Sprinkler_PWS_2017.doc

DOC document 141 KB Posted

Attached to
FIRE SPRINKLER SYSTEM INSPECTIONS Federal contract opportunity
Solicitation number
HSCG39-17-Q-FD525
Issued by
Department of Homeland Security US Coast Guard

About this file

PWS

View the file

Other files for this federal contract opportunity

Other files attached to FIRE SPRINKLER SYSTEM INSPECTIONS, newest first.
File Type Posted
SF-1449.pdf PDF
Sprinkler_17.doc DOC document
WDOL.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS) FOR

PREVENTATIVE MAINTENANCE, INSPECTION AND TESTING OF SPRINKLER SYSTEMS, STANDPIPES SYSTEMS, BACK FLOW PREVENTERS, SPRINKLER SYSTEM FIRE PUMPSAND FIRE HYDRANTS AT USCG ACADEMY, NEW LONDON, CT

1. INTRODUCTION

The United States Coast Guard Academy (CGA) is procuring services to conduct testing and inspections of the sprinkler, standpipe systems, fire hydrants, fire pumps and backflow prevention devices located in New London CT. All work shall be performed in accordance with the Performance Work Statement (PWS) and all current applicable State and Federal Regulations, National Fire Protection Agency Codes and USCGA Policies. For the purposes of this PWS, NFPA current editions are used. Changes to NFPA codes will require contractor to follow the current edition for the life of this contract.

2. BACKGROUND

2.1 The roots of today's Coast Guard were established in 1790 by Alexander

Hamilton. Hamilton proposed the formation of the Revenue Marine, a seagoing military service that enforced customs and navigation laws, collected tariffs, hailed in-bound ships, made inspections and certified manifests. The first Coast Guard Academy (then called the Revenue Cutter School of Instruction) was held aboard the two-masted topsail schooner Dobbin. The first class of nine cadets boarded the Dobbin in Baltimore, Maryland in 1876 for a two-year training mission.

The Coast Guard Academy was a shipboard operation until 1890 when the first land-based campus was established in Curtis Bay, Maryland. In 1910, the Academy moved to the Revolutionary War fort and Army post at Fort Trumbull in New London, Connecticut. The modern Academy was born in 1915 with the merger of the Life Saving Service and Revenue Cutter Service. In 1932, the citizens of New London donated the present site to the Academy.

Today the Academy is committed to strengthening the nation’s future by educating, training, and developing leaders of character who are ethically, intellectually, professionally, and physically prepared to serve their country and humanity, and who are strong in their resolve to build on the long military and maritime heritage and proud accomplishments of the United States Coast Guard.

The specifications contained herein are intended to describe the scope and nature of the work required of the Coast Guard Academy (CGA).

3. CONTRACTOR FURNISHED ITEMS

3.1 General. The contractor shall provide all equipment needed to service, test, repair, maintain, and inspect the systems covered by this contract.

3.2 Contractor shall be available to provide 24 hour emergency service to Coast Guard Academy in the event of activation, failure or other circumstances with regards to sprinkler systems, fire hydrants and fire pumps on board CGA. Contractor shall respond within four (4) hours of service call for call deemed “Emergency” by CGA Fire Marshal. Emergency calls for service include broken sprinkler heads or piping, fire pumps inoperable or instances where there is a degradation of Life Safety systems that affect the safety of CGA personnel. Routine calls for service may be handled during the next available business day or at a mutually agreed time by the contractor and CGA Fire Marshal 3.3 Contractor shall furnish all labor, materials, tools, equipment, supervision and transportation necessary to perform Service Calls, Testing and Inspection as indicated in paragraph 3.2 and Section 4 of the Performance Work Statement. Funding for Service Call(s) and Repair Work will not be obligated upon award of the contract. Service Calls and Repair Work within the scope of this contract shall be conducted as a Task Order and funded on as needed basis.

3.4 Contractor shall submit a Maintenance Approach and will be evaluated in accordance with FAR Clause 52.212-2 Evaluation.

3.5 Contractor shall submit sample test and inspection reports listed below as part of Factor 1: Maintenance Approach of FAR 52.212-2. While used as part of contract award evaluation process, ALL reports must be approved by the CGA Fire Marshal prior to execution of first scheduled inspection or test.

1. Quarterly Sprinkler and Standpipe Systems Inspection and Test.

2. Annual Sprinkler and Standpipe System Inspection and Test.

3. Monthly Backflow Prevention Devices Inspection.

4. Annual Backflow Prevention Inspection and Test.

5. Electric Fire Pump Weekly Inspection and Test.

6. Diesel Fire Pump Weekly Inspection and Test.

7. Fire Pump Annual Flow Test.

8. Annual Fire Hydrant Test and Inspection.

9. Semi-annual maintenance of CGA Dry Sprinkler System compressors

3.6 IAW Factor 2: Personnel Qualifications, of FAR Clause 52.212-2, Contractor shall provide evidence of all certification, permits, applicable licenses and insurance required by the State of Connecticut to inspect, test, maintain and repair all systems, devices and hydrants covered by this PWS.

3.7 Contractor shall submit a list of past and present customers within the last five (5) years; with a point of contact information; listing size and number of systems serviced. This list will be used to contact references and evaluate contractor for Factor 3, Past Performance of FAR Clause 52.212-2.

4. INSPECTIONS

4.1 The contractor shall conduct a complete and comprehensive inspection of

USCGA sprinkler systems, standpipe systems, and associated piping, valves and supervisory devices within 15 days of contract award. A detailed report of existing conditions in each building will be submitted to the CGA Fire

Marshal via hard copy and PDF on CD/DVD within 10 working days, after completion of this inspection. Report will include make, model and date of manufacture for sprinkler heads, valves and supervisory devices as well as any discrepancies found during inspections

4.2 Four (4) quarterly inspections and testing of CGA sprinkler system and standpipe systems and all its components IAW NFPA 25 (Current Edition). The results of the inspection and testing shall be documented in a detailed quarterly report. All Quarterly inspections WILL include a main drain test per CGA Fire Marshal. The main drain test may be waived by the CGA Fire Marshal if freezing temperatures exist and would create a hazardous situation to CGA personnel.

4.3 One (1) Annual inspection and testing of sprinkler and standpipe systems and their components IAW NFPA 25 (Current Edition). The results of the additional testing and inspection will be included with the annual report.

NOTE: It is the responsibility of the contractor to ensure that an elevator contractor is available to provide access to elevator shafts for sprinkler system inspection and testing.

4.4 Monthly inspection of CGA backflow prevention devices IAW NFPA 25 (Current Edition) 13.6.1. See Appendix B for list of CGA backflow devices.

4.5 Annual backflow preventer inspection and testing IAW NFPA 25 (Current Edition) 13.6.2. The results of the inspection and testing shall be documented in an annual report. Backflow testing will include a forward flow test and a friction loss test on an annual basis. See Appendix B for list of CGA backflow devices.

4.6 Annual flow testing and inspection of ALL the CGA fire hydrants. This testing will include inspection and operation of Hydrant Control Valves along with recording hydrant static pressure and hydrant pitot pressure. See Appendix C for hydrant list.

4.7 Semi-annual maintenance of CGA Dry Sprinkler System compressors located in Chase Hall B Annex (2), Child Development Center (1), and Yeaton Hall (1). IAW manufactures recommendations and applicable standards.

4.8 Weekly running and testing of the Chase Hall A and Chase Hall E Annex fire pump IAW with manufacturer’s recommendations and IAW NFPA 25 (Current Edition) Chapter 8 .

4.9 Annual flow testing of the Chase A and Chase E Annex fire pump IAW NFPA 25 (Current Edition) 8.3.3 .

4.10 All Inspection and Testing Reports shall be received at the below address within 10 calendar days of inspection or testing completion. Inspection and testing reports shall include a written estimate to effect repairs for each discrepancy found.

4.11 All inspection and testing reports shall be in the following format: One (1) hard copy and one (1) PDF format delivered via CD/DVD.

Exception: The weekly fire pump reports shall be a hard copy faxed to (860) 444-8219 AND a PDF format delivered via email to the CGA Fire Marshal.

4.12 Weekly fire pump testing and inspection reports shall be received within 2 business days of conducting the service. ALL discrepancies found shall be conveyed verbally to CGA Fire Marshal prior to contractor departing CGA.

4.13 Report routing. Route reports to:

USCG Academy (mee)

Attn: Fire Marshal

15 Mohegan Ave.

New London, CT 06320

5. ADDITIONAL ITEMS REQUIRED TO BE COMPLETED AT APPROPRIATE DATES DURRING OPTION YEARS TO BE INCLUDED IN BID:

5.1 Conduct 5 year flow and hydrostatic test of ALL standpipe systems at the CGA, IAW NFPA 25 (Current Edition) 6.3.1 and 6.3.2 and provide detailed report of conditions found.

5.2 Conduct 3 year trip test on CGA dry sprinkler systems located in Chase B

(2), Child Development Center and Yeaton Hall. This test will serve as be performed IAW NFPA 25 (Current Edition) 13.4.4.2.2.2 and every three years after.

5.3 Test anti-freeze solution in Chase Hall B Loading Dock IAW NFPA 25 (Current

Edition) 5.3.4, adjust solution as necessary and provide report to CGA Fire Marshal.

This is an annual requirement to be completed during annual inspection.

6. SCHEDULE OF INSPECTIONS

6.1 The first quarterly inspection will be conducted in the month of April.

6.2 The second quarterly inspection will be conducted in the month of July.

6.3 The annual inspection will be conducted in the month of July.

6.4 The third quarterly inspection will be conducted in the month of October.

6.5 The fourth quarterly inspection will be conducted in the month of January.

6.6 The backflow preventer test and inspection will be conducted in the month of July during the annual inspection.

6.7 Fire hydrant inspection, flush and flow testing will be conducted in the month of September.

6.8 Dry system compressor maintenance will be conducted in the months of February and August.

6.9 Annual flow test of the Chase Hall A and Chase Hall E fire pumps will be conducted in the month of July.

6.10 Running of the Chase Hall Echo Fire Pump will be conducted on a weekly basis with a minimum run time of 30 minutes.

6.11 Running of the Chase Hall Alpha Fire Pump will be conducted on a weekly basis with a minimum run time of 10 minutes.

6.12 Conduct monthly inspection of ALL CGA backflow prevention devices in conjunction with a weekly running of CGA fire pumps in Chase A and Chase E Annex.

6.13 Normal work hours are 7:30 a.m. to 4:00 p.m. Monday through Friday, excluding Federal Holidays and on days when special events are being held at the CGA. Inspections, maintenance, and repairs are to be performed during these hours. The contractor should coordinate the inspection schedule with the Coast Guard Academy’s Fire Marshal.

7. BUILDINGS SPRINKLER SYSTEM INVENTORY: The Coast Guard Academy has the following systems: twenty (21) wet, four (4) dry, twenty (16) standpipe systems and twenty (21) backflow prevention assemblies. Each building is considered to have its own system. (The intent is to cover the PMS requirements for the entire Academy). Changes to current list of CGA systems due to construction or renovations will require a modification to the contract. See attached Appendix A for list of systems.

8. ADDITIONAL GENERAL REQUIREMENTS.

8.1 The contractor is to provide a copy of the company’s current license and insurance and that of its employees conducting, inspection, testing and repairs under of the terms of this contract prior to the commencing of work under the contract.

8.2 Government Inspection. All work completed under this contract shall be subject to inspection by the Contracting Officer, or CGA Fire Marshal during and after completion of each task. Unsatisfactory work shall be corrected at no additional cost to the government.

8.3 Access to the Coast Guard Academy may vary depending on the existing state of alert. The contractor may expedite access to the Academy by providing a list of names to the Fire Marshal at least 24 hours prior to inspection. The Fire Marshal will forward the information to the Academy’s security personnel.

8.4 Check-in and Check-out Procedure. At the beginning of each service visit to the Coast Guard Academy, Contractor personnel shall report in person to the CGA Fire Marshal at the CG Academy Fire marshal Office in the Sail Loft during normal work hours (7:30 am EST through 4:00pm EST). Contractor personnel will pick up necessary keys for the day and a radio for communication. Contractor will provide a cell phone number to be used in the event radio communications are hampered by location. This radio/phone number will be used to maintain communications with main gate and CGA Fire Marshal, address questions or problems that may arise and update CGA Fire Marshal on work progress.

8.5 FAR Clause 52.222-41 requires the contractor to pay, at a minimum, the prevailing wage(s) and fringe benefits as determined by the Department of Labor’s Wage Determination.

8.6 Contractor shall ensure that when water is discharged via hydrants, main drains or other means; ALL precautions are taken and preventative measures are in place as to not disturb or destroy CGA grounds. Hoses and dispersing devices shall flow to large grass areas and not directly into storm drains. Contractor WILL be responsible for making repairs and restoring CGA to its pre-testing/inspection condition.

Appendix A 1.

Hamilton Hall: wet system, covering attic, with one (1) DCVA backflow preventer. The system has approximately 80 sprinkler heads. The sprinkler system and associated valves and switches are supervised by the fire alarm system.

2.

Chase Hall Alpha: standpipe, wet system, covering attic, 1st, 2nd and 3rd floors of the North and South Wings, with one (1) DC backflow preventer and electric fire pump. There are approximately 700 sprinkler heads in the building and the entire system is supervised by the fire alarm system.

3.

Chase Hall Bravo: standpipe, three (3) wet systems, and two (2) dry systems, covering all food service areas (including reefers and freezers), first floor, basement and sub basement areas with one (1) Reduced pressure (RP) backflow preventer. There are approximately 789 sprinkler heads covering the areas mentioned. The sprinkler system and associated valves are supervised by the fire alarm system.

4.

Chase Hall Charlie: standpipe, wet system, covering the Uniform Shop, with one (1) RP backflow preventer. The system has approximately 50 sprinkler heads. The sprinkler system flow switch is monitored by the fire alarm system.

5.

Chase Hall Delta: standpipe, wet system, covering attic, with one (1) Double Check Valve Assembly (DCVA) backflow prevention device. There are approximately 50 sprinkler heads covering the attic. The sprinkler system backflow device and flow switch are supervised by the fire alarm system.

6.

Chase Hall Echo: standpipe wet system, covering entire building, with two (2) DCVA backflow preventers and a diesel driven fire pump. The building has approximately 460 sprinkler heads. Sprinkler system and fire pump are supervised by the fire alarm system.

7. Chiller Plant: wet system, covering entire building. There are approximately 17 sprinkler heads and the system is supervised by the fire alarm system.

8.

Michel Hall (Medical): standpipe, wet system, covering attic, with one (1) DCVA backflow prevention device. System has approximately 90 sprinkler heads, backflow prevention device and flow switch are supervised by fire alarm system.

9.

Leamy Hall: standpipe, wet system, covering Auditorium, with one (1) DCVA backflow prevention device. There are approximately 25 sprinkler heads. The backflow device and flow switch are supervised by the fire alarm system.

10.

Johnson Hall: standpipe, wet system, covering entire building (except garage area), with one (1) RP backflow preventer. The system has approximately 175 sprinkler heads. The system and associated valves are supervised by the fire alarm system.

11.

Ida Lewis Hall (Child Development Center): wet and dry (1) systems covering the entire building and attic (dry), with one (1) RP backflow prevention device. System has approximately 390 sprinkler heads and supervisory devices are monitored by fire alarm system.

12.

Maintenance Shop: standpipe, wet system, covering entire building, with one (1) DCVA backflow prevention device. The system has approximately 122 sprinkler heads. The sprinkler system and associated valves are supervised by the fire alarm system.

13.

Paint Shop: wet system, covering entire building, with one (1) DCVA backflow prevention device. There are approximately 12 sprinkler heads and the system is supervised by the fire alarm system.

14.

Pine Hall: standpipe, wet system, covering the first floor and work shop/paint booth areas. There is one (1) DCVA backflow prevention device. System has approximately 90 sprinkler heads. Backflow and flow switch are supervised by the fire alarm system.

15.

Yeaton Hall: standpipe, wet system and one (1) dry system covering entire building, with one (1) DCVA backflow prevention device. System has approximately 575 sprinkler heads and, supervisory devices are monitored by fire alarm system. Dry system covers the attic while wet system covers the rest of the building. Backflow, flow switch and all associated valves are supervised by the fire alarm system.

16.

Roland Hall (Gym): standpipe, wet system, covering entire building, with one (1) DCVA backflow prevention device. There are approximately 1650 sprinkler heads covering the entire building. All valves and switches are supervised by the fire alarm system.

17.

Munro Hall: standpipe, (2) wet systems, covering entire building, with one (1) RP backflow prevention device. There are approximately 640 sprinkler heads. The backflow and associated valves are supervised by the fire alarm system.

18. Satterlee Hall: Standpipe, wet system, covering entire building, with one (1) DCVA back flow preventer. The system has approximately 550 sprinkler heads. The sprinkler system and associated valves and devices are supervised by the fire alarm system.

19. Waesche Hall: Standpipe, wet system with one (1) DCVA backflow prevention device. The backflow and flow switch is supervised by the fire alarm

20. Smith/Dimick Hall: Standpipe with one (1) DCVA backflow prevention device. The backflow and flow switch is supervised by the fire alarm system.

21. Alumni Center: wet system with one (1) DCVA back flow preventer, covering entire building. The system has approximately 125 sprinkler heads.

The system is supervised by the fire alarm system.

APPENDIX B

BACKFLOW PREVENTOR LIST

LOCATION
Size
Type
Model#
Serial#
Alumni Center
6inch
Wilikins
350A
U02289
Chase Bravo
6inch
Ames
4000SS
4CM0872
Chase Charlie
4inch
Febco
825Y
12465
Chase Delta
4inch
Ames/Colt
200A
LF-0393
Chase Echo
8inch
Ames
200
HC-3091
Chase Echo
.5inch
Watts
009 QT
18238
Hamilton Hall
4inch
Ames
Colt 200DC
LC-1303
Ida Lewis (CDC)
4inch
Watts
909
176740
Johnson Hall
6inch
Febco
825YD
14787
Leamy Hall
4inch
Ames
2000SS
169211-
Maintenance Shops
6inch
Ames
3000SS
3JJ1367
Michel Hall
4inch
Ames/Colt
200A
LF-0403
Munro Hall
6inch
Zurn/Wilkins
375
L00213
Paint Shop
2.5inch
Ames/Colt
200A
LH-1913
Pine Hall
4 inch
Ames/Colt
200A
LH-0909
Roland Hall
6inch
Ames
2000SS
2FM0146
Satterlee Hall
4inch
Ames
2001SS
1001979
Smith Hall
6inch
Ames/Colt
200DC
LE-0968
Waesche Hall
4inch
Ames/Colt
200A
LH-0951
Yeaton Hall
6inch
Ames
2000SS
2BM0364
Chase A
8inch
Ames
200DC
KJ-0684

Appendix C

CGA Fire Hydrant List

Updated 01/26/15

NUMBER
Manufacturer
YEAR
LOCATION
Notes

(*Date Installed)

H-1
Mueller
Leamy Hall, North West corner
*2012
H-2
Mueller
Smith Hall, South East corner
*2012
H-3
Mueller
2012
Munro Hall, by West enterance to 4th Deck
*2012
H-4
Mueller
2011
Chase "A" North on Bear Drive
*2011
H-5
Mueller
Chase A, Henley Circle by Medical parking
*2014
H-6
Mueller
2011
Satterlee Hall North on Bear Drive
*2011
H-7
Mueller
2011
Main Enterance by Guard Shack
*2011
H-8
Mueller
2011
Yeaton Hall South on Tampa Drive
*2011
H-9
Mueller
Between Yeaton Hall and Saterlee Hall
*2012
H-10
Mueller
Seneca Drive between Quarters 1 and 2
*2011
H-11
Mueller
Officer's Club main enterance
*2014
H-12
Mueller
Billard Hall, Point League parking lot
*2014
H-13
Mueller
2011
Roland Hall lower parking lot, Dexter Lane
*2011
H-15
Mueller
Pine Hall, South West corner
*2012
H-16
Mueller
2014
McAllister Hall South West by parking lot
*2014
H-17
Mueller
2011
Next 90 Day Storage
*2011
H-18
Mueller
2011
Hamilton Hall North on Bear Drive
*2011
H-19
Mueller
2011
Waesche
*2011
H-20
Mueller
2011
Munro Hall, by Circle and South enterance
*2011
H-21
Mueller
Michael Hall, North
*2012
H-22
Mueller
McAllister Hall South East corner
*2014
H-23
Mueller
Billard Hall by Harriet Lane and Bibbst.
*2012
H-24
Mueller
2011
Billard Hall North by Football Field
*2011
H-25
Mueller
Grounds Shop
*2014
H-26
Mueller
2011
Ball Field near Rail Road
*2011
H-27
Mueller
Visitor Center parking lot
*2014
H-28
Mueller
2011
Seneca Drive between Quarters 3 and 4
*2011
H-29
Mueller
1992
Chase A, Henley Circle by top of circle
H-30
Mueller
2005
Rowing Center
H-31
Mueller
2005
Chase E, North East lower parking lot
H-32
Mueller
By Field House
*2012
H-33
Mueller
2005
Chase E, North West upper parking lot
H-34
Mueller
2011
Hill by Alumni Center
*2011
H-35
Mueller
2011
Maintenance & Paint Shop
H-36
Mueller
2012
Chiller Plant, Bibb & Pickering