HAZMAT_Statement_of_Work_1.pdf

PDF 154 KB Posted

Attached to
HAZARDOUS WASTE COLLECTION AND DISPOSAL Federal contract opportunity
Solicitation number
140G0323Q0001
Issued by
Department of the Interior US Geological Survey Office of Acquisitions and Grants

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. BACKGROUND: (a) Introduction. The U.S. Geological Survey (USGS) Western Region conducts some of its work in laboratories and shops in Menlo Park, California, using various materials which result in the generation of an assortment of hazardous wastes. Warehouse facilities in Menlo Park, California also generate hazardous waste. Accordingly, the USGS established the Occupational Health, Safety, and Environmental Program for maintaining the health and safety of its personnel and minimizing adverse impacts on the quality of the environment. This program includes within its scope the proper handling, storage, and disposal of hazardous materials. Additionally, the program is responsible for ensuring that the USGS operates within the framework of Federal, State, and local regulations concerning all aspects of occupational health, safety, environmental issues, and hazardous materials.

(b) Requirement. The services described herein are required for approximately 100 wet laboratories, 7 shops and a warehouse facility. The laboratories and shops are located at the USGS Menlo Park Facility, 345 Middlefield Road, Menlo Park, California. The warehouse facility is located at 1020 O’Brien Drive, Menlo Park, California. The total employee population is approximately 450. The types of hazardous wastes generated by these facilities include, but are not limited to, those listed at the end to this solicitation.

(c) Facilities. The Menlo Park Center facility has an area in which hazardous waste can be stored. The waste can be transported to either a disposal or storage facility. The warehouse has no storage area for hazardous waste. The Menlo Park Center has an installed emergency shower and eyewash station. The Menlo Park warehouse has no emergency shower or eyewash station therefore the contractor is required to supply this safety equipment or a suitable substitute when working at that location.

(d) Contractor Qualifications. Materials picked up under this contract may only be transported by a State of California registered Hazardous Waste Transporter meeting all the requirements of 22 California Code of Regulations (CCR) Chapter 13 and using only vehicles possessing a Certificate of Compliance from the California Highway Patrol.

2. OBJECTIVES: The main objective of this contract is to provide services to the USGS safety and health office in managing and implementing the hazardous materials program for USGS employees located in Menlo Park. The services include hazardous materials storage and handling, including hazardous waste disposal. A second objective is to provide emergency response services to the Menlo Park facilities (see 4(b) below).

3. DOCUMENTS INCORPORATED BY REFERENCE: All pertinent and current Occupational Safety & Health Administration (OSHA), U.S. Environmental Protection Agency, U.S.

Department Of Transportation, state, county and local requirements are incorporated into this solicitation. In the event of a conflict in the requirements, the more stringent requirement shall take precedence unless otherwise specified by the Contracting Officer’s Representative. (COE;

see G1102).

4. SCOPE OF WORK: (a) Hazardous Materials Management Services

(1) Scope. The contractor shall provide qualified personnel, equipment and packaging materials to collect, identify, classify, handle, package, document, store, transport and recycle or dispose of all reclaimable, unwanted chemicals for recycling, and non-reclaimable hazardous chemical wastes for disposal. The contractor must perform the above services in compliance with all current and applicable Federal, State, and local regulations.

(2) Estimated frequency. The USGS usually requires one inventory and one pickup and disposal per month from the waste storage facility at 345 Middlefield Road, Menlo Park. Inventory and pickup/disposal from the Menlo Park Warehouse Facility is usually required once or twice, per year. Additional requirements resulting from ongoing facility renovation and other causes occur at irregular intervals. Frequency of requirements may change during the term of the contract.

(3) Hazard communications. Prior to the start of each on-site work activity, the Contractor will conduct and document a "Tailgate Safety Meeting,” in accordance with OSHA requirements, insuring that all persons involved in the activity are familiar with the safety equipment and procedures to be used.

(4) Reporting requirements. In addition to requirements stated in GS0921 and elsewhere in this contract, the Contractor shall provide the COR with a complete PC compatible computer readable inventory prior to the removal of hazardous waste. The inventory will be compatible with the software described in (5) below, if provided.

(5) Software. If included in the Contractor’s proposal resulting in this contract, the Contractor shall provide PC compatible computer software for tracking waste Inventories and Shipments.

The software will provide reporting capabilities including, but not limited to, the generation of biennial reports as required by the Department of Toxic Substances Control (DTSC) and Environmental Protection Agency (EPA), tracking waste shipment and tracking time limits and receipt of manifests and certificates of disposal. The software will be compatible with the software used by the Contractor for these purposes and will allow on-line downloading of data from the Contractor’s database.

(b) Emergency Response Services

(1) Requirement. USGS will normally use the local fire departments as the first respondents to a spill. The contractor may be required to provide extended support and cleanup.

(2) Post-Award Site Visit. Upon being awarded the contract, the contractor shall provide pre-emergency preparation by visiting the USGS facilities in Menlo Park and Redwood City to familiarize the contractor's own emergency team with the USGS facilities and to establish contact with key USGS personnel on site.

(3) Menlo Park facilities. The contractor shall provide 24-hour emergency extended support and cleanup response coverage, 365 days per year. The contractor shall establish and maintain a communications procedure that insures a telephonic response within one (1) hour and to be physically on the site within four (4) hours after notification of any potentially hazardous situations, such as chemical spills, that might occur.

(4) Post-Emergency Debriefing. The contractor shall evaluate and, as directed by the COR, remedy the problem leading to the emergency or recommend corrective action to allow regular operations of the USGS to continue. The contractor shall submit a preliminary written report within five (5) working days. On a case-by case basis, the COR may require a more comprehensive report.

(c) Reporting Regulatory Changes - The Contractor shall notify the COR of changes in federal, state and local regulations regarding hazardous materials within 10 working days of the Contractor’s receipt of notice of such changes. The Contractor will further notify the Contracting Officer and the COR if such changes may affect the contractor’s methods or ability to provide services. The USGS may order a written report evaluating the impact on the USGS of the change(s), with recommendations to insure that the USGS is in full compliance with such changed regulations. The contractor shall provide the COR one copy of such report within 15 days of receipt of written order or as instructed on the written order.

(d) EPA Treating - The Contractor shall sample and test any unknown chemicals and cylinders, using EPA approved methods, and obtain knowledge of their constituents in order that approval for disposal may be obtained from the disposal site. The report summarizing the analysis of unknown substances shall be furnished to the COR within five (5) days after the analysis is completed. The number of days over the seven calendar days required to remove the unknown chemicals and cylinders shall be coordinated with the COR.

(e) Removal - The Contractor shall remove inventoried and packaged waste immediately upon completion of packing. All work shall be completed within seven calendar days from date of request.

(f) Transportation - The Contractor shall transport all hazardous and non-hazardous waste to the approved disposal site that was identified in the Contractor’s proposal within seven calendar days after notification. At the time of award, the Contractor shall submit the shipping plan (which shall include a list of all routes to be taken) to the COR for his approval. The COR shall approve or disapprove the plan prior to first pick-up. COR approval is based upon compliance with all applicable State, EPA and DOT Regulations. If the plan is not approved, the Contractor must provide a revised shipping plan for approval to the COR. The plan shall have a minimum of interlining or intermediate stopping before reaching the disposal site. All required documentation, including the Uniform Hazardous Waste Manifest (UHWM), shall be submitted at the time of each pick-up. The Contractor shall provide to the COR, at time of award and updated annually, contingency plans in the event of an accident or spill which include:

(i) Chain of responsibility.

(ii) List of state agency and Contractor who will be contacted in case of emergency in each state in which they operate. At the time of transportation of all waste whether hazardous or non-hazardous, the Contractor shall supply, attached to the Manifest, the total estimated weight in pounds/kilograms of waste shipped.

(g) Disposal Site - Disposal shall be in accordance with federal, state and local regulations.

The Contractor shall provide to the COR an acknowledged copy of the manifest from the disposal site and a copy of the certification of disposal from the disposal facility, whether the Government's waste is blended or re-manifested at the storage facility. A copy of the manifest signed by the disposal facility operator shall be delivered to the COR within thirty (30) working days of receipt of the materials listed on the manifest. When deemed necessary by the Government, the Contractor shall obtain approval to incinerate appropriate combustible wastes at an EPA approved incineration facility. Reclaimable chemicals and wastes shall be recycled when practicable. The USGS is committed to reduce and minimize waste streams through best management practices of our pollution prevention efforts. The Contractor, therefore, shall maintain and comply with reporting their recycling efforts to the USGS in the quarterly reporting cycle as described in deliverables. Mere acceptance of the hazardous waste at a properly permitted treatment or disposal facility does not meet the definition of disposal under this contract. It is the Contractor's responsibility to obtain all necessary documentation, including the completed UHWM, to verify that both the delivery and the disposal of all items have been accomplished. The Contractor shall provide to the COR both a UHWM (signed by the disposal site) showing that the waste has been received, and a letter from the site operator or other certification which shows actual disposal has been completed.

(h) Deliverables The following documents, reports, items, services and reporting requirements shall be due at the times specified and indicated in the table below.

Item (Description) Time/Due Documentation

1. Contractor provides labor, equipment, and materials: Provide services necessary to collect, pack, transport and dispose of waste chemicals within seven days after initial contact. Package Labels on containers & manifests for transport.

2. Emergency Services and Incident Contingency Reporting: Provide 24-hour emergency services and contingency plans for spills and releases and a cleanup response if requested (See #3 below). Report within five (5) calendar days. Incident reporting - Original and two copies to COR.

3. Emergency Response Remediation: COR shall notify Contractor to provide emergency response. The Contractor shall provide telephone response within one hour and physical response at the site within four hours and complete inventorying, packaging, and removal within seven days. Telephone response within one (1) hour, physical response at the site within four (4) hours and complete within seven (7) calendar days provide the COR with estimate of inventory for removal.

4. Report and Analysis of Unknown Substances: (“Chain of Custody”): Provide a completed analysis and summary of unknowns for disposal and chain of custody signed by the laboratory within thirty calendar days of written request. Furnish to COR complete analysis.

5. Uniform Hazardous Waste Manifest (UHWM): Provide all drum inventories with recorded serial numbers for each container. At time of pick-up Copies of UHWM and inventories signed by the COTR on removal.

6. Disposal Site Certification (Certificate of Disposal): Provide in accordance with federal, state and local regulations upon completion of the manifest from the disposal facility, signed and pursuant to RCRA within thirty (30) working days after the action. Signed copies to COR of certification of actual disposal.

7. a. Required Permits and Licenses - Provide current Federal, state, and municipal documentation for the execution of services required under this contract.

b. Amendments, replacements, or as requested

a. With Proposal

b. Within five working days. Copies to CO of required licenses and permits, as amended for acquisition

8. Personal Protective Equipment Certification: Provide current fit test and forty hour HAZMAT training certification consistent with requirements under 29 CFR 1910 (OSHA) Prior to award Copies of certifications to CO.

9. Transporters and Treatment Storage or Disposal Facility (TSDF) Approval: Provide all permitted transporters, transporter shipping plan and treatment storage/disposal facilities, pursuant to RCRA, for handling all wastes prior to handling all wastes CO must approve in writing the requests.

10. TSDFs Insurance: Provide proof appropriate insurance as stipulated in the Code of Federal Regulations. At time of award Copies of certifications to COR.

11. Personnel Qualification and Requirements:

Provide academic training and requirements that support at least two professionally qualified personnel as required by OSHA, DOT and EPA Time of award Copies of certifications to CO.

12. Quarterly Contract Charges and Waste Disposal Reports - Provide quarterly reports of all waste generation activities and charges incurred under the contract. (Report shall include information that would effect generator status and recycling efforts. Tenth Business day of April, July, October and January.

Copies of all reports to the CO.

13. Reporting On the Job Incidents, Accidents, Injuries and Illnesses: Report ALL workplace accidents, injuries and illness on Departmental Standard Form 134 (DI-134) Immediately notify the COR.

Provide the written report within five days. Copies to the COR.

Any deviations from the schedule shall be coordinated with the COR and approved by the ACO in writing. In the cases of emergency or other circumstances which require immediate responses: (1) If time permits, the COR, the Contractor, or the Point of Contact at the site shall contact the ACO who shall provide verbal approval to the Contractor and then notify the COR of the action taken; or, (2) during nonstandard work hours, the COR or the Point of Contact shall provide verbal approval to the Contractor and document the circumstances that required the emergency service and provide the written document to the ACO within three days after the emergency or circumstances which required the immediate response. All verbal approvals shall be followed by a written approval within three working days after the verbal approval is given.

The Contractor shall also note, document, and be able to present upon request, the type of circumstance and action requiring the verbal approval, the time and date of the approval, and the name of the Administrative Contracting Officer giving the approval. The schedule in the table shall not, for any reason, be modified by the Contractor or the COR. Any unauthorized changes or failures to abide by the schedule may result in default of the contract.

5. INCLEMENT WEATHER

Weather conditions and forecasts shall be given strong consideration when scheduling waste disposal activities. Outside waste disposal activities will not be performed during periods of rainy weather or extreme temperatures. In the event of rain starting during waste disposal activities, all chemicals will be placed in a safe condition on shelving, inside of cabinets, or into secondary containment until the rain has stopped and/or a determination has been made that it is safe to continue. This determination will be made by both the USGS and Contractor's representatives based on the likelihood of continuing rain and the conditions of the working surfaces. Delay charges will be negotiated at the time of delay.

6. REQUESTS FOR DISPOSAL SERVICES - Chemical waste generated at USGS shall be managed in full compliance with all applicable Federal, state, and local regulations. The Contractor shall, without additional expense to the USGS, be responsible for the acquisition and maintenance of required licenses and permits, and for complying with applicable Federal, State, and municipal laws, codes, and regulations prior to and during the execution of services required under this contract. The Contractor shall submit all such permits and licenses with the proposal package. During the contract performance period, any amendments to such permits or licenses to include replacements by a regulatory authority or as requested by the USGS shall be submitted to the Contracting Officer (CO) within five days after such action. Contractor personnel conducting pick-ups shall confirm scheduling and work directly with the designated U.S. Geological Survey facility personnel (COR) in the completion of chemical waste pick-ups. A written schedule of the dates and times pick-ups will be conducted shall be maintained by the Contractor and submitted to the COR if requested. Pick-ups shall be conducted within the seven calendar days from the date of notification, unless an emergency situation warrants a quicker response. The Contractor shall perform a pre-performance walk through of the Menlo Park and Redwood City facilities with the COR for familiarization purposes. The walk through will be scheduled with the COR within 10 working days after contract award. The Contractor shall provide a telephone number that allows the COR to contact the Contractor 24 hours a day, 365 days a year.

7. PICK-UP PROCEDURES

(a) Personal Protective Equipment. The Contractor's personnel shall be equipped with and use all personal protective clothing and equipment necessary to safely handle chemicals. Use of personal protective clothing and equipment shall be consistent with requirements and recommendations of OSHA, the EPA, chemical manufacturer's recommendation, and/or the recommendations of the COR. The minimum level of personal protective equipment required in the handling of chemicals shall include chemical resistant gloves, safety shoes or boots, a work uniform, and appropriate eye protection. All such equipment shall be supplied and properly maintained by the Contractor.

(b) Chemical Waste Identification, Packaging, and Pick-ups. These services shall be conducted at the site or facility requesting chemical waste disposal services. Upon arriving at a pick-up location, Contractor personnel shall contact the COR for escort. The COR will identify appropriate parking and loading areas, the chemical waste storage location, areas where chemicals are to be packaged, and the location of the nearest eyewash and safety shower.

Contractor personnel shall evaluate the individual waste chemicals in the storage areas to ensure that each is properly identified and can be safely handled and transported. Contractor personnel shall then segregate, inventory, and package waste chemicals in Department of Transportation (DOT)-approved shipping containers according to compatibility; DOT and EPA requirements;

and treatment, disposal, or recycling facility requirements. A detailed inventory of all individual chemical items packaged in each shipping container shall be completed by the Contractor's personnel. The inventory, or packing list, shall identify each chemical and number of individual containers packaged therein, an estimated quantity for each item (in pounds and metric weight), a unique container tracking number, pertinent DOT shipping and labeling information (proper shipping name, hazard class or division, DOT identification number, reportable quantities, etc.), total weight of waste chemicals packed in shipping container (in pounds and metric weight), identification of final treatment or disposal site, and any other information required or pertinent to the proper identification and tracking of the packaged wastes. Contractor shall immediately report any generator status changes to the COR that would affect state reporting requirements.

The Contractor shall segregate, inventory, package, and remove all lab pack hazardous and non-hazardous waste, including completion of all manifests and required documentation as outlined in the paragraph above. In order to complete the removal within the seven calendar days, the Contractor and the COR shall agree to a schedule that consists of contiguous business days, with removal completed by the end of the last day of the schedule. Labpack waste that has been inventoried and/or packed shall not, for any reason, be left on-site for later removal. Only exception will be “unknown” chemicals which will be removed on a case by case basis.

Explosive, unstable, radioactive, controlled substances, unidentifiable, or other waste chemicals that cannot be routinely picked up shall be brought to the attention of the facility COR.

Reason(s) explaining why specific materials cannot be picked up shall also be provided.

(c) Shipping Containers. All waste shall be packaged in containers meeting DOT shipping requirements for the hazard class of waste to be shipped. Surplus empty containers provided by USGS facilities that meet DOT and final disposal site requirements should be used whenever possible and economically advantageous to the USGS. The Contractor shall assign and permanently affix a unique container tracking number and all other required DOT shipping and labeling information to the outside of the shipping container in accordance with DOT and EPA specifications.

(d) Manifest Preparation and Shipping Papers. Prior to transport of the waste, the Contractor’s personnel shall complete manifests and all associated documentation as required by the EPA, DOT, and local jurisdictions. Associated documentation shall include, but not be limited to, notifications, certifications, or demonstrations; packaging lists; a field generated invoice;

profiles, sample results, if available; container packing lists; and additional copies of manifests required for state regulatory agencies. Manifests and associated documentation shall be submitted to the facility COR for review and signature prior to transport of the wastes. The manifest and associated documentation is to be signed by the transporter in the presence of the facility COR. Duplicate copies of all paperwork generated at the time of pick-up shall be provided to the COR prior to transportation of the waste (Contractor will have access to duplicating machine on site). After receipt of the shipment at the designated facility named on the manifest, the owner or operator shall sign for receipt of the shipment on the appropriate copy of the manifest and provide this manifest to the COR within 30 working days of receipt.

(e) Sample Collection and Laboratory Services. The Contractor shall maintain accurate, chronological records of chemical waste samples collected for laboratory analyses and the result of the analyses that are performed. A “chain of custody” or equivalent documentation shall be created at the time the sample is obtained. The chain of custody shall minimally contain the following information: sample number; name of collector; date and time of collection;

description of container sampled; label information on the container sampled; sample type (composite, grab, etc.); place of collection; sampling method, field description of contents and related observations; analyses to be performed and results; and information on the distribution of sample results. A copy of the “chain of custody” is to be provided to the COR at the time samples are collected. All analyses shall be conducted by a reputable laboratory that is capable of accurately analyzing wastes via EPA and DTSC methods. A report with the results of the analyses shall be provided to the COR within thirty (30) working days after the sample was obtained. The report is to be signed by a representative of the laboratory

8. TREATMENT AND/OR DISPOSAL OF CHEMICAL WASTE

(a) Use of Permitted Facilities with Full Status Required. Unless otherwise approved, the Contractor shall utilize only the facilities identified in his proposal package for the treatment, disposal, or recycling of all chemical waste collected at the USGS. The facilities shall be in accordance with applicable Federal, State and local regulations. Wastes shall be transported to the facility which has been issued an operation permit pursuant to the Resource Conservation and Recovery Act (RCRA) and as implemented by the hazardous waste regulatory authorities of jurisdiction. General information about the facility (company brochures identifying the facility location, processes used to manage waste, qualifications of facility personnel, etc.), and copies of permits or operational violations shall be available for review by the COR at the time of award.

(b) Use of Land Disposal Discouraged. The land disposal of chemical wastes shall be kept to the smallest amount feasible. Secured chemical landfills shall only be employed by the Contractor when no other practical method of treatment or disposal for a particular waste is available, or when the COR determines that alternate methods of disposal are not economically acceptable.

(c) TSDF Facility. Contractor shall use only the TSDF identified in his proposal and must carry appropriate insurance as stipulated in the Code of Federal Regulations. The treatment facility shall employ validated, best available technologies to permanently destroy or render USGS wastes non-hazardous. Waste generated could contain unknown substances and reactive materials; therefore, services may require special and unique handling and disposal procedures.

A Chemist and a Chemical Technician will be required as well as all applicable licenses and permits as required by federal and state codes and regulations.

(d) Use of Transporters and other TSDFs Require Approval. The Contractor shall use only the TSDF identified in his proposal. However, if the Contractor determines that is it necessary to use another TSDF to handle chemical waste from the U.S. Geological Survey, a written request must be forwarded to the CO for approval with a copy of the request to COR prior to using the TSDF.

9. REQUIRED REPORTS AND DOCUMENTS

(a) Certificate of Disposal. A "Certificate of Disposal" or equivalent documentation shall be forwarded to the COR within thirty (30) working days of final treatment or disposal of wastes (40 CFR 262). The Certificate of Disposal shall identify the treatment or disposal facility, itemize each DOT-approved waste container received at the final treatment or disposal facility by its unique identification number, and document the date and method of treatment or disposal.

(b) Quarterly Contract Charges and Waste Disposal Reports. The Contractor shall furnish the CO with quarterly reports of the waste generating activities and charges incurred for each of the individual sites and facilities serviced under the contract. Reports shall be due to the CO within ten (10) business days following the end of a U.S. Government Fiscal Quarter (reports will therefore be due on the tenth business day in the months of October, January, April and July).

Information required in the reports includes the site or facility name, cumulative amount (in pounds) of waste shipped during the Fiscal Year, generator status changes, and cumulative charges incurred by the facility during the fiscal year. The COR will, if necessary, obtain these reports from the CO.

10. SPILLS, RELEASES, EMERGENCIES, AND INCIDENT REPORTING

(a) Releases Resulting from Contractor Negligence. In the event a chemical release occurs, regardless of quantity or location, due to the activities on the part of the Contractor, the Contractor shall provide, at no cost of the USGS, all labor, materials, and other services necessary to return the contaminated or affected area(s) to original conditions prior to the release.

All releases will reported to the COR or point of contact of the contract for remedial and necessary action. The Contractor shall assume responsibility for the reporting (Government will provide the DI-134), packaging, transportation, treatment and/or disposal of the resulting wastes and contaminated debris in accordance with the provisions of this contract.

(b) Other Spills and Releases. The USGS relies on the expertise and capability of local hazardous materials units possessing trained personnel and the appropriate equipment to respond to chemical spills that may cause health hazards or pose a threat of releases to the environment. The role of the local emergency response service is to effect rescue, if required, and contain chemical spills to prevent further contamination. Contractor is expected to provide final clean-up, decontamination, and disposal services following such an event. The Contractor shall be capable of providing emergency response services on a 24-hour basis with a maximum telephone response time of one hours and maximum physical response time of four hours between a telephone request for emergency services and arrival of Contractor personnel at facilities located in the Menlo Park/Redwood City, California area.

(c) Incident Reporting. All releases (regardless of quantity), employee exposures, occupationally related illnesses and injuries, or other unusual occurrences that take place in connection with the activities associated with this contract shall be promptly reported to the COR or point of contact representative. All required official notifications to Federal, State and local regulatory agencies concerning emergencies, spills, or releases that occur at the USGS shall be made directly by the

USGS.

11. PERSONNEL QUALIFICATIONS AND REQUIREMENTS

Chemical waste pick-ups shall be carried out by at least two personnel who are professionally trained and specifically qualified as required by OSHA, DOT and EPA to evaluate and safely manage the hazards associated with handling, sorting, packaging, and transporting waste chemicals. The qualifications of the personnel shall be provided to the COR at time of award.

The senior member of the team must have at least a Bachelor's degree in Chemistry, Chemical Technology, or a closely related discipline or equivalent experience and a minimum of one year of experience in the handling, packaging and management of chemical waste. All other team members who may handle chemical wastes at any time must have either formal academic training in chemistry, including at least one year each of college-level general and organic chemistry, or equivalent training. All personnel must meet applicable medical, training and licensing requirements of Federal, State, and local agencies having jurisdiction over chemical waste handling, transportation, and disposal activities. During the performance of this contract, the Contractor shall insure that its employees perform adequately and in a safe and professional manner. New hires or replacement employees are subject to the same qualification requirements as outlined above, and must be approved by the Contracting Officer in writing.

12. QUALITY CONTROL AND INSPECTION REQUIREMENTS

At any time during the contract period, the USGS may periodically monitor and observe the Contractor while packing waste containers in order to verify maximum packaging densities, chemical compatibility, and the accuracy of any given manifest document or packing list.

Vehicles and equipment used in the handling and transportation of chemical waste will also be periodically inspected. The TSDF or recycling facilities identified by the Contractor, or any other approved TSDF receiving waste from the USGS shall be receptive to reasonable and periodic inspection by USGS personnel during the contract period.

13. SECURITY

The Contractor shall take all reasonable precautions to ensure that the security of USGS personnel, projects, facilities, property, materials and visitors are not jeopardized by the contract operations. All Government facilities used by the Contractor shall be kept locked and secured when not in use. Only the Contractor’s personnel that have been approved by the COR shall be admitted to these facilities by the Contractor. All incidents of known or suspected unauthorized entry, theft, vandalism and the like occurring at such facilities shall be promptly reported to the COR. Chemicals that are under the control of the Contractor shall be properly secured at all times. Under no circumstances shall areas or vehicles containing chemicals be left unattended unless they have been locked and secured.

CHEMICAL UNIT SIZE EST QTY

2,4 D-ISOOCTYL ESTER ML 10 3

2,4 D-PROPYLENE GLYCOL BUTYL ETHER ESTER ML 10 1

ACETIC ACID (5% IN WATER) GL 0.1 1

ACETIC ACID (GLACIAL) GL 1 1

ACETONE GL 0.5 1

ACETONE AND WATER QT 1 1

ACETYL CHLORIDE IN METHANOL LB 3 1

ACETYLENE(COMPRESSED GAS) CU FT 366 1

ACRIDIN ORANGE, SELENIUM PHENOL SPILL CLEANUP LB 50 1

ALKALINE IODIDE AZIDE GM 100 1

ALUMINUM CHLORIDE L 0.8 1

ALUMINUM OXIDE LB 2 1

AMMONIUM CHLORIDE PT 1 1

AMMONIUM CHLORIDE/ACETIC ACID L 0.5 1

AMMONIUM HYDROXIDE GL 1 2

AMMONIUM NITRATE LB 1 10

BALLAST NO PCB LB 12 42

BATTERIES

BROMOFORM GL 1 1

BUTANE (CAMP STOVE FUEL CYLINDER, PARTIALLY FULL) CU FT 1 10

BUTANE(COMPRESSED GAS) CU FT 366 1

CALCIUM SELENATE GL 5 2

CARMINE L 0.8 1

CHROMIC ACID GL 0.25 1

CHROMIC ACID GL 0.67 1

CHROMIC ACID/SULFURIC ACID L 0.2 1

CHROMIUM CHLORIDE, HYDROCHLORIC ACID,ETHYL ALCOHOL GL 1 2

CHRYSOTILE (ASBESTOS) LB 2 1

CIBA 8010 EPOXY RESIN OZ 6 1

CIBA 840 EPOXY HARDENER OZ 6 1

COPPER SOLUTION L 0.7 1

CUPRIC CHLORIDE QT 0.75 1

DICHLOROSILANE METHANOL ML 150 1

DIETHYLTRIAMINE ML 80 1

DIMETHYL TEREPHTHALATE GM 500 1

DIMETHYL_P_PHENYLENEDIAMINE ML 250 1

DIMETHYL_P_PHENYLENE_DIAMINE DIHYDROCHLORIDE GM 25 1

DIPHOSPHATE IN WATER GL 1 1

DISODIUM ETHYLENEDIAMINE TETRA_ACETIC ACID L 0.5 1

ETHYLENE GLYCOL GL 55 1

FLUORESCEIN QT 1 3

FORMALDEHYDE (37%) GL 1 1

FORMIC ACID ML 400 1

FREON TETRAFLUORIDE GL 0.5 1

FREON-12 LB 35 1

GLUTALDEHYDE GM 500 1

GLYCEROL GL 1 1

HYDROCHLORIC ACID GL 55 1

HYDROCHLORIC AND HYDROBROMIC ACID GL 30 1

HYDROFLOURIC ACID (47% IN WATER) ML 500 7

HYDROFLOURIC ACID (5% IN WATER) GL 30 2

HYDROXYLAMINE HYDROCHLORIDE GM 200 1

ISOQUINOLINE, QUINOLINE GM 100 1

KEROSENE AND OIL GL 5 1

KEROSENE SATURATED DRY WASTE LB 1 6

LEAD NITRATE GM 200 1

LEAD PERCHLORATE ML 10 1

LEAD SULFIDE ML 125 2

MAGNESIUM NITRATE GM 500 3

MECURIC CHLORIDE SOLUTIONS

MERCURY OZ 1 2

MERCURY IRON THIOCYANATE GL 1 1

MERCURY SULFUR SPILL CLEANUP GM 50 1

MERCURY/NITRIC ACID GL 1 1

METHANOL AND KEROSENE GL 0.5 1

METHYL IODIDE QT 1 1

METHYL ISOBUTYL KETONE ML 200 1

METHYLENE CHLORIDE AND ACETONE L 0.5 1

METHYLENE IODIDE AND ACETONE QT 1 3

METHYLVALERIC ACID GM 5 1

MICRODOLOX DEVELOPER GM 482 1

NAPTHOL ETHYLENE DIAMINO GL 1 1

NAPTHOL ETHYLENEDIAMINE GL 1 1

NAPTHYLENE, HYDROCHLORIC ACID GL 1 1

NAPTHYLETHYENEDIAMINE DIHYDROCHLORIC GL 1 1

NITRIC ACID WITH SODIUM DICHROMATE GL 0.5 1

NITRIC ACID/NICKEL L 0.95 1

NITRIC ACID/SULFURIC ACID GL 1 1

OCTYLAMINE ML 125 1

OIL WITH A TRACE OF METHYLENE IODIDE QT 1 1

OIL, WATER AND CRUSHED ROCK GL 5 4

PENTANE ML 35 1

PENTYLAMINE ML 40 1

PETROLIUM ETHER L 4 1

PHENOL L 1 1

PHENYL CYANIDE GL 1 1

PHENYL MERCURIC ACETATE GL 1 1

PHENYLARSINE OXIDE L 1 1

PHENYLENE DIAMINE GM 250 1

PHENYLENE DIAMINE DIHYDROCHLORIDE GM 100 1

PHOSPHORIC ACID GL 14 1

PHOTOGRAPHIC DEVELOPER GL 55 2

PHOTOGRAPHIC FIXER GL 55 1

POTASSIUM DICHROMATE, SULFURIC ACID GL 2 2

POTASSIUM IODATE GL 600 1

POTASSIUM IODITE SOLUTION GL 1 2

POTASSIUM PERMAGANATE GL 1 2

POTASSIUM PERSULFATE IN NITRIC ACID GL 1 3

PROPANOL GL 0.75 1

REFRACTIVE INDEX FLUID ML 10 2

RUBIDIUM CHLORIDE QT 1

SELENATE/SELENITE IN CHLORINE GL 1 3

SELENIUM/SELENATE/SELENITE/ACRYDINE ORANGE LB 15 1

SODIUM HYDROXIDE QT 1 5

SODIUM POLYTUNGSTATE PT 1 1

SODIUM SELENATE/SELENITE/ACRIDINE ORANGE GL 1 5

SODIUM SULFITE GM 50 1

SODIUM SULFITE (5% IN WATER) GL 5 2

STANNOUS CHLORIDE IN HYDROCHLORIC ACID

SULFURIC ACID GL 1 1

TARTARIC ACID L 0.4 1

TETRABROMOETHANE GL 0.25 1

THALLIUM FORMATE,THALLIUM MALONATE OZ 2 2

TOLUENE QT 1 1

TRICHLORETHANE (1,1,1) PT 1 1

TRICHLOROTRIFLOUROETHANE GL 5 1

TRIFLUOROCHLORINE (COMPRESSED GAS) CU FT 100 1

UNIVERSAL WASTE

UREA PEROXIDE L 1 1

USED COMPRESSOR OIL GL 55 2

USED COMPRESSOR OIL L 1 3

VANADIUM LB 65 1

VANADIUM PENTOXIDE LB 1 20

WATER SOLUBLE OIL GL 10 1

ZEOLITE WITH OIL GM 500 1

File details come from the government source that posted it. Updated .