HDEC04-19-R-0023.docx
DOCX document 223 KB Posted
- Attached to
- MHE Preventive Maintenance and Repair Services Federal contract opportunity
- Solicitation number
- HDEC04-19-R-0023
- Issued by
- Defense Commissary Agency
About this file
Solicitation for MHE Preventive Maintenance and Repair Services at Crane NSWC, Fort Campbell, Fort Knox, and Harrison Village.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HDEC0419R0023
Section SF 1449 - CONTINUATION SHEET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Crane NSWC Commissary MHE
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment Base Period: September 1, 2019 or "Date of Award" - August 31, 2020
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AA
| 60 |
| Hours |
Time-Unscheduled Maint/Repairs - Crane T&M Hourly Rate FOB: Destination
TOT ESTIMATED PRICE
CEILING PRICE
PSC CD: J039
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AB
| 8,000 |
| Each |
Materials - Crane
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
TOT ESTIMATED PRICE
CEILING PRICE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AC
| 10 |
| Each |
Trip Charge – Unscheduled Maint/Repair
Round trip from contractor’s business to commissary and return.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AD
| 2 |
| Each |
1R12-A, Propane Forklift - Crane
Semi-Annual Preventive Maintenance
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Fort Campbell - Commissary MHE
Preventive Maintenance (PM) and Repair of Material Handling Equipment Base Period: September 1, 2019 or "Date of Award" - August 31, 2020
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0002AA
| 70 |
| Hours |
Time-Unscheduled Maint/Repair - Campbell
TOT ESTIMATED PRICE
CEILING PRICE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0002AB
| 9,000 |
| Each |
Materials - Ft Campbell
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
TOT ESTIMATED PRICE
CEILING PRICE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0002AC
| 10 |
| Each |
Trip Charge – Unscheduled Maint/Repair
Round trip from contractor’s business to commissary and return
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0002AD
| 8 |
| Each |
1R05-A, Electric Pallet Jack - Campbell
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0002AE
| 4 |
| Each |
1R06, Electric Forklift - Ft Campbell
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0002AF
| 2 |
| Each |
1R08, Walker/Rider
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0002AG
| 2 |
| Each |
1R12-A, Propane Forklift - Ft Campbell
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Fort Knox - Commissary MHE
Preventive Maintenance (PM) and Repair of Material Handling Equipment Base Period: September 1, 2019 or "Date of Award" - August 31, 2020
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0003AA
| 70 |
| Hours |
Time-Unscheduled Maint/Repair - Ft Knox
TOT ESTIMATED PRICE
CEILING PRICE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0003AB
| 9,000 |
| Each |
Materials - Ft Knox
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
TOT ESTIMATED PRICE
CEILING PRICE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0003AC
| 10 |
| Each |
Trip Charge – Unscheduled Maint/Repair
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0003AD
| 8 |
| Each |
1R05-A, Electric Pallet Jack - Ft Knox
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0003AE
| 4 |
| Each |
1R06, Electric Forklift - Ft Knox
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0003AF
| 2 |
| Each |
1R12-A, Propane Forklift - Ft Knox
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Harrison Village - Commissary
Preventive Maintenance (PM) and Repair of Material Handling Equipment Base Period: September 1, 2019 or "Date of Award" - August 31, 2020
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0004AA
| 70 |
| Hours |
Time-Unscheduled Maint/Repair - Harrison
TOT ESTIMATED PRICE
CEILING PRICE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0004AB
| 9,000 |
| Each |
Materials - Harrison Village
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
TOT ESTIMATED PRICE
CEILING PRICE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0004AC
| 10 |
| Each |
Trip Charge – Unscheduled Maint/Repair
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0004AD
| 6 |
| Each |
1R05-A, Electric Pallet Jack - Harrison
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0004AE
| 2 |
| Each |
1R05-B, Electric Pallet Jack - Harrison
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0004AF
| 2 |
| Each |
1R06, Electric Forklift - Harrison
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Crane NSWC Commissary MHE |
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment First Option Year: September 1, 2020 - August 31, 2021
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AA
| 60 |
| Hours |
| OPTION |
| Time-Unscheduled Maint/Repairs - Crane |
T&M
TOT ESTIMATED PRICE
CEILING PRICE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AB
| 8,000 |
| Each |
| OPTION |
| Materials - Crane |
T&M This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
TOT ESTIMATED PRICE
CEILING PRICE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AC
| 10 |
| Each |
| OPTION |
| Trip Charge – Unscheduled Maint/Repair |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AD
| 2 |
| Each |
| OPTION |
| 1R12-A, Propane Forklift - Crane |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Fort Campbell - Commissary MHE |
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment First Option Year: September 1, 2020 - August 31, 2021
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1002AA
| 70 |
| Hours |
| OPTION |
| Time-Unscheduled Maint/Repair - Campbell |
T&M
TOT ESTIMATED PRICE
CEILING PRICE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1002AB
| 9,000 |
| Each |
| OPTION |
| Materials - Ft Campbell |
T&M This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
TOT ESTIMATED PRICE
CEILING PRICE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1002AC
| 10 |
| Each |
| OPTION |
| Trip Charge – Unscheduled Maint/Repair |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1002AD
| 8 |
| Each |
| OPTION |
| 1R05-A, Electric Pallet Jack - Campbell |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1002AE
| 4 |
| Each |
| OPTION |
| 1R06, Electric Forklift - Ft Campbell |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1002AF
| 2 |
| Each |
| OPTION |
| 1R08, Walker/Rider |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1002AG
| 2 |
| Each |
| OPTION |
| 1R12-A, Propane Forklift - Ft Campbell |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Fort Knox - Commissary MHE |
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment First Option Year: September 1, 2020 - August 31, 2021
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1003AA
| 70 |
| Hours |
| OPTION |
| Time-Unscheduled Maint/Repair - Ft Knox |
T&M
TOT ESTIMATED PRICE
CEILING PRICE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1003AB
| 9,000 |
| Each |
| OPTION |
| Materials - Ft Knox |
T&M This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
TOT ESTIMATED PRICE
CEILING PRICE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1003AC
| 10 |
| Each |
| OPTION |
| Trip Charge – Unscheduled Maint/Repair |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1003AD
| 8 |
| Each |
| OPTION |
| 1R05-A, Electric Pallet Jack - Ft Knox |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1003AE
| 4 |
| Each |
| OPTION |
| 1R06, Electric Forklift - Ft Knox |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1003AF
| 2 |
| Each |
| OPTION |
| 1R12-A, Propane Forklift - Ft Knox |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Harrison Village - Commissary |
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment First Option Year: September 1, 2020 - August 31, 2021
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1004AA
| 70 |
| Hours |
| OPTION |
| Time-Unscheduled Maint/Repair - Harrison |
T&M
TOT ESTIMATED PRICE
CEILING PRICE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1004AB
| 9,000 |
| Each |
| OPTION |
| Materials - Harrison Village |
T&M This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
TOT ESTIMATED PRICE
CEILING PRICE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1004AC
| 10 |
| Each |
| OPTION |
| Trip Charge – Unscheduled Maint/Repair |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1004AD
| 6 |
| Each |
| OPTION |
| 1R05-A, Electric Pallet Jack - Harrison |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1004AE
| 2 |
| Each |
| OPTION |
| 1R05-B, Electric Pallet Jack - Harrison |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1004AF
| 2 |
| Each |
| OPTION |
| 1R06, Electric Forklift - Harrison |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Crane NSWC Commissary MHE |
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment Second Option Year: September 1, 2021 - August 31, 2022
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001AA
| 60 |
| Hours |
| OPTION |
| Time-Unscheduled Maint/Repairs - Crane |
T&M
TOT ESTIMATED PRICE
CEILING PRICE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001AB
| 8,000 |
| Each |
| OPTION |
| Materials - Crane |
T&M This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
TOT ESTIMATED PRICE
CEILING PRICE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001AC
| 10 |
| Each |
| OPTION |
| Trip Charge – Unscheduled Maint/Repair |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001AD
| 2 |
| Each |
| OPTION |
| 1R12-A, Propane Forklift - Crane |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Fort Campbell - Commissary MHE |
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment Second Option Year: September 1, 2021 - August 31, 2022
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2002AA
| 70 |
| Hours |
| OPTION |
| Time-Unscheduled Maint/Repair - Campbell |
T&M
TOT ESTIMATED PRICE
CEILING PRICE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2002AB
| 9,000 |
| Each |
| OPTION |
| Materials - Ft Campbell |
T&M This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
TOT ESTIMATED PRICE
CEILING PRICE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2002AC
| 10 |
| Each |
| OPTION |
| Trip Charge – Unscheduled Maint/Repair |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2002AD
| 8 |
| Each |
| OPTION |
| 1R05-A, Electric Pallet Jack - Campbell |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2002AE
| 4 |
| Each |
| OPTION |
| 1R06, Electric Forklift - Ft Campbell |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2002AF
| 2 |
| Each |
| OPTION |
| 1R08, Walker/Rider |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2002AG
| 2 |
| Each |
| OPTION |
| 1R12-A, Propane Forklift - Ft Campbell |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Fort Knox - Commissary MHE |
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment Second Option Year: September 1, 2021 - August 31, 2022
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2003AA
| 70 |
| Hours |
| OPTION |
| Time-Unscheduled Maint/Repair - Ft Knox |
T&M
TOT ESTIMATED PRICE
CEILING PRICE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2003AB
| 9,000 |
| Each |
| OPTION |
| Materials - Ft Knox |
T&M This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
TOT ESTIMATED PRICE
CEILING PRICE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2003AC
| 10 |
| Each |
| OPTION |
| Trip Charge – Unscheduled Maint/Repair |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2003AD
| 8 |
| Each |
| OPTION |
| 1R05-A, Electric Pallet Jack - Ft Knox |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2003AE
| 4 |
| Each |
| OPTION |
| 1R06, Electric Forklift - Ft Knox |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2003AF
| 2 |
| Each |
| OPTION |
| 1R12-A, Propane Forklift - Ft Knox |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Harrison Village - Commissary |
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment Second Option Year: September 1, 2021 - August 31, 2022
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2004AA
| 70 |
| Hours |
| OPTION |
| Time-Unscheduled Maint/Repair - Harrison |
T&M
TOT ESTIMATED PRICE
CEILING PRICE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2004AB
| 9,000 |
| Each |
| OPTION |
| Materials - Harrison Village |
T&M This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
TOT ESTIMATED PRICE
CEILING PRICE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2004AC
| 10 |
| Each |
| OPTION |
| Trip Charge – Unscheduled Maint/Repair |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2004AD
| 6 |
| Each |
| OPTION |
| 1R05-A, Electric Pallet Jack - Harrison |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2004AE
| 2 |
| Each |
| OPTION |
| 1R05-B, Electric Pallet Jack - Harrison |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2004AF
| 2 |
| Each |
| OPTION |
| 1R06, Electric Forklift - Harrison |
FFP
NET AMT
PERFORMANCE WORK STATEMENT
Maintenance and Repair of Material Handling Equipment (MHE)
1 Introduction Maintenance and Repair of Material Handling Equipment (MHE) at various Defense Commissary Agency (DeCA) locations.
1.1 Scope
Provide Preventive Maintenance (PM) and unscheduled repair of MHE, as identified, located at DeCA commissaries and/or Central Distribution Centers (CDC).
1.2 Definitions
A. Contractor: The party to a contract who is responsible for providing the contracted services.
B. Material(s)/Part(s): Includes all items which enable the equipment listed to operate in accordance with manufacturer's recommendations. Such items may include but are not limited to: batteries, filters, belts, hoses, tires, and various fluids. Fuel, of any type, is not provided via this maintenance contract. Any part or material which individually costs five dollars ($5.00) or less shall be absorbed in the contractor’s overhead; regardless of quantity purchased or used.
C. Trip charge shall be defined as the round trip travel needed to complete a service call, for repairs only, from the home office or service center, whichever is closest to the commissary, and return to the home office or service center. Contractor may bill for a trip charge for calls made by the stores for estimates that do not ultimately result in a repair. Trip charges shall be firm fixed price and do not apply to PM services.
D. Preventive Maintenance: Scheduled preventive maintenance (PM) procedures consist of a complete operational check and service of designated equipment to ensure it is maintained in its intended operating condition according to the attached PM checklist. Labor, travel, and supply (lubricants, consumables, bench stock) costs incurred by the contractor in performing PM shall be included in the scheduled PM cost and shall not be charged or reimbursed separately.
E. Material Handling Equipment: For coverage purposes this PWS will cover the following types of equipment:
Repair and PM:
| • | Pallet Jack, Electric Walkie, 5000 Lb Capacity, DeCA CED # 1R05-A |
| • | Pallet Jack, Electric Walkie Stacker, 3000 Lb Capacity DeCA CED # 1R05-B |
| • | Forklift, Electric, Sit-Down, Low Profile DeCA CED # 1R06 |
| • | Narrow Aisle, Reach and Tier DeCA CED # 1R07 |
| • | Pallet Jack, Electric Walkie-Rider, 6000 Lb Capacity DeCA CED # 1R08 |
| • | Forklift, Sit-Down, Propane DeCA CED # 1R12-A |
| • | Forklift, Sit-Down, Gasoline DeCA CED # 1R12-B |
| • | Order Picker / Stock Selector, 3000 Lb Capacity, DeCA CED # 1R13 |
Repair Only:
| • | Battery Charger, 24 Volt, DeCA CED # 1R01 |
| • | Battery Charger, 36 Volt, DeCA CED # 1R04 |
Not all equipment types listed will be at each location. An itemized listing of equipment located at each Commissary is attached to the solicitation and the contract. Only items listed for each store are covered by the contract. A contract modification is required to change the equipment list for each store.
1.3 Key Government Positions
A. Contracting Officer (KO): An individual with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the contracting officer acting within the limits of their authority as delegated by the contracting officer.
The KO for this contract is:
B. Contracting Officer's Representative (COR): An individual designated and authorized in writing by the contracting officer to perform specific technical or administrative functions. When the term COR is used elsewhere in this contract, it means the COR as designated by the Contracting Officer.
C. Store Director (SD): An individual responsible for overall commissary operations. When the term SD is used elsewhere in this contract, it means the SD personally or the Acting SD.
D. Supply Management Specialist (SMS): An individual responsible for administrative work primarily concerned with analyzing, developing, evaluating, or promoting improvements in the policies, plans, methods, procedures, systems, or techniques of an equipment/maintenance program.
The Headquarter (HQ) SMS for this contract may be contacted at:
DeCA HQ Equipment Maintenance Team, EquipmentMaintenanceTeamMembers@deca.mil
2 General Requirements Contractor shall provide all labor, supervision, equipment, tools, materials, parts, transportation of employees, permits and other necessary items to perform the various services as identified in this PWS. The contractor shall have access to technical manuals required to perform the services as stated in this PWS.
At time of award and throughout the duration of this contract, the Contractor shall assure that Contractor personnel completely understand the requirements of this PWS. All Contractor service technicians must have licenses to operate all equipment covered in this PWS and must provide evidence of such license if requested by the COR. Service technicians should have a sound mechanical aptitude, ability, and an extensive working knowledge of troubleshooting, diagnosis, and repair of the equipment included in this PWS, to include various attachments and the following systems:
| INTERNAL COMBUSTION EQUIPMENT | ELECTRONIC POWERED EQUIPMENT |
| Transmission | All Electric Motors |
| Engine | Electric Control Panels |
| Hydraulic System | Hydraulic System |
| Drive Axle and Brakes | Drive Axle and Brakes |
| Steering Axle and Brakes | Steering Axle and Brakes |
| Electrical System | Electronic Control Panels/Computer boards |
Electronic Control Panels/Computer boards
2.1 Non-Personal Services
The Government shall neither supervise Contractor employees nor control the method by which the Contractor performs the required tasks. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual Contractor employees. It shall be the responsibility of the Contractor to manage its employees and to guard against any actions that are of the nature of personal services, or give the perception of personal services. If the Contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the Contractor's responsibility to notify the KO immediately.
2.2 Management
The Contractor shall work to integrate and coordinate all activities needed to execute the requirements of this PWS with the SD and/or the COR, and with headquarter personnel (SMS) as referenced in section 3. The Contractor shall manage the timeliness, completeness, and problem identification of all equipment issues. The Contractor shall provide corrective action plans, submit quotes, monitor timely identification of issues, and the management of subcontractors if required. The Contractor shall seek to ensure customer satisfaction at all times and present a professional and ethical business behavior.
2.3 Contract Administration and Management
The following subsections specify requirements for contract, management and personnel administration.
2.3.1 Contract Management
The Contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of the resources assigned to the requirement. The Contractor must maintain continuity between the support operations at corresponding DeCA locations, the headquarter level and the Contractor's corporate offices.
2.3.2 Contract Administration
The Contractor shall establish processes and assign appropriate personnel resources to effectively administer the requirements of this contract. The Contractor shall respond to Government requests for contractual actions with-in the time constraints as dictated in section 3. The Contractor shall have a single point of contact (POC) identified between the Government and Contractor assigned to support this contract. The Contractor shall assign/direct the work effort, maintaining proper and accurate time keeping records of personnel assigned to work on this requirement. The Contractor shall ensure DeCA email addresses are in their address book to prevent any loss or delay in communications.
2.4 Subcontract Management
The Contractor shall be responsible and accountable for subcontractor performance on this requirement. The prime Contractor will manage work distribution to ensure there are no Organizational Conflict of Interest (OCI) considerations.
2.5 Contractor Personnel
The following subsections specify requirements for contract, management and personnel administration.
2.5.1 Personnel Training
The Contractor shall accomplish the assigned work by qualified personnel with appropriate combinations of education, training, and experience.
2.5.2 Consumption or Use of Government Property
The Contractor shall not permit Contractor personnel to consume or use Government-owned resale items or any Government-owned equipment or supplies that are not specifically provided for Contractor use under this contract.
2.5.3 Use of Alcoholic Beverages/Drugs
The Contractor shall not permit Contractor employees to work under the influence of alcoholic beverages, illegal drugs, or illegally controlled substances. Contractor personnel are prohibited from using alcoholic beverages, illegal drugs, or illegally controlled substances while on duty.
2.5.4 Removal of Employees for Cause
The KO will require, in writing, that the Contractor immediately bar any Contractor employee from performing further work under this contract for any of the following actions: Willful destruction or mishandling of Government, patron, or vendor property; theft; use of alcoholic beverages, illegal drugs or illegal use of controlled substances; execution of work in other than a skillful manner; displaying disruptive/unacceptable behavior (e.g., abusive, demeaning, foul or threatening language and/or fighting) and willful violations of safety standards by Contractor personnel. Removal of any employees for such cause shall not constitute a valid basis for non-performance of contract services or a claim for additional compensation.
2.5.5 Installation Access
The Contractor shall be responsible for obtaining installation access as required for all Contractor employees authorized to work at the site specifically for this contract. Any Government furnished identification shall be returned to the Government when the Contractor employee no longer works for the Contractor at this installation or at the end of the contract whichever comes first. Military, retired or dependant identification cards are not authorized for use as a means to access the base for performance on this contract. Additionally, see Federal Acquisition Regulation Clause 52.204-4500 and 52.204-9.
2.5.5.1 Denial of Installation Access
Contractor employees may be denied access to the military installation by the installation law enforcement officials if it is determined that such entry may be contrary to good order, discipline or the security of the installation. The installation may bar Contractor employees from entering the military installation under the provisions of Title 18, United States Code Section 1382.
2.5.5.2 Motor Vehicle Registration
Prior to commencing work Contractor employees shall register their vehicles IAW the installation motor vehicle registration regulations.
2.5.6 Parking
The Contractor employees shall park only in areas designated by the SD.
2.5.7 Shopping Privileges
Contractor employees who are authorized to make purchases in commissaries shall show appropriate identification before purchasing commissary items and shall immediately remove the item(s) purchased from the commissary through the main exit door. Contractor employees with commissary privileges shall shop in the commissary only when they are off duty. Contractor personnel with commissary privileges shall not purchase merchandise for consumption by other personnel or organizations not authorized to shop in the commissary.
2.5.8 Identification of Contractor Personnel
Contractor personnel shall be easily recognized by wearing distinctive clothing bearing the name of the company and/or company identification. Contractor personnel shall wear required government furnished badge at all times during performance of this contract. Contractor personnel must use Personal Protective Equipment (PPE) as required IAW OSHA 29 Code of Federal Regulations (CFR) 1910.132.
2.6 Location and Hours of Work
The following subsections specify requirements for contract, management and personnel administration.
2.6.1 Contractor Hours of Performance
The Contractor shall provide for employees Monday through Friday, 8:00 a.m. to 5:00 p.m. local time at the store, excluding federal holidays.
2.6.2 Closing for Inclement Weather or Emergency Conditions
In the event that inclement weather or other emergency conditions force commissary closure, the SD and Contractor’s POC will agree upon the method by which the Contractor’s POC will receive notification about closures or delayed reporting times. The Contractor shall provide service as long as the commissary remains open.
2.6.3 Location of Work
On site work is required; however, in the event that it is not feasible, authorization will be obtained from the COR, who will complete a DeCA Form 40-108 for equipment removed from the installation. Contractor signature on the form will serve to hold the Contractor liable for any and all loss or damage to such equipment while in the Contractor’s possession. The Contractor will notify the COR when equipment will be off site for a duration exceeding seven (7) calendar days. The COR will coordinate with DeCA HQ if backup equipment is not readily available at the store and determine a plan of action.
2.7 Quality Control Plan
The Contractor shall establish and forward to the KO a complete quality control plan. The Contractor is required to submit the quality control plan with the proposal. The Contractor shall provide an updated copy of the quality control plan to the KO as changes occur. At a minimum the plan shall include the following:
2.7.1 Inspection System
The plan shall include an inspection system covering all the maintenance and repair services required by this contract and any other areas deemed necessary by the Contractor. The plan must specify the services and equipment to be inspected on either a scheduled or unscheduled basis, and how often inspections will be accomplished.
2.7.2 Methods of Identifying/Preventing Deficiencies
The Contractor shall establish methods for identifying/preventing deficiencies in the quality of services performed before the level of performance becomes unacceptable.
2.7.3 Records
The plan shall include on-site records of all inspections conducted by the Contractor and any necessary corrective action taken. This documentation and all records and schedules, as described in the PWS, that are the responsibility of the Contractor, are the property of the Government and shall be made available to the Government during the term of the contract.
3. Performance Requirements/Standards The following section specifies the Performance Objectives and Performance Elements for the contract.
3.1. Perform preventive maintenance for material handling equipment.
3.1.1. Standard: PMs shall be performed semiannually on equipment IAW section 1.2 C. Initial PM shall be performed within 30 days of contract award. Completed PM shall comply with federal, state and local laws, regulations, OSHA and DeCA standards. PMs shall include: labor, parts, expendables, fluids and trip charges to perform the requirements listed in the PM checklist.
The PM Schedule shall be as follows:
First - Within 30 days of each period of performance Second - Between 150 and 180 days after first PM schedule
3.1.2. Standard: Respond to service call and provide a signed repair quote to the COR within 16 working hours after receiving call from COR. Repairs costing over $1,000 shall be made with the approval from DeCA HQ SMS; repairs less than $1,000 shall be approved by the COR. COR is responsible for obtaining HQ SMS approval for all repairs exceeding $1,000. No more than 3 delinquent responses per store per contract year.
3.1.3. Standard: Repairs discovered during a PM shall be reported to the COR and processed IAW Paragraph 3.2.
3.1.4. Standard: Maintain cleanliness of area to include disposal of hazardous materials IAW all applicable local, state and federal regulations. Nonhazardous materials shall be disposed of only in designated on-site area(s).
3.1.5. Standard: Provide service ticket with a PM checklist to the COR at time of PM services being rendered. Service ticket and PM Checklist shall be signed by contractor and the COR with a copy left at the location and the original to be maintained by the contractor. The signed documents shall be attached to the invoice in Wide Area Work Flow (WAWF).
3.2. Repair material handling equipment.
3.2.1. Standard: Respond to service call and provide a signed repair quote to the COR within 16 working hours after receiving call from COR. Repairs costing over $1,000 shall be made with the approval from DeCA HQ SMS; repairs less than $1,000 shall be approved by the COR. COR is responsible for obtaining HQ SMS approval for all repairs exceeding $1,000. No more than 3 delinquent responses per store per contract year.
3.2.2. Standard: Contractor shall coordinate with COR date/time of all repairs to minimize interference of daily operations.
3.2.3. Standard: Perform approved repairs within 7 working days. Completed repairs shall comply with federal, state and local laws, regulations, OSHA and OEM standards. Contractor shall provide parts/warranty documents upon submission of service ticket.
3.2.4. Standard: Justification for a second technician shall be in writing and approved by the DeCA HQ SMS before work is performed. COR is responsible for obtaining HQ SMS approval for a second technician.
3.2.5. Standard: Contractor shall provide a 30 day warranty on replacement part(s) installed on the equipment. The contractor shall repair the equipment at no additional cost to the government if same replacement part(s) fail within 30 days after service has been performed.
3.2.6. Standard: Contractor shall provide a 30 day labor warranty on repairs conducted on equipment. Additional labor, part(s) and other expenses shall not be applied for the same repair on the same piece of equipment within a 30 day period.
3.2.7. Standard: Maintain cleanliness of area to include disposal of hazardous materials IAW all applicable local, state and federal regulations. Nonhazardous materials shall be disposed of only in designated on-site area(s).
3.2.8. Standard: At the time of completion for each repair or PM, the service ticket shall be signed by both the COR and the contractor representative. A copy of the signed service ticket shall be given to the COR and the original shall be maintained by the contractor. The contractor shall attach the signed service ticket to invoice in WAWF.
3.2.9. Standard: The contractor shall not bill the Government for an additional trip charge for contractor oversights, such as responding to the service call without the tools and commonly used parts as referenced in section 1.2, subsection B.
3.2.10. Standard: No more than 3 calls per month for repairs on one piece of equipment, except when authorized by a HQ SMS. COR is responsible for obtaining HQ SMS approval.
3.3. Provide service ticket, invoice and service history for material handling equipment covered by the contract.
3.3.1. Standard: Furnish completed service ticket for each repair and PM provided at the time the service is rendered to the COR. Service ticket shall be signed by both the contractor’s representative and the COR before leaving the Commissary for the day. A copy of the signed service ticket shall be left at the location and the contractor shall maintain the original copy. At a minimum, the ticket shall include:
· DeCA Location
· Service ticket number/job order number
· DeCA bar code
· Serial number
· Manufacturer
· Item Description
· Description of malfunction and work/service performed
· Signed documents shall be attached to the invoice in Wide Area Work Flow (WAWF)
3.3.2. Standard: Provide and maintain a service history report for repairs and PM services. Report shall be provided in an Excel spreadsheet with the following column headings:
· DeCA Location
· Service ticket number/job order number
· DeCA bar code
· Serial number
· Manufacturer
· Item Description
· Description of malfunction and work/service performed
· Total cost of repair
Report shall be submitted semi-annually to the contract specialist/administrator and the DeCA HQ Equipment Maintenance Team Members at EquipmentMaintenanceTeamMembers@deca.mil. The report for each half is due no later than the 10th day of the first month of the next half. If no services/repairs are provided during the month a negative email is to be sent to the POCs.
3.3.3. Standard: Submit combo invoice in WAWF and attach supporting documents to include: service ticket, PM checklist, parts receipts, subcontractor invoices, etc. Submit combo invoice no later than seven (7) calendar days after service is rendered.
4. Required Documentation The Contractor shall provide the required documentation as specified by the Government and throughout this PWS. Delivery schedule for required documentation shall be as outlined in PWS Section 3.
PM Checklist (3.1.5) Signed service ticket (3.1.5 and 3.2.8) Warranty documents (Part(s)/Material(s)) (3.2.5) Semi-Annually service report in an electronic spreadsheet format. (3.3.2) WAWF Invoice (3.3.3)
5. Special Requirements This section describes the special requirements for this effort. The following sub-sections provide details of various considerations on this effort.
5.1 Safety
The Contractor shall comply with all applicable OSHA, DOD, DeCA and installation safety regulations.
OSHA: https://www.osha.gov/ DOD: http://www.dtic.mil/whs/directives/corres/ins1.html DeCA: http://www.commissaries.com/inside_deca/publications/directives/directives_index.cfm
5.2 Security of Property
The Contractor shall be responsible for safeguarding all property while in the Contractor's possession. A Government representative will designate entrances and exits for Contractor personnel to use in the commissary. At the close of each work period, the Contractor shall return all government equipment and materials provided for Contractor’s use to the proper designated location.
5.3 Accident Reporting
The contractor shall report accidents immediately to the COR or alternate COR or on duty government manager. The contractor shall maintain an accurate record of and shall report the accident on DeCA Form 30-301 as referenced in DeCAM 30-17.1, Chapter 6 and Appendix E for accidents resulting in death, traumatic injury, occupational illness or damage to government property incident to work performed under this contract. Such notification shall be as soon as practicable, but in no case later than the next business day following the accident.
The DeCA Form 30-301 and DeCAM 30-17.1 can be found at: http://www.commissaries.com/inside_deca/publications/directives/directives_index.cfm
6. Government Furnished Materials This section describes the special requirements for this effort. The following sub-sections provide details of various considerations on this effort.
6.1 Utilities
The Government will provide the utilities necessary to perform all operations required by this contract.
6.2 Telephone
The Government will provide access to local telephone service (installation and surrounding community). The local service is limited to use for official business only (Government business and emergencies).
7. Environmental Requirements The Contractor shall comply with all environmental requirements listed below as mandatory and referenced under paragraph 3.0, Performance Requirements. The Contractor shall comply with all applicable OSHA, DOD, DeCA and Installation environmental regulations.
7.1 Mandatory Compliance
· Lubricating oils shall be a minimum of 25% recovered materials.
· Engine coolants shall be reclaimed.
8. Enterprise Wide Contractor Manpower Reporting (eCMRA) The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Defense Commissary Agency (DeCA) via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/ .
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year.. Contractors may direct questions to the eCMRA help desk at http://www.ecmra.mil/.
PM CHECKLIST
| CED# |
| PREVENTIVE MAINTENANCE TASK LIST |
| 1R13 |
| ORDER PICKER / STOCK SELECTOR |
| Task |
| Procedure or Action |
| Service Tech Initials |
| 1 |
| Battery |
| check water level and add water if necessary |
perform an equalization charge
| Panels - Latches |
| check operation |
| Power Disconnect |
| check operation |
| 2 |
| Brake |
| check operation |
| Fluid |
| check fluid level and add fluid if necessary |
Change brake fluid annually (TO BE PERFORMED DURING THE FIRST "SEMI-ANNUAL" PREVENTIVE MAINTENANCE (PM)
| Rods & Drum Splines |
| lubricate with anti-seize lubricant if necessary |
| Master Cylinder |
| check operation |
| 3 |
| Control Handle |
| check operation |
| Control Handle Bushing |
| check condition and lubricate with multi-purpose grease |
| 4 |
| Electrical Circuits |
| check operation |
| Contactors |
| check condition |
| Motor Brushes |
| check condition and replace if needed |
| 5 |
| Forks |
| check for damage |
| Fork pin & guides |
| lubricate with engine oil if necessary |
| Lowering interrupt switch |
| check operation |
| 6 |
| Gauges, Horn, Lights, Fuses |
| check operation |
| 7 |
| Hydraulic hoses and clamps |
| check for leaks |
| Hydraulic oil level |
| check level and add hydraulic oil if necessary |
change hydraulic oil annually (TO BE PERFORMED DURING THE FIRST "SEMI-ANNUAL" PREVENTIVE MAINTENANCE (PM)
| Dipstick/Breather Cap |
| clean or replace |
| Hydraulic oil filter |
| replace annually (TO BE PERFORMED DURING THE FIRST "SEMI-ANNUAL" PREVENTIVE MAINTENANCE (PM) |
| 8 |
| Lift Chains and Anchors |
| check for damage and lubricate with engine oil |
| Sheaves |
| check condition and lubricate with engine oil |
| 9 |
| Mast and Platform |
| check condition |
| 10 |
| Header hoses and clamps |
| check condition |
| 11 |
| Sliding surfaces |
| check condition and lubricate with multipurpose grease |
| 12 |
| Wheel nut torque |
| tighten if required |
| 13 |
| Master Drive Unit |
| check operation |
| M.D.U. splines |
| check operation |
| 14 |
| Steering Chain |
| check condition and lubricate with multipurpose grease |
| 15 |
| Electrical Cable Sheaves |
| check condition and lubricate with engine oil |
| 16 |
| Pedals, Levers, Hinges, Linkages |
| check operation and lubricate with anti-seize lubricant |
| 17 |
| Base Arm Bearing |
| lubricate with engine oil if necessary |
| 18 |
| Drive Tire and Wheels |
| check condition |
| Wheel bearings |
| check condition and lubricate with multipurpose grease if necessary |
| 19 |
| All motors |
| clean with compressed air |
| 20 |
| Safety Labels |
| check condition and replace if needed |
| NOTE* |
| If deficiencies are detected during semi-annual PM checks, report findings to the COR. |
| CED# |
| PREVENTIVE MAINTENANCE TASK LIST |
| 1R06 |
| FORKLIFT, ELECTRIC, SIT-DOWN LOW PROFILE |
| Task |
| Procedure or Action |
| Service Tech Initials |
| 1 |
| Battery |
| check water level and add water if necessary |
perform an equalization charge
| Panels - Latches |
| check operation |
| Power Disconnect |
| check operation |
| 2 |
| Brake |
| check operation |
| Fluid |
| check fluid level and add fluid if necessary |
change brake fluid annually (TO BE PERFORMED DURING THE FIRST "SEMI-ANNUAL" PREVENTIVE MAINTENANCE (PM)
| Rods & Drum Splines |
| check operation and lubricate with anti-seize lubricant |
| Brake linkage and shafts |
| check operation and lubricate with multipurpose grease |
| Master Cylinder |
| check operation |
| 3 |
| Parking Brake |
| Check operation and adjust as necessary |
| Linkage |
| check condition and lubricate with silicone spray |
| 4 |
| Direction and speed control pedals |
| check operation |
| 5 |
| Electrical Circuits |
| check operation |
| Contactors |
| check condition |
| Motor Brushes |
| check condition and replace if needed |
| 6 |
| Differential and speed reducer |
| check for leaks |
change gear oil annually (TO BE PERFORMED DURING THE FIRST "SEMI-ANNUAL" PREVENTIVE MAINTENANCE (PM)
| 7 |
| Forks |
| check condition |
| Fork pins and guides |
| check condition and lubricate with engine oil if necessary |
| 8 |
| Side shift carriage |
| check 4 fittings and lubricate with multipurpose grease |
| Integral Side shift carriage (upper/lower bearings) |
| check wear on bearings and replace as necessary |
| 9 |
| Gauges, Horn, Lights, Fuses |
| check operation |
| 10 |
| Hydraulic hoses and clamps |
| check for leaks |
| Hydraulic oil level |
| check hydraulic oil level and add if necessary |
change hydraulic oil level annually (TO BE PERFORMED DURING THE FIRST "SEMI-ANNUAL" PREVENTIVE MAINTENANCE (PM)
| Hydraulic Tank Breather |
| Clean or replace |
| Hydraulic oil filter |
| replace annually (TO BE PERFORMED DURING THE FIRST "SEMI-ANNUAL" PREVENTIVE MAINTENANCE (PM) |
| 11 |
| DC motor brushes hydraulic pump |
| check condition and replace if needed |
| 12 |
| Pivots (mast) |
| check fittings and lubricate with multipurpose grease as necessary |
| Mast |
| check operation |
| Mast sliding surfaces |
| check condition and lubricate with multipurpose grease as necessary |
| Mast carriage, header, hoses |
| check condition |
| Lift chains |
| check condition and lubricate with engine oil if necessary |
| 13 |
| Tires |
| Check condition |
| Steering and drive wheel nuts |
| Check torque |
| Wheel bearings |
| check condition and lubricate with multipurpose grease if needed |
| 14 |
| All motors |
| clean with compressed air |
| 15 |
| Safety Labels |
| check condition and replace if needed |
| NOTE* |
| If deficiencies are detected during semi-annual PM checks, report findings to the COR. |
| CED# |
| PREVENTIVE MAINTENANCE TASK LIST |
| 1R05-A |
| PALLET JACK, ELECTRIC, (WALKIE 1R05-A) AND (WALKIE/RIDER 1R08) |
| 1R08 |
| Task |
| Procedure or Action |
| Service Tech Initials |
| 1 |
| Battery |
| check water level and add water if necessary |
perform an equalization charge
| Panels - Latches |
| check operation |
| Power Disconnect |
| neutralize and clean |
| 2 |
| Brake |
| check operation |
| 3 |
| Drive unit |
| check level and add oil if necessary |
change oil annually (TO BE PERFORMED DURING THE FIRST "SEMI-ANNUAL" PREVENTIVE MAINTENANCE (PM)
| 4 |
| Electrical Circuits |
| check operation |
| Contactors |
| check condition |
| Motor Brushes |
| check condition and replace if needed |
| 5 |
| Chassis |
| check all fittings and lubricate with multipurpose grease if needed |
| 6 |
| Caster Wheel |
| check clearance and adjust if needed |
| 7 |
| All linkage |
| check condition and lubricate with multipurpose grease |
| 8 |
| Load wheel bearings |
| check condition and lubricate with multipurpose grease |
clean and repack bearings annually (TO BE PERFORMED DURING THE FIRST "SEMI-ANNUAL" PREVENTIVE MAINTENANCE (PM)
| 9 |
| Hydraulic hoses and clamps |
| check for leaks |
| Hydraulic oil level |
| check level and add hydraulic oil if necessary |
change hydraulic oil annually (TO BE PERFORMED DURING THE FIRST "SEMI-ANNUAL" PREVENTIVE MAINTENANCE (PM)
| Dipstick/Breather Cap |
| clean or replace |
| Hydraulic oil filter |
| replace annually (TO BE PERFORMED DURING THE FIRST "SEMI-ANNUAL" PREVENTIVE MAINTENANCE (PM) |
| Relief valve |
| check condition and settings |
| 10 |
| mounting bolts for the electric motor and drive unit |
| check torque |
| 11 |
| Wheel bolts |
| check torque |
| 12 |
| Controls |
| clean as needed |
| 13 |
| Interlock switches |
| check operation |
| 14 |
| All motors |
| clean with compressed air |
| 15 |
| Steer handle pivot pins |
| check torque |
| 16 |
| Emergency disconnect switch |
| test operation |
| 17 |
| Safety Labels |
| check condition and replace if needed |
| NOTE* |
| If deficiencies are detected during semi-annual PM checks, report findings to the COR. |
| CED# |
| PREVENTIVE MAINTENANCE TASK LIST |
| 1R05-B |
| PALLET JACK, ELECTRIC, WALKIE-STACKER |
| Task |
| Procedure or Action |
| Service Tech Initials |
| 1 |
| Battery |
| check water level and add water if necessary |
perform an equalization charge
| Power Disconnect |
| check operation |
| Battery box and connectors |
| neutralize and clean |
| 2 |
| Brake |
| check operation |
| 3 |
| Drive unit |
| check level and add oil if necessary |
change oil annually (TO BE PERFORMED DURING THE FIRST "SEMI-ANNUAL" PREVENTIVE MAINTENANCE (PM)
| 4 |
| Electrical Circuits |
| check operation |
| Contactors |
| check condition |
| Motor Brushes |
| check condition and replace if needed |
| 5 |
| Chassis |
| check all fittings and lubricate with multipurpose grease if needed |
| 6 |
| Caster Wheel |
| check clearance and adjust as needed |
| 7 |
| All linkage |
| check condition and lubricate with multipurpose grease |
| 8 |
| Load wheel bearings |
| check condition and lubricate with multipurpose grease |
clean and repack bearings annually (TO BE PERFORMED DURING THE FIRST "SEMI-ANNUAL" PREVENTIVE MAINTENANCE (PM)
| 9 |
| Hydraulic hoses and clamps |
| check for leaks |
| Hydraulic oil level |
| check level and add hydraulic oil if necessary |
change hydraulic oil annually (TO BE PERFORMED DURING THE FIRST "SEMI-ANNUAL" PREVENTIVE MAINTENANCE (PM)
| Dipstick/Breather Cap |
| clean or replace |
| Hydraulic oil filter |
| replace annually (TO BE PERFORMED DURING THE FIRST "SEMI-ANNUAL" PREVENTIVE MAINTENANCE (PM) |
| Relief valve |
| check condition and settings |
| 10 |
| Mounting bolts for the electric motor and drive unit |
| check torque |
| 11 |
| Wheel bolts |
| check torque |
| 12 |
| Controls |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.