Technical_Response_Template.xlsx
XLSX spreadsheet 10 KB Posted
- Attached to
- Two-Photon Laser Scanning Microscope System for NINDS Federal contract opportunity
- Solicitation number
- HHS-NIH-NIDA-SSSA-CSS-16-250
About this file
Please use this template to submit technical responses. The red text should be amended as appropriate by the contractor.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Question_and_Answer_HHS_NIH_NIDA_SSSA_CSS_16_250.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| HHS-NIH-NIDA-SSSA-CSS-16-250 Technical Response Template | ||||
| Compliance | Reference | Comments | ||
| Equipment Requirements | ||||
| 1 | The system must employ resonant scanning (8kHz) in the X axis with galvanometer-based scanning in the Y axis. Alignment tools must be included. | Yes/No | Literature Reference | Any Comments |
| 2 | The system must include two GaAsp photomultiplier tubes for sensitive, two-channel fluorescence detection. Appropriate filters must be included to enable simultaneous detection of red and green fluorescence. | Yes/No | Literature Reference | Any Comments |
| 3 | The system must have a minimum of 20X/1.0 NA objective, with a minimum 2.0 mm working distance. | Yes/No | Literature Reference | Any Comments |
| 4 | The system must have an X-Y scanning stage, motorized objective positioning and a condenser for transmitted light imaging. Either Dodt or DIC optics should be included for transmitted infrared contrast imaging. | Yes/No | Literature Reference | Any Comments |
| 5 | The system must include a CCD camera for transmitted light imaging. | Yes/No | Literature Reference | Any Comments |
| 6 | The system must include a Pockel cell, driver and mount for rapid laser attenuation. | Yes/No | Literature Reference | Any Comments |
| 7 | The system must allow for user installed patterned (spatial) visual light stimulation, through either the objective or condenser. | Yes/No | Literature Reference | Any Comments |
| 8 | The system must have a PC work station, peripherals and software compatible with resonant scanning that is able to control scanning and image acquisition. | Yes/No | Literature Reference | Any Comments |
| Warranty Requirements | ||||
| 1 | A minimum of a one (1) year warranty and a one (1) year additional extended warranty must be included. The warranty must nclude preventative maintenance and support services by a company certified service technician. All products shall be warranted to be free from material defects in workmanship or material under normal use and service for the warranty period. | Yes/No | Literature Reference | Any Comments |
| Delivery, Installation, and Training Requirements | ||||
| 1 | Delivery, Installation, and Training shall be completed within or before fourteen (14) weeks after receipt of order. | Yes/No | Literature Reference | Any Comments |
| 2 | The contractor shall deliver and install the required equipment within twelve (12) weeks after receipt of order. Delivery must be FOB Destination and must include inside installation. The equipment shall be delivered and installed between the hours of 8:00am and 5:00pm, Bethesda, MD local prevailing time, Monday through Friday. | Yes/No | Literature Reference | Any Comments |
| 3 | On-site training must take place at the customer site within two (2) weeks of equipment installation. Training shall take place between the hours of 8:00am and 5:00pm, Bethesda, MD local prevailing time, Monday through Friday. | Yes/No | Literature Reference | Any Comments |
| 4 | The contractor shall provide a company certified service technician to perform setup, installation, and training. | Yes/No | Literature Reference | Any Comments |
File details come from the government source that posted it. Updated .