A0001-SF30-ORCAS.pdf
PDF 296 KB Posted
- Attached to
- USCGC ORCAS - Dry Dock Repairs Federal contract opportunity
- Solicitation number
- HSCG80-13-R-P45030
About this file
USCGC ORCAS - Amendment 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ORCAS__WPB_110B__DD_JSZ_13R1.pdf | ||
| A0002-SF30-ORCAS.pdf | ||
| ORCAS DD FY13 SPECS REV-0.pdf | ||
| RFP-ORCAS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLARIFICATIONS AND GOVERNMENT RESPONSES
HSCG80-13-R-P45030
USCGC ORCAS - Dry Dock Repairs
QUESTION 1. In item 1 Hull Plating U/W Body Inspect para. 3.1.6 coating system inspection, it states to visual inspect the U/W body coating system and document the condition. Due to the fact that the scope of work will not be known till after the inspection, the question is shouldn’t item 49 be an optional item, the same as option item 48?
RESPONSE 1. The government already anticipates a partial preservation so WI #49 was labeled as a Definite Item. In the event that the coverage extends more than 33%, WI # 48 would be activated and WI #49 would be de‐ scoped in its entirety.
QUESTION 2. If item 49 is to be a definite item will it be in conjunction with item O‐48?
RESPONSE 2. No (See RESPONSE 1).
QUESTION 3. In item 50 U/W Body Preserve Partial Condition A, para. 3.2.2 U/W Hull Appendages is this part of the 33% or in addition to the 33%.
RESPONSE 3. The appendages are in addition to the 33%.
QUESTION 4. In item 50 Stern Tube Interior surfaces Preserve 100%. Is it the intent of the Coast Guard to only preserve just one the stern tubes?
RESPONSE 4. Yes, the intent is to preserve one stern tube.