply with engine/reduction gear manufacturer's installation standards.

3.1.5.1 Personnel engaged in the supervision of the alignment work shall possess a résumé of demonstrated experience with engine and reduction gear systems.

3.1.5.2 Submit a copy of the supervisor’s résumé and any applicable references to the COTR at the Arrival Conference.

3.2 Alignment preparation. Prior to shaft realignment, the Contractor shall ensure the following conditions are met for at least 24 hours before the alignment check:

· The vessel is waterborne with fuel and water filled to normal operating levels, a minimum of three-quarters capacity.

· All major equipment and machinery weighing over 1,000 pounds (450 kilograms) are either installed or simulated by equivalent weights appropriately located.

3.3 Realignment. The Contractor shall accomplish the following for shaft-to-MDE/reduction gear realignment using Coast Guard Drawings 87 WPB 182-001, 87 WPB 243-001, and Engine/Gearbox Plant Alignment Instructions (USCG CPB Project MTU-FA 771903) as guidance:

3.3.1 Alignment adjustment. Correct any misalignment by repositioning the propulsion engine/reduction gear. Shim the engine foundations in place as necessary.

NOTE

***Epoxy-resin chocking is an acceptable mounting method with approval from the Coast Guard Inspector***

3.3.2 Final readings. Recheck all the final alignment readings as follows and record on the forms under Paragraph 4.2:

· parallel measurements between shaft coupling and reduction gear coupling ODs (concentricity);

· angular measurements between shaft coupling and reduction gear coupling faces;

· shaft coupling to reduction gear coupling gap.

3.3.3 Insert the bolts in the flanges, and tighten to the proper torque for the size and type. Submit a CFR for all final readings.

NOTE

The tightening torque for the flange bolts shall be 430 Nm according to Engine/Gearbox Plant Alignment Instructions (USCG CPB Project MTU-FA 771903).

3.4 Operational test. After completion of work, the Contractor shall thoroughly test during sea trials, in the presence of the Coast Guard Inspector, and demonstrate the propeller shaft to be in satisfactory operating condition and operates without binding. Inspect and correct any abnormal noise and vibration generated from the shaft or bearings (see 4.1, Equipment operation). Submit CFR.

4. NOTES

4.1 Equipment operation. Coast Guard personnel will operate all shipboard machinery and equipment during all tests.

4.2 Alignment inspection form. See below.

Circle one: PORT STARBOARD - HUB ALIGNMENT Measurement Form

Vessel Name and Hull Number:

All measurements in INCHES
Shaft initial position
shaft rotated

90° Shaft rotated 180° shaft rotated 270°

Gap

Parallel A

Parallel B

Parallel C

Parallel D

Angular A

Angular B

Angular C

Angular D

Inspection Facility: ______________________ Date and Time:_____________________

Inspector Signature:

24300_FJL_0517_87364

WORK ITEM 5: Propulsion Shaft, Remove, Inspect and Reinstall

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to remove, inspect and reinstall the port propulsion shaft.

1.2 Government-furnished property.

MTI
ITEM DESCRIPTION
NSN/PN
QTY
ESTIMATED COST

($/UNIT)

Y
**Propeller Shaft
NSN: 2010-01-458-9175
1 ea.
10195.95
N
Type FSE Face (solid)
PN: H75440-01-6

NSN: 2040-01-642-6640

1 ea.
2636.00
N
Type FSE Seat (solid)
PN: H75440-01-7

NSN: 2040-01-643-1801

1 ea.
2675.00
N
Type FSE Seal Cup (split)
PN: H75440-01-1-3

NSN: 3120-01-521-2390

1 ea.
263.70
N
Type FSE O-Cord
PN: H75440-01-1-4

NSN: 3120-01-521-2268

1 ea.
167.60
N
Type FSE Emergency Seal
PN: H75440-01-3-6

NSN: 5330-01-521-4855

1 ea.
411.29
N
**Shaft Seal Bellow
PN: H75440-01-2-1

NSN: 5340-01-521-3573

1 ea.
470.00
N
*Compression Tool Assembly
N/A
1 ea.
200.00
N
*Alignment Kit
N/A
1 set
5,000.00
Y
*Propeller Nut Wrench
N/A
1 ea.
200.00
Y
*Pilot Nut
NSN: 2010-01-276-3952
1 ea.
795.33

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

2. REFERENCES

Coast Guard Drawings

Coast Guard Drawing 87 WPB 243-001, Rev M, Propulsion Shaft Details

Coast Guard Drawing 87 WPB 243-050, Rev -, Propulsion Shaft: Single Sheet Detail

Coast Guard Drawing 87 WPB 245-003, Rev A, Propeller Details Coast Guard Publications

Coast Guard Technical Publication (TP) 4593D, July 2011, SWBS 243, Manufacturer's Instruction Book, 87' WPB Propulsion Shaft Seal - Type F.S.E.

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes Other References

Bollinger Shipyard, USCG CPB Project MTU-FA 771903, 07 Feb 2000, Engine/Gearbox Plant Alignment Instructions 8V396 TE94/Flange mounted BW 255

3. REQUIREMENTS

3.1 General.

3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraphs:

· 3.2.1 Waterborne coupling hub alignment check.

· 3.2.2 Mount measurements.

· 3.6.1 Shaft visual and NDT inspections.

· 3.6.2 Shaft dimensional measurements.

· 3.7 Shaft seal clean and inspect.

· 3.8.1 Visual inspection and bearing ID check.

· 3.8.2 Alignment (concentricity) measurements.

3.1.2 Tech Rep. The Contractor shall provide the services of a qualified Tech Rep, who is familiar with and experienced with the FSE-type seal system, to do the following, on site:

· Advise on manufacturer's proprietary information pertinent to the system.

· Advise on seal condition and identify the component that requires renewal.

· Assist with proper disassembly, reassembly, and installation of the seal.

· Ensure compliance with manufacturer's procedures and standards during disassembly, reassembly, and installation.

3.1.2.2 Ensure that the Tech Rep has a résumé of demonstrated experience with the system/equipment stated above.

3.1.2.3 Submit a copy of the Tech Rep’s résumé and a list of references to the to the COR at the Arrival Conference.

3.1.3 Protective measures.

3.1.3.1 General. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.3.2 Propeller protection. The Contractor shall accomplish the following:

· Prevent…