HHS-Acquisition Plan IHS1404481_Desktop Computers signed by CCO.pdf

PDF 865 KB Posted

Attached to
Chinle Indian Health Service - Desktop Computers Federal contract opportunity
Solicitation number
IHS1404481
Issued by
Department of Health and Human Services Indian Health Service

About this file

This acquisition plan and related federal contract opportunity document describe a requirement by the Chinle Indian Health Service for desktop computers. The acquisition plan identifies the need to replace outdated desktop computers that are beyond their useful lifecycle in order to reduce failure risk. The requirement is for Dell desktop computers to align with the agency's existing IT architecture. The contract will have a 30 day delivery period after order receipt. The federal contract opportunity is a combined synopsis and solicitation issued as a 100% Buy Indian set-aside for offers from registered small businesses. Offerors must meet the attached specifications and pricing terms. The submission deadline is listed, as well as standard federal clauses to be included in any resulting contract.

View the file

Other files for this federal contract opportunity

Other files attached to Chinle Indian Health Service - Desktop Computers, newest first.
File Type Posted
JOFOC Brand Name-Chinle Desktop Computers.pdf PDF
Specifications.pdf PDF
Pricing Schedule.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

Department of Health and Human Services Acquisition Plan (AP) Purpose: This document provides the template for completing an Acquisition Plan (AP).

References: Federal Acquisition Regulation (FAR) 7.1

Requirements and Responsibilities: Acquisition Planning is required for all acquisitions. The SPE has established $150,000.00 as the threshold which increasingly greater detail and formality in the planning process is required. Use of this template is required for all acquisitions with an estimated value (inclusive of options) greater than $150,000.00. A streamlined AP format for acquisition at or below $150,000.00 shall be established by the HCA and address the content of written APs as defined in FAR Part 7.105.

"Acquisition planning" means the process by which the efforts of all personnel responsible for phases of the acquisition lifecycle are coordinated and integrated through a comprehensive plan for fulfilling the agency need in a timely manner and at a reasonable cost. It should include information in the approved Acquisition Strategy (AS) detailing plans for managing the execution of the contract. The final approved AP must address the following as required by statute (41 USC 253(a)) as implemented through FAR, Subpart 7.102 to promote and provide for:

(1) Acquisition of commercial or non-developmental items, to the maximum extent practicable (41 U.S.C. 3307), see guidance in FAR Part 12 and the definition of commercial item in FAR Part 2, Section 2.101;

(2) Full and open competition (see FAR Part 6) or to obtain competition to the maximum extent practicable, with due regard to the nature of the supplies or services to be acquired (41 U.S.C. 3306(a) (1));

(3) Selection of appropriate contract type in accordance with FAR Part 16; and

(4) Appropriate consideration of the use of pre-existing contracts, including interagency and intra-agency contracts, to fulfill the requirement (See FAR 8.002 through 8.004 and Subpart 17.5).

In accordance with FAR 7.101, the acquisition planner is responsible for developing and executing an AP. Within HHS, the primary acquisition planner is the Program Manager (PM). The AP should incorporate applicable portions of the approved Acquisition Strategy. It is incumbent upon the PM to coordinate the plan with all those who have a responsibility for the development, management or administration of any phase of the acquisition lifecycle.

The Contracting Officer supports the PM by providing input and advising the PM on contracting strategy, appropriate contract type selection, and other contractual business matters. The small business specialist advises on small business considerations that may potentially impact the contracting strategy The Acquisition Plan must address all the technical, business, management, and other significant considerations that will control the acquisition. The basic details supporting Program/Project impacts for these areas should have been included in the approved AS and should be duplicated in the AP. The specific content of plans will vary, depending on the nature, circumstances, and stage of the acquisition.

For sections that do not apply to the instant requirement, please indicate Not Applicable (N/A) and explain why. The length and detail of an acquisition plan depends on the complexity of each individual acquisition. The AP shall be completed for all sections that apply to the acquisition. Do not include the instructions in the final document or contract file.

FAR 7.105 (a) Acquisition Background and Objectives FAR 7.105 (a)(1) Statement of Need Statement of Need Technical and Contractual History Acquisition Alternatives FAR 7.105(a)(2) Applicable Conditions Compatibility Constraints FAR 7.105(a)(3) Cost Cost Provide a completed IGCE utilizing the HHS IGCE Template Package. Will this procurement with all options have a value equal or greater than $20,000,000?

FAR 7.105(a)(3) - Cost over $20,000,000 If Yes, see HHSAR Part 334.

Include a completed IGCE utilizing the HHS IGCE Template Package.

FAR 7.105 (a)(4) Capability or Performance Compatibility or Performance FAR 7.105 (a)(5) Delivery or Performance-Period Requirements Delivery or Performance-Period Requirements FAR 7.105(a)(6) Trade-offs Trade-offs FAR 7.105 (a)(7) Risks Technical, Cost, and Schedule Risks Organizational Conflict of Interest FAR 7.105 (a)(8) Acquisition Streamlining Acquisition Streamlining FAR 7.105 (b) Develop Plan of Action FAR 7.105 (b)(1) Sources Sources Small Business Market Research FAR 7.105(b)(2) Competition also see FAR, Subpart 7.102, (2) Competition Include the Justification and Approval for other than Full and Open/Limited Source Justification/Exception to Fair Opportunity, if applicable.

Major Components or Subsystems Competition Spares and Repair Parts Competition Subcontract Competition FAR 7.105(b)(3) Contract Type Selection Contract Type Selection FAR 7.105(b)(4) Source-Selection Procedures Source Selection Procedures FAR 7.105(b)(5) Acquisition Considerations Special Contracting Methods Unique Solicitation Clauses or Provisions Lease or Purchase Performance-Based Acquisition Information Technology Acquisition FAR 7.105 (b)(6) Budgeting and Funding Budgeting Funding Funds Certifying Official's Certification:

FAR 7.105 (b)(7) Product or Service Descriptions Product or Service Descriptions FAR 7.105(b)(8) Priorities, Allocations, and Allotments Priorities, Allocations and Allotments FAR 7.105 (b)(9) Contractor versus Government Performance Contractor versus Government Performance Consideration FAR 7.105 (b)(10) Inherently Governmental Functions Inherently Governmental Functions Services Certification:

Is for an inherently governmental function:

Is for an inherently governmental function:

Is closely associated with an inherently governmental function:

Is closely associated with an inherently governmental function:

Is for a critical governmental function:

Is for a critical governmental function:

FAR 7.105(b)(11) Management Information Requirements Contractor Monitoring Management System Section 508 FAR 7.105 (b)(12) Make or Buy Make or Buy Program Considerations FAR 7.105 (b)(13) Test and Evaluation Test and Evaluation FAR 7.105 (b)(14) Logistics Considerations Contractor or Agency Maintenance Support Reliability, Maintainability, and Quality Assurance Requirements Contractor Data Requirements Standardization Concepts FAR 7.105 (b)(15) Government-Furnished Property Government-Furnished Property FAR 7.105 (b)(16) Government-Furnished Information Government Furnished Information FAR 7.105 (b)(17) Environmental and Energy Conservation Objectives Environmental and Energy Conservation Objectives FAR 7.105 (b)(18) Security Consideration Classified Matters Security Considerations Information Technology Security Considerations Contractor Facility Access and Identity Verification Security Considerations FAR 7.105(b)(19) Contract Administration Contract Administration FAR 7.105(b)(20) Other Considerations Other Considerations FAR 7.105(b)(21) Milestones For the Acquisition Cycle The Acquisition Milestone Schedule should be realistic and consistent with the requirements of the proposed acquisition. The acquisition milestones specified in the table below are examples which may be tailored to each unique acquisition. The PM, CS, and CO must sign the schedule where provided. The CO/CS must update and revise the schedule, as necessary, to track progress of the acquisition and maintain the schedule as part of the contract file. The review and approval of the signatories of the AP must mutually agree to any revisions to the milestone dates that will impact meeting the scheduled award.

Acquisition Milestone

1. Business Case Completed2. Acquisition Plan (AP) Approved by CO3. Acquisition Plan Received by CCO or designee4. Market Research Completed5. Small Business Review Completed

6. Small Business Bundling Determination Approved7. 8(a) offering letter sent to SBA8. SBA approval of acquisition in the 8(a) program9. Justification and Approval (J&A) for Other than Full and Open Competition)/Limited Source Justification (LSJ) Routed for approval10. J&A/LSJ Approved

11. Legal review as required12. Presolicitation Notice Published in FedBizOpps13. Solicitation Issued14. Pre-proposal Conference Held15. Proposals/Quotations/Bids Received

16. Initial Technical Review Completed17. Initial Technical Report/Minutes Received18. Competitive Range Determination Completed19. Site Visits/Surveys Completed20. Negotiations Start

21. Negotiations Completed22. Final Proposal Revisions Received23. Final Technical Review Completed24. Final Technical Report/Minutes Received25. Source Selection Approved

26. DOL EEO Clearance Obtained (over $10M)27. Subcontracting Plan, concurrence by SBS & PCR28. Internal Pre-award Review/Approval Completed29. External Pre-award Review/Approval Completed30. Contract Award Issued

31. Post-award Notifications Issued (e.g., Congressional Notification)32. Award Synopsis Published Acquisition Milestone Target Date Revised Date Completion Date FAR 7.105(b)(22) Identification of Participants in Acquisition Plan Preparation Reviews and Approvals of Acquisition Plan Note: Please fill in with N/A for Reviews and Approvals that are not required due to the value of the Acquisition.

Official N/A Name and Title Signature Date Funds Certifying Official Requiring Activity Representative Requiring Activity Representative's Immediate Supervisor Program Manager Head of the Sponsoring Program Office Contracting Officer Chief of the Contracting Office Office of the General Counsel (Legal) Head of the Contracting Activity Competition Advocate HHS Senior Procurement Executive *Please submit final draft and properly reviewed APs with appropriate signatures, which require review and approval at the Department to: OGAPA@HHS.gov - Subject Line should include “Department Review and Approval for AP” (see section 1.4 of the APG guidance for additional information.

Request for changes to this Template may be submitted to the Director, Office of Acquisition Policy (OAP). After review accepted changes will be approved by the Senior Procurement Executive (SPE). The Director, OAP will document all approved changes, to include publishing as required.

11.0.0.20130303.1.892433.887364 Acquisition Planning Health and Human Services Acquisition Planning

Acquisition Title: CHC DESKTOP REFRESH
Agency: IHS
NIH Divisions:
PSC Divisions:
PSC Other Division:
Acquisition Year: 2020
Author: PERRY FRANCIS
FAR 7.105 (a)(1) Statement of Need: This acquisitions will replace desktops at the Chinle Hospital Facility that have reached their useful lifecycle. Desktops performance requirements have increased and the equipment no longer meets the performance requirements. Equipment is no longer under warranty and poses a risk for failure.
FAR 7.105 (a)(1) - Technical and Contractual History: 80% of the existing desktops are beyond their useful lifecycle of 5 year of service, they have potential for failure at anytime and would put departments and the facility at risk if the function they provide is critical.
FAR 7.105 (a)(1) - Acquisition Alternatives: This does not apply to this requirement.
FAR 7.105(a)(2) - Compatibility: CSU currently has invested in an Enterprise Architecture comprising of the "DELL" hardware and services. The facility infrastructure as been in aligned with vendor technologies and protocols for set management and functions. The cost/time to merge technologies/environments and to ensure an overall stable infrastructure while using mixed architecture would greatly multiply requirements of man-hours/capital investments.
FAR 7.105(a)(2) - Constraints: CSU currently has invested in an Enterprise Architecture comprising of the "DELL" hardware and services. The facility infrastructure as been in aligned with vendor technologies and protocols for set management and functions. The cost/time to merge technologies/environments and to ensure an overall stable infrastructure while using mixed architecture would greatly multiply requirements of man-hours/capital investments.
:
FAR 7.105 (a)(4) - Compatibility or Performance: Referenced OIT Approved Hardware and Software specifications for use in IHS and recommended requirements for Electronic Health Record use.
FAR 7.105 (a)(5) - Delivery or Performance-Period Requirements: Delivery lead time is 30 days after receipt of order.
FAR 7.105(a)(6) - Trade-offs: This does not apply to this requirement. Will use Lowest Price Technically Acceptable.
FAR 7.105 (a)(7) - Technical, Cost, and Schedule Risks: This does not apply to this requirement.
FAR 7.105 (a)(7) - Organizational Conflict of Interest: This does not apply to this requirement.
FAR 7.105 (a)(8) - Acquisition Streamlining: Per FAR 12.6, a combined synopsis/solicitation for commercial items will be used in addition to FAR 13.5 procedures. No need for draft solicitations or pre-solicitation conferences.
FAR 7.105 (b)(1) - Sources: Based on Market Research using NAICS 334111 and searching in the Dynamic Small Business website, there are SMALL BUSINESS = 3,306

BUY INDIAN = 230, SDVOSB = 485 ,HUBZONE = 236, BUY INDIAN & HUBZONE = 29

FAR 7.105 (b)(1) - Small Business: Based on the market research, there is enough competition to warrant use of a Total Small Business Set-Aside and in conjunction with a socio-economic indicator. Based on the findings, a Buy Indian set-aside will be used.
FAR 7.105 (b)(1) - Market Research: Along with small business source research, from experience as a Contracting Officer, CCHCF has been successful in acquiring IT equipment through Buy Indian vendors in the past 2-3 years.
FAR 7.105(b)(2) - Competition: Per FAR Subpart 13.5 a combined synopsis/solicitation for commercial items will be issued on beta.SAM.gov. A Brand Name Justification for Dell products will be attached to the solicitation.
FAR 7.105(b)(2) - Major Components or Subsystems Competition: This does not apply to this requirement.
FAR 7.105(b)(2) - Spares and Repair Parts Competition: This does not apply to this requirement.
FAR 7.105(b)(2) - Subcontract Competition: This does not apply to this requirement.
FAR 7.105(b)(2) - Contract Type Selection: The resultant contract will be a firm fixed price purchase order for a one time delivery of IT equipment.
FAR 7.105(b)(2) - Source Selection Procedures: The lowest price technically acceptable source selection process is appropriate in this case, because best value is expected to result from selection of the technically acceptable proposal with the lowest evaluated price. Solicitations shall specify that award will be made on the basis of the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-cost factors.
FAR 7.105(b)(5) - Special Contracting Methods: This does not apply to this requirement.
FAR 7.105(b)(5) - Unique Solicitation Clauses or Provisions: This does not apply to this requirement.
FAR 7.105(b)(5) - Lease or Purches: This does not apply to this requirement.
FAR 7.105(b)(5) - Performance-Based Acquisition: This does not apply to this requirement, because this is a one time supply order.
FAR 7.105(b)(5) - Information Technology Acquisition: CPIC Business Needs Statement and Business Case was approved by OIT, a copy is available upon request: 2019-54-0031
FAR 7.105 (b)(6) - Budgeting: IGCE was derived by researching the price of DELL products.
IGCE Completion Date: 05/27/2020
FAR 7.105 (b)(6) - Funding: 100% of funds are available.
CheckBox1: 1
CheckBox2: 0
CheckBox7: 0
CheckBox3: 0
CheckBox4: 0
CheckBox8: 0
FAR 7.105 (b)(7) - Product or Service Descriptions: The IT equipment products requested are commercial items, and this requirement is a one time delivery, and is not a performance based acquisition.
FAR 7.105(b)(8) - Priorities, Allocations and Allotments: This does not apply to this requirement.
FAR 7.105 (b)(9) - Contractor versus Government Performance Consideration: This does not apply to this requirement.
FAR 7.105 (b)(10) - Inherently Governmental Functions: This does not apply to this requirement.
(Please indicate your rationale for selecting either “yes” or “no.”):
FAR 7.105(b)(11) - Contractor Monitoring Management System: This does not apply to this requirement.
FAR 7.105(b)(11) - Section 508: This requirement will reference HHSAR provision 352.239-73 Electronic and Information Technology Accessibility Notice in the solicitation, and also 352.239-74 Electronic and Information Technology Accessibility in the resultant contract.
FAR 7.105 (b)(12) - Make or Buy Program Considerations: This does not apply to this requirement.
FAR 7.105 (b)(13) - Test and Evaluation: This does not apply to this requirement.
FAR 7.105 (b)(140) - Contractor or Agency Maintenance Support: This does not apply to this requirement.
FAR 7.105 (b)(140) - Reliability, Maintainability, and Quality Assurance Requirements: The specifications call for ProSupport services for 1 year extended and 3 years in addition. Hardware warranty has initial year but extended years.
FAR 7.105 (b)(140) - Contractor Data Requirements: This does not apply to this requirement.
FAR 7.105 (b)(140) - Standardization Concepts: Chinle currently has invested in an Enterprise Architecture comprising of the "DELL" hardware and services. The facility infrastructure as been in aligned with vendor technologies and protocols for set management and functions. The cost/time to merge technologies/environments and to ensure an overall stable infrastructure while using mixed architecture would greatly multiply requirements of man-hours/capital investments.
FAR 7.105 (b)(15) - Government-Furnished Property: This does not apply to this requirement.
FAR 7.105 (b)(16) - Government-Furnished Information: This does not apply to this requirement.
FAR 7.105 (b)(17) - Environmental and Energy Conservation Objectives: The following will apply: 52.223-15 Energy Efficiency in Energy-Consuming Products and 52.223-16 Acquisition of EPEAT®-Registered Personal Computer Products.
FAR 7.105 (b)(18) - Classified Matters Security Considerations: This does not apply to this requirement.
FAR 7.105 (b)(18) - Information Technology Security Considerations: This does not apply to this requirement.
FAR 7.105 (b)(18) - Contractor Facility Access and Identity Verification Security Considerations: This does not apply to this requirement.
FAR 7.105(b)(19) - Contract Administration: Supervisory Point of Contact will sign off on the initial delivery of goods. COR is not required.
FAR 7.105(b)(20) - Other Considerations:
Acquisition milestone: Acquisition Plan signed by CO
Acquisition milestone: Acquisition Plan signed by CCO
Acquisition milestone: Market Research Completed
Acquisition milestone: Small Business Review Completed
Acquisition milestone: Justification and Approval (J&A) BRAND NAME APPROVED
Acquisition milestone: Solicitation Issued
Acquisition milestone: Proposals Received
Acquisition milestone: Technical Review Completed
Acquisition milestone: Technical Report/Minutes Received
Acquisition milestone: Competitive Range Determination Completed
Acquisition milestone: Source Selection Approved
Acquisition milestone: Contract Award Issued
Acquisition milestone: Award Synopsis Published
Target date: 06/01/2020
Target date: 06/01/2020
Target date: 06/01/2020
Target date: 06/01/2020
Target date: 06/01/2020
Target date: 06/15/2020
Target date: 07/08/2020
Target date: 07/15/2020
Target date: 07/20/2020
Target date: 07/20/2020
Target date: 07/30/2020
Target date: 08/07/2020
Target date: 08/10/2020
Revised date:
Completion date:
Insert Milestone:
FAR 7.105(b)(22) - Identification of Participants in Acquisition Plan Preparation:
Requiring Activity Representative is N/A: 0
Requiring Activity Representative is N/A: 0
Requiring Activity Representative Name and Title: Philene Tyler, Finance Officer
Requiring Activity Representative Name and Title: Perry Francis, IRM Supervisor
Funds Certifying Official signature:
Requiring Activity Representative date: 2020-05-28
Requiring Activity Representative date: 2020-05-28
Requiring Activity Representative signature:
HHS Senior Procurement Executive is N/A: 0
HHS Senior Procurement Executive is N/A: 1
HHS Senior Procurement Executive is N/A: 1
HHS Senior Procurement Executive is N/A: 0
HHS Senior Procurement Executive is N/A: 0
HHS Senior Procurement Executive is N/A: 1
HHS Senior Procurement Executive is N/A: 1
HHS Senior Procurement Executive is N/A: 1
HHS Senior Procurement Executive is N/A: 1
Requiring Activity Representative's Immediate Supervisor Name and Title: Darlene Chee, Acting CEO
Requiring Activity Representative's Immediate Supervisor signature:
Requiring Activity Representative's Immediate Supervisor date: 2020-06-02
Program Manager Name and Title:
Program Manager signature:
Program Manager date:
Head of the Sponsoring Program Office Name and Title:
Head of the Sponsoring Program Office signature:
Head of the Sponsoring Program Office date:
Contracting Officer Name and Title: Tanya Begay, CO
Contracting Officer signature:
Contracting Officer date: 06/02/2020
Chief of the Contracting Office Name and Title: DeeAndra Salabye, Acting Director
Chief of the Contracting Office signature:
Chief of the Contracting Office date: 6/2/2020
Office of the General Counsel (Legal) Name and Title:
Office of the General Counsel (Legal) signature:
Office of the General Counsel (Legal) date:
Head of the Contracting Activity Name and Title:
Head of the Contracting Activity signature:
Head of the Contracting Activity date:
Competition Advocate Name and Title:
Competition Advocate signature:
Competition Advocate date:
HHS Senior Procurement Executive Name and Title:
HHS Senior Procurement Executive signature:
HHS Senior Procurement Executive date: