HDEC04-15-R-0023_Solicitation_Amendment.pdf
PDF 392 KB Posted
- Attached to
- MHE Maintenance and Repair Services Federal contract opportunity
- Solicitation number
- HDEC04-15-R-0023
- Issued by
- Defense Commissary Agency
About this file
MHE Maintenance and Repair Services
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 0415R0023_Amendment_0002.pdf | ||
| HDEC04-15-R-0023.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
HDEC04-15-R-0023 12-Feb-2014
b. TELEPHONE NUMBER 8. OFFER DUE DATE/LOCAL TIME
04:00 PM 13 Apr 2015
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
HDEC049. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
HDEC04-15-R-0023
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
CHRISTINA WILLIS
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
SEE SCHEDULE
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
WOMEN-OWNED SMALL
BUSINESS (WOSB)
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
DEFENSE COMMISSARY AGENCY
SUPPLY & EQUIPMENT DIVISION
BUILDING P 11200
1300 E AVENUE
FORT LEE VA 23801-1800
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE
SEE ITEM 9
15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
(804) 734-8269/8886FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL BUSINESS
(EDWOSB)
SIZE STANDARD:
$7.5 million
NAICS:
811310
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF106
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
HDEC04-15-R-0023
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Eglin AFB Commissary MHE
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment Base: April 1, 2015 or "Date of Award" - March 30, 2016
PMs shall include: labor, parts, expendables, fluids and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
FOB: Destination
PURCHASE REQUEST NUMBER: HQCSK333252700000
NET AMT
0001AA 54 Hours Time - Unscheduled Maint/Repairs - Eglin
T&M
Hourly Rate
TOT ESTIMATED PRICE
CEILING PRICE
0001AB 7,000 Each Materials - Eglin
T&M
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
0001AC 5 Each Trip Charge - Unscheduled Maint/Repairs
FFP
Round trip from contractor's business to commissary and return.
0001AD 8 Each 1R05-A, Electric Pallet Jack-Eglin
FFP
Semi-Annual Preventative Maintenance
0001AE 6 Each 1R06, Electric Forklift-Eglin
FFP
0001AF 2 Each 1R07, Narrow Aisle Forklift-Eglin
FFP
0001AG 4 Each 1R08, Walkie Rider-Eglin
FFP
0001AH 2 Each 1R12-A, Propane Forklift- Eglin
FFP
0001AJ 2 Each 1R13, Order Picker - Eglin
FFP
Pensacola Commissary MHE
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment Base: April 1, 2015 or "Date of Award" - March 30, 2016
PMs shall include: labor, parts, expendables, fluids and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
PURCHASE REQUEST NUMBER: HQCSKC33252700000
0002AA 54 Hours Time-Unscheduled Maint/Repairs-Pensacola
T&M
0002AB 7,000 Each Materials-Pensacola
T&M
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and
0002AC 5 Each Trip Charge-Unscheduled Maint/Repair
FFP
Round trip from contractor’s business to commissary and return.
0002AD 4 Each 1R05-A, Electric Pallet Jack-Pensacola
FFP
0002AE 4 Each 1R06, Electric Forklift-Pensacola
FFP
0002AF 6 Each 1R08, Walkie Rider-Pensacola
FFP
0002AG 2 Each 1R12-B, Gas Forklift-Pensacola
FFP
Tyndall AFB Commissary MHE
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment Base: April 1, 2015 or "Date of Award" - March 30, 2016
PMs shall include: labor, parts, expendables, fluids and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
PURCHASE REQUEST NUMBER: HQCSJR33252700000
0003AA 54 Hours Time - Unscheduled Maint/Repair -Tyndall
T&M
0003AB 7,000 Each Materials - Tyndall
T&M
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and
0003AC 5 Each Trip Charge-Unscheduled Maint/Repair
FFP
0003AD 4 Each 1R05-A, Electric Pallet Jack-Tyndall
FFP
0003AE 4 Each 1R06, Electric Forklift-Tyndall
FFP
0003AF 2 Each 1R07, Narrow Aisle Forklift-Tyndall
FFP
0003AG 6 Each 1R08, Walkie Rider-Tyndall
FFP
Whiting Field Commissary MHE
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment Base: April 1, 2015 or "Date of Award" - March 30, 2016
PMs shall include: labor, parts, expendables, fluids and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
PURCHASE REQUEST NUMBER: HQCSJS33232700000
0004AA 54 Hours Time - Unscheduled Maint/Repair-Whiting
T&M
0004AB 7,000 Each Materials - Whiting Field
T&M
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and
0004AC 5 Each Trip Charge - Whiting Field
FFP
0004AD 2 Each 1R06, Electric Forklift-Whiting Field
FFP
0004AE 2 Each 1R07,Narrow Aisle Forklift-Whiting Field
FFP
0004AF 2 Each 1R08, Walkie Rider-Whiting Field
FFP
0004AG 2 Each 1R12-A, Propane Forklift-Whiting Field
FFP
Hurlburt Field Commissary MHE
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment Base: April 1, 2015 or "Date of Award" - March 30, 2016
PMs shall include: labor, parts, expendables, fluids and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
PURCHASE REQUEST NUMBER: HQCSJT33252700000
0005AA 54 Hours Time-Unscheduled Maint/Repair-Hurlburt
T&M
0005AB 7,000 Each Materials-Hurlburt Field
T&M
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and
0005AC 5 Each Trip Charge-Unscheduled Maint/Repair
FFP
0005AD 6 Each 1R05-A, Electric Pallet Jack-Hurlburt
FFP
0005AE 4 Each 1R06, Electric Forklift- Hurlburt
FFP
0005AF 2 Each 1R07, Narrow Aisle Forklift-Hurlburt
FFP
0005AG 2 Each 1R08, Walkie Rider-Hurlburt
FFP
OPTION Eglin AFB Commissary MHE
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment Option Year One: March 1, 2016 - February 29, 2017
PMs shall include: labor, parts, expendables, fluids and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
1001AA 54 Hours OPTION Time-Unscheduled Maint/Repair-Eglin
T&M
1001AB 7,000 Each OPTION Materials-Eglin AFB
T&M
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and
1001AC 5 Each OPTION Trip Charge-Unscheduled Maint/Repair
FFP
1001AD 8 Each OPTION 1R05-A, Electric Pallet Jack-Eglin AFB
FFP
1001AE 6 Each OPTION 1R06, Electric Forklift-Eglin AFB
FFP
1001AF 2 Each OPTION 1R07, Narrow AIsle Forklift-Eglin AFB
FFP
1001AG 4 Each OPTION 1R08, Walkie Rider-Eglin AFB
FFP
1001AH 2 Each OPTION 1R12-A, Propane Forklift-Eglin AFB
FFP
1001AJ 2 Each OPTION 1R13, Order Picker-Eglin AFB
FFP
OPTION Pensacola Commissary MHE
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment Option Year One: March 1, 2016 - February 29, 2017
PMs shall include: labor, parts, expendables, fluids and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative
1002AA 54 Hours OPTION Time-Unscheduled Maint/Repair-Pensacola
T&M
1002AB 7,000 Each Materials-Pensacola
T&M
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and
1002AC 5 Each OPTION Trip Charge-Unscheduled Maint/Repair
FFP
1002AD 4 Each OPTION 1R05-A, Electric Pallet Jack-Pensacola
FFP
1002AE 4 Each OPTION 1R06, Electric Forklift-Pensacola
FFP
1002AF 6 Each OPTION 1R08, Walkie RIder-Pensacola
FFP
1002AG 2 Each OPTION 1R12-B, Gas Forklift-Pensacola
FFP
OPTION Tyndall AFB Commissary MHE
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment Option Year One: March 1, 2016 - February 29, 2017
PMs shall include: labor, parts, expendables, fluids and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative
1003AA 54 Hours OPTION Time-Unscheduled Maint/Repair-Tyndall
T&M
1003AB 7,000 Each OPTION Materials-Tyndall
T&M
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and
1003AC 5 Each OPTION Trip Charge-Unscheduled Maint/Repair
FFP
Round trip from contractor’s business to commissary and return.5
1003AD 4 Each OPTION 1R05-A, Electric Pallet Jack, Tyndall
FFP
Semi-Annual Preventive Maintenance
1003AE 4 Each OPTION 1R06, Electric Forklift- Tyndall AFB
FFP
1003AF 2 Each OPTION 1R07, Narrow Aisle Forklift-Tyndall AFB
FFP
1003AG 6 Each OPTION 1R08, Walkie Rider-Tyndall AFB
FFP
OPTION Whiting Field Commissary MHE
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment Option Year One: March 1, 2016 - February 29, 2017
PMs shall include: labor, parts, expendables, fluids and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative
1004AA 54 Hours OPTION Time-Unscheduled Maint/RepairWhiting Fie
T&M
1004AB 7,000 Each OPTION Materials-Whiting Field
T&M
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and
1004AC 5 Each Trip Charge-Unscheduled Maint/Repair
FFP
1004AD 2 Each 1R06, Electric Forklift- Whiting Field
FFP
1004AE 2 Each OPTION 1R07,Narrow Aisle Forklift-Whiting Field
FFP
1004AF 2 Each OPTION 1R08, Walkie Rider-Whiting Field
FFP
1004AG 2 Each OPTION 1R12-A, Propane Forklift-Whiting Field
FFP
1004AH
OPTION Not Used
FFP
Not Used
OPTION Hurlburt Commissary MHE
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment Option Year One: March 1, 2016 - February 29, 2017
PMs shall include: labor, parts, expendables, fluids and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative
1005AA 54 Hours OPTION Time-Unscheduled Maint/Repair Hurlburt
T&M
1005AB 7,000 Each OPTION Materials-Hurlburt Field
T&M
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and
1005AC 5 Each OPTION Trip Charge-Unscheduled Maint/Repair
FFP
1005AD 6 Each OPTION 1R05-A, Electric Pallet Jack-Hurlburt
FFP
1005AE 4 Each OPTION 1R06, Electric Forklift-Hurlburt
FFP
1005AF 2 Each OPTION 1R07, Narrow Aisle Forklift-Hurlburt
FFP
1005AG 2 Each OPTION 1R08, Walkie Rider-Hurlburt
FFP
OPTION Eglin AFB Commissary MHE
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment Option Year Two: March 1, 2017 - February 29, 2018
PMs shall include: labor, parts, expendables, fluids and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative
2001AA 54 Hours OPTION Time-Unschedule Maint/Repair Eglin
T&M
2001AB 7,000 Each OPTION Materials-Egiln AFB
T&M
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and
2001AC 5 Each Trip Charge-Unscheduled Maint/Repair
FFP
2001AD 8 Each OPTION 1R05-A, Electric Pallet Jack-Eglin AFB
FFP
2001AE 6 Each OPTION 1R06, Electric Forklift-Eglin AFB
FFP
2001AF 2 Each OPTION 1R07, Narrow Aisle Forklift-Eglin AFB
FFP
2001AG 4 Each OPTION 1R08, Walkie Rider-Eglin AFB
FFP
2001AH 2 Each OPTION 1R12-A, Propane Forklift-Eglin AFB
FFP
2001AJ 2 Each OPTION 1R13, Order Picker-Eglin AFB
FFP
OPTION Pensacola Commissary MHE
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment Option Year Two: March 1, 2017 - February 29, 2018
PMs shall include: labor, parts, expendables, fluids and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative
2002AA 54 Hours OPTION Time-Unscheduled Maint/Repair Pensacola
T&M
2002AB 7,000 Each OPTION Materials-Pensacola
T&M
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and
2002AC 5 Each OPTION Trip Charge-Unscheduled Maint/Repair
FFP
2002AD 4 Each OPTION 1R05-A, Electric Pallet Jack-Pensacola
FFP
2002AE 4 Each OPTION 1R06, Electric Forklift-Pensacola
FFP
2002AF 6 Each OPTION 1R08, Walkie Rider-Pensacola
FFP
2002AG 2 Each OPTION 1R12-B, Gas Forklift-Pensacola
FFP
OPTION Tyndall AFB Commissary MHE
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment Option Year Two: March 1, 2017 - February 29, 2018
PMs shall include: labor, parts, expendables, fluids and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative
2003AA 54 Hours OPTION Time-Unscheduled Maint/Repair Tyndall
T&M
2003AB 7,000 Each OPTION Materials- Tyndall
T&M
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and
2003AC 5 Each OPTION Trip Charge-Unscheduled Maint/Repair
FFP
2003AD 4 Each OPTION 1R05-A, Electric Pallet Jack-Tyndall
FFP
2003AE 4 Each OPTION 1R06, Electric Forklift-Tyndall
FFP
2003AF 2 Each OPTION 1R07, Narrow Aisle Forklift-Tyndall
FFP
2003AG 6 Each OPTION 1R08, Walkie Rider-Tyndall
FFP
OPTION Whiting Field Commissary MHE
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment Option Year Two: March 1, 2017 - February 29, 2018
PMs shall include: labor, parts, expendables, fluids and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative
2004AA 54 Hours OPTION Time-Unscheduled Maint/Repair
T&M
2004AB 7,000 Each OPTION Materials-Whiting FIeld
T&M
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and
2004AC 5 Each OPTION Trip Charge-Unscheduled Maint/Repair
FFP
2004AD 2 Each OPTION 1R06, Electric Forklift-Whiting Field
FFP
2004AE 2 Each OPTION 1R07,Narrow Aisle Forklift-Whiting Field
FFP
2004AF 2 Each OPTION 1R08, Walkie Rider-Whiting FIeld
FFP
2004AG 2 Each OPTION 1R12-A, Propane Forklift-Whiting Field
FFP
OPTION Hurlburt FIeld Commissary MHE
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment Option Year Two: March 1, 2017 - February 29, 2018
PMs shall include: labor, parts, expendables, fluids and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative
2005AA 54 Hours OPTION Time-Unscheduled Maint/Repair-Hurlburt
T&M
2005AB 7,000 Each OPTION Materials-Hurlburt
T&M
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and
2005AC 5 Each OPTION Trip Charge-Unscheduled Maint/Repair
FFP
2005AD 6 Each OPTION 1R05-A, Electric Pallet Jack-Hurlburt
FFP
2005AE 4 Each 1R06, Electric Forklift-Hurlburt
FFP
2005AF 2 Each OPTION 1R07, Narrow Aisle Forklift-Hurlburt
FFP
2005AG 2 Each OPTION 1R08, Walkie Rider-Hurlburt
FFP
ADDENDUM TO FAR 52.212-1
INSTRUCTION TO OFFERORS- COMMERCIAL ITEMS
(a) North American Industry Classification System (NAICS) code and small business size standard: The applicable NAICS to this solicitation is 811310 and the Size Standard is $7.5 million. Your Reps and Certs must include the NAICS applicable to this solicitation document and indicate your organization’s business size status.
(b) Submission of Offers: Proposals are to be submitted to the Defense Commissary Agency (DeCA), Supply/Equipment Acquisition Division DeCA/LEAE, ATTN: Christina Willis, 1300 E Avenue, Fort Lee, Virginia 23801-1800. You may send an email to christina.willis@deca.mil. The complete proposal with authorized representative’s signature must be received by the closing date and time annotated within this solicitation.
Failure by the offeror to submit all of the requirements may be cause for the proposal to be rejected with no further consideration given.
(b)(2) By submission of a proposal: Offeror acknowledges the requirement to register in Wide Area Workflow (WAWF) prior to award. The successful awardee will be required to submit “combo invoices” in WAWF to facilitate the payment process. For more information on WAWF, please log in to https://wawf.eb.mil/.
Offerors are encouraged to take the Web Based Training on the WAWF site if this is the first time providing a proposal to the government.
Offerors acknowledges the requirement to register in Electronic Document Access (EDA) prior to award. The successful awardee will use this site to receive and/or obtain the basic contract and any future modifications. For more information on EDA, please log in to http://eda.ogden.disa.mil/ via https://wawf.eb.mil/.
Offerors are encouraged to review the Training Material on the EDA site if this is the first time providing a proposal
Offerors acknowledges the requirement to register in myInvoice prior to award. The successful awardee can use this site to review payment status for invoices. For more information on myInvoice, please log in to https://myinvoice.csd.disa.mil/ via https://wawf.eb.mil/. Offerors are encouraged to review the Instructions on the myInvoice site if this is the first time providing a proposal to the government.
(b)(4) Technical acceptability: Offerors shall submit a separate technical proposal, including attachments.
It is imperative that your written technical proposal explicitly addresses all of the evaluation factors and sub-factors set forth under Technical Capability below. Each question should be addressed separately. The narrative must be written in a clear, concise fashion, describing precisely HOW the offeror proposes to perform the requirements. If you plan on subcontracting, provide information on your subcontractor(s) in each narrative. Please keep in mind the Limitations on Subcontracting as stated in FAR 52.219-14 when applicable.
Offerors are encouraged to arrange site visits to obtain detailed information regarding the equipment shown in the equipment list in the PWS. Arrangements should be made with the store director at each location. Store addresses and contact information can be found at http://www.commissaries.com/store_locator.cfm.
Technical specifications for the equipment covered by this requirement can be found on the Automated Commercial Equipment Description (ACED) website. Please reference the complete Commercial Equipment Description (CED) of the requested items at www.commissaries.com. Use the following instructions to navigate the website:
(1) Go to: www.commissaries.com
(2) To “About Us”
(3) To “Business with DECA”
(4) To “Equipment”
(5) To “Automated Commissary Equipment Descriptions”
(6) To “Search CED’s”
(7) In “Search” enter the CED number and search
(8) The CED will open for viewing/printing
CED numbers, for Material Handling Equipment (MHE) covered by this requirement, can be found in the Performance Work Statement (PWS).
(b)(6) Price: Provide your best price for each line item and enter the total price for the maximum quantity for each line item. Enter all pricing for the base and option years. Do not price parts CLINs. We will use a predetermined amount as a place holder for systems purposes once the contract is awarded. The vendor will be paid for actual costs for materials as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services supported by a copy attached to the invoice in Wide Area Workflow (WAWF).
Enterprise Wide Contractor Manpower Reporting (eCMRA) - Offerors should include the cost as part of your overall pricing submitted for base and option years.
(b)(8) Offerors must have certifications updated for the System for Award Management (SAM) at https://www.sam.gov/portal/public/SAM/ via https://www.acquisition.gov/ . SAM certifications must include the respective NAICS code found within the solicitation. The offeror only needs to complete paragraph (b) of FAR 52.212-3 and submit with their proposal if in SAM, if not in SAM then the offeror must complete FAR 52.212-3 in its entirety.
By submission of a proposal, the offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database prior to award, during performance, and through final payment of any contract resulting from this solicitation. If the Offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror. (refer to clause 52.204-7 System for Award Management (SAM) (JUL 2013))
(b)(10) Past Performance: Submit at least five (5) references from companies that you have conducted business with for services that are similar to those listed in this solicitation within the last three (3) years. You should notify the references that we will be contacting them to complete past performance surveys and that they should respond promptly.
Include the following information for each reference:
(1) Name of Company
(2) Point of Contact Name and Title
(3) Phone Number/Email Address
(4) Facsimile Number
(5) Email Address
(6) Description of Services Provided
The references will be asked to provide information on your company's past performance with regard to timeliness of service, repair history, and customer service/business relations. Any other past performance information available will also be considered. Please do not submit past performance references from DeCA Commissaries or DeCA HQ. DeCA will obtain past performance information from the commissaries and HQ. Past performance references are due 7 days prior to the closing date of the solicitation.
(c) Period for acceptance of offerors: 90 days.
ADDENDUM TO FAR 52.212-2
EVALUATION – COMMERCIAL ITEMS
The Government will make award to the Lowest Price Technically Acceptable (LPTA) offeror(s), in accordance with FAR 15.101-2. The evaluation criteria consist of three (3) evaluation factors: Technical, Past Performance and Price. To receive consideration for award, a rating of “Acceptable” must be achieved for the Technical factor and rating of “Acceptable” for the Past Performance factor. For each proposal found to be eligible for award, price will become the determining factor for making the award.
The LPTA process is appropriate when best value is expected to result from selection of the technically acceptable proposal with the lowest evaluated price. The LPTA process does not permit tradeoffs between price and non-price factors (FAR 15.101-2).
Evaluation factors and sub-factors shall be the primary determinant of the detailed information requested in the solicitation’s instructions to offerors.
If sub-factors are used, they are to be evaluated separately.
Factors and sub-factors shall be evaluated on an acceptable or unacceptable basis.
All LPTA shall evaluate cost/price and acceptability of the product/service.
1. Evaluation Factors: Offerors proposals will be evaluated against the following factors:
Factor 1 – Technical Acceptability of Service Sub-factor 1.1 – Performance Proposal Sub-factor 1.2 – Technician Experience
Factor 2 – Past Performance
Sub-factor 2.1 – Service Timeliness Sub-factor 2.2 – Repair History Sub-factor 2.3 – Customer Satisfaction
Factor 3 – Cost/Price
a. Order of Importance – Technical Acceptability of Service and Past Performance, when combined, are approximately equal to cost or price.
1.1 Factor 1: Technical Acceptability of Service
Submission Requirement:
Sub-factor 1.1: Performance Proposal
1. Offeror must provide a brief narrative, not to exceed 3 pages that demonstrate the offerors ability to provide the services detailed in the Performance Work Statement (PWS) and Preventive Maintenance (PM) task list. The narrative must be written in a clear, concise method, describing precisely how the offeror proposes to perform the requirements.
Minimum Requirement: Offeror must provide a brief narrative explaining how they will perform the standards prescribed in section 3 of the PWS.
Sub-factor 1.2: Technician Experience
2. Offeror must explain how service technicians have a sound mechanical aptitude, ability and extensive working knowledge of troubleshooting, diagnosing and repairing the equipment listed in the PWS section 1.2 paragraph E.
Minimum Requirement: Offeror possesses evidence that service technicians have the training or experience to perform repair(s) of equipment listed in PWS section 1.2 paragraph E.
Technical Acceptability: Technical factors and sub-factors that match the specific evaluation criteria for the RFP and assess whether the offeror’s proposal will satisfy the Government’s minimum requirements. Technical acceptability will be based on a scale of acceptable or unacceptable.
Technical Acceptable / Unacceptable Ratings All factors and sub-factors must receive an “acceptable” rating in order to be considered for award Rating Description Acceptable Proposal clearly meets the minimum requirements of the solicitation.
Unacceptable Proposal does not clearly meet the minimum requirements of the solicitation.
1.2 Factor 2: Past Performance
Submission Requirement:
The contractor is required to submit at least five (5) references from companies that they have conducted business with for services that are similar to those listed in this solicitation within the last three (3) years. Do NOT submit references from DeCA Commissaries or Headquarters, as that data will already be included in the Past Performance Information Retrieval System (PPIRS).
Past performance will be rated on an acceptable or unacceptable basis. A past performance questionnaire with the following questions will be submitted to the references provided.
Sub-factor 2.1: Service Timeliness
1. How is this offeror rated regarding their timeliness in responding and completing work/repair requests?
2. Do reports/surveys indicate that the offeror is responsive regarding customer’s questions or additional information concerning work performed?
Sub-factor 2.2: Repair History
1. What is this company’s success rate of completing work/repair request on first time visits?
Sub-factor 2.3: Customer Satisfaction
1. How did the offeror rate in overall business relations and customer satisfaction?
2. Do reports/surveys indicate that company would select this offeror again if they were given the opportunity?
Past Performance evaluation results in an assessment of the offeror’s probability of meeting the solicitation requirements. The past performance evaluation considers each offeror’s demonstrated recent and relevant record of performance in supplying products and services that meet the contract’s requirements.
Past Performance Acceptable / Unacceptable Ratings Rating Description Acceptable Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown.
Unacceptable Based on the offeror’s performance record, the Government has no reasonable expectation that the offeror will be able to successfully perform the required effort.
1.3 Factor 3: Cost/Price
Submission Requirement:
Each offer must submit a fixed price for preventative maintenance services for each equipment category. The contractor must also submit fixed labor rate for repairs.
Each offeror must submit:
Time – a fixed hourly labor rate for repairs (eCMRA – Offerors should include the cost as part of your overall pricing submitted for base and option years)
Materials – This is not a priced CLIN, it is a predetermined amount where DeCA will pay actual costs for materials as evidenced by supplier invoice for direct materials and supplies used to accomplish repair services.
PM – a firm-fixed price for preventative maintenance services for each equipment category Trip Charge – a firm-fixed price for a round trip from Contractor’s business to commissary and return.
The number of estimated trips is for evaluation purposes only and are not to be construed as guaranteed quantities.
Evaluation criteria
Time Hourly Rate * Estimated Hours = Evaluated Price Materials = Predetermined by DeCA
PM PM Rate * Quantity = Evaluated Price Trip Charge Contractor Rate * Estimated Trips = Evaluated Price
Sum of All of the Above = Total Evaluated Price Per Year
The above process will determine the total evaluated price per year for one location. The sum of the total evaluated price for the base and all option years for all locations will determine the total value for each proposal.
Award will be made to the responsible offeror(s) whose offer, conforming to the solicitation, provides the Lowest Price Technically Acceptable offer.
There are multiple locations on the solicitation; ONLY ONE AWARD IS POSSIBLE.
ADDENDUM TO FAR 52.212-4
TERMS AND CONDITIONS - COMMERCIAL ITEMS
The following paragraphs have been changed/added to FAR 52.212-4 Terms and Conditions – Commercial Items.
(c) Changes: Administrative Modifications-
The government may issue unilateral written modifications that do not affect the substantive rights of the parties. Examples of administrative modifications are corrections in the payment office address or changes to the accounting and appropriation data. Contract modifications will be issued and accessed through the Electronic Document Access System (EDA) http://eda.ogden.disa.mil via Wide Area Work Flow (WAWF) https://wawf.eb.mil/. Contractors must complete the on-line registration available at the website in order to retrieve documents displayed there.
(g) Invoice: Procedures-
All invoices shall be submitted electronically to DFAS Columbus via https://wawf.eb.mil/ in accordance with DFARS clause 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports (MAR 2008). The contract will require the type of invoice to be used as “Invoice and Receiving Report (COMBO)”.
Separate invoices shall be created for each location and service call.
The contractor must access the WAWF Vendor Tools on the DFAS website and complete the requirements to obtain an active WAWF account. This will allow the contractors to submit invoices via WAWF so that payments can be processed electronically through EFT.
(i) Payment: Procedures-
Contract payments will be processed electronically via EFT through the Defense Finance and Accounting Service (DFAS). Prior to DFAS releasing any contract payment, the contractor must submit a proper invoice using Wide Area Work Flow (WAWF) electronic commerce. After a proper invoice is received, a Government representative will acknowledge acceptance and receipt. After all items are properly submitted, the contract payment will be processed via DFAS electronically.
Payment status can be obtained by checking the Misc Info Tab on your invoice in WAWF and on the MyInvoice link or at https://myinvoice.csd.disa.mil/index.html via https://wawf.eb.mil/.
Payment Inquiries: Payment questions can be addressed by calling DFAS – Columbus, OH Customer Service at 800-756-4571, Opt 2, Opt 2.
If you need technical assistance on WAWF, contact: Ogden Help Desk, 866-618-5988, Opt 2, Opt 3
For additional WAWF information, see clause 252.232-7003, ELECTRONIC SUBMISSION OF PAYMENT
REQUESTS AND RECEIVING REPORTS (MAR 2008).
(q) Other Compliances: Labor Poster Information-
Clause at 52.222-41, Service Contract Act of 1965, as amended, is applicable to the services performed under this contract. The contractor is responsible for obtaining and posting the following publications available at http://www.dol.gov/compliance/topics/posters.htm
1. Employee Rights on Government Contracts (WHD Publication 1313)
2. Employee Rights under Fair Labor Standards Act (WHD Publication 1088)
3. Equal Employment Opportunity is the Law (OFCCP 1420)
If you are unable to obtain a copy of the applicable posters at the above web site, please contact the Contract Administrator identified on page one of this award document.
PERIODS OF PERFORMANCE:
Base Year: April 1, 2015 or “date of award” through March 31, 2016 Option Year 1: April 1, 2016 through March 31, 2017 Option Year 2: April 1, 2017 through March 31, 2018
PERFORMANCE WORK STATEMENT
Maintenance and Repair of Material Handling Equipment (MHE)
1 Introduction Maintenance and Repair of Material Handling Equipment (MHE) at various Defense Commissary Agency (DeCA) locations.
1.1 Scope
Provide Preventive Maintenance (PM) and unscheduled repair of MHE, as identified, located at DeCA commissaries and/or Central Distribution Centers (CDC).
1.2 Definitions
A. Contractor: The party to a contract who is responsible for providing the contracted services.
B. Material(s)/Part(s): Includes all items which enable the equipment listed to operate in accordance with (IAW) manufacturer's recommendations. Such items may include but are not limited to: batteries, filters, belts, hoses, tires, and various fluids. Fuel, of any type, is not provided via this maintenance contract. Replacement material(s) shall be OEM compliant, new out of the box. Any part or material which individually costs five dollars ($5.00) or less shall be absorbed in the contractor’s overhead; regardless of quantity purchased or used.
C. Trip charge shall be defined as the round trip travel needed to complete a service call, for repairs only, from the home office or service center, whichever is closest to the commissary, and return to the home office or service center. Contractor may bill for a trip charge for calls made by the stores for estimates that do not ultimately result in a repair. Trip charges shall be firm fixed price and do not apply to PM services.
D. Preventive Maintenance: PM’s shall be included and billed as repairs including hourly labor charge and parts.
E. Material Handling Equipment: For coverage purposes this PWS will cover the following types of equipment:
Repair and PM:
Pallet Jack, Electric Walkie, 5000 lb. Capacity, DeCA CED # 1R05-A Pallet Jack, Electric Walkie Stacker, 3000 Lb Capacity DeCA CED # 1R05-B Forklift, Electric, Sit-Down, Low Profile DeCA CED # 1R06 Narrow Aisle, Reach and Tier DeCA CED # 1R07 Pallet Jack, Electric Walkie-Rider, 6000 Lb Capacity DeCA CED # 1R08 Forklift, Sit-Down, Propane DeCA CED # 1R12-A Forklift, Sit-Down, Gasoline DeCA CED # 1R12-B Order Picker / Stock Selector, 3000 Lb Capacity, DeCA CED # 1R13
Repair Only:
Battery Charger, 24 Volt, DeCA CED # 1R01 Battery Charger, 36 Volt, DeCA CED # 1R04
Not all equipment types listed will be at each location. Only quantities listed for each store are covered by the contract.
1.3 Key Government Positions
A. Contracting Officer (KO): An individual with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the contracting officer acting within the limits of their authority as delegated by the contracting officer.
The KO for this contract is: Dessie L. Mills Phone: 804-734-8000 x48511 Email: dessie.mills@deca.mil
B. Contracting Officer's Representative (COR): An individual designated and authorized in writing by the contracting officer to perform specific technical or administrative functions. When the term COR is used elsewhere in this contract, it means the COR as designated by the Contracting Officer.
C. Store Director (SD): An individual responsible for overall commissary operations. When the term SD is used elsewhere in this contract, it means the SD personally or the Acting SD.
D. Supply Management Specialist (SMS): An individual responsible for administrative work primarily concerned with analyzing, developing, evaluating, or promoting improvements in the policies, plans, methods, procedures, systems, or techniques of a maintenance program.
The Headquarter (HQ) SMS for this contract may be contacted at:
DeCA HQ Equipment Maintenance Team, EquipmentMaintenanceTeamMembers@deca.mil
2. General Requirements Contractor shall provide all labor, supervision, equipment, tools, materials, parts, transportation of employees, permits and other necessary items to perform the various services as identified in this PWS. The contractor shall have access to technical manuals required to perform the services as stated in this PWS.
At time of award and throughout the duration of this contract, the Contractor shall assure that Contractor personnel completely understand the requirements of this PWS. Service technicians should have a sound mechanical aptitude, ability, and an extensive working knowledge of troubleshooting, diagnosis, and repair of the equipment included in this PWS, to include various attachments and the following systems:
INTERNAL COMBUSTION EQUIPMENT ELECTRONIC POWERED EQUIPMENT
Transmission All Electric Motors
Engine Electric Control Panels Hydraulic System Hydraulic System Drive Axle and Brakes Drive Axle and Brakes Steering Axle and Brakes Steering Axle and Brakes Electrical System Electronic Control Panels/Computer boards Electronic Control Panels/Computer boards
2.1 Non-Personal Services
The Government shall neither supervise Contractor employees nor control the method by which the Contractor performs the required tasks. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual Contractor employees. It shall be the responsibility of the Contractor to manage its employees and to guard against any actions that are of the nature of personal services, or give the perception of personal services. If the Contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the Contractor's responsibility to notify the KO immediately.
2.2 Management
The Contractor shall work to integrate and coordinate all activities needed to execute the requirements of this PWS with the SD and/or the COR, and with headquarter personnel (SMS) as referenced in section 3. The Contractor shall manage the timeliness, completeness, and problem identification of all equipment issues. The Contractor shall provide corrective action plans, submit quotes, monitor timely identification of issues, and the management of subcontractors if required. The Contractor shall seek to ensure customer satisfaction at all times and present a professional and ethical business behavior.
2.3 Contract Administration and Management
The following subsections specify requirements for contract, management and personnel administration.
2.3.1 Contract Management
The Contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of the resources assigned to the requirement. The Contractor must maintain continuity between the support operations at corresponding DeCA locations, the headquarter level and the Contractor's corporate offices.
2.3.2 Contract Administration
The Contractor shall establish processes and assign appropriate personnel resources to effectively administer the requirements of this contract. The Contractor shall respond to Government requests for contractual actions with-in the time constraints as dictated in section 3. The Contractor shall have a single point of contact (POC) identified between the Government and Contractor assigned to support this contract. This POC shall be provided to the COR within 10 days of contract award. The Contractor shall assign/direct the work effort, maintaining proper and accurate time keeping records of personnel assigned to work on this requirement. The contractor's POC shall sign in and out of the visitor log and notify the COR for surveillance prior to performing service and after completing service. The Contractor shall ensure DeCA email addresses are in their address book to prevent any loss or delay in communications.
2.4 Subcontract Management
The Contractor shall be responsible and accountable for subcontractor performance on this requirement. The prime Contractor will manage work distribution to ensure there are no Organizational Conflict of Interest (OCI) considerations.
2.5 Contractor Personnel
The following subsections specify requirements for contract, management and personnel administration.
2.5.1 Personnel Training
The Contractor shall accomplish the assigned work by qualified personnel with appropriate combinations of education, training, and experience.
2.5.2 Consumption or Use of Government Property
The Contractor shall not permit Contractor personnel to consume or use Government-owned resale items or any Government-owned equipment or supplies that are not specifically provided for Contractor use under this contract.
2.5.3 Use of Alcoholic Beverages/Drugs
The Contractor shall not permit Contractor employees to work under the influence of alcoholic beverages, cannabis, illegal drugs, or controlled substances. Contractor personnel are prohibited from using alcoholic beverages, cannabis, illegal drugs, or controlled substances while on duty.
2.5.4 Removal of Employees for Cause
The contractor shall immediately bar a contractor employee(s) for the following actions: deliberate destruction or mishandling of government, patron or vendor property; theft; use of alcoholic beverages; cannabis, illegal drugs or use of controlled substances; performance of work in other than a skillful manner; displaying disruptive/unacceptable behavior (e.g., abusive, demeaning, foul or threatening language and/or fighting) and willful violations of safety standards by contractor personnel. Removal of any employees for such cause shall not constitute a valid basis for non-performance of contract services or a claim for additional compensation. The contractor shall provide written notification to the KO regarding this action.
2.5.5 Installation Access
The contractor shall be responsible for obtaining installation access as required for all contractor employees authorized to work at the site specifically for this contract. Any government furnished identification shall be returned to the government when the contractor employee no longer works for the contractor at this installation or at the end of the contract, whichever comes first. Military, retired or dependent identification cards are not authorized for use as a means to access the base for performance on this contract. Additionally, see Federal Acquisition Regulation (FAR) Clause 52.204-9.
2.5.5.1 Denial of Installation Access
Contractor employees may be denied access to the military installation by the installation law enforcement officials if it is determined that such entry may be contrary to good order, discipline or the security of the installation. The installation may bar Contractor employees from entering the military installation under the provisions of Title 18, United States Code Section 1382.
2.5.5.2 Motor Vehicle Registration
Prior to commencing work Contractor employees shall register their vehicles IAW the installation motor vehicle registration regulations.
2.5.6 Parking
The Contractor employees shall park only in areas designated by the SD or COR.
2.5.7 Shopping Privileges
Contractor employees who are authorized to make purchases in commissaries shall show appropriate identification before purchasing commissary items and shall immediately remove the item(s) purchased from the commissary through the main exit door. Contractor employees with commissary privileges shall shop in the commissary only when they are off duty. Contractor personnel with commissary privileges shall not purchase merchandise for consumption by other personnel or organizations not authorized to shop in the commissary.
2.5.8 Identification of Contractor Personnel
Contractor personnel shall be easily recognized by wearing distinctive clothing bearing the name of the company and/or company identification. Contractor personnel shall wear required government furnished badge at all times during performance of this contract. Contractor personnel must use Personal Protective Equipment (PPE) as required IAW OSHA 29 Code of Federal Regulations (CFR) 1910.132 to include changes thereafter.
2.6 Location and Hours of Work
The following subsections specify requirements for location and hours of work.
2.6.1 Contractor Hours of Performance
The hours of performance are Monday through Friday, 8:00 a.m. to 5:00 p.m. local time at the store. The vendor is not required to work on federal holidays. Refer to the Office of Personnel Management (OPM) website (http://www.opm.gov/) for a listing of federal holidays. Hours shall be recorded and invoiced in fifteen (15) minute increments from the time the contractor enters the Commissary until the contractor exits the commissary.
2.6.2 Closing for Inclement Weather or Emergency Conditions
In the event that inclement weather or other emergency conditions force commissary closure, the COR and Contractor’s POC will agree upon the method by which the Contractor’s POC will receive notification about closures or delayed reporting times. The Contractor shall provide service as long as the commissary remains open.
2.6.3 Location of Work
The COR will provide a safe work area for the contractor to perform PM or repair services.
Though on-site work is required, in the event that it is not feasible, authorization will be obtained by the COR and from the HQ SMS, who will coordinate the transfer of the equipment with Logistics Engineering Property Accountability Division. The COR will have the contractor complete a DeCA Form 40-108 for equipment removed from the installation. The DeCA Form 40-108 will be forwarded by HQ SMS to the appropriate POC in the property accountability branch for record keeping purposes. The contractor shall notify the COR when equipment will be off-site for a duration exceeding seven (7) calendar days. The COR will coordinate with DeCA HQ if backup equipment is not readily available at the store and determine a plan of action.
3. Performance Requirements/Standards The…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .