Attachment_C_PROPOSAL_SUMMARY_SLIDE_TEMPLATE.PPTX

PPTX presentation 444 KB Posted

Attached to
Gamma Ray Inspection Technology (GRIT) Federal contract opportunity
Solicitation number
HR001119S0073
Issued by
Defense Advanced Research Projects Agency

About this file

This document contains a slide template and details for a federal contract opportunity solicitation. The slide template outlines the required proposal structure and content, including concept impact, approach, schedule and milestones, cost summary, cost breakout, component matrix, and integration tables. Key details of the solicitation include that it was issued by the Defense Advanced Research Projects Agency to develop transformational approaches for high intensity, tunable, and narrow-bandwidth gamma-ray production in a compact form factor for applications such as nuclear material detection and medical technologies. Proposals are sought to achieve gamma ray source objectives and metrics for intensity, repetition rate, energy range, and bandwidth, with consideration given to additional desired capabilities.

Not Listed

View the file

Other files for this federal contract opportunity

Other files attached to Gamma Ray Inspection Technology (GRIT), newest first.
File Type Posted
Attachment_G_PROPOSAL_TEMPLATE_VOLUME_3_ADMINISTRATIVE_AND_NATIONAL_POLICY_REQUIREMENTS_VOLUME.docx DOCX document
Attachment_A_ABSTRACT_SUMMARY_SLIDE_TEMPLATE.pptx PPTX presentation
Attachment_B_ABSTRACT_TEMPLATE.docx DOCX document
Attachment_F_COST_PROPOSAL_TEMPLATE.xlsx XLSX spreadsheet
Attachment_E_PROPOSAL_TEMPLATE_VOLUME_2_COST_VOLUME.docx DOCX document
Attachment_D_PROPOSAL_TEMPLATE_VOLUME_1_TECHNICAL_AND_MANAGEMENT_VOLUME.docx DOCX document
HR001119S0073.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TA #: Full Proposal Title Organization Name(s); Technical POC Name(s) Provide graphic and description.

Describe need and problem being addressed.

Describe goals.

Describe proposed demonstrations/stakeholders.

Describe new ideas and innovations.

Key risks and mitigations.

Describe existing approaches, and current state of the art of your/related approaches.

HR001119S0073 GRIT BAA

Proposal Summary Slide Template Source Selection Information – see FAR 2.101 & 3.104

CONCEPT

IMPACT

CONTEXT

APPROACH

Organization Name – Technical Area X Concept Title Describe How It Works/Innovative Claims (One slide per TA addressed) Source Selection Information – see FAR 2.101 & 3.104

Organization Name – Schedule Tasks/Deliverables/Milestones/Demonstrations/Time-Table (e.g. Gantt Chart)

Organization Name – Cost Summary

Phase 1Phase 2 (ROM)
Phase Length(Months)
Direct Labor ($)
# of FTEs/year* (Researcher)
# of FTEs/year* (Technician)
# of FTEs/year* (Business)
Indirect Costs/Overhead (as a percentage of direct labor)
Materials and Equipment ($)
Travel ($)
Total Proposal Cost ($)

*Please include the total number of FTEs/year working on the project including subcontractors.

Organization Name – Cost Breakout (By Task)

Phase 1Phase 2 (ROM)
Labor + Indirect + Overhead (Task 1)
Labor + Indirect + Overhead (Task 2)
Labor + Indirect + Overhead (Task 3)
…

*Please include the total number of FTEs/year working on the project including subcontractors.

Component/Sub-system Summary Matrix (All Proposals)

Component Summary Matrix Table
Component Name[1]Technology/ApproachComponent Metric(s)State of the Art Metric Value(s)End of Phase 1 Metric Value(s)Final Metric Value(s)
~CostHighest RiskMitigation
Name[2]

[1]: List all major/key components comprising your technical approach [2]: Include a footnote for each component describing how achieving the metric(s) enables the desired integrated system performance in Phase 2 for either TA1 or TA2. Add additional slide if needed to capture all key components.

Integration Table: High Intensity, High Purity Source (TA1 Only)

Primary Objectives
System MetricObjectiveProposed ValueHighest RiskMitigation
Intensity (ph/s)10^10
Repetition Rate (kHz)0.5
Energy Range (MeV)0.03 – 1
Bandwidth (dE/E)< 10%
Size (m)

Weight (kg) Power (kW) < 2.4x2.3x12.0 < 16,000 < 300

Secondary (Desired) Objectives
System MetricGoalProposed ValueNotes:
Variable format beam (pencil, fan, or cone) geometriesYesIf applicable, describe additional beam formats available, methods, limitations, and anticipated dependencies on other system parameters such as energy
Tunable intensity and brillianceYesIf applicable, describe intensity tunability methods, limitations and anticipated dependencies on other system parameters
Ultralow bandwidth (dE/E) of 10-6YesIf applicable, describe ultralow bandwidth methods, limitations and anticipated dependencies on other system parameters

Integration Table: High Energy Source (TA2 Only)

Primary Objectives
System MetricObjectiveProposed ValueHighest RiskMitigation
Intensity (ph/s)10^12
Repetition Rate (kHz)1
Energy Range (MeV)0.03 – 3
Bandwidth (dE/E)< 0.1%
Size (m)

Weight (kg) Power (kW) < 2.4x2.3x12.0 < 16,000 < 300

Secondary (Desired) Objectives
System MetricGoalProposed ValueNotes:
Variable format beam (pencil, fan, or cone) geometriesYesIf applicable, describe additional beam formats available, methods, limitations, and anticipated dependencies on other system parameters such as energy
Tunable intensity and brillianceYesIf applicable, describe intensity tunability methods, limitations and anticipated dependencies on other system parameters
Variable pulse rate and duty factorsYesIf applicable, describe pulse rate tunability methods, limitations and anticipated dependencies on other system parameters

image2.png image4.png

File details come from the government source that posted it. Updated .