HS0021-17-R-0001-0003.pdf

PDF 212 KB Posted

Attached to
DSS Leadership Development Program Federal contract opportunity
Solicitation number
HS0021-17-R-0001
Issued by
Defense Counterintelligence and Security Agency

About this file

Amendment 03

View the file

Other files for this federal contract opportunity

Other files attached to DSS Leadership Development Program, newest first.
File Type Posted
HS0021-17-R-0001-0004.pdf PDF
HS0021-17-R-0001-0004_Conformed.pdf PDF
HS0021-17-R-0001-0003_Conformed.pdf PDF
Preproposal_conference_QandAs_finalized.pdf PDF
HS0021-17-R-0001-0002_Conformed.pdf PDF
HS0021-17-R-0001-0002.pdf PDF
Preproposal_conference_QnA_Draft2Post.pdf PDF
Amendment_01_Conformed.pdf PDF
Amendment_01.pdf PDF
HS0021-17-R-0001_LDP.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The Purpose of this Amendment is to Revise Sections L and M of the Solicitation and extend the due date for quotes from January 26, 2017 to

February 2, 2017.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 8

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Jan-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X HS0021-17-R-0001

X 9B. DATED (SEE ITEM 11)

14-Dec-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Jan-2017

CODE

DEFENSE SECURITY SERVICE

MONICA HURUI

RUSSELL-KNOX BUILDING

27130 TELEGRAPH ROAD

QUANTICO VA 22134

HS0021 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

HS0021-17-R-0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 26-Jan-2017 11:59 AM to 02-Feb-2017 11:59 AM.

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

INSTRUCTIONS TO OFFERORS

L-1. DSS Headquarters on behalf of its HCMO requests your participation in solicitation #HS0021-17-R-0001 for the Leadership Development Program under NAICS 611430 – Professional and Management Development

Training. The Government anticipates a single award indefinite delivery indefinite quantity contract. This contract shall be issued to the Company whose Quote provides the best value to the Government in terms of Past

Performance. The Government is ultimately seeking a company with successful experience in executing Leadership

Development. Vendors shall be evaluated based on the following criteria and guidelines of Section M. Please ensure you have submitted all the following required information in order to be evaluated:

L-2. Factors

1. Past Performance

The vendor shall demonstrate it meets the following criteria within a 30 page limit count.

Vendors shall provide three references for past and on-going work in Government and non-Government contracts for the Leadership Development Program (prime and major subcontracts (in performance or awarded)) during the past three (3) years, which are relevant to the efforts required by this solicitation. Data concerning the prime Vendor shall be provided first, followed by each proposed major subcontractor, in alphabetical order. A major subcontractor is defined as one whose subcontract is for more than 25% of the total proposed price.

1.1. This volume shall be organized into the following sections:

1.2. Contract Description: This section shall include the following information in the following format:

a. Vendor/Subcontractor place of performance, CAGE Code and DUNS Number. If the work was performed as a subcontractor, also provide the name of the prime Vendor and Point of Contact (POC) within the prime Vendor organization (name, and current address, e-mail address, and telephone and fax numbers).

b. Government contracting activity and current address Procuring CO’s name, email address, and telephone and fax numbers.

c. Government’s CO’s Representative (COR) and current e-mail address, telephone and fax numbers.

d. Government contract administration activity and the Administrative CO’s name, and current e-mail address, telephone and fax numbers.

e. Contract Number and, in the case of Indefinite Delivery type contracts, GSA contracts, and Blanket

Purchase Agreements, include Delivery Order Numbers also.

f. Contract Type (specific type such as Fixed Price, Cost Reimbursement, Time & Material, etc. In the case of Indefinite Delivery contracts, indicate specific type (Requirements, Definite Quantity, and

Indefinite Quantity) and secondary contract type (FP, CR, T&M, etc.).

g. Awarded price/cost

h. Final or projected final price/cost

i. Original delivery schedule, including dates of start and completion of work.

j. Final or projected final, delivery schedule, including dates of start and completion work.

1.3. Past Performance: Vendors shall provide a specific narrative explanation of each contract/experience listed in the Contract Description section above, describing the objectives achieved and detailing how the effort is relevant to the requirements of this solicitation.

For any contracts that did not/do not meet original schedule or technical capability performance requirements, provide a brief explanation of the reason(s) for the shortcomings and any corrective action(s) taken to avoid recurrence. The Vendor shall list each time the delivery schedule was revised and provide an explanation as to why the revision was necessary. All Requests for Deviation and Requests for Waiver shall be addressed with respect to causes and corrective actions. The Vendor shall also provide a copy of any Cure Notices or Show Cause Letters received on each contract listed and a description of any corrective action implemented by the Vendor or proposed subcontractor. The Vendor shall indicate if any of the contracts listed were terminated and the type and reasons for the termination.

1.4. Subcontracts: Vendors shall provide an outline of how the effort required by the solicitation will be assigned for performance within the Vendor’s corporate entity and among the proposed subcontractors. The information provided for the prime Vendor and each proposed major sub must include the entire company name, company address, CAGE code, DUNS Number and type of work to be performed by citing the applicable Government

PWS subparagraph number. This includes all subcontractors whose subcontract is for more than 25% of the total proposed price.

1.5. New Corporate Entities: New corporate entities may submit data on prior contracts involving its officers and employees. However, in addition to the other requirements in this section, the Vendor shall discuss in detail the role performed by such persons in the prior contracts cited. Information should be included in the files described in the sections above.

1.6. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Vendor.

2. Technical

The Vendor shall demonstrate it meets the following criteria within a 25 page limit count:

a. Quote clearly demonstrates the Vendor understands and will meet the delivery schedule of the requirement.

b. Quote clearly demonstrates an understanding and integration of the 13 elements essential to this requirement, as stated in the PWS.

c. Quote clearly demonstrates the Vendor will provide appropriate personnel to meet the key personnel requirement. Please provide not more than 10 resumes with a 2 page count limit each to demonstrate. These resumes will not count against the overall page limit for the technical section.

Vendors shall submit Past Performance and Technical in one Adobe PDF file, not password protected. Times

New Roman 12 Font.

3. Price

Sections A-M of the solicitation shall be submitted containing the following criteria with no page limit:

The Quote shall provide pricing for all contract line item numbers (CLINs) listed in Section B of the

Solicitation. Vendor shall include a unit price and an extended/MAX price.

Vendors shall submit the Quote in accordance with 52.212-1 Instructions to Vendors -

Commercial Items. Vendors shall complete all blocks on this solicitation standard form coverpage and all other fill-ins within the solicitation.

Vendors shall submit Price / Sections A-M of the Solicitation in one Adobe PDF file, not password protected.

Times New Roman 12 Font.

4. Subcontracting Plan

It is the Government’s intent that small business concerns have, to the maximum extent practicable, opportunities to participate in contracts consistent with their efficient performance. Vendors shall submit their individual Comprehensive Small Business Subcontracting Plans in accordance with FAR 52.219-9 and

DFARS 252.219-7003. Vendor’s qualified as Small Businesses are not required to submit subcontracting plans. Small businesses shall state their participation as a prime contractor in their Quote. The Vendor shall demonstrate its plans to subcontract at least 50.5% (DoD goal) of its total proposed subcontracting dollars to small businesses, see below for breakout.

Small Business Program Goals

Type Percentage

Small Business 34.5%

HUBZone Small Business 3.0%

Service-Disabled Veteran-Owned Small Business 3.0%

Small Disadvantaged Business 5.0%

Women-Owned Small Business 5.0%

Total 50.50%

If proposed percentages/dollars do not meet the goals above, the Vendor shall include an explanation of why and what actions are being taken to increase percentage/dollars participation to meet them.

Vendors shall submit the Subcontracting Plan in one Adobe PDF file, not password protected. Times New

Roman 12 Font.

L-3. The Government will host a preposal conference on 21 December 2016 to answer industry questions.

Questions shall be submitted by 10AM on 20 December 2016. Please let the Government know by email submission to the below contact by 10AM 19 December 2016 if your company is interested in attending.

L-4. Vendors shall ensure all Quotes are valid through 30 September 2017. All Quotes (including three separate files as stated above) shall be submitted to and received by the below POC by 2 February 2017, 11:59AM Eastern

Time via email. Quotes received late or incomplete may not be evaluated by the Government. By submission of a

Quote, with modifications and revisions, the Vendor is stating ALL terms and conditions of the entire RFQ are accepted and applied to their Quote. Email transmission is not instantaneous and delays in transmission may occur anywhere along the route. The Government takes no responsibility for any delays in the transmission of an email containing a Quote. Please note, DSS reserves the right to not award a contract / cancel a solicitation / resolicit for this requirement for any reason. The POC for this RFQ is:

Monica Hurui

Monica.F.Hurui.civ@mail.mil

(571) 305-6110

SECTION M - EVALUATION FACTORS FOR AWARD

mailto:Monica.F.Hurui.civ@mail.mil

The following have been modified:

EVALUATION FACTORS FOR AWARD

M.1 Evaluation and Source Selection Process

The Government intends to award a contract resulting from this solicitation to the responsible Vendor whose quote represents the best value after evaluation in accordance with the factors. The four (4) evaluation factors are: 1) Past

Performance 2) Technical Capability 3) Price and 4) Small Business Subcontracting Plan. To receive consideration for award, a rating of no less than “Acceptable” must be achieved for the Technical Capability and Small Business

Subcontracting Plan Factors.

Vendors are cautioned that the award may not necessarily be made to the Vendor who provides the lowest price quote. The Government is more concerned with obtaining a superior quality Past Performance of relevant contracts with similar scope, size and complexity than with making an award at the lowest overall price to the Government.

However, the Government will not make an award at a significantly higher overall price to the Government to achieve a slightly superior past performance.

M.2 Evaluation Criteria

The following factors will be used to evaluate offers:

a. Factor 1: Past Performance

b. Factor 2: Technical

c. Factor 3: Price

d. Factor 4: Small Business Subcontracting Plan

M.2.1. Price Evaluation. Initially, quotes shall be ranked according to price, lowest to highest, including any option prices. A quoter’s proposed prices will be determined by multiplying the quantities identified in Section B by the proposed unit price for each Contract Line Item Number (CLIN) to confirm the extended amount for each. The price evaluation will be documented for the reasonableness and affordability of the proposed total evaluated price for the quotes that have received an Acceptable rating from the Technical Capabilities evaluation and received a Substantial

Confidence rating from the Past Performance evaluation as described below in M.2.2. and M.2.3. respectfully.

M.2.2. Technical Acceptability. The Government technical evaluation team (TET) shall evaluate the Technical

Capability volume submitted by the lowest priced quoter on a pass/fail basis, assigning a rating of Acceptable or

Unacceptable. If the vendor’s quote is determined acceptable, the TET will then evaluate the vendor’s Past

Performance as described below in M.3.

M.2.3. Performance Confidence Assessment. Using the references provided, the CO shall seek relevant performance information on the lowest priced quoter, if found Acceptable under M.2.2., based on (1) the past and present efforts provided by the quoter and (2) data independently obtained from other government and commercial sources. The government reserves the right to seek information on higher priced quoter if the lowest priced quoter does not receive a Substantial Confidence performance confidence assessment. If the lowest priced evaluated technically

Acceptable quote is determined to have a Substantial Confidence performance confidence assessment, that quote represents the best value for the government and the evaluation team will only evaluate further quotes for the purpose of determining adequate price competition to determine prices fair and reasonable. The evaluation process then stops at this point. Award shall be made to that lowest priced quoter without further consideration of any other quotes.

M.2.3.1. Relevant performance includes performance of efforts involving Leadership Development Programs that are similar or greater in scope, magnitude and complexity than the effort described in this solicitation. The purpose of the past performance evaluation is to allow the government to assess the quoter’s ability to perform the effort described in this RFQ, based on the quoter’s demonstrated present and past performance. The assessment process will result in an overall performance confidence assessment of Substantial Confidence, Satisfactory Confidence, Limited Confidence, No Confidence, or Unknown Confidence. Past performance regarding predecessor companies, key personnel who have relevant experience, or subcontractors that will perform major or critical aspects of the requirement will be rated as highly as past performance information for the principal quoter. Vendors with no relevant past or present performance history shall receive the rating "Unknown Confidence," meaning the rating is treated neither favorably nor unfavorably.

M.3 Factor 1 – Past Performance

The Government is seeking to determine how well the Vendor has performed in the execution and completion of

Contracts of similar size, scope and complexity to those identified in the solicitation. The Past Performance Factor will assess the extent to which the Vendor’s past performance reflects knowledge, technical and project managerial proficiency. The Government will conduct a past performance assessment based on the quality, relevancy and confidence of the Vendor's past performance, as well as that of its major subcontractors, as it relates to the probability of successful accomplishment of the required effort.

The Government will evaluate Past Performance using the information submitted in the Past Performance

References required in Section L.2 Factor 1. Past Performance. The Government will assess the extent to which the

Vendor’s past performance reflects effective methods to control schedule and cost to meet all project objectives in their past performance. The extent of satisfaction of end users with contract deliverables and overall Vendor’s service as well as business-like concerns for Government’s interest will also be evaluated. Also evaluated will be the record of compliance with previous contract requirements, accuracy and timeliness of reports, technical excellence, and quality awards/certificates. The extent to which past performance reflects good operational support, reliability, and responsiveness to technical direction, initiative, and adequacy of resources will be evaluated. The

Past Performance evaluation will assess the relative risks associated with a Vendor's likelihood of success in performing the solicitation's requirements as indicated by that Vendor's record of past performance. Past performance information on work for State and local governments, private sector clients, and subcontractors that is similar to the Government requirement will be evaluated equally with similar Federal contracts.

In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the

Past Performance Information Retrieval System (PPIRS), including Vendor Performance Assessment Reporting

System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Vendor’s quote, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract

Reporting System (eSRS), and any other known sources not provided by the Vendor.

M.3.1. Ratings. Factor 1 (Past Performance) will be evaluated using the following ratings in Table 1 and 2 below.

Table 1 provides rating definitions concerning the relevancy of past performance information. Table 2 provides rating definitions reflecting the quality and usefulness of the past performance information.

Table 1

Past Performance Relevancy Ratings

Rating Definition

Very Relevant

Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.

Relevant

Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Somewhat Relevant

Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.

Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

Table 2

Rating Description

Substantial Confidence

Based on the Vendor’s recent/relevant performance record, the Government has a high expectation that the

Vendor will successfully perform the required effort.

Satisfactory Confidence Based on the Vendor’s recent/relevant performance record, the Government has a reasonable expectation that the Vendor will successfully perform the required effort.

Limited Confidence record, the Government has a low expectation that the

Vendor will successfully perform the required effort.

No Confidence record, the Government has no expectation that the

Vendor will be able to successfully perform the required effort.

Unknown Confidence (Neutral)

No recent/relevant performance record is available or the

Vendor’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.

M.4 Factor 2: Technical

a. The delivery schedule requirement will be assessed on a go / no go basis. If the quote demonstrates it will meet the delivery schedule requirements, it will receive a “go” and be rated technically acceptable. If it does not meet the requirement, it will not be evaluated any further and rated technically unacceptable.

b. The 13 elements requirement will be assessed on a go / no go basis. If the quote demonstrates it meets the

13 elements requirement, it will receive a “go” and be rated technically acceptable. If it does not meet the requirement, it will not be evaluated any further and rated technically unacceptable.

c. The key personnel requirement will be assessed on a go / no go basis based on resumes submitted. If the quote demonstrates it will meet the key personnel requirement, it will receive a “go” and be rated technically acceptable. If it does not meet the requirement, it will not be evaluated any further and rated technically unacceptable.

Technical Rating

Acceptable Quote clearly demonstrates it meets all technical requirements

Unacceptable Does not meet all technical requirements

M.5 Factor 3: Price

The price proposed will be evaluated for fair and reasonable, but not rated or scored.

For evaluation purposes only, the Government will add the proposed pricing for CLIN 0001 at a MAX QTY of 1, CLIN 0002 at a QTY of 10, CLIN 0003 at a QTY of 5, CLIN 0004 at a MAX QTY of 4, and CLIN 0005 at a MAX

QTY of 1 to assist in the determination of fair and reasonable pricing ONLY.

Failure to provide detailed pricing may be grounds for quote nonconformance. While price will not be scored, it will be evaluated for price reasonableness. Additionally, a determination will be made if there is any significant performance risk to the Government because of unrealistically low or high prices. If Price information is included in any volume other than Price, that volume may not be evaluated.

M.6 Factor 4: Small Business Subcontracting Plan

The Vendor’s Comprehensive Small Business Subcontracting Plan will be evaluated against the DoD Small

Business goals as defined in Section L. Small Business Vendors submitting as a Prime Contractor for this

Solicitation will automatically be considered acceptable for this factors. The Vendor will be evaluated on the extent of participation of Small Business concerns in performance of this contract opportunity. Factor 4 will be evaluated as follows using an Acceptable/Unacceptable rating:

1) If proposed percentages/dollars meet the DoD goals, then an acceptable rating will be given.

2) If proposed percentages/dollars do not meet the DoD Goals, the Offer shall include an explanation describing why and what actions are being taken to increase the percentage/dollars. If the Vendor provides a valid justification and adequately describes the actions being taken to increase percentage/dollars, then an acceptable rating will be given.

3) If proposed percentages/dollars do not meet the DoD Goals and the Vendor does not provide a valid explanation as to why or describe actions being taken to increase percentage/dollars, then an unacceptable rating will be given.

Small Business Subcontracting Plan Rating

Acceptable Quote Meets the minimum requirements of the solicitation.

Unacceptable Quote Does not meet the minimum requirements of the solicitation.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .