NJ14.pdf

PDF 16 KB Posted

Attached to
Replace an Electrical Panel at Housing Unit #1841 Pennsylvania Avenue Federal contract opportunity
Solicitation number
HSCG42-12-Q-PFC009
Issued by
Department of Homeland Security US Coast Guard

About this file

DB NJ14

View the file

Other files for this federal contract opportunity

Other files attached to Replace an Electrical Panel at Housing Unit #1841 Pennsylvania Avenue, newest first.
File Type Posted
SF-1442 page 1-2 of solicitation PFC009.doc DOC document
Reference Information sheet.doc DOC document
USCG SPECIFICATION CMS-1344.pdf PDF
RFQ solic ALL enclusive including embedded docs - PFC009.doc DOC document
Request for Information.doc DOC document
USCG Drawing T-6279-ED.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: NJ100014 12/02/2011 NJ14

Superseded General Decision Number: NJ20080014

State: New Jersey

Construction Type: Residential

County: Cape May County in New Jersey.

RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family homes and apartments up to and including 4 stories).

Modification Number Publication Date 0 03/12/2010 1 04/16/2010 2 06/04/2010 3 07/02/2010 4 01/28/2011 5 04/29/2011 6 08/05/2011 7 09/02/2011 8 09/30/2011 9 12/02/2011

BRNJ0002-004 05/01/2011

Rates Fringes

BRICKLAYER.......................$ 36.70 24.97

BRNJ0005-001 11/01/2008

Rates Fringes

BRICKLAYER (Cement Mason)........$ 25.10 9.25

* CARP0006-001 11/01/2011

Rates Fringes

CARPENTER, Includes Drywall Hanging..........................$ 40.18 55% Residential Construction....$ 25.49 45%

ELEC0351-006 10/01/2009

Rates Fringes

12/5/2011http://www.wdol.gov/wdol/scafiles/davisbacon/NJ14.dvb

Electricians:....................$ 27.25 28.75%+1.05

ENGI0825-006 07/01/2010

Rates Fringes

Power equipment operators:

(1) Backhoe including Backhoe Track; Crane;

Front End Loader 5 cu yd and over....................$ 41.02 25.75

(2) Backhoe Loader Combo;

Front End Loader 2 yd < 5 cu yd; Hydraulic Crane < 10 cu yd;...................$ 39.43 25.75

(3) Bulldozer; Roller blacktop; Front End Loader 1 < 2 cu yd;................$ 37.52 25.75

(4) Roller including Subgrade Roller; Front End Loader < 1 cu yd............$ 35.89 25.75

PAID HOLIDAYS:

New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided

1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday.

IRON0350-003 07/01/2010

Rates Fringes

Ironworkers:

Reinforcing.................$ 33.97 15.85 Structural..................$ 34.97 15.85

LABO0222-004 05/01/2009

Rates Fringes

LABORER

MASON TENDER:

Cement/Concrete.............$ 28.55 19.42

PAIN0711-001 05/01/2009

Rates Fringes

PAINTER (Brush & Roller).........$ 23.12 10.95

PLUM0322-002 06/01/2010

Rates Fringes

PLUMBER..........................$ 23.85 9.11

ROOF0030-019 05/01/2009

Rates Fringes

ROOFER (All Types)...............$ 23.25 13.77

SUNJ2004-047 01/02/2009

Rates Fringes

LABORER: Common or General......$ 17.10 6.90

OPERATOR: Concrete Pump, Truck Mounted....................$ 13.50 2.34

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in he matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .