This document outlines the requirements for a federal construction contract to pave 1.2 miles of road at the Haystack Reservoir located 14 miles south of Madras, Oregon. The work includes clearing and grubbing, excavation and embankment, untreated aggregate courses, asphalt concrete paving, minor concrete structures including 24 linear feet of 24-inch culverts, cleaning and repairing existing drainage structures, erosion control, seeding and mulching, and temporary and permanent traffic control items including pavement markings. The estimated price range for the contract is between $500,000 and $1,000,000. The pre-solicitation number is 69056720B000022 and is being issued by the Department of Transportation Federal Highway Administration. The tentative fixed completion date for the work is May 2021.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OR BOR CCAO 2018(1)/Haystack Reservoir Paving
The work consists of Grading, base and paving
Project length: 1.2 Miles
Tentative Fixed Completion Date: May 2021 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: Between $500,000 and $1,000,000
Location: 14 miles S of Madras, Oregon
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
On e S ch ed ul e
Sc h
Na m e
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance
(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control (erosion control devices) - Lump Sum
DIVISION 200 – Earthwork 201 Clearing & Grubbing 1 ACRE 203 Removal of Structures & Obstructions (structures, demolition)
204 Excavation & Embankment 2,000 CY 207 Earthwork Geosynthetics 211 Roadway Obliteration 212 Linear Grading
On e S ch ed ul e
Sc h
Na m e
DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap 5 CY
DIVISION 300 – Aggregate and Base Courses 301 Untreated Aggregate Courses (crushed aggregate) 2,700 Tons 302 Minor Crushed Aggregate 303 Road Reconditioning
DIVISION 400 – Asphalt Pavements & Surface Treatments 401 Asphalt Concrete Pavement By Gyratory Mix Design Method 403 Asphalt Concrete 2,500 Tons
DIVISION 600 – Incidental Construction 601 Minor Concrete Structures (concrete – minor structures) 602 Culverts & Drains (indicate one or both) 24” Culverts 150 LF 607 Cleaning, Relaying, & Repairing Existing Drainage Structures 80 LF 622 Rental Equipment (yes/no) Yes 623 General Labor (yes/no) Yes 624 Topsoil (landscaping & related items) 625 Turf Establishment (indicate seeding or mulching separately) Seeding, mulching 1 acre 633 Permanent Traffic Control (traffic control devices) 634 Permanent Pavement Markings (traffic pavement markings) 8 Each
635 Temporary Traffic Control Lump Sum
| DIVISION 200 – Earthwork |
| DIVISION 250 – Slope Reinforcement and Retaining Walls |
| DIVISION 300 – Aggregate and Base Courses |
| DIVISION 400 – Asphalt Pavements & Surface Treatments |
File details come from the government source that posted it. Updated .