CFMS - Chameleon Corporation - GS29F005AA

DOC document 189 KB

Attached to
Federal Supply Schedule GS29F005AA Federal contract IDV
Contract number
GS29F005AA
Issued by
GSA Federal Acquisition Service

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Services Administration Federal Supply Service Authorized Federal Supply Schedule Pricelist

On-line access to contract ordering information, terms and conditions, up-to-date pricing, and the option to create an electronic delivery order are available through GSA Advantage!™, a menu-driven database system. The INTERNET address for GSA Advantage!™ is: http://www.fss.gsa.gov.

Federal Supply Schedule 71II K- Comprehensive Furniture Management Services (CFMS)

Contract Number: GS- 29F- 0005AA

For more information on ordering from Federal Supply Schedules, click on the FSS Schedules button at http://www.fss.gsa.gov .

Contract Period: 2/12/18 through 2/11/23 Contractor: Chameleon Corp 6408 Break Point Ave.

Las Vegas, NV 89130 Ph: 702.232.5293 Fax: 541.655.5761 chris@solutionsforgov.com www.solutionsforgov.com Contract Administration: Christopher Rattigan

Business Size: Small Business Customer Information 1a. Awarded Special Item Number(s):

712 1- Project Management (Furniture/Furnishings Related) Comprehensive support for the design, reconfiguration, relocation and increasing/downsizing of office space and similar facilities. Furniture, office equipment and furnishings included.

712 2- Assets Management (Furniture/Furnishings Related) Supply customer agencies with services designing and installing systems to manage office furniture and related inventories, includes warehouse and property disposal management 712 3- Reconfiguration/Relocation Management (Furniture and Furniture Related) Services for reorganizing, consolidating, warehousing and/or opening new facilities. Furniture, office equipment and furnishings included.

712 4- Furniture Design/Layout Services for inclusive furniture consultations, interior design and product specifications. Furniture, office equipment and furnishings included.

712 97- Ancillary Repairs and Alterations Repair and Alterations ancillary to existing SINs under this Schedule. Ancillary Repair and Alterations projects are those (1) solely associated with the repair, alternation, delivery or installation of products or services also purchased under this Schedule, and which are (2) routine and non-complex in nature, such as routine painting or carpeting, simple hanging of drywall, basic electrical or plumbing work, landscaping, and similar noncomplex services. This SIN EXCLUDES: (1) major or new construction of buildings, roads, parking lots and other facilities; (2) complex R&A of entire facilities or significant portions of facilities, and (3) Architect-Engineering Services subject to Public Law 92-582 (Brooks Act).

The work performed under this SIN shall be associated with existing SINs that are part of this Schedule. Ancillary Repair and Alterations shall not be the primary purpose of the work ordered but be an integral part of the total solution offered. Ancillary Repair and Alteration services may only be ordered in conjunction with or in support of products or services purchased under this Federal Supply Schedule contract.

This SIN includes all regulatory guidance outlined in accordance with FAR 36, including the Davis Bacon Act and the Miller Act.

Special Instructions: No award will be made under 712-97, Ancillary Repair and Alteration unless an offeror is awarded (or receives award concurrently) for another SIN under this Schedule. The Repair and Alteration work must be ancillary (incidental) to the primary services offered under the Schedule.

For Federally-owned space managed by GSA's Public Building Service (PBS), approval of the PBS Building Manager must be received by the ordering activity and contractor before any repair and alteration work may be ordered. A copy of the approval must be retained by both the ordering activity contracting officer and the contractor.

Owned or leased space outside the PBS inventory may also include approval requirements. A copy of the approval must be retained by both the ordering activity contracting officer and the MAS contractor performing the R&A services.

This R&A SIN shall not be used for PBS leased space.

Any Agency contracting officer ordering services under this SIN for Ancillary Repair and Alterations is responsible for complying with his or her agency's internal policies when procuring R&A services. This may include a specific warrant delegation for procuring construction services when the estimated amount of this portion of the task order exceeds $2,000 (Ref. FAR 22.4).

Special Notice to Ordering Agencies: GSA or other landlords may require re-performance of any nonconforming work at agency expense. If applicable, agencies may seek appropriate recourse from the contractor responsible for the nonconforming work.

1b. Lowest Priced Model Number for each Special Item Number(s):

Labor Categories and Pricing Prices Are Fully Loaded and Include the IFF

SIN(s) Proposed
Service Proposed (e.g. Labor Category or Job Title/Task)
Unit of Issue (e.g. Hour, Task, Sq Ft)
Price Offered to GSA (including IFF)
712-1, 712-2. 712-3, 712-4, 712-97
Space Planner
Per Hour
$69.65
712-1, 712-2. 712-3, 712-4, 712-97
Designer
Per Hour
$98.47
712-1, 712-2. 712-3, 712-4, 712-97
Design Assistant
Per Hour
$75.36
712-1, 712-2. 712-3, 712-4, 712-97
Project Manager
Per Hour
$77.14
712-1, 712-2. 712-3, 712-4, 712-97
Sr. Project Manager
Per Hour
$92.16
712-1, 712-2. 712-3, 712-4, 712-97
Subject Matter Specialist
Per Hour
$123.30
712-2, 712-3, 712-97
General Laborer
Per Hour
$36.35
712-2, 712-3, 712-97
Installer I
Per Hour
$42.80
712-2, 712-3, 712-97
Installer II
Per Hour
$53.56
712-2, 712-3, 712-4, 712-97
Project Lead Installer
Per Hour
$64.24
712-2, 712-3
Move Supervisor
Per Hour
$62.25
712-2, 712-3
Move Coordinator
Per Hour
$52.01
712-2, 712-3
Driver/ Forklift Operator
Per Hour
$57.39

Labor Category Descriptions and Requirements

712-1 Project Management

Labor Category
Description
Requirements
Space Planner
Meets with clients and develops workspace concepts for future design and occupancy of furniture
2-4 years experience with space planning or a bachelors degree and 1 year of experience. Must be knowledgeable of all applicable building codes
Design Assistant
Designs furniture floor plans from concepts created by Space Planner
1-2 years experience in the design industry or associates degree in auto cad or equivalent
Designer
Designs furniture floor plans from concepts created by Space Planner
2-4 years experience in the design industry or associates degree in auto cad or equivalent
Project Manager
Performs project coordination, logistical aspects, resource allocation and sub-contractor performance
2-4 years experience managing projects or Bachelors degree and 1 year in project management
Sr. Project Manager
Performs project coordination, logistical aspects, resource allocation and sub-contractor performance
4-6 years experience in managing projects or Bachelors degree and 2 years in project management
Subject Matter Specialist
Identifies required tasks and develops a project plan for task completion. Identifies resource requirements for each task. Possesses expert knowledge in a specific functional area to serve as an expert resource for a specific task order. Demonstrates exceptional oral and written communication skills.
Bachelors degree and 4-6 years or 10 years of experience involving unique specialization in a product or industry.
Move Supervisor
Lead and organize moving crews. Meet with clients and discuss project statuses.
High School Diploma; 3 Years of experience
Move Coordinator
Must complete safety training. Unload and Load requested items to and from various locations. Unload and load Moving trucks with office furniture and all other designated items.
High School Diploma; No experience
Driver/ Forklift Operator
Standard driver’s license unless CDL required. Transport goods and moving crews to and from jobsites and other designated locations
High School Diploma; 1 Years of experience

712-3 Reconfiguration/Relocation/Installation Management

Labor Category
Description
Requirements
General Laborer
Performs tasks such as garbage removal, inventory control, general clean-up and retrieves parts for installation team
1 year of experience in any work environment
Mover
Performs freight loading and unloading on the job site.
1-3 years of experience in the moving industry
Installer I
Performs installations, demolitions and reconfigurations of multiple types of office furniture.
1-2 years experience installing office furniture
Installer II
Performs installations, demolitions and reconfigurations of multiple types of office furniture.
2-4 years experience installing office furniture
Project Lead Installer
Leads the installation project and performs installations, demolitions and reconfigurations of multiple types of office furniture.
4-6 years experience installing office furniture or a Bachelors Degree and 1 year of experience in the industry
Space Planner
Meets with clients and develops workspace concepts for future design and occupancy of furniture
2-4 years experience with space planning or a bachelors degree and 1 year of experience. Must be knowledgeable of all applicable building codes
Design Assistant
Designs furniture floor plans from concepts created by Space Planner
1-2 years experience in the design industry or associates degree in auto cad or equivalent
Designer
Designs furniture floor plans from concepts created by Space Planner
2-4 years experience in the design industry or associates degree in auto cad or equivalent
Project Manager
Performs project coordination, logistical aspects, resource allocation and sub-contractor performance
2-4 years experience managing projects or Bachelors degree and 1 year in project management
Sr. Project Manager
Performs project coordination, logistical aspects, resource allocation and sub-contractor performance
4-6 years experience in managing projects or Bachelors degree and 2 years in project management
Subject Matter Specialist
Identifies required tasks and develops a project plan for task completion. Identifies resource requirements for each task. Possesses expert knowledge in a specific functional area to serve as an expert resource for a specific task order. Demonstrates exceptional oral and written communication skills.
Bachelors degree and 4-6 years or 10 years of experience involving unique specialization in a product or industry.
Move Supervisor
Lead and organize moving crews. Meet with clients and discuss project statuses.
High School Diploma; 3 Years of experience
Move Coordinator
Must complete safety training. Unload and Load requested items to and from various locations. Unload and load Moving trucks with office furniture and all other designated items.
High School Diploma; No experience
Driver/ Forklift Operator
Standard driver’s license unless CDL required. Transport goods and moving crews to and from jobsites and other designated locations
High School Diploma; 1 Years of experience

712-4 Design/Layout

Labor Category
Description
Requirements
Project Lead Installer
Leads the installation project and performs installations, demolitions and reconfigurations of multiple types of office furniture.
4-6 years experience installing office furniture or a Bachelors Degree and 1 year of experience in the industry
Space Planner
Meets with clients and develops workspace concepts for future design and occupancy of furniture
2-4 years experience with space planning or a bachelors degree and 1 year of experience. Must be knowledgeable of all applicable building codes
Design Assistant
Designs furniture floor plans from concepts created by Space Planner
1-2 years experience in the design industry or associates degree in auto cad or equivalent
Designer
Designs furniture floor plans from concepts created by Space Planner
2-4 years experience in the design industry or associates degree in auto cad or equivalent
Project Manager
Performs project coordination, logistical aspects, resource allocation and sub-contractor performance
2-4 years experience managing projects or Bachelors degree and 1 year in project management
Sr. Project Manager
Performs project coordination, logistical aspects, resource allocation and sub-contractor performance
4-6 years experience in managing projects or Bachelors degree and 2 years in project management
Subject Matter Specialist
Identifies required tasks and develops a project plan for task completion. Identifies resource requirements for each task. Possesses expert knowledge in a specific functional area to serve as an expert resource for a specific task order. Demonstrates exceptional oral and written communication skills.
Bachelors degree and 4-6 years or 10 years of experience involving unique specialization in a product or industry.

712-97 Ancillary Repairs and Alterations

Labor Category
Description
Requirements
General Laborer
Performs tasks such as garbage removal, inventory control, general clean-up and retrieves parts for installation team
1 year of experience in any work environment
Mover
Performs freight loading and unloading on the job site.
1-3 years of experience in the moving industry
Installer I
Performs installations, demolitions and reconfigurations of multiple types of office furniture.
1-2 years experience installing office furniture
Installer II
Performs installations, demolitions and reconfigurations of multiple types of office furniture.
2-4 years experience installing office furniture
Project Lead Installer
Leads the installation project and performs installations, demolitions and reconfigurations of multiple types of office furniture.
4-6 years experience installing office furniture or a Bachelors Degree and 1 year of experience in the industry
Space Planner
Meets with clients and develops workspace concepts for future design and occupancy of furniture
2-4 years experience with space planning or a bachelors degree and 1 year of experience. Must be knowledgeable of all applicable building codes
Design Assistant
Designs furniture floor plans from concepts created by Space Planner
1-2 years experience in the design industry or associates degree in auto cad or equivalent
Designer
Designs furniture floor plans from concepts created by Space Planner
2-4 years experience in the design industry or associates degree in auto cad or equivalent
Project Manager
Performs project coordination, logistical aspects, resource allocation and sub-contractor performance
2-4 years experience managing projects or Bachelors degree and 1 year in project management
Sr. Project Manager
Performs project coordination, logistical aspects, resource allocation and sub-contractor performance
4-6 years experience in managing projects or Bachelors degree and 2 years in project management
Subject Matter Specialist
Identifies required tasks and develops a project plan for task completion. Identifies resource requirements for each task. Possesses expert knowledge in a specific functional area to serve as an expert resource for a specific task order. Demonstrates exceptional oral and written communication skills.
Bachelors degree and 4-6 years or 10 years of experience involving unique specialization in a product or industry.

2. Maximum Order Guideline: $250,000 FOR Sin# 712-97; $500,000 for all other Sin#’s

3. Minimum Order Limitation: $250.00 per SIN

4. Geographic Coverage: CONUS, District of Columbia, Alaska, Hawaii and Puerto Rico

5. Points of Production: N/A

6. Basic Discount: Please see enclosed Price list

7. Quantity Volume Discount: Dollar Value
Discount
$100,000.00- 200,000.00
1%
$200,001.00- 300,000.00
2%
$300,001.00- 400,000.00
3%
$400,001.00- 500,000.00
4%
8. Prompt Payment Terms: Terms
Discount
Payment Within 10 Days
2%
Payment Within 10-20 Days
1%
Payment Within 20-30 Days
0%

9a. Government Purchase Cards are Accepted

9b. Notification Whether Government Purchase Cards are Accepted or Not Accepted Above the Micro Purchase Threshold: No

10. Foreign Items: None

11a. Time of Delivery: 30 Days ARO

11b. Expedited Delivery: 14 Days ARO

11c. Overnight/2-Day Delivery: N/A

11d. Urgent Requirements: N/A

12. FOB Point: Destination

13. Ordering Address: Same as Contractor

14. Payment Address: Same as Contractor

15. Warranty Provisions: Standard Commercial Warranty

16. Export Packing Charges, If Applicable: Non-Applicable

17. Terms and Conditions of Government Purchase Card Acceptance: None

18. Terms and Conditions of Government Purchase Card Acceptance (Any Thresholds Above the Micro Purchase Threshold Level): None

19. Terms and Conditions of (If Applicable): None

20. Terms and Conditions of Repair parts indicating Date of Parts Price Lists and any discounts from List Prices (If Applicable): None

21. List of Service and Distribution Points (If Applicable): CONUS, District of Columbia, Alaska, Hawaii and Puerto Rico

22. List of Participating Dealers (If Applicable): None

23. Preventative maintenance (If Applicable): N/A

24. Environmental Attributes, e.g., Recycled Content, Energy Efficiency and /or Reduced pollutants: None

25. Data Universal Number System (DUNS) Number: 60-090-1396

26. Notification Regarding Registration in System For Award Management System (SAM): Registered

File details come from the government source that posted it. Updated .