CONFIDENCE_SCHEDULE_Blank.xls
XLS spreadsheet 35 KB Posted
- Attached to
- USCGC CONFIDENCE DOCKSIDE REPAIRS FY13 Federal contract opportunity
- Solicitation number
- HSCG80-13-Q-P45V70
About this file
CONFIDENCE SCHEDULE - BLANK
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CONFIDENCE_SPEC_-_REV-0_DTD_07_JUN_2013.pdf | ||
| Performance_Questionnaire_based_on_CPARS.doc | DOC document | |
| CONFIDENCE_RFQ.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| USCGC CONFIDENCE (WMEC-619) DOCKSIDE AVAILABILITY FY2013 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Tanks (Aviation Fuel Service), Clean and Inspect | JOB | 1 | ||
| D-002 | Tanks (Aviation Fuel Stowage and Overflow), Clean and Inspect | JOB | 1 | ||
| D-003 | Chain Lockers, Clean and Inspect | JOB | 1 | ||
| D-004 | Tanks (MP Fuel Stowage and Overflow), Clean and Inspect | JOB | 1 | ||
| D-005 | Tanks (MP Fuel Service), Clean and Inspect | JOB | 1 | ||
| D-006 | Tanks (Hydraulic Oil Stowage and Service), Clean and Inspect | JOB | 1 | ||
| D-007 | Tanks (Potable Water), Clean and Inspect | JOB | 1 | ||
| D-008 | Tanks (Lube Oil), Clean and Inspect | JOB | 1 | ||
| D-009 | Voids (Accessible), Clean and Inspect | JOB | 1 | ||
| D-010 | Tanks (Dirty Oil and Waste), Clean and Inspect | JOB | 1 | ||
| D-011 | Propulsion Shafting, Strain Gauge Alignment Inspections | JOB | 1 | ||
| D-012 | Vent Ducts (Engine and Motor Room All), Commercial Cleaning | JOB | 1 | ||
| D-013 | Vent Ducts (Galley and Pantry Room All), Commercial Cleaning | JOB | 1 | ||
| D-014 | Vent Ducts (Laundry Supply and Exhaust), Commercial Cleaning | JOB | 1 | ||
| D-015 | Vent Ducts (All Other), Commercial Cleaning | JOB | 1 | ||
| D-016 | Anchor Windlass, Inspect and Service | JOB | 1 | ||
| D-017 | Anchor Chains, Renew | JOB | 1 | ||
| D-018 | Warping Capstan, Inspect and Service | JOB | 1 | ||
| D-019 | Towing Bitts, Chocks, and Fairleads; Inspect and Test | JOB | 1 | ||
| D-020 | Watertight Doors (External), Renew | JOB | 1 | ||
| D-021 | Stack Space (01-99-0-Q) Structural Repair | JOB | 1 | ||
| D-022 | Helo Talon Grids, Inspect and Test | JOB | 1 | ||
| D-023 | Plenum Space Bulkhead, Renew | JOB | 1 | ||
| D-024 | Bulkhead and Vent Duct, Renew | JOB | 1 | ||
| D-025 | Officer Head Joiner Panels and Insulation, Renew | JOB | 1 | ||
| D-026 | Compressors, Replace | JOB | 1 | ||
| D-027 | Temporary Services, Provide | JOB | 1 | ||
| O-00A | Composite Labor Rate | HOUR | 639 | ||
| O-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | JOB | 1 | ||
| O-00Z | Total Price of Definite Items | $0.00 | |||
| Total Price of Definite Items | |||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| $ 2,880.00 | 1 | 62 | Baltimore, MD | |||||||||||||||||||||
| $ 2,000.00 | 1 | 52 | Biloxi, MS | |||||||||||||||||||||
| 1 | 56 | Boston, MA | ||||||||||||||||||||||
| $ 29,770.00 | 1 | 50 | Charleston, SC | |||||||||||||||||||||
| $ 6,550.00 | 1 | 60 | Corpus Christi, TX | |||||||||||||||||||||
| Tanks (Hydraulic Oil Stowage and Service), Clean and Inspect | $ 3,220.00 | 1 | 51 | Hampton Roads | ||||||||||||||||||||
| $ 7,880.00 | 1 | 64 | Honolulu, HI | |||||||||||||||||||||
| $ 1,000.00 | 1 | 55 | Houston, TX | |||||||||||||||||||||
| $ 2,000.00 | 1 | 55 | Median Rate | |||||||||||||||||||||
| $ 4,000.00 | 1 | 49 | Miami | |||||||||||||||||||||
| $ 20,000.00 | 1 | 50 | Narragansett Bay, RI | |||||||||||||||||||||
| $ 19,770.00 | 1 | 55 | New London, CN | |||||||||||||||||||||
| $ 7,000.00 | 1 | 45 | New Orleans | |||||||||||||||||||||
| $ 7,000.00 | 1 | 62 | NYNY | |||||||||||||||||||||
| $ 15,000.00 | 1 | 49 | Panama City, FL | |||||||||||||||||||||
| $ 1,600.00 | 1 | 60 | Philadelphia, PA | |||||||||||||||||||||
| 1 | 51 | Portland, ME | ||||||||||||||||||||||
| Anchor Chains, Renew | $ 41,600.00 | 1 | 57 | Portland, OR | ||||||||||||||||||||
| 1 | 55 | San Diego, CA | ||||||||||||||||||||||
| 1 | 67 | San Francisco, CA | ||||||||||||||||||||||
| 1 | 55 | Santa Barbara, CA | ||||||||||||||||||||||
| 1 | 55 | SE North Carolina | ||||||||||||||||||||||
| 1 | 65 | Seattle, WA | ||||||||||||||||||||||
| 1 | 48 | Tampa-St. Petersburg | ||||||||||||||||||||||
| 1 | 60 | Wilmington, DE | ||||||||||||||||||||||
| 1 | ||||||||||||||||||||||||
| 57 |
&C(1/29/2013) Draft-1 - Page &P of &N
CostEstimateTemplate
File details come from the government source that posted it. Updated .