QASP - EPT Firing Range.doc

DOC document 70 KB Posted

Attached to
Potable Bulk Water Delivery Federal contract opportunity
Solicitation number
HSBP1012Q0061
Issued by
Department of Homeland Security Customs and Border Protection

About this file

Bilateral Assessment of Bulk Water Delivery Services

View the file

Other files for this federal contract opportunity

Other files attached to Potable Bulk Water Delivery, newest first.
File Type Posted
PWS_Bulk Water- Firing Range.doc DOC document
SF1449-12.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EL PASO SECTOR FIRING RANGE BULK WATER DELIVERY

QUALITY ASSURANCE SURVEILLANCE PLAN

FOR

El PASO SECTOR FIRING RANGE BULK WATER

El Paso Sector

QUALITY ASSURANCE SURVEILLANCE PLAN

FOR

BULK WATER SERVICES

INTRODUCTION

This Quality Assurance Surveillance Plan (QASP) has been developed to evaluate contractor actions while implementing this SOW. The QASP provides a systematic method to evaluate the services the contractor is required to furnish.

This QASP is based on the premise the government desires to maintain a quality standard in operating, maintaining, and repairing facilities and that a service contract to provide the service is the best means of achieving that objective.

The contractor, and not the government, is responsible for management and quality control actions to meet the terms of the contract. The role of the government is quality assurance to ensure contract standards are achieved.

In this contract the quality control program is the driver for product quality. The contractor is required to develop a comprehensive program of inspections and monitoring actions. The first major step to ensuring a “self-correcting” contract is to ensure that the quality control program approved at the beginning of the contract provides the measures needed to lead the contractor to success.

Once the quality control program is approved, careful application of the process and standards presented in the remainder of this document will ensure a robust quality assurance program.

QUALITY ASSURANCE SURVEILLANCE PLAN

FOR

BULK WATER SERVICES

1. This checklist shall be filled out by the Contractor and submitted to the COR or his representative by the third [traditional] workday following the end of each performance month.

2. Contractor shall sign and date the completed form.

3. COR/Representative shall countersign and date, if in agreement with report. If there are discrepancies, COR/Representative shall so note the Objective and discrepancies noted on this form.

4. COR shall retain original. Contractor, COR Representative, and Contract Specialist shall receive copies of the form.

See the last page for a more detailed list of actions under this quality assurance plan.

MONTH/YEAR: ________________________________

Performance Objective
Standard
PWS Para
Frequency of Actions
Performance Threshold/

Number of Valid Complaints Actual Performance

(√ if threshold met. Attach explanation if not) Penalty imposed After/

% Penalty Imposed

Bulk potable water delivered
CRITICAL:

Maintain bulk potable water tanks at levels sufficient to meet continuous hygienic needs for training attendees.

3.2a & b
Once per week or as needed
No more than 1 customer complaint per service month

2nd Complaint/

5%

Servicing receipts issued for each bulk potable water delivery
Receipts issued per service call to correlate with billing cycle. Receipts shall include, date, time, name, and signature of receiving Border Patrol Agent
3.2c
Per Delivery
No more than 3 customer complaints per month

4th Complaint/

2%

Notification of COR or designated representative if water levels fall abnormally low
Contractor shall perform quality checks to determine if leaks or pipe damage may have compromised the effective operation of the plumbing between the water holding tanks and the places of usage.
3.2d
Per delivery
No more than 2 valid complaints per month

4th Complaint/2%

SUBMITTED:

Date: _________________

Contractor

CONCURRED:

Date: _________________

COR/COR Representative

OR: See Below for Discrepancies (Forward a copy to Contract Specialist)

SURVEILLANCE: The CBP COR shall appoint a quality assurance (QA) person to receive complaints from compound personnel and pass them to the contractor for correction.

STANDARDS: General standards of performance are published in the PWS. More specific standards are noted in the QASP Table above. Violation of these standards and customer complaints shall not exceed the thresholds cited above for each performance objective. The QA shall notify the Contract Specialist for appropriate action in accordance with FAR 52.212.4, Contract Terms and Conditions-Commercial Items (May 1997) or the appropriate Inspection of Services clause, if any of the above performance objectives exceed the customer complaint thresholds. In most cases, this requirement is satisfied by submission of the monthly report. Continued non-compliance may require more a more formal memorandum stating the severity of the violations along with records of discussion with the Contractor.

PROCEDURES: Any CBP employee that observes unacceptable services, either incomplete or not performed, for any of the above performance objectives should immediately contact the QA and the QA will complete appropriate documentation to record the complaint. The QA will consider the customer complaint valid upon receipt from the customer. The QA should inform the customer of the approximate time the unacceptable performance will be corrected and shall advise the customer to contact the QA if not corrected. The QA will consider customer complaints as resolved unless notified otherwise by the customer. The QA shall verbally notify the Contractor to pick up a copy of the complaint. The Contractor will be given two hours after verbal notification to correct the unacceptable performance. If the Contractor disagrees with the complaint after investigation of the site and challenges the validity of the complaint, the Contractor will notify the QA who will conduct an investigation to determine the validity of the complaint. If the QA determines the complaint as invalid, he will document the written complaint of the findings and notify the customer. The QA will retain the annotated copy of the written complaint for his/her files. If after investigation the QA determines the complaint as valid, the QA will inform the Contractor and the Contractor will be given an additional hour to correct the customer complaint. A customer complaint will not be recorded if proper and timely correction of the unacceptable condition(s) is accomplished – unless the complaints become routine. The Contractor shall return the written customer complaint document, properly completed with actions taken, to the QA, who will file the complaint for monitoring future recurring performance. Recurring customer complaints are not permitted for any of the above service items. If repeat customer complaints are received for the same deficiency – and they exceed the threshold for number of complaints - during the service period, the QA should contact the Contract Specialist for appropriate action. The Contract Specialist and Contracting Officer are the only persons permitted to authorize deductions from a Contractor’s invoice.

Corrective Actions: If unsatisfactory performance occurs in the same category for two consecutive months, the Contractor will be required to submit a plan for corrective action to the Contracting Officer. The COR, COR Representative, and Contract Specialist shall also receive a copy of the plan. The COR and COR Representative will monitor that (those) activities closely in that month to insure that the Contractor follows through with the plan for corrective action, and they will note compliance with or deviation from that plan in the month that the plan for corrective action is initiated.

Consequences for Continued Poor Performance: If the Contractor fails to achieve satisfactory performance in at least two of the performance objective areas, the Contracting Officer has the prerogative, upon the recommendation of the COR, to issue a Cure Notice to the Contractor. If the poor performance continues, the Contracting Officer may terminate the contract for cause and re-solicit the snow plowing activity. The former Contractor shall be barred from participation in any re-solicitation action.