HC101318QA941-0004.pdf
PDF 13 KB Posted
- Attached to
- AWARD NOTICE FOR A 10GBE (GIGABIT ETHERNET) IP BACKBONE CIRCUIT BETWEEN BLDG 542, RM 127, 560 EIELSON STREET, GRAND FORKS AFB, ND, 58205 AND IN BLDG 1575, RM C1B, 1st FL, 103 WEST LOSEY STREET, SCOTT AFB, IL, 62225. Federal contract opportunity
- Solicitation number
- HC101318QA941
- Issued by
- Defense Information Systems Agency
About this file
*** THE PURPOSE OF HC101318QA941-0004 IS AS FOLLOWS: *** 1. EXTEND THE QUOTE DUE DATE TO 05 JULY 19 TO ALLOW FOR ENHANCED COMPETITION AND QUOTE SUBMISSION. 2. ADJUST THE SERVICE DATE TO 04 OCTOBER 19. 3. UPDATE DIVERSITY REQUIREMENTS - RELAX DIVERSITY DISTANCE FROM 50 METERS TO 20 METERS OF SEPARATION. ****ALL ELSE REMAINS THE SAME ****
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| HC101318QA941-0005.pdf | ||
| Amendment_HC101318QA941-0003.pdf | ||
| AMENDMENT_FOR_SOLICITATION_HC101318QA941-0002.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IQO INQUIRY
FM: PL8211
TO: Contractors
DATE (MM/DD/YYYY): 6/4/2019
SUBJECT: HC101318QA941-0004 Amend: 0004
A. TYPE ACTION: ADMIN AMEND
1. PURPOSE: *** THE PURPOSE OF HC101318QA941-0004 IS AS FOLLOWS: ***
1. EXTEND THE QUOTE DUE DATE TO 05 JULY 19 TO ALLOW FOR ENHANCED COMPETITION
AND QUOTE SUBMISSION.
2. ADJUST THE SERVICE DATE TO 04 OCTOBER 19.
3. UPDATE DIVERSITY REQUIREMENTS - RELAX DIVERSITY DISTANCE FROM 50 METERS TO
20 METERS OF SEPARATION.
****ALL ELSE REMAINS THE SAME ****
PROVIDE, INSTALL AND MAINTAIN A 10GBE (GIGABIT ETHERNET) IP BACKBONE CIRCUIT
BETWEEN BLDG 542, RM 127, 560 EIELSON STREET, GRAND FORKS AFB, ND, 58205 AND IN
BLDG 1575, RM C1B, 1st FL, 103 WEST LOSEY STREET, SCOTT AFB, IL, 62225.
2. ROUND TRIP DELAY (RTD): RTD SHALL BE MEASURED OVER THE 10GB CIRCUIT AND
SHALL BE LESS THAN OR EQUAL TO 10 MILLISECONDS PER 350 MILES MEASURED AS THE
GREAT CIRCLE DISTANCE BETWEEN THE "A" AND "Z" LOCATIONS.
3. ETHERNET FRAME SIZE WILL BE CONFIGURED TO SUPPORT MAXIMUM TRANSMISSION
UNIT (MTU) OF 9100 OCTETS (BYTES) WITH JUMBO FRAMES.
4. EACH CONTRACTOR IS RESPONSIBLE FOR READING AND COMPLYING WITH ALL
TECHNICAL ASPECTS OF THIS SOLICITATION, TO INCLUDE READING AND AGREEING
WITH THE STANDARD PROVISIONS, ATTACHMENTS LISTING SPECIFIC TECHNICAL
REQUIREMENTS, PRICE QUOTE REQUIREMENTS, AND REQUESTED SERVICE DATE.
FAILURE TO READ AND ADHERE TO ANY PORTION OF THE INQUIRY SHALL RENDER THE
QUOTE NON-COMPLIANT AND RESULT IN IT BEING EXCLUDED FROM EVALUATION AND
AWARD.
5. THE SERVICE DATE TO BE MET IS: 04 OCTOBER 19 (SIP). THE GOVERNMENT ASSUMES
THAT CONTRACTORS HAVE CONSIDERED ALL ISSUES THAT MAY IMPACT THE SERVICE
DATE. THE GOVERNMENT MAY CANCEL, TERMINATE, OR REQUEST CONSIDERATION
IAW STANDARD PROVISION 42 FOR FAILURE TO MEET CONTRACTUAL SERVICE DATE OR
COMPLY WITH ANY CONTRACT TERMS OR CONDITIONS.
6. THIS REQUIREMENT MUST BE WORKED IN CONJUNCTION WITH SOLICITATION
HC101318QA942/TSR RU21FEB185790 AND MUST BE ENGINEERED AND PROVISIONED
HC101318QA941-0004
TOTALLY DIVERSE END TO END FROM THE GOVERNMENT SERVICE DELIVERY POINTS
(SDP) FROM SOLICITATION HC101318QA942/TSR RU21FEB185790; MEANING THE PHYSICAL
PATHS ARE TOTALLY SEPARATE INCLUDING MAN HOLES, CONDUIT, CENTRAL OFFICE
LOCATIONS, AND FIBER BUILDS. ADDITIONALLY AS A MINIMUM MUST HAVE 20 METERS
PHYSICAL SEPARATION FROM SOLICITATION HC101318QA942/TSR RU21FEB185790.
7. CONTRACTOR SHALL PROVIDE COLOR POWERPOINT DRAWINGS SHOWING THE
ROUTES FROM THE COMMERCIAL DEMARKS TO THE SUPPORTING CENTRAL OFFICES AND/
OR WIRING CENTERS, ENSURING THE PHYSICAL END TO END DIVERSITY REQUIREMENTS
ARE BEING MET. DRAWINGS MUST INCLUDE SEPARATION DISTANCES, TOTAL FIBER MILES
AND ROUND TRIP DELAY BASED ON ACTUAL DISTANCE IN MILES. REFER TO STANDARD
PROVISION 39 FOR SPECIFIC DOCUMENTATION REQUIREMENTS. SAMPLE DRAWINGS ARE
INCLUDED THE ATTACHMENTS.
8. CONTRACTORS SHALL SUBMIT QUOTES IAW STANDARD PROVISION 04. QUOTES SHALL
INCLUDE SUFFICIENT DETAIL FOR EFFECTIVE EVALUATION AND SHOULD NOT SIMPLY
REPHRASE OR RESTATE THE GOVERNMENT REQUIREMENTS. RATHER, THEY MUST
PROVIDE CONVINCING RATIONALE TO ADDRESS HOW THE CONTRACTOR INTENDS
TO MEET THE REQUIREMENT. IN RESPONSE TO THIS SOLICITATION, NO TERMS OR
CONDITIONS PLACED UPON THE GOVERNMENT, NOR ASSUMPTIONS WILL BE ACCEPTED.
RESPONSES TO CONTRACTORS ARE ENCOURAGED TO SUBMIT QUESTIONS AND REQUEST
CLARIFICATIONS OF THE REQUIREMENT (S) BEFORE SUBMITTING QUOTES. QUESTIONS
SHALL BE SUBMITTED TO CONTRACT SPECIALIST AND CONTRACTING OFFICER DURING
THE SOLICITATION PHASE ONLY, AND RESPONSES FOR ALL INTERESTED PARTIES WILL BE
POSTED TO FEDBIZOPPS.
9. PRE AWARD SITE SURVEYS ARE AUTHORIZED (AT CONTRACTOR EXPENSE) WITH LOCAL
POCS AT EACH GOVERNMENT SITE. IT IS HIGHLY RECOMMENDED THAT AT A MINIMUM,
CONTRACTORS CONDUCT PHONE SURVEYS TO ADEQUATELY ASSESS THE MAGNITUDE OF
THE WORK TO BE PERFORMED IN DETERMINING THEIR PRICE STRATEGY.
10. ESTABLISH TSP: TSP0HA8WX-01
M. ADDITIONAL INFORMATION:
3. TSR NUMBER: RU21FEB185787
4. CCSD: XXXXBBME
Z. DITCO CONTACT:
Andrew Fernandez
618-229-9194 andrew.r.fernandez.civ@mail.mil
Dale L. Rupright
DITCO Contracting Officer
Unless otherwise specified, all other terms and conditions are unchanged.
Paragraph E.SERVICE DATE change from:
Aug 26, 2019
To:
Oct 4, 2019
Paragraph M.3.TSR NUMBER change from:
RU21FEB185787B
RU21FEB185787
Paragraph V.QUOTE DUE DATE AND TIME change from:
Apr 26, 2019 3:00:00 PM CDT
Jul 5, 2019 3:00:00 PM CDT
File details come from the government source that posted it.