HRMC-022-21 PACKAGE_Redacted.pdf

PDF 612 KB Posted

Attached to
Dive Boat Repair Federal contract opportunity
Solicitation number
N3225321Q0065
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document package includes a work specification and a presolicitation notice for dive boat repair services. The Navy seeks a contractor to service one 60-foot dive boat in accordance with work specification HRMC-022-21, which is included and outlines the required scope of work. The work must take place at the contractor's facility. This is intended as a 100% total small business set-aside. The presolicitation notice is issued in accordance with FAR 15.202 and invites interested small businesses to submit capability statements by July 16, 2021 to be evaluated for technical merit and consideration for the solicitation, which is intended to be posted for at least 10 days starting on July 16. Interested parties must be registered in SAM and meet the small business requirements for NAICS code 336611.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

HRMC (NMD)

SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED

SPECIFICATION NUMBER: HRMC-022-21

INCLUDES ALL CHANGES THROUGH 7/15/2021

INDEX

HRMC-022-21

ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.

CATEGORY I. FY-22 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.

ITEM NO. TITLE CHANGE DATE CHANGE

009-01 General Criteria; accomplish 10/01/2019 Original

009-02 Environmental Compliance Report for Material Usage; accomplish 10/01/2019 Original

009-03 Toxic and Hazardous Substance; control 10/01/2019 Original

009-04 Quality Management System; provide 10/01/2019 Original

009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;

accomplish

03/06/2020 Original

009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping;

accomplish

02/21/2021 CH-1

009-08 Shipboard Fire Protection and Fire Prevention; accomplish 02/21/2021 CH-1

009-10 Asbestos-Containing Material (ACM); control 10/01/2019 Original

009-18 Mine Warfare Ships Magnetic Material; control 04/30/2018 Original

009-19 Provisioning Technical Documentation (PTD); provide 10/01/2018 Original

009-20 Government Property; control 10/01/2017 Original

009-21 Logistics and Technical Data; provide 10/01/2018 Original

009-23 Interference; remove and install 10/01/2018 Original

009-24 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness;

accomplish

10/01/2019 Original

009-34 Fire Protection of Unmanned Vessel at Contractor Facility; accomplish 10/01/2018 Original

009-39 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for Commercial Equipment/Component; accomplish

10/01/2018 Original

009-40 Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a Naval Facility; provide

10/01/2019 Original

009-60 Schedule and Associated Reports for CNO Availabilities; provide and manage 02/21/2021 CH-1

009-61 Shipboard Use of Fluorocarbons; control 07/18/2014 Original

009-67 Integrated Total Ship Testing; manage 04/30/2018 Original

009-69 Heavy Weather/Mooring Plan; provide 04/30/2018 Original

009-70 Confined Space Entry, Certification, Fire Protection, Fire Prevention and

Housekeeping for Unmanned Vessels; accomplish

10/01/2019 Original

009-72 Physical Security at a Private Contractor Facility; accomplish 10/01/2019 Original

009-73 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, and repair

10/01/2018 Original

009-74 Occupational, Safety and Health Plan; accomplish 02/21/2021 CH-1

009-80 Ship Facilities; maintain 11/18/2016 Original

009-81 Compartment Closeout; accomplish 10/01/2019 Original

009-82 Installation of Equal Component Vice Specified Component; report 03/26/2018 Original

009-84 Threaded Fastener Requirements; accomplish 03/06/2020 Original

009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution

Prevention Act (PPA) Information; provide

03/06/2018 Original

009-99 Ship Departure Report; provide 07/18/2014 Original

009-100 Ship's Stability; maintain 03/06/2018 Original

009-101 Ship Transit and Berthing; accomplish 03/26/2018 Original

ITEM_NO. TITLE CHANGE DATE CHANGE

009-106 Work Authorization Form Coordinator (WAFCOR); provide 10/01/2017 Original

009-109 Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish 10/01/2017 Original

009-110 Non-Nuclear Work on a Nuclear Vessel; accomplish 11/18/2016 Original

009-111 Schedule and Associated Reports for non-CNO Availabilities; provide and manage

02/21/2021 CH-1

009-117 Combat Systems, Light-Off Suport; provide 10/01/2019 Original

009-118 CG Deck Loading; accomplish 07/18/2014 Original

009-120 Fact Finding and Critique of Unplanned Event; manage 03/06/2018 Original

009-122 Temporary Padeye; install and remove 10/01/2018 Original

009-125 Boats Less Than 65 Feet Long; accomplish 07/11/2020 Original

099-40PH Additional Requirements for Contractor Cranes, Multi-Purpose machine, and

Material Handling Equipment at Joint Base Pearl Harbor Hawaii; accomplish

09/28/2020 Original

099-69PH Pier Laydown for Pearl Harbor Naval Shipyard & IMF (PHNSY & IMF) Availability;

accomplish

Original

ITEM NO. TITLE

Hazardous Waste Produced on Naval Vessels; control077-11-001

Voids, Tanks; open and inspect123-11-001

Watertight Hatch; repair167-11-001

Dive Platform; repair179-11-001

Main Engines and Reduction gears; inspect, repair, and service233-11-001

Propeller; repair245-10-001

Generator; inspect, repair, and service311-21-001

Air Conditioning Unit; repair514-31-001

Transfer of Boat Custody; accomplish583-11-001

60-Foot Dive Support Boat Components; replace583-31-001

Push Knee; inspect and repair611-11-001

Fender; replace611-11-002

Lifelines and Stanchions; repair612-11-001

Dive Support Boat Exterior; clean, inspect, repair, and preserve631-11-001

Nonskid; repair634-11-001

Drydocking, Undocking; accomplish997-11-001

ITEM NO: 077-11-001

COAR: 16 PCN: OD01-L115

CMP: NONE

SSP: HRMC-022-21 1 of 5 ITEM NO: 077-11-001

1. SCOPE:

1.1 Title: Hazardous Waste Produced on Naval Vessels; control

1.2 Location of Work:

1.2.1 Throughout the Ship

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Resource Conservation and Recovery Act (RCRA)

2.2 Federal Hazardous Materials Transportation Act, 49 U.S.C. 5103

2.3 Applicable Hazardous Waste Manifest Form

2.4 10 U.S.C. 7311

3. REQUIREMENTS:

3.1 Manage and dispose of all hazardous waste listed in 3.5 in accordance with 2.1 and 2.2.

3.1.1 When a Navy generator number is required by this Work Item, submit the original of 2.3 to the SUPERVISOR for assignment of Environmental Protection Agency (EPA) or delegated state environmental agency identification number.

3.1.2 Manage and transport for Navy disposal, Navy-generated

hazardous waste listed in 3.5 in accordance with 2.1 and 2.2, as designated by the SUPERVISOR.

3.1.3 Submit one legible copy of 2.3 signed by the owner or operator of the disposal facility to the SUPERVISOR within 48 hours of receipt from owner or operator of disposal facility.

3.2 Complete documentation required by 2.1 and 2.2, using EPA or delegated state environmental agency identification number in accordance with 2.4.

3.2.1 Documentation related to hazardous waste generated solely by the physical actions of Ship's Force or Navy employees (termed Navy- Generated Hazardous Waste) on board the vessel shall only bear a generator identification number issued to the Navy pursuant to applicable law. The contractor shall obtain SUPERVISOR'S concurrence with the categorization of the waste as Navy-generated before completion of the manifest. The manifest prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.

3.2.2 Documentation related to hazardous waste generated solely by the physical actions of contractor personnel (termed Contractor- Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law.

Regardless of the presence of other material in or on the shipboard systems or structure which may have qualified a waste stream as hazardous, where the contractor performs work on a system or

SSP: HRMC-022-21 2 of 5 ITEM NO: 077-11-001 structure using materials (whether or not the use of such materials was specified by the Navy) which by themselves would cause the waste from such work to be a hazardous waste, documentation related to such waste shall only bear a generator number issued to the contractor.

3.2.3 Documentation related to hazardous waste generated by the combined physical actions of Navy and contractor personnel (termed Co-Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law and shall also cite in the remarks block a generator identification number issued to the Navy pursuant to applicable law. When the contractor merely drains a system and such drainage creates hazardous waste or the contractor performs work on system or structure using materials which by themselves would not cause the waste from such work to be hazardous waste but such work nonetheless creates a hazardous waste, documentation related to such waste shall bear a generator identification number issued to the contractor and shall also cite in the remarks block a generator identification number issued to the Navy. The contractor shall sign the generator certification on the Uniform Hazardous Waste Manifest whenever use of the manifest is required for disposal. The contractor shall obtain SUPERVISOR's concurrence with the categorization of the wastes as co-generated before completion of the manifest. Manifests prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.

3.3 If the contractor, while performing work at a Government facility, cannot obtain a separate generator identification number from the state in which the availability will be performed, the contractor shall notify the SUPERVISOR within three business days of receipt of written notification by the state. After obtaining approval of the SUPERVISOR, the contractor shall use the Navy site generator identification number and insert in the remarks block the contractor generator identification number issued for the site where his main facilities are located.

3.4 If, for availabilities at a contractor-owned or controlled facility, the Navy cannot obtain a separate generator identification number for use at a contractor facility, the Navy shall notify the contractor within three business days of receipt of notification by the state. The contractor shall dispose of hazardous waste in accordance with 2.1, 2.2, and 3.2.3.

3.5 Hazardous waste, as identified in 2.1, expected to be produced during performance of this Job Order:

AMOUNT

TYPE NAVY CO-GENERATED CONTRACTOR

Acid Solutions (may include _____ ____________ __________ spent sulfamic, citric, chromic, nitric, sulfuric, hydrochloric, etc.)

Ethylene Glycol (Antifreeze) _____ ____________ __________

Sodium Hydroxide _____ ____________ __________

Cleaning Solvents _____ ____________ __________

SSP: HRMC-022-21 3 of 5 ITEM NO: 077-11-001

Sodium Phosphates (Tri, Bi, _____ ____________ __________ or Mono)

Fluorocarbons _____ ____________ __________

Morpholine _____ ____________ __________

Sodium Chromates _____ ____________ __________

Hydrazine _____ ____________ __________

Methyl Ethyl Ketone _____ ____________ __________

Spent Abrasive Blast Material _____ ____________ __________

(contaminated with a known hazardous waste)

Trichloroethane _____ ____________ __________

Miscellaneous Chemicals _____ ____________ __________

(Rust Preventative)

Miscellaneous Chemicals _____ ____________ __________

(Corrosive)

Miscellaneous Chemicals _____ ____________ __________

(TCLP Toxic)

Miscellaneous Chemicals _____ ____________ __________

(Reactive)

Oil (Synthetic) _____ ____________ __________

Paints (Enamel, Latex, _____ ____________ __________

Epoxy, thinners, oil based, rubber paint, non-skid, lacquer, remover, varnishes)

Paints (May include lead, _____ ____________ __________ cadmium, or chrome)

Paint Strippers (phenols, _____ ____________ __________ lead, chromium)

Sludges (Contaminated with _____ ____________ __ a known hazardous waste)

Wool Felt (contaminated _____ ____________ __________ with chromium and PCB's)

Lube/Fuel Oil Soaked Rags _____ ____________ __________

Paint/Flakes (Pressure Washing _____ ____________ __________

Ext Hull Surfaces)

Fuel Oil(Residual) _____ ____________ __________

Bilge Water _____ ____________ __________

SSP: HRMC-022-21 4 of 5 ITEM NO: 077-11-001

Oil/Water _____ ____________ __________

AFFF/Water _____ ____________ __________

MEK Contaminated Rags _____ ____________ __________

3.5.1 Provide zero dollars for managing and disposing of all

hazardous waste listed in 3.5. Total cost greater or less than above dollar amount will be the subject of an equitable adjustment.

3.6 Submit one legible copy, in approved transferrable media of a report identifying type, amount, and disposal cost of waste listed in 3.5 that was removed during the performance of this Job Order to the SUPERVISOR.

3.6.1 The report shall include analysis or other method used to identify the waste and state whether each listed waste was hazardous (with generator assignment), non-hazardous, or did not exist.

3.6.1.1 Chemical analysis shall be accomplished by laboratories with state or EPA approved quality assurance programs.

3.6.2 The contractor shall make an effort to minimize hazardous waste generation by reducing the volume or toxicity by neutralizing, recycling, or otherwise removing it from the requirements of Subtitle C of 2.1 and include a description of such efforts in the report.

3.7 Nothing contained in this Work Item shall relieve the contractor from complying with applicable federal, state, and local laws, codes, ordinances, and regulations, including the obtaining of licenses and permits in connection with hazardous waste handling and disposal in the performance of this contract.

4. NOTES:

4.1 The waste listed in 3.5 is based on the best information available at the time of preparation of the solicitation. Hazardous waste generated during the actual performance of the work may vary in type or amount from waste listed in 3.5 which may result in renegotiation for credit or increase pursuant to Paragraph (b) of 2.4. The contractor is expected to use best management practice to identify and dispose of all hazardous waste. Some of the substances listed in 3.5 may be neutralized, recycled, or otherwise removed from the requirements of Subtitle C of 2.1. Inclusion of these substances in the waste listed in

3.5 does not preclude the contractor from taking action consistent with

2.1 to reduce or eliminate the hazardous constituents of any waste required to be disposed of under the contract in accordance with 2.2.

Processes that add hazardous constituents to the bilges may require that bilge water be disposed of as a hazardous waste.

4.1.1 The types and amounts of wastes listed in 3.5 are estimates of waste to be disposed of under this contract as required by 2.4. They are not estimates of the amount of the work involved in generating that waste. The work requirements of each individual Work Item specify the actual work to be accomplished.

4.2 Hazardous wastes are determined by one or more of the following methods:

4.2.1 Chemical analysis which shows that the material

characteristics of ignitability, corrosivity, reactivity, and/or toxicity (Toxicity Characteristic Leachate Procedure - TCLP) exceed the limits for that material in 40 CFR 261.20 Subpart C.

SSP: HRMC-022-21 5 of 5 ITEM NO: 077-11-001

4.2.2 Reference to a Material Safety Data Sheet (MSDS), or

4.2.3 Applying knowledge of the hazardous characteristics of the waste in light of the materials or the process used.

4.3 Asbestos, bilge water, oil/water including sludge, debris and other contaminants, sludge which includes solids and sludge from ballast tanks, CHT tanks, voids, oily waste tanks, fuel ballast tanks, fuel oil tanks, skegs (West coast), PCB's (Maryland), etc., apply only in those states listing them as hazardous waste. When an availability is to be performed in a state where these items are hazardous waste, an estimate of the amount to be generated shall be included in 3.5.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.

ITEM NO: 123-11-001

COAR: 16 PCN: OD01-L096

OD01-L101

OD01-L100

OD01-L109

OD01-L099

SSP: HRMC-022-21 1 of 2 ITEM NO: 123-11-001

1.1 Title: Voids, Tanks; open and inspect

1.2 Location of Work:

1.2.1 Throughout

1.3 Identification:

1.3.1 Starboard Fuel Tank

1.3.2 Port Fuel Tank

1.3.3 Gray Water Tank

1.3.4 Black Water Tank

1.3.5 Potable Water Tank

2. REFERENCES:

2.1 Standard Items, (FY-22)

2.2 200-593-001, Black/Gray Water System Layout

2.3 29 CFR Part 1915, Occupational Safety and Health Standards for Shipyard Employment

3. REQUIREMENTS:

3.1 Open, ventilate, empty, and render dry all voids and tanks listed in

1.3 using 2.2 through 2.3 for guidance.

3.1.1 Dispose of all liquids and wastes in accordance with all federal, state and local laws, codes, ordinances or regulations.

3.1.1.1 Remove and dispose of system fluids. Contractor shall accomplish the removal, storage of and commercial disposal of fluids produced by the execution of this work item.

3.2 Provide the services of a certified marine chemist to accomplish gas free certification for "Safe for Entry" of each tank listed in 1.3.

3.3 Accomplish a visual inspection of the tanks listed in 1.3 for structural integrity, deterioration, pitting, cracks, and areas of damage or distortion, including tank vents, overflows, piping, structural members, covers, hoses, hose clamps and foundations.

3.3.1 Submit one legible copy, in hard copy or approved transferable media, of a report listing results of the requirements of 3.3 to the

SUPERVISOR.

3.4 Inspect tanks listed in 1.3 for cleanliness. Accept/reject criteria:

Cleanliness is defined as no visible or detectable by touch of oil, grease, debris or any surface contaminants.

3.5 Replace all hoses and hose clamps on tanks listed on 1.3.3 through

SHIP: PHNSY/IMF (RMC 32253)

SSP: HRMC-022-21 2 of 2 ITEM NO: 123-11-001

1.3.5 using 2.2 as guidance s directed by the SUPERVISOR..

(I)(G) "COMPLETION AIR TEST"

3.6 Accomplish the requirements of 009-25 of 2.1 for air test of the equipment listed in 1.3. Test pressure shall be 2 PSIG and shall be maintained 15 minutes, prior to the start of the test, to accommodate temperature stabilization. After temperature stabilization, the test pressure shall be held for 10 minutes. Allowable drop in pressure: None.

3.6.1 Submit one legible copy, in hard copy or electronic media, of a report listing results of the requirements of 3.5 to the

SUPERVISOR.

3.7 Upon notification by the SUPERVISOR, reinstall and secure the covers to all voids and tanks listed in 1.3 using new gaskets and fasteners similar and or equal to existing.

3.8 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces to match surrounding areas.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

ITEM NO: 167-11-001

COAR: 16 PCN: OD01-L095

SSP: HRMC-022-21 1 of 2 ITEM NO: 167-11-001

1.1 Title: Watertight Hatch; repair

1.2 Location of Work:

1.2.1 Main Deck

1.3 Identification:

1.3.1 Quantity (One EA), ForeDeck Hatch

1.3.2 Quantity (2 EA), Aft Deck Hatches

2. REFERENCES:

2.1 Standard Items, (FY 22)

2.2 200-110-001 Rev 1, hull And Deck Framing

2.3 2466-0006, 30" X 30" Square Hinged "K" Style ALUM Cast Hatch

3. REQUIREMENTS:

3.1 Accomplish the requirements to clean, Inspect and repair deck hatch assemblies including seating surfaces identified in 1.3 located in 1.2 using 2.2 and 2.3 as guidance.

3.1.1 Chip and grind surfaces flush in way of repairs.

3.2 Accomplish the requirements of 009-12 of 2.1, including Table 3, Column C, Lines One through 7, for seating surface repair.

3.2.1 Accomplish nondestructive testing in accordance with Line 10 on all new welds. Criteria: No signs of cracks and or deformation allowed.

3.2.2 Replace with new gasket, bushings, and apply new grease using

2.2 and 2.3 for guidance.

(I)(G) "CHALK TEST"

3.3 Accomplish the requirements of 009-25 of 2.1 for a chalk test of the watertight deck hatch. Chalk imprint shall be centered with 100 percent contact.

(V)(G) "OPERATIONAL TEST"

3.4 Accomplish an operational test of each disturbed watertight door listed in 1.3. Operate through 3 complete cycles, with no sticking or binding permitted.

3.5 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 None

5. GOVERNMENT FURNISHED MATERIAL (GFM):

SSP: HRMC-022-21 2 of 2 ITEM NO: 167-11-001

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

ITEM NO: 179-11-001

COAR: 16 PCN: OD01-L094

SSP: HRMC-022-21 1 of 1 ITEM NO: 179-11-001

1.1 Title: Dive Platform; repair

1.2 Location of Work:

1.2.1 Throughout the Ship

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items, (FY-22)

2.2 200-169-010 Rev 2, Swim Platform Details

3. REQUIREMENTS:

3.1 Remove existing and install new Dive Platform hinge assemblies using

2.2 for guidance.

3.1.1 Chip and grind surfaces flush in way of repairs.

3.2 Accomplish the requirements of 009-12 of 2.1, including Table 3, Column C, Lines One through 7 for new installations.

3.2.1 Accomplish nondestructive testing in accordance with Line 10 on all new welds. Criteria: No signs of cracks and or deformation allowed.

3.3 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 None

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

ITEM NO: 233-11-001

COAR: 16 PCN: OD01-L091

OD01-L093

SSP: HRMC-022-21 1 of 3 ITEM NO: 233-11-001

1.1 Title: Main Engines and Reduction gears; inspect, repair, and service

1.2 Location of Work:

1.2.1 Engine Compartment

1.3 Identification:

1.3.1 Quantity (One EA): Port Diesel Engine, Make: Cummings, Model:

QSL9 MCD Rating, 400 HP @ 2100 RPM S/N: 74013047

1.3.2 Quantity (One EA): Starboard Diesel Engine, Make: Cummings, Model: QSL9 MCD Rating, 400 HP @ 2100 RPM S/N: 74012796

1.3.3 Quantity (One EA):Port Main engine Reduction Gear, ZF Marine, Model 325-1, Ratio: 1.727:1 S/N: 20265648

1.3.4 Quantity (One EA):Starboard Main engine Reduction Gear, ZF Marine, Model 325-1, Ratio: 1.727:1 S/N: 20265649

2. REFERENCES:

2.1 Standard Items, (FY-22)

2.2 QSL9 M CM2250 L106, Owners Manual

2.3 Dive Support Boat, Boat Operators Handbook

2.4 233 ZF 3270.325.5272, Operating Maunal

3. REQUIREMENTS:

3.1 Accomplish the requirements of 009-90 of 2.1, for the inspection, repair, and maintenance service requirements of the equipment listed in

1.3 located in 1.2, using Manufactures service manual, 2.2 and 2.3 for guidance.

3.2 Provide the services of a qualified Cummings Diesel technical representative to accomplish the following service / repairs to the equipment listed in 1.3.1 and 1.3.2 in accordance with manufacturer's instructions and or specified in this Work Item.

3.2.1 Remove existing and replace with new all associated engine zincs (anodes).

3.2.2 Drain and replace lubricating oil and filter.

3.2.3 Clean and service engine air filter assembly.

3.2.4 Remove and replace primary and secondary fuel filter.

3.2.5 Remove and replace with new fuel/transmission cooler assembly.

3.2.6 Remove and replace with new raw water pump impeller.

3.2.7 Remove and replace with new engine belt.

3.2.8 Inspect all seawater hoses and replace as required.

SSP: HRMC-022-21 2 of 3 ITEM NO: 233-11-001

3.2.9 Drain, flush and replace engine coolant.

3.2.10 Remove and replace with new coolant filter.

3.2.11 Remove and replace with new heat exchanger cap (Radiator cap).

3.2.12 Inspect all coolant hoses for damage, replace if required.

3.2.13 Inspect all engine wiring harness for damage or chaffing, replace if required.

3.2.14 Visually inspect engine vibration dampers.

3.2.15 Accomplish an overhead set adjustment.

3.2.16 Check for current and pending fault codes on engine ECM.

3.2.17 Remove, inspect, clean and reseal charge air cooler

3.2.18 Remove, inspect, clean and reseal engine heat exchanger

3.2.19 Take sample of engine oil and coolant and send out for analysis.

3.3 Provide the services of a qualified ZF Marine technical

representative to accomplish the following service / repairs to the equipment listed in 1.3.3 and 1.3.4 in accordance with manufacturer's instructions, using 2.3 and 2.4 for guidance and or specified in this Work Item.

3.3.1 Remove and replace transmission lubrication oil and filter.

3.3.2 Remove, inspect and clean suction pick up screen.

3.3.3 Remove propeller shaft mounting bolts and check alignment.

3.3.4 Take sample of fluid and send out for analysis.

3.4 Remove and dispose of system fluids in accordance with federal, state, and local laws, codes, ordinances, and regulations.

3.5 Coordinate with Dive Locker personnel and accomplish an operational test of the equipment listed in 1.3, to verify proper operation.

Operational parameters: Normal. No external leakage permitted. No unusual noise, vibration, or heat build up permitted.

3.5.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing results of the requirements of 3.5 to the SUPERVISOR.

3.6 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4.

SSP: HRMC-022-21 3 of 3 ITEM NO: 233-11-001

4.2 As of May 18th 2021, running hours of 1.3.1 and 1.3.2 is as follows:

Port Engine: 723 total running hours

Starboard Engine: 722 total running hours

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

ITEM NO: 245-10-001

COAR: 16 PCN: OD01-L111

SSP: HRMC-022-21 1 of 2 ITEM NO: 245-10-001

1.1 Title: Propeller; repair

1.2 Location of Work:

1.2.1 Underwater Hull

1.3 Identification:

1.3.1 Quantity (2 EA): Propellers, Michigan Wheel, 4 Blades, Nibral DQX 28 x 22

2. REFERENCES:

2.1 Standard Items, (FY 22)

2.2 NSTM S9086-TX-STM-010/CH-583, Boats and Small Craft

2.3 200-243-001 Rev 1, Shaftline

2.4 T9074-AS-GIB-010/271, Requirements for Non-destructive Testing Methods

2.5 MIL-STD-2035, Non-destructive Testing Acceptance Criteria

3. REQUIREMENTS:

3.1 Disassemble, disconnect and remove each equipment listed in 1.3, using 2.2 and 2.3 for guidance.

3.1.1 Clean and polish the propeller, removing a minimum of metal, maintaining design dimensions and tolerances.

3.1.2 Inspect each part for wear and defects.

(I)(G) "NDT (PT) INSPECTION"

3.1.2.1 Accomplish a liquid penetrant inspection of propeller for cracks and discontinuities in accordance with 2.4, using 2.5 for accept/reject criteria.

(V)(G) "BLUE-CHECK PROPELLER"

3.1.2.2 Accomplish bluing check of shaft taper contact to

propeller. Ensure a minimum of 75 percent bluing contact pattern and that pattern is uniform and evenly distributed.

3.1.2.3 Fair-in and straighten minor bends.

3.1.2.4 Route propeller to a certified repair facility to check and correct blade pitch and to static balance.

3.1.3 Submit one legible copy, in hard copy or electronic media, of a report documenting the propeller balancing results and NDT Inspection to the SUPERVISOR.

3.2 Install propellers listed in 1.3 using new shaft keys, propeller nuts and cotter pins.

SHIP: PHNSY/IMF (RMC 32253)

SSP: HRMC-022-21 2 of 2 ITEM NO: 245-10-001

(V)(G) "OPERATIONAL TEST "

3.3 Accomplish an operational test of the equipment listed in 1.3.1 in conjunction with sea trials, no excessive noise or vibration allowed.

3.4 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 None

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

ITEM NO: 311-21-001

COAR: 16 PCN: OD01-L092

SSP: HRMC-022-21 1 of 3 ITEM NO: 311-21-001

1.1 Title: Generator; inspect, repair, and service

1.2 Location of Work:

1.2.1 Engine Room Compartment

1.3 Identification:

1.3.1 Quantity (One EA): Port Generator, Make: Northern Lights 40 kW, Model M944T3, 480/277V, 3Ø, 60Hz, S/N: 9442-51223.

1.3.2 Quantity (One EA): Starboard Generator, Make: Northern Lights 38 kW, Model M944T3, 240/120V, 1Ø, 60Hz, S/N: 9442-50957.

2. REFERENCES:

2.1 Standard Items, (FY-22)

2.2 Dive Support Boat, Boat Operators Handbook (BOH)

2.3 300 OM944T3, Operators Manual

3. REQUIREMENTS:

3.1 Accomplish the requirements of 009-90 of 2.1, for the inspection, repair, and maintenance service requirements of the equipment listed in 1.3, located in 1.2, using Manufactures Service Manual, 2.2 and 2.3 for guidance.

3.2 Provide the services of a qualified Northern Lights technical representative to accomplish the following service / repairs to the equipment listed in 1.3 in accordance with manufacturer's instructions and or specified in this Work Item.

3.2.1 Disassemble, disconnect and remove components listed in

3.2.1.1 through 3.2.1.4 using 2.2 and 2.3 for guidance.

3.2.1.1 Remove and replace with new, engine oil and lube oil

filter.

3.2.1.2 Remove and replace with new, generator air cleaner.

3.2.1.3 Remove and replace with new, raw water impeller.

3.2.1.4 Remove and replace with new, primary fuel filter and

secondary fuel filter element.

3.2.2 Clean and inspect each part for wear and defects, adjust, repair or replace with new as required, for the equipment listed in

1.3 using 2.2 and 2.3 for guidance.

3.2.2.1 Inspect and check V-belt and tension, adjust as needed.

3.2.2.2 Load test and service the associated batteries currently to assure the proper working condition.

3.2.2.3 Clean and inspect air cleaner, including associated

hoses, replace if required.

3.2.2.4 Inspect/check injection pump settings, maximum speed, SSP: HRMC-022-21 2 of 3 ITEM NO: 311-21-001 exhaust smoke and for wear and defects.

3.2.2.5 Check valve clearances, adjust if required.

3.2.2.6 Inspect turbocharger air, lubrication and cooling lines for leaks, replace hoses, lines and gaskets if required.

3.2.2.7 Remove, clean, inspect and test injectors.

3.2.2.8 Clean and inspect all zinc electrodes for wear, allowable lost 50 percent, replace if required.

3.2.2.9 Drain, clean, inspect and refill cooling system, check for signs of leakage. Allowable leakage: None.

3.2.2.10 Drain, clean, flush, and inspect heat exchangers. Fill cooling system and check for leaks. Allowable leakage: None.

3.2.2.11 Inspect/check generator starter and alternator.

3.3 Remove and dispose of system fluids in accordance with federal, state, and local laws, codes, ordinances, and regulations.

3.4 Coordinate with Dive Locker personnel and accomplish an operational test of the equipment listed in 1.3, to verify proper operation. Test shall be at a minimum of 30 continues minutes of run time. Operational parameters: Normal. No external leakage permitted. No unusual noise, vibration, or heat build up permitted.

3.4.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing results of the requirements of 3.4 to the SUPERVISOR.

4.

4.2 As of May 18th 2021, running hours of 1.3.1 and 1.3.2 is as follows:

Port Generator: 2365 total running hours

Starboard Generator: 1888 total running hours

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

SSP: HRMC-022-21 3 of 3 ITEM NO: 311-21-001

ITEM NO: 514-31-001

COAR: 16 PCN: OD01-L097

CSWT FILE NO: 514-001 (LPD 17) CMP: NONE

REVISED: 21 Oct 2020

SSP: HRMC-022-21 1 of 2 ITEM NO: 514-31-001

1. SCOPE:

1.1 Title: Air Conditioning Unit; repair

1.2 Location of Work:

1.2.1 Main Cabin

1.2.2 Galley

1.3 Identification:

1.3.1 Quantity (One EA), Galley/Head Self Contained Air conditioning Unit, Technicold Model #SC24VB-H

1.3.2 Quantity (3 EA), Main Cabin Self Contained Air conditioning Unit, Technicold Model #SC18CVB-H

2. REFERENCES:

2.1 Standard Items, (FY 22)

2.2 Dive Support Boat, Boat Operators Handbook (BOH)

2.3 Technicold, Manual

2.4 Technicold, Operator's Manual

2.5 200-512-005 Rev 1, HVAC Layout

2.6 S9086-RW-STM-010/CH-516 Rev 5, Refrigeration Systems

3. REQUIREMENTS:

3.1 Obtain an qualified marine HVAC technician for the inspection, cleaning, and maintenance service requirements of the equipment listed in 1.3, located in 1.2, using 2.2 through 2.6 for guidance.

3.2 Accomplish the following service / repairs to the equipment listed in 1.3 in accordance with manufacturer's instructions and using 2.2 through 2.6 as guidance.

3.2.1 Clean and Inspect equipment listed in 1.3.

3.2.1.1 Submit one legible copy, in approved transferrable

media, of a report listing results of the requirements of 3.2.1.

3.2.2 Remove all liquids, clean, and recharge all units listed in

1.3 with coolant.

3.2.3 Clear all drain lines.

3.3 Accomplish a pressure test of each air conditioning plant in accordance with Paragraph 516-8.2.13.1 of 2.6 if determined to be required. Allowable leakage: None.

(Q)(G) "OPERATIONAL TEST"

3.4 Operationally test the air conditioning units listed in 1.3 using,

2.2 through 2.6 as guidance. Adjust and set switches, valves, capacity controls and automatic features using 2.4 as a guide, and bring the temperatures of the chilled water down to the required operating

SSP: HRMC-022-21 2 of 2 ITEM NO: 514-31-001 temperatures.

3.5 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

4. NOTES:

4.1 None

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

ITEM NO: 583-11-001

COAR: 16 PCN: OD01-L113

SSP: HRMC-022-21 1 of 1 ITEM NO: 583-11-001

1.1 Title: Transfer of Boat Custody; accomplish

1.2 Location of Work: Contractor's Plant

1.3 Identification:

1.3.1 None

2. REFERENCES:

2.1 Attachment (A): Boat Custody Form

3. REQUIREMENTS:

3.1 The Government will deliver custody of the boat to contractor facility prior to avail start and will accept custody of the boat at contractor facility upon satisfactory completion of all contracted work.

3.1.1 The Contractor will be responsible for the boat during the time in which he has custody.

3.2 Upon receiving custody of the boat from the activity, complete Part A of 2.1. Submit one copy, in approved transferrable media, of 2.1 to the SUPERVISOR within 24 hours after delivery of the boat.

3.3 After returning custody of the boat to the activity, complete Part B of 2.1. Submit one copy, in approved transferrable media, of 2.1 to the SUPERVISOR within 24 hours after redelivery of the boat.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

ITEM NO: 583-31-001

COAR: 16 PCN: OD01-L103

OD01-L104

SSP: HRMC-022-21 1 of 2 ITEM NO: 583-31-001

1.1 Title: 60-Foot Dive Support Boat Components; replace

1.2 Location of Work:

1.2.1 Dive Equipment Room

1.3 Identification:

1.3.1 Quantity (One EA), Portaco E-15S10-G6-W Hydraulic Power Unit

(HPU), PN MGDS1601L515E15S10G6W

1.3.2 Quantity (One EA), Ingersoll Rand Type 30, Model #2340 Low Pressure Compressor (LP)

2. REFERENCES:

2.1 Standard Items, (FY 22)

2.2 Dive Support Boat, Boat Operators Handbook

2.3 200-592-003 Rev 4, Hydraulic Power Unit System Electrical

2.4 200-592-002 Rev 1, Electric HPU System Layout

2.5 200-592-005, LP Compressor Piping Layout

3. REQUIREMENTS:

3.1 Disconnect electrically and mechanically and remove the existing components located in 1.2.1, and listed in 1.3 in using 2.2 through 2.5 as guidance. Record electrical hook-up data.

3.2 Install and connect new components, identified in 1.3, in place of that removed in 3.1, using recorded hook-up data and manufacturer's installation manual for guidance.

3.2.1 New HPU and Low pressure compressor shall be identical or equivalent to existing. Equivalent HPU and compressor shall be approved by the SUPERVISOR prior to installation.

3.2.2 Modify foundation to suit new equipment listed in 1.3.

3.2.3 Accomplish the requirements of 009-12 of 2.1, including Table 3, Column C, Lines One through 7.

(V)(G) "OPERATIONAL TEST"

3.3 Accomplish an operational test of the newly installed items listed in 1.3, using 2.2 through 2.4 and the manufacturer's manual for guidance.

3.3.1 Deliver each Technical Manual and Warranty Information to the Dive Locker representative. Provide the name and date of the representative receiving the documents to the SUPERVISOR.

3.4 Accomplish the requirements of 009-32 of 2.1 for new and disturbed

4. NOTES:

SSP: HRMC-022-21 2 of 2 ITEM NO: 583-31-001

4.1 None

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

ITEM NO: 611-11-001

COAR: 16 PCN: OD01-L102

OD01-L110

SSP: HRMC-022-21 1 of 2 ITEM NO: 611-11-001

1.1 Title: Push Knee; inspect and repair

1.2 Location of Work:

1.2.1 Bow

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items, (FY-22)

2.2 200-169-001 Rev 1, Push Knees & Bow Fenders Inboard Structure

2.3 200-690-001 Rev 1, Fendering System Layout

2.4 Systems and Specifications, SSPC Painting Manual, Volume 2

3. REQUIREMENTS:

(V)(G) "VISUAL INSPECTION"

3.1 Accomplish a visual inspection of the Push Knee and Bow fender assembly, including rubber bumper, push frame assembly, channels, gussets, flanges, webs and pipes including retaining hardware for structural integrity, deterioration, pitting, cracks, and areas of damage or distortion around the periphery of craft at the location listed in 1.2.1.

3.1.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing results of the requirements of 3.1 to the SUPERVISOR.

3.2 Remove each existing rubber bumper and retain for reuse. Mark, tag, and retain each existing rubber bumper found suitable for reuse.

3.3 Accomplish the requirements of Systems and Specifications SSPC-SP 7 of 2.4 to brush-off blast each rubber bumper that was removed in 3.2 and found to be reusable.

3.4 Remove existing and install new Push Knee and Bow fender components and hardware found to be defective in report listed in 3.1.1 using 2.2 and 2.3 for guidance and as directed by the SUPERVISOR.

3.4.1 Chip and grind surface flush and smooth in way of removals.

3.4.2 Template exact size, configuration, and location from

existing shipboard conditions.

3.4.3 New material shall meet the material requirements of 2.2.

3.5 Accomplish the requirements of 009-12 of 2.1, including Table 3, Column C, Lines One through 7.

3.6 Install each existing rubber bumper found to be reusable and new rubber bumper replacing defective bumper found on report listed in 3.1.1, SSP: HRMC-022-21 2 of 2 ITEM NO: 611-11-001 using 2.2 through 2.3 for guidance and as directed by the SUPERVISOR.

3.7 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

4. NOTES:

4.1 None

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

ITEM NO: 611-11-002

COAR: 16 PCN: OD01-L108

SSP: HRMC-022-21 1 of 1 ITEM NO: 611-11-002

1.1 Title: Fender; replace

1.2 Location of Work:

1.2.1 Pilot House

1.2.2 Main Cabin, Forward

1.2.3 Canopy

1.3 Identification:

1.3.1 Quantity (6 Each):Yokohama Type Fenders, 50kPa/2.0D X 3.5L, NSN 00-821-0808

2. REFERENCES:

2.1 Standard Items, (FY 22)

2.2 200-690-001 Rev 1, Fendering System

3. REQUIREMENTS:

3.1 Install new Yokohama Fenders identified in 1.3.1, in the location listed in 1.2 using 2.2 for guidance.

3.2 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 None

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

ITEM NO: 612-11-001

COAR: 16 PCN: OD01-L107

SSP: HRMC-022-21 1 of 2 ITEM NO: 612-11-001

1.1 Title: Lifelines and Stanchions; repair

1.2 Location of Work:

1.2.1 Throughout

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items, (FY 22)

2.2 200-612-001 Rev 2, Rail And Stanchions

2.3 S9AA0-AB-GOS-010, General Specification For Overhaul of Surface Ships

3. REQUIREMENTS:

3.1 Remove all main deck life lines and stanchions located in 1.2.1.

3.1.1 Clean and inspect stanchions and stanchion base sockets for corrosion, cracking and deformity.

3.1.1.1 Submit one legible copy, in approved transferrable

media, of a report listing the results of the requirements of

3.1.1 to the SUPERVISOR.

3.2 Repair or replace with new, stanchions, including stanchion base sockets found damaged in 3.1.1.1 using 2.2 as guidance

3.2.1 Chip and grind surfaces flush and smooth in way of removals.

3.2.2 Accomplish the requirements of 009-12 of 2.1, including Table 3, Column C, Lines One through 7.

3.3 Install all retained and new stanchions, including new lifelines, using new toggle pins.

(V)(G) "STATIC LOAD TEST"

3.4 Accomplish a static load test on the lifelines and stanchions installed in 3.3 using paragraph 612.i of 2.3 as guidance.

3.4.1 All new base sockets and stanchions shall be hammer tested for soundness and strength per 2.3.

3.4.2 Accomplish a static load test of 100 percent of the stanchions and lifelines assemblies with new base sockets installed in 3.2 and 10 percent of the remaining stanchions and lifelines installed in 3.3 A test load of 300 pounds shall be applied horizontally outboard at the top of the stanchion and perpendicular (90 degrees) to the railing and held for ten minutes. Remove the test load and inspect the lifeline rails, stanchions and surrounding structure for evidence of damage or permanent deformation. Allowable damage: None.

3.5 Accomplish the requirements of 009-32 of 2.1 for new and disturbed

SSP: HRMC-022-21 2 of 2 ITEM NO: 612-11-001

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

ITEM NO: 631-11-001

COAR: 16 PCN: OD01-L098

OD01-L105

SSP: HRMC-022-21 1 of 3 ITEM NO: 631-11-001

1.1 Title: Dive Support Boat Exterior; clean, inspect, repair, and preserve

1.2 Location of Work:

1.2.1 Throughout

1.2.1.1 Underwater hull

1.3 Identification:

1.3.1 Quantity (14 EA): Zinc Anodes, ZHC-23 Bolt-On Type

1.3.2 Quantity (2 EA): Shaft Collar Anodes

1.3.3 Quantity (2 EA): Rudder Zinc

2. REFERENCES:

2.1 Standard Items, (FY-22)

2.2 S9086-VD-STM-020/CH-631, Volume 2, Preservation of Ships in Service

2.3 200-110-001 Rev 1, Hull and Deck Framing

2.4 200-117-001, Transverse Framing

2.5 T9074-AS-GIB-010/271, Requirements for Nondestructive Testing Methods

2.6 200-630-001, Bottom Paint Upper Limit

2.7 200-997-001 Rev 3, Docking Plan

2.8 S9086-DA-STM-010, Hull Structures

2.9 Dive Support Boat, Boat Operators Handbook

3. REQUIREMENTS:

3.1 Immediately after drydocking or removing the Dive Support Boat from the water accomplish the following:

3.1.1 Record the existing periphery lines, exact locations, colors and dimensions of painted coatings on the hull of the Dive Support Boat.

3.1.2 Clean the areas listed in 1.2.1.1 including each sea chest, bow, stern, appendage and sides up to the waterline free of marine growth and prepare each surface for inspections using one of the following methods in accordance with Paragraph 631-5.4.7.4 or Paragraph 631-5.5 of 2.2.

3.1.2.1 Remove each sea chest strainers. Retain the strainers for reinstallation.

3.1.3 Contain dust from brush blasting, water from hydroblasting and other foreign matter resulting from blasting and cleaning operations and prevent contamination to the air, sea water and adjacent ships.

3.2 Accomplish a visual inspection of each area listed in 1.2, including

SSP: HRMC-022-21 2 of 3 ITEM NO: 631-11-001 each appendage, sea chest, and well deck. Inspect for damage and deteriorated conditions of each existing weld and surfaces of hull plating.

3.2.1 Submit one legible copy, in hard copy or electronic media, of a report listing results of the requirements of 3.2 with sketches listing the type, amount and frame location of structural damage and deterioration including comprehensive details of repairs required to the SUPERVISOR using 2.3 and 2.4 for guidance.

(I) "UT INSPECTION"

3.3 Accomplish an ultrasonic thickness survey on the underwater hull plating up to the waterline in accordance with 2.5 using 2.3 for guidance. The accept / reject criteria shall be in accordance with paragraph 100-2.6.4.3 of 2.8.

3.3.1 The survey shall be conducted on each intersecting point of a 4 foot grid pattern.

3.3.1.1 Scan a total of 150 additional areas discovered by the ultrasonic survey in 3.3 and the visual inspection in 3.2 to determine the total size and location of each defect.

3.3.2 Submit one legible copy, in hard copy or electronic media, of the ultrasonic survey results to the SUPERVISOR listing the locations of each point inspected in respect to the ship's frame, strakes, distance off centerline, measured thickness of plating, original thickness of plating and percent of deterioration. Report shall contain a recommended repair for each area(s) rejected.

3.4 Accomplish the following structural repairs in area listed 1.2 as determined by the visual inspection, the ultrasonic survey and in locations specified by the SUPERVISOR.

3.4.1 Vee out and weld repair total of 20 linear feet of cracked and/or eroded weld seams along bottom side of keel located in 1.2.1.1.

3.5 Accomplish the requirements of 009-12 of 2.1, including Table 3, Column C, Lines One through 7 for structural repairs.

3.6 Accomplish the requirements of 009-25 of 2.1 for air hose test of the new plating and weld seams. Allowable leakage: None.

(I)(G) "CLEANLINESS"

3.7 Accomplish preservation of areas listed in 1.2, in accordance with

2.6 and 2.9.

3.7.1 Accomplish the requirements of paragraphs 3.7 through 3.10.11, 009-32 of 2.1, for the preservation of "critical coated" areas

1.2.1.1 including all appendages.

3.7.1.1 The method of surface preparation is as follows: 1st

Coat Primer - SeaGuard 5000 HS, Red, 5-7 wet mils. 1st primer coat to be installed with 6 hours of surface prep, 2nd Coat Primer – SeaGuard 500 HS, Gray, 5-7 wet mils, 1st Coat AF –

SSP: HRMC-022-21 3 of 3 ITEM NO: 631-11-001

SeaVoyage, Black, 5-7 wet mils and 2nd Coat AF – SeaVoyage, Red, 5-7 wet mils.

3.7.1.2 Reposition supporting keel blocks to permit 100 percent preservation of the entire hull.

3.7.1.3 Apply hull lettering and draft marks as recorded in

3.1.1.

3.8 Install a total of 18 (EA) new hull zinc anodes including new hardware , identified in 1.3, in areas listed in 1.2.1.1, in accordance with 2.7 upon completion of preservation.

3.8.1 Clean the surfaces in way of each new hull zinc anodes and apply coatings the same as that specified for the surrounding areas in accordance with General Note 1 of 2.7.

3.8.1.1 Turn over any new additional zinc anodes to the

SUPERVISOR in the event that all 18 each zinc anodes can't be installed using existing zinc mounting foundations or if extras were ordered.

3.9 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 None

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

ITEM NO: 634-11-001

COAR: 16 PCN: OD01-L106

SSP: HRMC-022-21 1 of 1 ITEM NO: 634-11-001

1.1 Title: Nonskid; repair

1.2 Location of Work:

1.2.1 Main Deck

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items, (FY-22)

2.2 Dive Support Boat, Boat Operators Handbook

3. REQUIREMENTS:

3.1 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 46, Columns A, B and E and using 2.2 as guidance for deck surfaces located in 1.2, as identified by Dive Team.

3.1.1 New nonskid shall match existing.

3.2 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 None

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

ITEM NO: 997-11-001

COAR: 16 PCN: OD01-L114

SSP: HRMC-022-21 1 of 4 ITEM NO: 997-11-001

1.1 Title: Drydocking, Undocking; accomplish

1.2 Location of Work:

1.2.1 Not Applicable

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Dive Support Boat, Boat Operators Handbook

2.2 200-997-001 Rev 3, Docking Plan

2.3 S9086-7G-STM-010/CH-997, Docking Instructions and Routine Work in Drydock

2.4 200-110-001 Rev 1, Hull and Deck Framing

2.5 200-117-001, Transverse Framing

3. REQUIREMENTS:

3.1 Furnish a sound docking facility with qualified personnel, plus necessary equipment to safely and satisfactorily dock the Dive Boat.

3.1.1 Provide the SUPERVISOR with an independent third party

certification of the docking facility and its capability for docking the craft . Any limitation in dock loading, rate of flooding or dewatering, block location , craft displacement or trim shall be included in the statement.

3.1.2 Provide the services of a dockmaster who has been certified by the contractor and accepted by the SUPERVISOR. Provide necessary supporting personnel to satisfactorily accomplish the docking.

3.1.3 Provide tugs, pilots, and personnel for the complete transfer, docking and undocking of the craft. The number of tugs (if any) shall be agreed to by the SUPERVISOR at the Docking Conference.

3.1.4 Submit a drydocking procedure, using 2.1 and 2.5 for guidance, to the SUPERVISOR prior to drydocking the craft which shall include the following: operating practices; safety and security plans;

special precautions or actions that are required by the characteristics of the dock or the craft, such as the pumping and flooding schedule on floating drydocks and specific list, trim and stability requirements of the craft during docking and undocking.

This procedure shall address the specific docking and undocking evolutions to be performed within the availability.

3.2 Using 2.1 through 2.5 for guidance develop and provide a blocking plan to set and align the docking blocks to the SUPERVISOR for review and approval.

3.2.1 The blocking plan shall be submitted in the form of a scaled drawing which includes: block size, block spacing, location of the

SSP: HRMC-022-21 2 of 4 ITEM NO: 997-11-001 craft with respect to the blocks at landing. Position blocking to ensure that the hull will not be damaged and shall be accessible for removal and repairs. Provide at least the minimum clearance between the craft's hull and drydock necessary to accomplish drydock work within these work items. Docking clearances shall be determined by the contractor utilizing 2.4 for guidance and the minimum clearance between the side of the craft (including fixed projections) and permanent dock structure (such as catwalks, crane rails, etc.) shall be 12 inches for bringing the craft into or out of dock and performing drydock work. Ensure that hull openings will not be obstructed or state that fleeting or some other method will be used to make all openings accessible during the drydock period. Data requested by this item shall be accompanied by a written request for approval to the SUPERVISOR a minimum of 5 days prior to the scheduled docking date. The use of haul, fixed, universal or fitted blocks and the type of docking facility in which the craft will be docked shall be clearly stated.

3.2.2 Docking proposals shall include supporting data substantiating that the block loading pressures are limited to a maximum of 20 long tons per square foot and that at least 90 percent of blocks land on longitudinal strength members or main transverse bulkheads.

3.2.3 Crib and brace blocking shall be in accordance with Paragraph 997-2.5 of 2.3 using the drawing applicable to the contractor's type of docking facility.

3.2.4 Blocking shall be constructed of hardwood or composite

concrete/hardwood and soft caps, with at least 2 inches of soft cap thickness.

3.3 Provide, set and align the blocks in accordance with the approved blocking plans.

(V)(G) "BLOCK INSPECTION"

3.4 Accomplish an inspection of blocking. Provide documentation of inspection showing blocking locations relative to sighting marks on docking coping, spacing, offsets, heights and shaping to the SUPERVISOR at least 4 hours prior to flooding the drydock.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .