USCGC DAUNTLESS (WMEC-624) 210 Foot B Class Medium Endurance Cutter Specification for Dockside Repairs Rev. 2 dated 29 Dec 2010
Text of this file
USCGC DAUNTLESS (WMEC 624)
210 FOOT "B CLASS" MEDIUM ENDURANCE CUTTER
SPECIFICATION FOR DOCKSIDE REPAIRS
11 April - 03 June 2011
Developed By: LT John Carter
(Rev-2, 29 Dec 2010)
USCGC DAUNTLESS (WMEC-210B) DOCKSIDE AVAILABILITY 2011
ii (Rev-2)
TABLE OF CONTENTS
Revisions Record ....................................................................................................................................... iii Consolidated List of References ................................................................................................................. v Consolidated List of Government-furnished Property ............................................................................. viii Consolidated List of Critical Inspection Items .......................................................................................... ix Principal Characteristics ............................................................................................................................. x General Requirements WORK ITEM 1: Tanks (Potable Water), Clean and Inspect WORK ITEM 2: Tanks (Potable Water), Preserve “Partial” WORK ITEM 3: Potable Water Tank, Repair WORK ITEM 4: Main Diesel Engine (MDE) Exhaust Stack Uptakes, Clean WORK ITEM 5: Ship Service Diesel Generator (SSDG) Exhaust Piping, Clean WORK ITEM 6: Boiler Exhaust Stack Uptakes, Clean WORK ITEM 7: Vent Ducts (Engine Room), Commercial Cleaning WORK ITEM 8: Vent Ducts (Galley and Pantry Room All), Commercial Cleaning WORK ITEM 9: Vent Ducts (Laundry Exhaust), Commercial Cleaning WORK ITEM 10: Vent Ducts (All Other), Commercial Cleaning WORK ITEM 11: Ventilation Fan (Vaneaxial), Overhaul WORK ITEM 12: Helo Talon Grid, Inspect and Test WORK ITEM 13: EDG Tank (Fuel), Preserve “100%” WORK ITEM 14: Piping Insulation, Renew (AFC30 Funded) WORK ITEM 15: Piping Insulation, Renew (AFC45 Funded) WORK ITEM 16: Deck Fittings, Inspect and Load Test WORK ITEM 17: Magnetic Compass Foundation, Inspect and Renew WORK ITEM 18: 02 Deck Plate, Renew WORK ITEM 19: Condensate Piping, Renew WORK ITEM 20: Anchor Windlass, Level 2 Inspect and Repair WORK ITEM 21: Warping Capstan, Level 2 Inspect and Repair
Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
15 Dec 2010 1 3 List of Reference Drawings Added: 627 WMEC 111-001, Rev A, Shell Expansion Framing & CVK, 627 WMEC 117-003, Rev-A Midship and Type Sections, 627 WMEC 601-003, Rev- C, General Arrangement- Second and Third Deck
15 Dec 2010 15 List of Reference Drawings Added: 627 WMEC 536-001, Rev-, Diagram Diagram Sea Water Piping for MN Engines, AUX & Emer. Gens & A/C 15 Dec 2010 17 List of Reference Drawings Added: 618 WMEC 601-005, Rev- F, General Arrangement 02 Dk, Bridge DK & House Top, 618 WMEC 136-001, Rev-K, 01,02,and Bridge Dk
Plating and Supports, 627 WMEC 154-001, Rev-C Aluminum Pilot House Details, 627 WMEC 184-001, Rev-H, Pilot House
& Bridge Deck Foundations 28 Dec 2010 2 Consolidated
List of References
Modify drawing list to include most recent revision numbers.
Delete “Note to user” paragraph from list.
2 Insert “30%” in each empty box in paragraph 1.1 table under “% of Tank Coating Repair” column.
Delete “NSP” from corresponding SOSS CLIN.
Delete paragraphs 3.2, 3.6 and 3.7.
3 Under paragraph 3.1.4, correct typo by deleting “3.1.5” and replace with “3.3.5”.
Delete paragraphs 3.1.6, 3.1.7, 3.6, 3.7 and 3.8.
Modify paragraph 3.9 by deleting “all designated tank TLIs”, and replace with “disturbed sounding tube piping”.
4 Modify paragraph 3.1.1; change “(Inspections)” to
“(Inspection and report)”.
Modify paragraph 3.1.5; delete “to perform”.
Modify paragraph 3.5; change “CFR” to “CIR”.
5 Modify paragraph 3.1.1; change “(Inspections)” to “(Inspection and report)”.
Modify paragraph 3.5; change “CFR” to “CIR”.
6 Modify paragraph 3.1.1; change “(Inspections)” to
“(Inspection and report)”.
Modify paragraph 3.5; change “CFR” to “CIR”.
10 Under paragraph 3.3, delete “A-team note: Identify /verify the applicable ventilation systems for the work item.”
14 Delete paragraphs 3.2.1 and 3.2.2.
15 Delete paragraphs 3.2.1 and 3.2.2.
16 Add “Coast Guard Drawing 627 WMEC 572-001, Rev C, Details of ER and Passageway Trolley Beams” to Section 2 under COAST GUARD DRAWINGS.
Modify paragraph 3.1; add “The Contractor shall refer to the Coast Guard drawing(s) listed under Section 2 (References) for iii (Rev-2) guidance in accomplishing this work item.”
Modify paragraph 3.2.2; add “Submit a CFR.”
20 Modify paragraph 3.2; delete “3141” and replace with “3020”.
Delete “Coast Guard Drawing 627 WMEC” and replace with
“the Coast Guard drawings listed under Section 2 (References)”.
21 Modify paragraph 1.1; delete “anchor windlass” and replace with “warping capstan”.
Modify paragraph 3.2; delete “3141” and replace with “3020”.
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iv (Rev-2) v (Rev-2)
Consolidated List of References
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free or charge. Other Government documents may be accessed – free of charge – as follows:
• MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm
• Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp
• Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws::
www.gpoaccess.gov
The Government is aware of the following internet web links where contractors may procure commercial specifications:
• American Welding Society (AWS): http://www.awspubs.com/index.php
• ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/
• NFPA: http://www.nfpa.org
• SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace
COAST GUARD DRAWINGS
Coast Guard Drawing 618 WMEC 601-005, Rev- F, General Arrangement 02 Dk, Bridge DK & House Top Coast Guard Drawing 618 WMEC 136-001, Rev-K, 01,02,and Bridge Dk Plating and Supports Coast Guard Drawing 627 WMEC 85-201, Rev A, Booklet of General Plans Coast Guard Drawing 627 WMEC 85-301, Rev A, Booklet of General Plans Coast Guard Drawing 628 WMEC 103-004, Rev A, Gen Arrg Main And 01 Decks Coast Guard Drawing 628 WMEC 103-005, Rev A, Gen Arrg 02 Lvl, Brdge Dk & House Top Coast Guard Drawing 627 WMEC 111-001, Rev A, Shell Expansion Framing & CVK Coast Guard Drawing 627 WMEC 117-003, Rev-A Midship and Type Sections Coast Guard Drawing 627 WMEC 154-001, Rev-C Aluminum Pilot House Details Coast Guard Drawing 627 WMEC 184-001, Rev-H, Pilot House & Bridge Deck Foundations Coast Guard Drawing 627 WMEC 186-002, Rev C, Talon Grid Foundations and Structural Mod 01 Level Coast Guard Drawing 627 WMEC 186-006, Installation of Jared Anchor Windlass & Warping Capstan Coast Guard Drawing 627 WMEC 259-001, Rev D, Arrangement Exhaust Piping Coast Guard Drawing 627 WMEC 320-011, Anchor Windlass & Capstan Replacement Coast Guard Drawing 627 WMEC 512-1-001, Rev-, Ventilation Equipment List Coast Guard Drawing 627 WMEC 512-6-001, Rev-, Ventilation Diagram-Second Deck Coast Guard Drawing 627 WMEC 512-006, Rev D, Ventilation Diagram – Second Deck Coast Guard Drawing 627 WMEC 512-007, Rev D, Ventilation Diagram – Main Deck Coast Guard Drawing 627 WMEC 512-008, Rev D, Ventilation Diagram – 01 Deck & Abv Coast Guard Drawing 627 WMEC 512-020, Rev -, Arrangement Vent and AC 02 Level Coast Guard Drawing 627 WMEC 512-021, Rev -, Arrangement Vent and AC 01 Level Coast Guard Drawing 627 WMEC 512-026, Rev -, Arrangement Vent and AC Main Deck http://www.assistdocs.com/search/search_basic.cfm http://www.uscg.mil/directives/default.asp http://www.gpoaccess.gov/ http://www.awspubs.com/index.php http://www.techstreet.com/ http://www.nfpa.org/ http://shopping.netsuite.com/sspcmarketplace
Coast Guard Drawing 627 WMEC 512-029, Rev -, Arrangement Vent and AC 2nd Deck Coast Guard Drawing 627 WMEC 512-030, Rev -, Arrangement Vent and AC 3rd Deck Coast Guard Drawing 627-WMEC 513 001, Rev -,Ventilation Arrgt Machinery Spaces Coast Guard Drawing 627-WMEC 513 002, Rev -,Arrgt Ventilation Machinery Space Coast Guard Drawing 627 WMEC 536-001, Rev-, Diagram Diagram Sea Water Piping for MN Engines, AUX & Emer. Gens & A/C Coast Guard Drawing 627 WMEC 581-005, Anchor Windlass Coast Guard Drawing FL-588-001, Rev C, Talon Grid Support Skirt Replacement Coast Guard Drawing 627 WMEC 601-003, Rev-C, General Arrangement- Second and Third Deck Coast Guard Drawing FL-8301-002, Rev A, Talon Helo Landing Grid Stanchion Bolt with Locknut NAVSEA Drawing 804-5959214, Rev-, Piping Insulation - Installation Details
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Change 1, Jun 2006, Coatings and Color Manual Coast Guard Technical Publication (TP) 3368, Feb 2006, Technical Documentation Helicopter Land Grid
TYPE 18-22-01
Surface Forces Logistics Center (SFLC), Standard Specification 0000_STD, 2009 Edition, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), Jan 2009, Overhaul AC Electrical Motors In-Shop Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), Jan 2009, Clean Shipboard Ventilation Systems Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), Jan 2009, Temporary Hull Accesses
OTHER REFERENCES
American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2002, Disinfection of Water-Storage Facilities American National Standards Institute/NSF International (ANSI/NSF) 61, 2008, Drinking Water System Components - Health Effects ASTM International (ASTM) E797, 2005, Standard Practice for Measuring Thickness by Manual Ultrasonic Pulse-Echo Contact Method ASTM International (ASTM) D3951, Reapproved 2004, Standard Practice for Commercial Packaging ASTM International (ASTM) D5363, 2003, Standard Specification for Anaerobic Single Component Adhesives ASTM International (ASTM) F683, 2003, Standard Practice for Selection and Application of Thermal Insulation for Piping and Machinery Code of Federal Regulations (CFR) Title 29, Part 1915, Jul 2008, Occupational Safety and Health Standards for Shipyard Employment Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety Administration, Department Of Transportation International Standard Organization (ISO) 2953, 1999, Mechanical Vibration, Balancing Machines, Description and Evaluation MIL-DTL-24244, May 2000, Insulation Material, With Special Corrosion, Chloride, and Fluoride Requirements vi (Rev-2)
MIL-I-16411, Nov 1988, Insulation Felt, Thermal, Glass Fiber MIL-PRF-16173, 2006, Corrosion Prevention Compound, Solvent Cutback, Cold-Application MIL-PRF-24667, Jun 2005, Coating system, Non-Skid, for Roll or Spray Application MIL-Y-1140, Sep 1985, Yarn, Cord, Sleeving, Cloth, And Tape- Glass QPL-24667, May 2006, Qualified Product List of Products Qualified under Performance Specification MIL- PRF-24667, Coating system, Non-Skid, for Roll or Spray Application Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2007, Cork and Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal vii (Rev-2) viii (Rev-2)
Consolidated List of Government-furnished Property The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
12 N M16 Bolts NSN: 5305-01-393-1827 24 ea. 24.79 12 N M12 Bolts NSN: 5305-01-584-6095 12 ea. 48.00 12 N **Talon Grid
Stanchion Bolt Assembly, Including Locking Nut
NSN: 5340-01-481-3786 60 ea. 31.50
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter
Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000_STD, paragraph
3.2.6.5 (Inspection report particulars)):
WORK ITEM 01: Tanks (Potable Water), Clean and Inspect WORK ITEM 04: Main Diesel Engine Exhaust Stack Uptakes, Clean WORK ITEM 05: Ship Service Diesel Generator Exhaust Piping, Clean WORK ITEM 06: Boiler Exhaust Stack Uptakes, Clean WORK ITEM 12: Helo Talon Grid, Inspect and Test WORK ITEM 20: Anchor Windlass (Port and Stbd), Level 2 Inspect and Repair WORK ITEM 21: Warping Capstan, Level 2 Inspect and Repair ix (Rev-2)
PC_210B_WMEC_0909
Principal Characteristics
210' WMEC (B-Class)
PHYSICAL CHARACTERISTICS
Length Overall 210' 6" Length, Design Waterline 200' 0" Depth (main deck at side to baseline) 19' 6" Maximum Beam 34' 0" Height of Highest Projection 88' 0" Full Load Draft 4,000 lbs Height of FM Antenna Above Baseline 90' 0" Light Ship Displacement 875 long tons Full Load Displacement 1100 long tons Shore Tie Voltage Requirements 400A / 440V Frame Spacing 1' 0"
MACHINERY CHARACTERISTICS
Main Propulsion 2 Alco Model 251B Diesel Engines, 5,000 BHP total
Ship's Service Generators 2 Caterpillar Model 3406B Diesel-driven SR4. 250 KW each @ 0.8 power factor, 440V AV, 3 phase, 60 cycle
Emergency Generator Caterpillar Model D333B Diesel-Driven. Century Synchronous Model, ACR-507, 100KW
Number of Propellers 2 Number of Blades 4 Diameter 7' 6" Pitch Controllable Shaft RPM 300 Shaft Diameter 8.25"
TANK CAPACITIES
Diesel Fuel (95%) 48,375 gal Fresh Water (95%) 11, 108 gal JP-5 Fuel (95%) 4,697 gal Lube Oil (95%) 1,942 gal x (Rev-2) xi (Rev-2)
00000_0310_FLT
REC_0000_FLT_ Commercial Project @ CG Facility (1209)
General Requirements
1. SCOPE
1.1 Intent. This item describes the general requirements to be followed by the Contractor while conducting this availability.
2. REFERENCES
COAST GUARD DRAWINGS
None.
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Change 1, Jun 2006, Coatings and
Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General
Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes
OTHER REFERENCES
Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety
Administration, Department Of Transportation
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and also to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:
1 (Rev-2)
• Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.
• Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.
3.3 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
3.4 HW disposal. The Contractor shall be responsible for all hazardous wastes generated by work under this contract. Label and package all hazard wastes in 49 CFR-approved containers, and in accordance with all other applicable Federal, state, and local laws and regulations. In addition, comply with applicable parts of 40 CFR 262, applicable to handling of hazardous wastes.
3.4.1 Along with the Government, the Contractor shall be contractually considered the co-generator of all hazardous wastes; be aware that the Government will make available its facility’s EPA Generator Identification (ID) Number for manifesting of hazardous wastes.
3.4.2 The Contractor shall identify, arrange, and be responsible for the turnover of all hazardous wastes, within the confines of the Coast Guard shore facility, to the facility’s HM/HW Coordinator. Notify the ship’s HW Coordinator prior to any transfers of HW from ship to shore.
3.4.3 The Contractor shall prepare a manifest of hazardous waste to be reviewed and signed by the HM/HW Coordinator. Contact the HM/HW Coordinator for turnover of any hazardous waste; in addition, notify the COTR 24 hours prior to any waste removals, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).
3.4.4 The Contractor shall be aware of the following:
3.4.4.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast Guard facility without COTR or KO-approval.
3.4.4.2 Local environmental regulations at the Government facilities may be more stringent than in many jurisdictions. As with all environmental regulations, it is the Contractor's responsibility to research, prepare for, and comply with, the local and state regulations.
3.4.4.3 Coast Guard facilities do not have Facilities Response Plans (see 33 CFR 154 Subpart F). It is the Contractor’s responsibility to furnish the Facility Response Plan (FRP) when required for over-the-water liquids transfers to and from vessels. This requirement is applicable to transfers to/from vessels with an oil/fuel capacity of 250 barrels or more.
4. NOTES
4.1 Access to COMDTINST M10360.3. The COMDTINST M10360.3 may be accessed at the following URL address: http://www.uscg.mil/directives/cim.asp
2 (Rev-2) http://www.uscg.mil/directives/cim.asp
4.2 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 0000 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
3 (Rev-2)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
Vessel Name: _______________________ Hull Number: ______________ CLIN No.: _____________ Work Item Title: ________________________________________________ Specific Area Being Preserved: ___________________________________________________________
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with COMDTINST M10360.3, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating manufacturer(s).
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-based coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating manufacturer(s).
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-12, SP-11, SP-10…).
Verify surface anchor profile (1.5-3.5 mils for abrasive-blasted steel surfaces; 1.0 mil (minimum) for power-tool cleaned surfaces; 1.0-1.5 mils for abrasive-blasted aluminum surfaces); and 1.5 –2.5 for surfaces to be coated w/single coat of inorganic zinc). Conduct 5 sets of 3 readings for the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Measure soluble salt conductivity (5 measurements per 1000 sqft) – maximum threshold: 70 microsiemens/cm for non-submerged surfaces and 30 microsiemens/cm for submerged surfaces.
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application:_________/_________; Return to service or removal from environment controls: _______/_______
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
Name of QP-1 or NACE-Certified Inspector: __________________________________________ Cert. No.: ____________ Signature of Inspector: _______________________________________ Date:_______________ Time: _________
4 (Rev-2)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
Vessel Name: _______________________ Hull Number: ______________ CLIN No.: _____________ Work Item Title: ________________________________________________
(Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat)
DATE &
TIME
ENTER ACTIVITY
(Surface preparation, primer coat, barrier coat, top coat, etc…)
LOCATION
TEMPERATURE
% REL.
HUMIDITY
SIGNATURE
OF
INSPECTOR DEW
POINT SURFACE AMBIENT
ΔT
| DP - Surface
Name of QP-1 or NACE-Certified Inspector: __________________________________________ Cert. No.: ____________ Signature of Inspector: _______________________________________ Date:_______________ Time: _________
5 (Rev-2)
QA-3 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG)
Vessel Name: _______________________ Hull Number: ______________ CLIN No.: _____________ Work Item Title: ________________________________________________ Location of Surface Profile Measurements: ___________________________________________________________
SURFACE PREPARATION
METHOD
PROFILE
(mils)
Min Max Avg.
SSPC-SP-10/NACE No. 2
SSPC-SP-12/NACE No. 5
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________ Place Surface Profile Replica Tapes In The Spaces Provided Below, To Serve As Permanent QA record. Maintain separate log for each area/location. When an Area Is Divided Into Separate Sections, Maintain A Separate Log for Each Section.
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils Average Mil Reading (IAW ASTM D4417-Method C) for above 15 readings: ______________
Name of QP-1 or NACE-Certified Inspector: __________________________________________ Cert. No.: ____________ Signature of Inspector: _______________________________________ Date:_______________ Time: _________
6 (Rev-2)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
Vessel Name: _______________________ Hull Number: ______________ CLIN No.: _____________ Work Item Title: ________________________________________________
Location of Work (including frame numbers): _______________________________________ Area (square feet): ____________
DATE TEST LOCATIONS CONDUCTIVITY
(microsiemens/cm)
Name of QP-1 or NACE-Certified Inspector: __________________________________________ Cert. No.: ____________ Signature of Inspector: _______________________________________ Date:_______________ Time: _________
7 (Rev-2)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence) Vessel Name: _______________________ Hull Number: ______________ CLIN No.: _____________ Work Item Title: ________________________________________________
Coating Manufacturer: ___________________Product Name: _______________________Batch Number: ____________ Induction Time: _______________________________________________________________ Coating System Sequence (Indicate Whether: Primer, Touch-Up Primer, Barrier Coat, 3rd Coat…): __________________
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC PA-2
SPOT 1 2 3 4 5 AVERAGE
VALUE
*BASE METAL
READING (BMR)
*Required, If Magnetic Pull-Of (Type I/Banana) Gauge Is Used.
Location (Frame Reference): ___________________
SPOT 1 2 3 4 5
Overall Avg. DFT
ADJUSTMENTS
1 Avg. BMR Deviation 3 Before
Adjustments After Adjustments
Avg.
Location (Frame Reference): ___________________
SPOT 1 2 3 4 5
Overall Avg. DFT
ADJUSTMENTS
1 Avg. BMR Deviation 3 Before
Adjustments After Adjustments
Avg.
Location (Frame Reference): ___________________
SPOT 1 2 3 4 5
Overall Avg. DFT
ADJUSTMENTS
1 Avg. BMR Deviation 3 Before
Adjustments After Adjustments
Avg.
Application Method (Airless, Conventional Spray, Rolled):____________________ Average DFT: __________________________________________________________
Name of QP-1 or NACE-Certified Inspector: __________________________________________ Cert. No.: ____________ Signature of Inspector: _______________________________________ Date:_______________ Time: _________
8 (Rev-2)
9 (Rev-2)
12314_DLA_0209_FLT
REC_12314_FLT/210’ WMEC ‘B’ Class (ALL) (0310)
WORK ITEM 1: Tanks (Potable Water), Clean and Inspect
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the following tank(s):
TYPE OF
TANK LOCATION CAPACITY - 95%
(gallons)
LOW SUCTION
(gallons) Potable Water 4-FP-0-W 6,080 120 Potable Water 4-172-0-W 6,990 160 Potable Water 4-174-1-W 2,250 40 Potable Water 4-174-2-W 2,250 40
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 627 WMEC 85-301, Rev A, Booklet of General Plans
COAST GUARD PUBLICATIONS
None.
OTHER REFERENCES
American National Standards Institute/NSF International (ANSI/NSF) 61, 2008, Drinking Water System
Components - Health Effects
Disinfection of Water-Storage Facilities
3. REQUIREMENTS
3.1 General. The Contractor shall refer to Coast Guard Drawing 627 WMEC 85-301 for guidance. The Contractor shall notify the Dockmaster prior to filling or draining the potable water tank(s), when this item is being executed in a drydock availability. The Contractor shall accomplish the following for the tank(s) designated in paragraph 1.1 (Intent):
3.1.1 Operational test - initial. Prior to commencement of work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of all designated tank TLIs, to demonstrate existing operational condition.
Submit a CFR.
3.1.2 Tank content removal. Remove and dispose of all fluids and/or residues in accordance with all applicable Federal, state, and local regulations.
3.1.3 Tank cleaning. Remove tank cover(s); clean tank interior surfaces free of all foreign materials, such as sediment or sludge. Remove all persistent residues, taking care not to damage the tank coating system. Remove cleaning media and residues continuously from the tank during the washing process. Remove any residual wash media and wipe up residual moisture with clean lint-free cloths. Collect, contain, and dispose of all wash media, residues, and cleaning materials in accordance with all Federal, state, and local regulations.
3.1.4 Inspection. Visually inspect all tank interior surfaces, including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces. Submit a CIR including the following, as applicable:
• Tank structural condition.
• Inaccessible areas, if any.
• Condition of tank coating, including measurements taken, percentage, location, and type of coating failure.
• Tank level indicator (TLI) and/or float switch condition (if applicable).
• Sounding tube and striker plate condition.
• Suction and discharge piping condition.
• Fastener material and condition (correct fastener material is stainless steel).
3.2 Tank closing. The Contractor shall ensure that the tank(s) remain open for approximately 24 hours after completion of the tasks specified above. Notify the COTR at least 24 hours prior to closing the tank(s). After satisfactory inspection by the Coast Guard Inspector, and completion of all authorized repairs, close tank manhole cover(s) with new gasket material conforming to ANSI/NSF 61. Renew all stud cotton grommets (as applicable) upon reinstallation of manhole cover(s).
3.3 Tank disinfecting. After all other work involving the potable water system and tank closing have been completed, the Contractor shall disinfect and treat the affected potable water tank(s) and associated disturbed piping and components, as necessary, to meet or exceed the requirements of AWWA C652. After tank disinfecting; remove and dispose of all treated water in accordance with all Federal, state and local regulations.
NOTE
Ensure that no one enters the tanks once disinfection is completed.
10 (Rev-2)
3.4 Operational test – post repairs. After completion of work, the Contractor shall witness an operational test (by Coast Guard personnel) of all designated tank TLIs to prove satisfactory operating condition. Submit a CFR.
4. NOTES
This section is not applicable to this work item.
11 (Rev-2)
12 (Rev-2)
REC_12314_FLT_210’ WMEC ‘B’ Class (ALL) (0310)
WORK ITEM 2: Tanks (Potable Water), Preserve “Partial”
OPTIONAL ITEM
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to prepare and preserve the following tank(s):
TANK LOCATION CAPACITY - 95%
(GALLONS)
% OF TANK
COATING
REPAIR
LOW SUCTION
(gallons)
Potable Water
4-FP-0-W 6,080 30 120
Potable Water
4-174-1-W 2,250 30 40
Potable Water
4-174-2-W 2,250 30 40
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 627 WMEC 85-301, Rev A, Booklet of General Plans
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General
Requirements Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), Jan 2009, Temporary Hull Accesses
American National Standards Institute/NSF International (ANSI/NSF) 61, 2008, Drinking Water System
Components - Health Effects
Disinfection of Water-Storage Facilities
3.1 Temporary access openings. Due to limited access to work areas, the Contractor may, with express permission of the KO (via submission of a CFR), cut access holes to facilitate accomplishment of the work specified herein. Perform all work required to open and close the access openings in accordance with SFLC Std Spec 8636.
3.2 Surface preservation. The Contractor shall refer to Coast Guard Drawing 627 WMEC 85-301 for guidance.
The Contractor shall remove and retain the tank manhole cover(s). Prepare and coat the designated tank interior surfaces, using the system specified for "Tanks and Voids (Potable Water Tanks)" in COMDTINST M10360.3, Appendix B (Cutter and Boat Interior Painting Systems). Power tool clean all affected surfaces to “bare metal”, in lieu of using abrasive blasting; and feather edges of existing intact coating to the prepared areas, in order to provide a smooth transition with the new paint. Select finish/top coat color to match existing adjacent surfaces.
3.2.1 Drying between coats shall be no less than 48 hours at a minimum temperature of 21°C (70°F). Heated air shall be used if necessary to maintain the proper temperature. Ventilation shall be a continuous airflow with a minimum of one complete air change every four (4) hours.
3.2.2 Fully coated tanks shall be cured in accordance with the manufacturer’s instructions for NSF/NEHC certification under the same conditions before being filled.
NOTE
Typical curing times are at least 7 days, and RANGE up to 14 days, depending on the paint selected and environmental conditions.
3.2.3 Freshly painted potable water tanks shall be rinsed at least twice with freshwater before being disinfected and put into service.
3.3 In-process quality control measures. The Contractor shall abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces).
NOTE
Surfaces being preserved are considered “critical-coated surfaces”.
3.4 Inspection. After surface preparation and before coating application, the Contractor shall visually inspect all interior surfaces; including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces. Submit a CFR including structural condition, inaccessible areas, tank level indicator (TLI) and/or float switch condition, sounding tube and striker plate condition, suction and discharge piping condition; as applicable.
13 (Rev-2)
NOTE
Ensure that no one enters the tanks once disinfection is completed.
4. NOTES
14 (Rev-2)
WORK ITEM 3: Potable Water Tank, Repair
1.1 Intent. This work item describes the requirements for the Contractor to repair the below designated tank:
TYPE OF TANK LOCATION CAPACITY
(GALLONS)
Potable Water 4-172-0-W 6,990
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 627WMEC 111-001, Rev A, Shell Expansion Framing & CVK Coast Guard Drawing 627 WMEC 117-003, Rev A, Midship and Type Sections Coast Guard Drawing 627 WMEC 601-003, Rev C, General Arrangement - Second and Third Decks
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General
Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes
OTHER REFERENCES
American National Standards Institute/NSF International (ANSI/NSF) 61, 2008, Drinking Water System
Components - Health Effects American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2002, Disinfection of Water-Storage Facilities
3. REQUIREMENTS
3.1 General. The Contractor shall refer to Coast Guard drawings 627 WMEC 111-001, 627 WMEC 117-003, and 627 WMEC 601-003 as guidance.
15 (Rev-2)
3.1.1 CIR.
None.
3.1.2 Technical Representative.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to the below-listed. Handle all interferences in accordance with SFLC Std Spec 0000, paragraph
3.3.5 (Interferences):
• Kick pipe.
• Sounding tube.
• Watertight bulkhead.
• Ladder.
• J Davit bracket.
• AFFF Rack.
3.2 Ultrasonic thickness (UT) measurement. The Contractor shall take a total of 10 UT measurements of tank surface, in locations designated by the Coast Guard Inspector, in accordance with SFLC Std Spec 0740, Appendix C. Use Coast Guard Drawing 627 WMEC 111-001 as guidance. Submit a CFR.
3.3 Structure renewal. The Contractor shall crop and renew approximately 10 square feet of 3/16” (7.65 lbs/ft) steel plate of the designated potable water tank plating from Frame 172 to Frame 175, approximately 2 ft to either side of damaged plate, as shown on Coast Guard Drawing 627 WMEC 111-
001. In addition, the Contractor shall crop out and renew 24” of corroded Sounding Tube piping.
3.4 Welding repairs. The Contractor shall clad weld any additional locations designated necessary by Coast Guard Inspector. Submit a CFR.
3.5 Touch-up preservation. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with COMDTINST M10360.3, Appendix A (Cutter and Boat Exterior Painting Systems) and Appendix B (Cutter and Boat Interior Painting Systems), respectively, and as applicable. Abide by all touch-up requirements outlined in SFLC Std Spec 0000, Appendix A (Requirements for Preservation of Ship Structures).Use the coating system specified for "Tanks and Voids (Potable Water Tanks)" in Appendix B (Cutter and Boat Interior Paint Systems) for tank interior surfaces. Power tool clean all affected surfaces to “bare metal”, in lieu of using abrasive blasting, and feather edges of existing intact coating to the prepared areas, in order to provide a smooth transition with the new paint.
16 (Rev-2)
Surfaces being preserved are considered “critical-coated surfaces”. Ambient conditions should be monitored closely to prevent condensation.
Ensure that no one enters the tanks once disinfection is completed
3.6 Operational test – post repairs. After completion of work, the Contractor shall witness an operational test (by Coast Guard personnel) of all disturbed sounding tube piping to prove satisfactory operating condition. Submit a
CFR.
4. NOTES
17 (Rev-2)
25901_JAH_1109_FLT
REC_25901_FLT_210' WMEC 'B' Class (ALL) (1109)
WORK ITEM 4: Main Diesel Engine (MDE) Exhaust Stack Uptakes, Clean
1.1 Intent. This work item describes the requirements for the Contractor to clean the Main Diesel Engine (MDE) exhaust stacks.
1.2 Government-furnished equipment.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 627 WMEC 259-001, Rev D, Arrangement Exhaust Piping
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General
Requirements
OTHER REFERENCES
Code of Federal Regulations (CFR) Title 29, Part 1915, Jul 2008, Occupational Safety and Health
Standards for Shipyard Employment
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
• 3.5 (Inspection and Report)
3.1.2 Technical Representative.
Not applicable.
18 (Rev-2)
3.1.3 Protective measures. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to the below-listed. Handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences):
• Access covers.
• Exhaust stack.
• MDE.
• Piping.
• Pipe insulation.
• Vent ducting.
• Wiring.
• Exhaust pipe expansion joints.
• Exhaust insulation blankets.
3.1.5 Scaffolding. The Contractor shall, in accordance with 29 CFR 1915, Subpart E, erect suitable staging or scaffolding, as required, to perform work.
3.1.6 Safety precaution. The Contractor shall rig suitable safety netting, to protect workers during possible falls, and to protect the Engine Room and machinery from falling tools.
3.1.7 Access openings.
Not applicable.
3.1.8 Work site access. The Contractor shall gain access to both MDE exhaust stacks via existing Accesses 02- 106-1 and 02-106-2.
3.2 Work plan. The Contractor shall develop and submit, to the COTR, a plan for collecting and disposing of waste extracted during cleaning process. Ensure that the proposed plan shall detail how and where exhaust piping will be disconnected, how entire length of exhaust piping will be divided/sectioned for cleaning, and precautions to protect the MDE. The Contractor shall perform this work upon receiving Coast Guard approval of the plan.
3.3 Operational test - initial. Prior to commencement of work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of the exhaust stack system, to demonstrate existing operational condition.
Determine if there are any exhaust leaks present. Submit a CFR.
3.4 Cleaning. The Contractor shall clean the interior surfaces of the exhaust piping to the MDE, shown on Coast Guard Drawings 627 WMEC 295-001, to a condition free from soot, tar, and any other foreign matter as follows:
3.4.1 Disconnect the exhaust piping as necessary to facilitate cleaning.
19 (Rev-2)
3.4.2 Remove and retain the existing exhaust mufflers.
3.4.3 Thoroughly sweep, mechanically clean, and vacuum the interior of each exhaust pipe system, including the mufflers, from the exhaust outlet to the topmost location outside the vessel. Ensure that all tar deposits, soot deposits, and all other surface contaminants are completely removed.
3.4.4 Upon completion of cleaning, do the following:
3.4.4.1 Remove all debris from the pipe surfaces, stack deck, and Engine Room areas by vacuuming. Dispose of all cleaning materials and generated debris in accordance with all applicable Federal, state, and local regulations.
3.4.4.2 Reassemble exhaust piping; renew all flange connection gaskets with suitable high temperature, non-asbestos-containing gasket materials, and renew all fasteners (corrosion resistant) throughout the entire exhaust piping system.
3.5 Inspection and report. The Contractor shall perform a visual inspection of the following components; submit a CIR:
• Exhaust stack access hatches, including all associated studs and nuts.
• All cleaned exhaust stack surfaces.
• All exhaust expansion joints, including associated bolts.
3.6 Touch-up preservation. The Contractor shall prepare and touch-up coat all disturbed surfaces to match existing adjacent surfaces in accordance with COMDTINST M10360.3, Appendix B (Cutter and Boat Interior Painting Systems). Abide by all touch-up requirements outlined in SFLC Std Spec 0000, Appendix A (Requirements for Preservation of Ship Structures).
3.7 Operational test – post repairs. After completion of work, the Contractor shall witness an operational test (by Coast Guard personnel) of the exhaust stack system to prove satisfactory operating condition. Submit a CFR.
4. NOTES
20 (Rev-2)
21 (Rev-2)
25902_JAH_1109_FLT
REC_25902_FLT_210' WMEC 'B' Class (ALL) (1109)
WORK ITEM 5: Ship Service Diesel Generator (SSDG) Exhaust Piping, Clean
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean the Ship Service Diesel Generator (SSDG) exhaust piping.
1.2 Government-furnished equipment.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 627 WMEC 259-001, Rev D, Arrangement Exhaust Piping
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General
Requirements
OTHER REFERENCES
Code of Federal Regulations (CFR) Title 29, Part 1915, Jul 2008, Occupational Safety and Health
Standards for Shipyard Employment
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
• 3.5 (Inspection and Report)
3.1.2 Technical Representative.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to the below-listed. Handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences):
• Access covers.
• Exhaust stack.
• SSDG.
• Vent ducting.
• Wiring.
• Exhaust pipe expansion joints.
• Exhaust insulation blankets.
3.1.5 Safety precaution. The Contractor shall rig suitable safety netting, to protect workers during possible falls, and to protect the Engine Room and machinery from falling tools.
3.1.6 Access openings.
Not applicable.
3.2 Work plan. The Contractor shall develop and submit, to the COTR, a plan for collecting and disposing of waste extracted during cleaning process. Ensure that the proposed plan shall detail how and where exhaust piping will be disconnected, how entire length of exhaust piping will be divided/sectioned for cleaning, and precautions to protect the SSDG. The Contractor shall perform this work upon receiving Coast Guard approval of the plan.
3.3 Operational test - initial. Prior to commencement of work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of the exhaust stack system, to demonstrate existing operational condition and determine if there are any exhaust leaks. Submit a CFR.
3.4 Cleaning. The Contractor shall clean the interior surfaces of the exhaust piping to the SSDG, shown on Coast Guard Drawings 627 WMEC 295-001, to a condition free from soot, tar, and any other foreign matter as follows:
3.4.1 Disconnect the exhaust piping as necessary to facilitate cleaning.
3.4.2 Remove and retain the existing exhaust mufflers.
3.4.3 Thoroughly sweep, mechanically clean, and vacuum the interior of each exhaust pipe system, including the mufflers, from the exhaust outlet to the topmost location outside the vessel. Ensure that all tar deposits, soot deposits, and all other surface contaminants are completely removed.
3.4.4 Upon completion of cleaning, do the following:
22 (Rev-2)
3.4.4.1 Remove all debris from the pipe surfaces, stack deck, and Engine Room areas by vacuuming. Dispose of all cleaning materials and generated debris in accordance with all applicable Federal, state, and local regulations.
3.4.4.2 Reassemble exhaust piping; renew all flange connection gaskets with suitable high temperature, non-asbestos-containing gasket materials, and renew all fasteners (corrosion resistant) throughout the entire exhaust piping system.
3.5 Inspection and report. The Contractor shall perform a visual inspection of the following components; submit a CIR:
• Exhaust stack access hatches, including all associated studs and nuts.
• All cleaned exhaust stack surfaces.
• All exhaust expansion joints, including…
This is the start of the file's text. The full file is on GovTribe.
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend A0004.pdf | ||
| DAUNTLESS | — | |
| DAUNTLESS | — | |
| DAUNTLESS | — | |
| Amend A0003.pdf | ||
| Amend A0002.pdf | ||
| DAUNTLESS_WMEC_210B_DS_11R1.pdf | ||
| Amend A0001.pdf | ||
| DAUNTLESS | — | |
| HSCG8011QP30662pdffile.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .