PLT_LFX_Supply_List.docx

DOCX document 34 KB Posted

Attached to
PLT Live Fire Supplies Federal contract opportunity
Solicitation number
HAAF175AML0084
Issued by
Department of the Army

View the file

Other files for this federal contract opportunity

Other files attached to PLT Live Fire Supplies, newest first.
File Type Posted
Build_Schematics.pptx PPTX presentation
Build_SOW.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1st RANGER BATTALION – PLT LFX TARGET EMPLACEMENT Background:

1st Ranger Battalion (1/75), Hunter Army Airfield, Georgia conducts Platoon Live Fire Exercise (PLT LFX) at Fort Stewart, Georgia (FSGA) Range Red Cloud Hotel from 01 Febuary through 01 March 2019. The purpose of this training is to exercise tactical systems, mission command, and the fundamentals of the Platoon attack and raid under stressful conditions similar to those found in overseas combat operations. This supply list describes the supplies necessary to effectively support the stated training objectives and satisfy the commander’s intent for training. The contractor shall provide the required training supplies in accordance with the specific mission requirements identified in this document. Due to the time-intensive training schedule, 1/75 requires that the contractor complete the target build no later than 14 Feburary 2019.

Training Objectives:

1. Provide realistic tactical and enemy scenarios that closely replicate the characteristics of the environments encountered by Special Operations Forces (SOF) during combat operations at the Company level.

2.Exercise all aspects of the Platoon Attack through at least 1 blank fire and 1 live fire iteration, day and night, each day for a minimum of 18 blank and 18 live iterations over the course of the period of work.
3.Provide scenarios and problems that are realistic and effectively exercise individual Ranger adaptability and leadership capability under extreme stress.

Scope:

1. Contractor:

a. Emplace a total of 6 target buildings on range RED CLOUD HOTEL. Target building specifications will be specified in this statement of work under three types, Type A, Type B, and Type C.

b. Type A:

1. Emplace 2 Type A target buildings on Range RED CLOUD HOTEL as specified by a schematic provided to the contractor NLT 14 Feburary 2019.

2. Type A target buildings will be 20’x30’ and will at minmum be constructed from 2x4 with 24 inch spacing on center between Studs, with ¾ inch Plywood sheeting, see provided schematic for windows and doors.

3. Each building will have an exterior breach door that utilizes a dowel locking mechanism to minimize rehab time.

c. Type B:

1. Emplace 2 Type B target buildings on Range RED CLOUD HOTEL as specified by a schematic provided to the contractor NLT 14 Feburary 2019.

2. Type B target buildings will be 30’x30’ and will at minmum be constructed from 2x4 with 24 inch spacing on center between Studs, with ¾ inch Plywood sheeting, see provided schematic for windows and doors.

3. Each building will have an exterior breach door that utilizes a dowel locking mechanism to minimize rehab time.

d. Type C:

1. Emplace 2 Type C target buildings on Range RED CLOUD HOTEL as specified by a schematic provided to the contractor NLT 14 Feburary 2019.

2. Type C target buildings will be 40’x 30’ and will at minmum be constructed from 2x4 with 24 inch spacing on center between Studs, with ¾ inch Plywood sheeting, see provided schematic for windows and doors.

3. Each building will have an exterior breach door that utilizes a dowel locking mechanism to minimize rehab time.

e. Compound Enclosure (Drawing E):

1. Install 130 Linear feet of plywood wall in accordance with schematic. Wall will be 8’ high with studs 24 inches on center. Wall will be anchored to ground with minimum 2 foot stakes every 10 feet.

2. The fence will have 1x 10’ gate that will accommodate vehicle traffic into the compound as specified by the schematic.

f. Breaching Walls (Drawing F):

1. Pre-fabricate and deliver 18 breaching walls 4 feet wide, and 8 feet tall.

2. Walls will be framed with ¼ in. steel, bottom of frame will have rectangular steel to to enable movement with forklift.

3. Walls will be filled with 5,000lb concrete from bottom to top frame. Walls should only be reinforced with enough remesh or rebar necessary to hold the concrete in place.

g. General Instructions:

1. Buildings do not require roof, floor, or foundation. Buildings will require to be anchored to the ground with minimum of 2’ stake, 3 stakes per wall.

2. Doors will be 80 inches by 36 inches, at minimum ¾ inch plywood.

3. All doors will be hinged with 4” x 1-5/8” Butt Hinge with square corners, 3 hinges per door.

4. All doors will be secured with a latch.

5. All exterior doors will be inward-swinging.

6. The contractor shall supply 36 x extra doors and required hardware.

7. Windows will be 3 feet by 3 feet, and will be four feet off the ground.

8. Emplacement of target buildings will be complete no later than 14 Feburary 2018. Contractor will have access to Range RED CLOUD HOTEL in FSGA no earlier than 01 Feburary 2019, and all work will be complete NLT 14 Feburary 2019.

9. Will be responsible for providing all support and materials required to achieve the stated tasks (such as shipping).

10. Provide overage for all materials to conduct target refurbishment.

11. Contractor will be responsible for removal of buildings at the completion of the exercise NLT 28FEB19.

Performance Requirement Summary:

1. Coordination and Reporting Tasks

0. Provide a single point of contact that has the authority to manage the build during the period of performance. This individual will be referred to as the contractor’s liaison officer (LNO).

1. Contractor Organization Requirements:

0. Contractor organization must understand 1/75 specific training objectives and scenario design.

Deliverables:

1. Contractor will provide all necessary equipment and materials to conduct the range build on the days specified:

1. Individual PPE for all personnel. All personnel are required to have protective eyewear, hearing protection and gloves.

1. Contractor must provide overage for all materials to conduct target refurbishment.

1. Contractor must remove all buildings and debris at the conclusion of training.

Government furnished property (GFE):

1. 1/75 will not furnish any equipment or GFE to the contractor.

Travel and Specifications:

1.The contractor is required to provide transportation and equipment to complete target assembly at Ft. Stewart, GA.
2.The contractor must follow the clear guidance and understand the objectives and intent of training in order to ensure the training objectives are met.

Build Dates:

Contractor will have access to Range RED CLOUD HOTEL in FSGA no earlier than 01 February 2019, and all work will be complete NLT 14 February 2019.