ANSWERS_TO_VENDOR_QUESTIONS-_Amendment_0002.doc

DOC document 41 KB Posted

Attached to
Lead Abatement Services for CGC Eagle Federal contract opportunity
Solicitation number
HSCG40-15-R-60388
Issued by
Department of Homeland Security US Coast Guard

About this file

Continuation Sheet for Amendment A0002 Answers to vendor questions.

View the file

Other files for this federal contract opportunity

Other files attached to Lead Abatement Services for CGC Eagle, newest first.
File Type Posted
Amendment_A0004.pdf PDF
ANSWERS_TO_VENDOR_QUESTIONS-_Amendment_0003_(2).doc DOC document
Amendment_A0003.pdf PDF
Amendment_A0002.pdf PDF
A0001SITE_VISIT_INFORMATION.doc DOC document
Amendment_A0001.pdf PDF
attachment_5_wage_determination_lead_abatement.doc DOC document
Attachment_4_327-WIX_103_10_3_-_E.pdf PDF
Attachment_4_327-WIX_103_10_1_-_E.pdf PDF
SOW_Eagle_lead_abatement_9-23-15.doc DOC document
Attachment_3I_-_Past_Performance.doc DOC document
Attachment_4_Berthing_Area_Blkhds.pdf PDF
Attachment_4_327-WIX_103_2_1_-_C.pdf PDF
Attachment_2_Pricing_sheet_Eagle_Lead_Abatement_9-24.xls XLS spreadsheet
Attachment_4_327-WIX_103_10_2_-_E.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ANSWERS TO VENDOR QUESTIONS

HSCG40-15-Q-60388

LEAD ABATEMENT SERVICES FOR CGC EAGLE

1. Question: Will the coast guard provide a shower for the contractor?

Answer: The Contractor is responsible for their own shower; however the Coast Guard will provide water for hookup. In addition, the Coast Guard will provide a dumpster to dispose of tyvex suits.

2. Question: Will the job be done on the pier or will the vessel be on dry dock?

Answer: All work shall be completed pier side

3. Question: Will the Coast Guard provide the use of a fork lift and crane to lift equipment and materials?

Answer: The Coast Guard will provide the use of a fork lift and crane to lift equipment and materials.

4. Question: Only portions of the identified areas in the vessel require blasting. Will the Coast Guard mask and protect the electrical cables, insulated piping, floors and other interferences on the bulkheads, decks and overheads that do not require blasting but are in the areas that blasting will occur?

Answer: The Coast Guard will cover wiring and piping, in addition the decks will have a rubber mat covering them. The Contractor shall be responsible for ensuring these areas are protected.

5. Question: Will the USCG provide power for equipment such as vent fans, blowers, and hand power tools.

Answer: Yes, The Coast Guard will provide power for Contractor’s equipment (200 amps and up to 480 volts).

6. Question: Will the floors be protected and covered by the USCG or is the vendor responsible for that?

Answer: The Coast Guard will have a rubber matting on the decks, however the Contractor shall be responsible for ensuring the decking is properly protected.