MAS - Ponciano Construction, Inc. - GS21F048CA

PDF 138 KB

Attached to
Federal Supply Schedule GS21F048CA Federal contract IDV
Contract number
GS21F048CA
Issued by
GSA Federal Acquisition Service

About this file

Products and Services:

  • The document mentions various labor categories and their respective prices for the years 2022-2023 and 2023-2024. These labor categories include Principle, Sr. PM/Estimator, Project Manager, Quality Control Manager, Site Safety Manager, Project Superintendent, Architect, Engineering: MP&E, Senior Engineer Soil, Soil Technician, Laboratory Soil Testing, Concrete Technician, Concrete Compression Test, Sample Pickup, Engineering Letter of Affidavit, Asbestos Testing Engineer, Asbestos Remover Lab, Carpenter, Carpenter-Welder, Carpenter – Millwright, Drywall Finisher/Taper, Drywall Installer, Electrician, Glazier, Lab. Grp #1: Demo, etc., Lab. Grp#1: Landscape, Lab Grp#1: Fence Erector, Lab. Grp#4: Concrete, Modular Furniture, Operator: Forklift, Grp #1, Operator: Paving, Grp #6, Operator: Welder, Grp #7, Operator: Crane, Grp #8, Painter, Painter: Repaint, Plaster Clean-Up Lab, Labor (1), Labor (1) Landscape, Labor (1) Fence Erector, Labor (4) Concrete, Asbestos Remove Lab, Carpenter (1), Carpenter (2), Carpenter – Millwright, Drywall Installer, Electrician, Operator (1), Operator (6), Operator (7), Operator (8), Drywall Finisher/Taper, Painter, Repaint, Plaster Clean Up, Labor (1), Labor (1) Landscape, Labor (1) Fence Erector, Labor (4) Concrete, Glazier, Asbestos Remove Lab.

Location:

  • The services are to be provided at the contractor's address: Ponciano Construction, Inc., 525 S. Grade Rd., Alpine, CA 91901.

Dates:

  • The contract period is from June 23rd 2020 to June 22nd 2025.
  • The time of delivery is 30 days after receipt of order.

People:

  • The contractor is Ponciano Construction, Inc.
  • The contract administration source is Peter Ponciano, who is the President of Ponciano Construction, Inc. His contact details are: Phone: (619) 328-6381, Fax: (619) 328-0752, Email: Pete@poncianoconstruction.com.

Ponciano Construction, Inc. Pricelist and/or Vendor Terms and Conditions for GS21F048CA, a Federal Supply Schedule awarded to Ponciano Construction, Inc., under Facilities Maintenance and Management (03FAC)

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL SERVICES ADMINISTRATION FEDERAL SUPPLY SERVICE

AUTHORIZED FEDERAL SUPPLY SCHEDULE PRICE LIST

Online access to contract ordering information, terms and conditions, up‐to‐date pricing and the option to create an electronic delivery order is available through GSA Advantage!, a menu‐driven database system. The INTERNET address for GSA Advantage! Is http://www.gsaadvantage.gov

MULTIPLE AWARD SCHEDULE (MAS)

FACILITIES MAINTENANCE AND MANAGEMENT

Contract Number: GS‐21F‐048CA

Contract Period: June 23rd 2020 – June 22nd 2025

**For more information on ordering from Federal Supply Schedules click on the GSA Schedules link at www.gsa.gov

Contractor name and information:

Ponciano Construction, Inc.

525 S. Grade Rd.

Alpine, CA 91901 www.poncianoconstruction.com

Contract Administration Source:

Peter Ponciano

President

525 S. Grade Rd.

Alpine, CA 91901

Phone: (619) 328‐6381

Fax: (619) 328‐0752

Email: Pete@poncianoconstruction.com

Business Size:

Small Business

SBA Certified Small Disadvantaged Business

Minority‐Owned Business

Customer Information for Ordering Activities

1a. Table of Awarded Special Item Numbers

SIN DESCRIPTION

ANCRA Ancillary Repair and Alterations

561210FAC Facilities Maintenance and Management

OLM Order‐Level Materials

003 97 Ancillary Repair and Alterations

03FAC500 Order‐Level Materials

1b. Table of Awarded Special Item Numbers

SIN MODEL PRICE

811 004 Lab. GRP #1 Demo $83.47 per Hour

003 97 Stocker/Scrapper $49.65 per Hour

1c. Descriptions of Labor Categories: Maintenance of Utility Systems and Ancillary Repair and

Alterations

2. Maximum Order*: 250,000.00

*If the best value selection places your order over the Maximum order identified on this catalog/pricelist, you have an opportunity to obtain a better schedule contract price. Before placing your order, contact the aforementioned contractor for a better price. The contractor may (1) offer a new price for this requirement (2) offer the lowest price available under this contract or (3) decline the order. A delivery order that exceeds the maximum order may be placed under the schedule contract in accordance with FAR 8.404.

3. Minimum Order: 100.00

4. Geographic Coverage: The Continental United States (CONUS)

5. Points of Production: Same as Contractors Address

6. Discounts from Price List: 5% and 10% depending on Labor Category

7. Quantity/Volume Discounts: additional 1% of orders over $500,000.00

8. Prompt Payment Terms: 1% 15 days Net 30

8a. Information for Ordering Offices: Prompt Payment terms cannot be negotiated out of the contractual agreement in exchange for other concessions.

9. Foreign Items: Not Applicable

10a. Time of Delivery: 30 Days after Receipt of Order

10b. Expedited Delivery: Call for Pricing

10c. Overnight and 2‐Day delivery: Call for Pricing

10d. Urgent Requirements: When the delivery period above does not meet the customer’s bona fide urgent deliver requirements, customers are encouraged, if time permits, to contact the contractor for the purpose of requesting accelerated delivery. The contractor shall reply within 3 workdays after the receipt. (Telephonic replies shall be confirmed by the contractor in writing. ) If the contractor offers an accelerated delivery time acceptable to the customer, any orders placed pursuant to the agreed upon accelerated delivery time frame shall be delivered within this shorter delivery time and in accordance with all other terms and conditions of the contract.

11. FOB Point: Destination

12a. Ordering Address: Ponciano Construction, Inc.

525 S. Grade Rd.

12b. Ordering Procedures: Ordering activities shall use the ordering procedures described in

Federal Acquisition Regulations 8.405 when placing an order or establishing a BPA for products.

The ordering procedures, information on Blanket Purchase Agreements (BPAs) and a sample

BPA can also be found at the GSA/FSS Schedule Homepage (fss.gsa.gov/schedules)

13. Payment Address: Ponciano Construction, Inc.

525 S. Grade Rd.

14. Warranty Provision: Standard Commercial Warranty

15. Export Packing Charges: Not Applicable

16. Terms and Conditions of Rental, Maintenance, and Repair: Not Applicable

17. Terms and Conditions of Installation: Not Applicable

18a. Terms and Conditions of Repair Parts Indicating Date of Parts Price Lists and any

Discounts from List Prices: Not Applicable

18b. Terms and Conditions for Any other Services: Professional type services related to facilities maintenance work are applicable under this contract.

19. List of Service and Distribution Points: Not Applicable

20. List of Participating Dealers: Not Applicable

21. Preventative Maintenance: Not Applicable

22a. Special Attributes such as Environmental Attributes: Not Applicable

22b. Section 508 Compliance for EIT: Not Applicable

23. SAM Unique Entity Identification Number: YJGTUP1W3JX9

24. Notification regarding Registration in System for Award Management (SAM) Database:

Contractor is active in SAM until November 23, 2023.

Labor Categories Price List

Labor Category Functional Responsibility

Education Years of Experience

Principle Review: Estimate, Schedule, Project

Status, Project Budget, Project Staffing, Project Accounting. Manage:

Project Managers, Quality Control Managers, Safety

Managers, Office Staff.

Experience in Business/Financ ial Operations

25 Years

Sr. PM/Estimator Review: RFP, SOW, Estimates, Specifications, Architectural Design, Schedules CPM and 3 Week Look Ahead’s.

Create: Estimates, Budgets, CPM

Schedules, Project Status, Subcontracts.

Manage: Project

Manager, Superintendents, Subcontractors

Minimum Associates Degree

15 Years

Project Manager Review: RFP, SOW, Estimates, Schedules, Specifications, Architectural Design, CPM and 3 Week Look

Ahead’s. Create:

Budgets, CPM

Schedules, Project Status, Subcontracts.

Manage:

Superintendents, Subcontractors

Minimum Associates Degree

10 Years

Quality Control Manager

Review: RFP, SOW, Schedules, Specifications, Architectural Design, CPM and 3 Week Look

Minimum Associates

Degree/Field Experience

5 Years

Ahead’s. Create: QC Plans, Submittals, Submittal Logs, RFI’s, Estimates. Manage:

Quality Control

Site Safety Manager Review: RFP, SOW, Schedules CPM and 3 Week Look Ahead’s.

Create: Safety Plans, AHA’s. Manage: Project Safety

Minimum Associates

Degree/Field Experience

5 Years

Project Superintendent Review: RFP, SOW, Estimates, Schedules, Specifications, Architectural Design, CPM and 3 Week Look Ahead’s. Create: CPM Schedules, Project Status, Subcontracts

SOW. Manage:

Subcontractors, Production Meeting

Minimum Associates

Degree/Field Experience

5 Years

Architect Review: Design Requirements RFP, SOW, Specifications, Estimates, Schedules CPM. Create: Design Concepts, Design

Inception, Specifications. Manage:

Engineers, Designers, Submittal Review and

RFI’s.

A&E Degree (Bachelor of Architecture)

10 Years

Engineering: MP&E Review: Design Requirements RFP, SOW, Specifications, Estimates, Schedules CPM. Create: Design Concepts, Design Inception. Manage:

Engineers, Designers, Submittals, Shop Drawings and RFI’s

Engineering 5 Years

Senior Engineer Soil Review: Design Requirements RFP, SOW, Estimates, Schedules CPM. Create:

Design Concepts, Design

Inception. Manage:

Engineers and Soil

Technicians

Soil Engineering 5 Years

Soil Technician Review: RFP, SOW, Estimates, Schedules

CPM. Perform: Field Soil Testing

Training for Tasks

5 Years

Laboratory Soil Testing Perform Laboratory Testing

Engineering Degree/Trainin g for Tasks

5 Years

Concrete Technician Review: RFP, SOW, Estimates, Schedules

CPM. Perform: Field Soil Testing

Training for Tasks

5 Years

Concrete Compression Test

Review: RFP, SOW, Specifications, Architectural Design.

Perform: Laboratory Concrete Testing

Training for Tasks

5 Years

Sample Pickup Perform: Sample Pickup from Jobsite deliver to

Engineering Firm

Training for Tasks

2 Years

Engineering Letter of Affidavit

Review: RFP, SOW, Specifications, Architectural Design, Review Test Results.

Perform: Onsite

Inspection

Engineering Degree/Trainin g for Tasks

10 Years

Asbestos Testing Engineer

Review: RFP, SOW, Specifications, Architectural Design, Abatement Plan, Safety

Plan, Review Test Results. Perform:

Response Letter Compliance

Engineering Degree/Trainin g for Tasks

5 Years

Asbestos Remover Lab Mobilization, Cleanup, Site prep, removal of

Training of Tasks asbestos‐containing material & toxic waste, encapsulation, enclosure & disposal of materials by hand, equipment or machinery. Assembly of decontamination stations

Carpenter Carpenter, cabinets, insulation, hardwood floors, acoustical installer.

Training for Tasks

5 Years

Carpenter‐Welder Welding Pertaining to the Craft of Carpentry

Training for Tasks

5 Years

Carpenter – Millwright Millwright Training for Tasks

5 Years

Drywall Finisher/Taper Drywall Finishing, Taping

Training for Tasks

5 Years

Drywall Installer Install Drywall Training for Tasks

5 Years

Electrician Install & Repair of Electrical Components, Pulling Wire, Running

Conduit

Certified/Traini ng for Tasks

5 Years

Glazier Window Glazing Training for Tasks

5 Years

Lab. Grp #1: Demo, etc. Demolition Labor Training for Tasks

2 Years

Lab. Grp#1: Landscape Landscaping Labor Training for Tasks

2 Years

Lab Grp#1: Fence Erector

Install Fencing Panels & Supports

Training for Tasks

5 Years

Lab. Grp#4: Concrete Concrete core cutter, grinder, concrete saw, cutting concrete walls or flat work

Training for Tasks

2 Years

Modular Furniture Install/Assemble Modular Furniture

Training for Tasks

2 Years

Operator: Forklift, Grp #1

Operating Forklift Certified/Traini ng for Tasks

5 Years

Operator: Paving, Grp #6

Roller Operator, Skiploader Operator, Training for

Asphalt & Concrete Equipment Operator

Operator: Welder, Grp #7

Welding Pertaining to the Craft of Operator

Certified/Traini ng for Tasks

5 Years

Operator: Crane, Grp #8

Crane Operator (up to and including 25 ton capacity)

Certified/Traini ng for Tasks

10 Years

Painter Painting Training for Tasks

5 Years

Painter: Repaint Repaint of any previously painted structure

Training for Tasks

2 Years

Plaster Clean‐Up Lab Plaster Clean‐up Training for Tasks

2 Years

Plaster Tender Assist in Plaster Application

Training for Tasks

5 Years

Plumber (ALL) Plumbing Work Performed on all Work Except New Additions &

Remodeling

Training for Tasks

5 Years

Plumber (NEW) Plumbing Work Performed only on New Additions & Remodeling

Training for Tasks

10 Years

Plumber (Tenant Improve)

Plumbing Work Only on Light Commercial

Tenant Improvement & Remodel Work

Training for Tasks

5 Years

Roofer Install or Repair of Various Roofing

Materials & Stages

Certified/Traini ng for Tasks

5 Years

Sheet metal Worker New & Remodel Sheet Metal Work

Certified/Traini ng for Tasks

5 Years

Soft Floor Layer Apply Coverings to Floors

Training for Tasks

5 years

Sprinkler Fitter Install & Fix Pipes Certified/Traini ng for Tasks

5 Years

Sprinkler Fitter Fire Install & Fix Pipes in Fire Sprinkler Systems

Certified/Traini ng for Tasks

5 Years

Stocker/Scrapper Stocking & Scrapping Drywall

Training for Tasks

2 Years

Stripping/Slurry Grp #4 Striper: Layout & apply traffic stripes & markings

Training for

Soundman Wire‐Pulling, Splicing, assembling & installing devices

Certified/Traini ng for Tasks

10 Years

Soundman Technician Terminating, Operating & Performing final check‐out

Certified/Traini ng for Tasks

Ponciano GSA Price List

Labor Category

06/23/2022 ‐ 06/22/2023

06/23/2023 ‐ 06/22/2024

Principle $116.46 $123.45

Sr. PM/Estimator $96.98 $102.80

Project Manager $96.98 $102.80

Quality Control Manager $76.20 80.77

Site Safety Manager $86.90 $92.11

Project Superintendent $86.90 $92.11

Architect $240.99 $255.45

Engineering: MP&E $261.00 $276.67

Senior Engineer Soil $188.31 $199.61

Soil Technician $130.30 $138.12

Laboratory Soil Testing $272.62 $288.98

Concrete Technician $131.13 $139.00

Concrete Compression Test $81.55 $86.44

Sample Pickup $193.05 $204.63

Engineering Letter of Affidavit

$193.05 $204.63

Asbestos Testing Engineer $247.77 $262.64

Asbestos Remover Lab $94.79 $100.48

Carpenter $96.06 $101.82

Carpenter‐Welder $96.06 $101.82

Carpenter – Millwright $96.62 $102.42

Drywall Finisher/Taper $92.60 $98.16

Drywall Installer $76.15 $80.72

Electrician $114.30 $121.16

Glazier $105.05 $111.35

Lab. Grp #1: Demo, etc. $83.47 $88.48

Lab. Grp#1: Landscape $113.53 $120.34

Lab Grp#1: Fence Erector $87.49 $92.74

Lab. Grp#4: Concrete $49.65 $52.63

Modular Furniture $49.65 $52.63

Operator: Forklift, Grp #1 $113.17 $119.96

Operator: Paving, Grp #6 $115.64 $122.58

Operator: Welder, Grp #7 $118.60 $125.72

Operator: Crane, Grp #8 $113.66 $120.48

Painter $72.74 $77.10

Painter: Repaint $67.27 $66.01

Plaster Clean‐Up Lab $83.33 $88.33

DBA Matrix

Labor Category DBA Wage Classification

Code

Wage Determination

Mod No.

Date County

Modular Furniture Installer

CARP0721‐001 CA20230022 4 03/17/2023

Los Angeles

Carpenter (1) CARP00213‐001 CA20230022 4 03/17/2023 Los Angeles

Carpenter (2) CARP00213‐001 CA20230022 4 03/17/2023 Los Angeles

Carpenter – Millwright

CARP00213‐001 CA20230022 4 03/17/2023 Los Angeles

Drywall Installer CARP0213‐004 CA20230022 4 03/17/2023 Los Angeles

Electrician ELEC0011‐004 CA20230022 4 03/17/2023 Los Angeles

Operator (1) ENGI0012‐003 CA20230022 4 03/17/2023 Los Angeles

Operator (6) ENGI0012‐003 CA20230022 4 03/17/2023 Los Angeles

Operator (7) ENGI0012‐003 CA20230022 4 03/17/2023 Los Angeles

Operator (8) ENGI0012‐003 CA20230022 4 03/17/2023 Los Angeles

Drywall Finisher/Taper

PAIN0036‐0001 CA20230022 4 03/17/2023 Los Angeles

Painter PAIN0036‐001 CA20230022 4 03/17/2023 Los Angeles

Repaint PAIN0036‐001 CA20230022 4 03/17/2023 Los Angeles

Plaster Clean Up LABO1414‐001 CA20230022 4 03/17/2023 Los Angeles

Labor (1) LABO0300‐003 CA20230022 4 03/17/2023 Los Angeles

Labor (1) Landscape LABO0300‐003 CA20230022 4 03/17/2023 Los Angeles

Labor (1) Fence Erector

LABO0300‐003 CA20230022 4 03/17/2023 Los Angeles

Labor (4) Concrete LABO0300‐003 CA20230022 4 03/17/2023 Los Angeles

Glazier PAIN0036‐0015 CA20230022 4 03/17/2023 Los Angeles

Asbestos Remove Lab ASBE0005‐002 CA20230022 4 03/17/2023 Los Angeles

Modular Furniture Installer

CARP0721‐001 CA20230001 1 01/13/2023 San Diego

Carpenter (1) CARP0619‐003 CA20230001 1 01/13/2023 San Diego

Carpenter (2) CARP0619‐003 CA20230001 1 01/13/2023 San Diego

Carpenter – Millwright

CARP0619‐003 CA20230001 1 01/13/2023 San Diego

Drywall Installer CARP0619‐002 CA20230001 1 01/13/2023 San Diego

Electrician ELEC0569‐001 CA20230001 1 01/13/2023 San Diego

Operator (1) ENGI0012‐003 CA20230001 1 01/13/2023 San Diego

Operator (6) ENGI0012‐003 CA20230001 1 01/13/2023 San Diego

Operator (7) ENGI0012‐003 CA20230001 1 01/13/2023 San Diego

Operator (8) ENGI0012‐003 CA20230001 1 01/13/2023 San Diego

Drywall Finisher/Taper

PAIN0036‐0010 CA20230001 1 01/13/2023 San Diego

Painter PAIN0036‐001 CA20230001 1 01/13/2023 San Diego

Repaint PAIN0036‐001 CA20230001 1 01/13/2023 San Diego

Plaster Clean Up PLAS0200‐005 CA20230001 1 01/13/2023 San Diego

Labor (1) LABO0089‐001 CA20230001 1 01/13/2023 San Diego

Labor (1) Landscape LABO0089‐001 CA20230001 1 01/13/2023 San Diego

Labor (1) Fence Erector

LABO0089‐001 CA20230001 1 01/13/2023 San Diego

Labor (4) Concrete LABO0089‐001 CA20230001 1 01/13/2023 San Diego

Glazier PAIN0036‐0012 CA20230001 1 01/13/2023 San Diego

Asbestos Remove Lab ASBE0005‐004 CA20230001 1 01/13/2023 San Diego

File details come from the government source that posted it. Updated .