REPLACE TILES IN SHOWER UNITS Federal contract opportunity
Solicitation number
HSCG27-13-Q-PCV912
Issued by
Department of Homeland Security US Coast Guard

About this file

Scope of Work revision 1

View the file

Other files for this federal contract opportunity

Other files attached to REPLACE TILES IN SHOWER UNITS, newest first.
File Type Posted
RFQ_Package.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

05/02/2013

SCOPE OF WORK

1. GENERAL REQUIREMENTS: The work consists of providing all labor, materials and equipment as required to remove and replace existing tile work in the 4 shower units located at USCG Station Hobucken, 196 HWY 33West, Hobucken, NC 28537.

2. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: Upon acceptance the contractor shall commence work NLT fifteen (15) days after notice to proceed and work diligently to complete the entire work ready for use by 35 working days after contract award.

3. SCOPE OF WORK:

Provide all labor and materials to remove the existing installed equipment that shall be held for re-installation to include the toilets assemblies w/ valves, and floor drain.

Remove existing installed tile from concrete block walls and prep surface for installation of new 6”X6” tile on walls and smaller, mosaic tiles on the floor. All existing tile shall be disposed of IAW all local, state and federal codes. Contractor shall work with unit to transition through the different shower/heads to allow some in operation at a time as members will be utilizing the berthing rooms. Recommend accomplishing 2 heads at a time and phase in construction. Contractor may tile over existing tile work if feasible and with the use of proper membranes.

New tile of satisfactory, standard grade and of a neutral tan/gray/slate color shall be used and approved by the unit EPO prior to purchasing. Unit has examples of tile and may be the Fall Creek Suede Mosaic porcelain tile or similar. Contractors shall quote the tile for a specific set price with multiple options in that price range. Tile shall cover the area that the existing tile now covers and the rest will remain painted cinder block wall. Grout lines should be applied to provide a clean looking tile finish. Unit will be re-installing the appropriate shower heads, valve body, paper dispensers, towel hooks and shower curtain rods.

Once tile has been installed the grout shall be clear coated for protection.

All removal and installation shall be made in accordance with all current applicable International Code Council, Mechanical, Electrical, Plumbing, Fire Codes, Fuel, Gas and Energy Conservation Codes and shall pass inspection by a Coast Guard Quality Assurance Evaluator, as required. All permitting requirements will be met by the contractor.

4. SITE VISIT: All bidders are strongly encouraged to visit the site to verify any/all quantities before submitting bids. Interested parties shall make arrangements for a site visit with MK1 Joseph Lawrence or MK2 Josh Shoemaker @ (252) 745-3132.

5 . DESIGNATED CONTRACTING OFFICER’S QA EVALUATOR (QAE) REPRESENTATIVE: The designated contracting officer’s QAE representative and Point of Contact for this project is MK1 Joseph Lawrence @ (252)745-3132. Inquiries concerning any phase of the specification before or after award shall be made to DCCS Russell Cox 252-240-8487.

6. CONDITIONS AFFECTING THE WORK: The Offeror should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, the general and local conditions which can affect the cost of the work thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The government will assume no responsibility for any understanding or misrepresentations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the request for quotes, the specification or related documents.

7. AFTER AWARD OF THE CONTRACT: The contractor must immediately notify the contracting officer’s QAE representative of his intended start date. The work shall be done in accordance with the specification.

8. ORAL MODIFICATION: No oral statement of any person other than the contracting officer shall in any manner or degree, modify or otherwise affect the terms of this contract.

9. WORKMANSHIP: All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory to the Contracting Officer.

10. PERMITS: The contractor shall without additional expense to the government, obtain all appointments, licenses, and permits required for the prosecution of the work. The contractor shall comply with all applicable federal, state and local laws.

11. CLEAN UP: All trash and debris shall be removed from the site daily. The job site shall be left in a clean and neat manner.

12. WORK OUTSIDE REGULAR HOURS: If the contractor desires to carry on work on Saturday, Sunday, holidays or outside the unit’s regular hours, must submit their request in writing to the Contracting Officer’s QAE Representative for approval consideration. The contractor shall allow ample time to enable satisfactory arrangements to be made by the government for inspecting the work in progress.

13. UPON COMPLETION OF WORK: Contact the Contracting Officer’s QAE Representative to arrange for inspection/acceptance of work.

14. IDENTIFICATION OF CONTRACTOR PERSONNEL AND VEHICLES: The contractor shall provide a detailed list of all employees to the QAE Representative five (5) days prior to commencing work. The employee list shall contain the employee’s full name, date and place of birth, current address and last four (4) of SSN. The Coast Guard Station Hobucken Security Officer will be given a copy of the employee list and a pass will be issued for entry. Each contractor provided vehicle or towed trailer shall show the contractor’s name so that it is clearly visible on the vehicle. A valid state license plate and safety inspection sticker is required. All vehicles operated on government property shall be maintained in a good state of repair.

15. SAFETY REQUIREMENTS:

1. Responsibilities:

a. All contractors working on CG Station Hobucken shall abide by all federal safety regulations as published by the Occupational Health and Safety Administration, 29 CFR 1910 (series) and 29 CFR 1926 (series). Contractor written safety programs shall be reviewed by the Base Safety Officer prior to starting work.

b. Written notification must be provided to the Station Hobucken Base Safety Officer, MK1 Joseph Lawrence in their capacity as Fire Marshal of any activity that could potentially cause fire or explosion or that changes or reduces the capability of fighting a fire or explosion. Some examples of qualifying activities are: a fire hydrant or fire suppression system that must be taken out of service for any reason, electrical work that affects fire alarm systems, introduction of hazardous or flammable material onto the unit, and blocking of any egress routes or emergency vehicle routes. Inclusion of this information in the contract constitutes written notification as long as the outsource review sheet is signed by Base Safety Officer.

c. Copies of the following must be provided to the Base Safety Officer prior to starting work in affected areas: Confined Space Entry Permits, Hot Work Chits, and Dig Chits. Confined space clearance must be conducted by a certified marine chemist and permit required spaces will have a copy of the permit posted on site during work. Hot work will only be conducted with permission and a fire watch must be posted during work. A facility dig chit is required in addition to a Miss Utility dig chit.

d. Lock Out/Tag Out requires notification and coordination with facilities and will not be conducted by a contractor on Coast Guard Station Hobucken. A Facilities Division representative is required for all contractor Lock Out/Tag Out needs.

2. Rights:

a. Every employee working on Station Hobucken has the right to a safe and healthy work place. The contractor has the responsibility and right to stop unsafe work. QAE’s and the Safety Officer may also institute a work stoppage relating to unsafe practices or immediate danger to life and health situations.

16. ENVIRONMENTAL PROTECTION REQUIREMENTS:

a. All contractors working on Station Hobucken shall abide by all federal environmental regulations as published by the Environmental Protection Agency, 40 CFR (series). Contractor written environmental management and pollution prevention programs shall be reviewed by the Environmental Protection Specialist MK1 Joseph C. Lawrence, prior to starting work and must be in accordance with the Unit Environmental Guide.

b. Written notification must be provided to the Environmental Protection Specialist of any activity that could potentially cause a permit violation on Station Hobucken. Some examples of qualifying activities are: any activity that could result in a spill or discharge into a waterway or introducing a hazardous material into the environment.

c. Copies of the following must be provided to the Environmental Protection Specialist prior to starting work in affected areas: Material Safety Data Sheets, permits, and notices of intent.

d. Hazardous materials used by a contractor are required to be disposed of by that contractor. Disposal must be in accordance with federal, state, and local guidelines.

File details come from the government source that posted it. Updated .