MAS - Ponciano Construction, Inc. - GS21F048CA
PDF 138 KB
- Attached to
- Federal Supply Schedule GS21F048CA Federal contract IDV
- Contract number
- GS21F048CA
- Issued by
- GSA Federal Acquisition Service
About this file
Products and Services:
- The document mentions various labor categories and their respective prices for the years 2022-2023 and 2023-2024. These labor categories include Principle, Sr. PM/Estimator, Project Manager, Quality Control Manager, Site Safety Manager, Project Superintendent, Architect, Engineering: MP&E, Senior Engineer Soil, Soil Technician, Laboratory Soil Testing, Concrete Technician, Concrete Compression Test, Sample Pickup, Engineering Letter of Affidavit, Asbestos Testing Engineer, Asbestos Remover Lab, Carpenter, Carpenter-Welder, Carpenter – Millwright, Drywall Finisher/Taper, Drywall Installer, Electrician, Glazier, Lab. Grp #1: Demo, etc., Lab. Grp#1: Landscape, Lab Grp#1: Fence Erector, Lab. Grp#4: Concrete, Modular Furniture, Operator: Forklift, Grp #1, Operator: Paving, Grp #6, Operator: Welder, Grp #7, Operator: Crane, Grp #8, Painter, Painter: Repaint, Plaster Clean-Up Lab, Labor (1), Labor (1) Landscape, Labor (1) Fence Erector, Labor (4) Concrete, Asbestos Remove Lab, Carpenter (1), Carpenter (2), Carpenter – Millwright, Drywall Installer, Electrician, Operator (1), Operator (6), Operator (7), Operator (8), Drywall Finisher/Taper, Painter, Repaint, Plaster Clean Up, Labor (1), Labor (1) Landscape, Labor (1) Fence Erector, Labor (4) Concrete, Glazier, Asbestos Remove Lab.
Location:
- The services are to be provided at the contractor's address: Ponciano Construction, Inc., 525 S. Grade Rd., Alpine, CA 91901.
Dates:
- The contract period is from June 23rd 2020 to June 22nd 2025.
- The time of delivery is 30 days after receipt of order.
People:
- The contractor is Ponciano Construction, Inc.
- The contract administration source is Peter Ponciano, who is the President of Ponciano Construction, Inc. His contact details are: Phone: (619) 328-6381, Fax: (619) 328-0752, Email: Pete@poncianoconstruction.com.
Ponciano Construction, Inc. Pricelist and/or Vendor Terms and Conditions for GS21F048CA, a Federal Supply Schedule awarded to Ponciano Construction, Inc., under Facilities Maintenance and Management (03FAC)
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL SERVICES ADMINISTRATION FEDERAL SUPPLY SERVICE
AUTHORIZED FEDERAL SUPPLY SCHEDULE PRICE LIST
Online access to contract ordering information, terms and conditions, up‐to‐date pricing and the option to create an electronic delivery order is available through GSA Advantage!, a menu‐driven database system. The INTERNET address for GSA Advantage! Is http://www.gsaadvantage.gov
MULTIPLE AWARD SCHEDULE (MAS)
FACILITIES MAINTENANCE AND MANAGEMENT
Contract Number: GS‐21F‐048CA
Contract Period: June 23rd 2020 – June 22nd 2025
**For more information on ordering from Federal Supply Schedules click on the GSA Schedules link at www.gsa.gov
Contractor name and information:
Ponciano Construction, Inc.
525 S. Grade Rd.
Alpine, CA 91901 www.poncianoconstruction.com
Contract Administration Source:
Peter Ponciano
President
525 S. Grade Rd.
Alpine, CA 91901
Phone: (619) 328‐6381
Fax: (619) 328‐0752
Email: Pete@poncianoconstruction.com
Business Size:
Small Business
SBA Certified Small Disadvantaged Business
Minority‐Owned Business
Customer Information for Ordering Activities
1a. Table of Awarded Special Item Numbers
SIN DESCRIPTION
ANCRA Ancillary Repair and Alterations
561210FAC Facilities Maintenance and Management
OLM Order‐Level Materials
003 97 Ancillary Repair and Alterations
03FAC500 Order‐Level Materials
1b. Table of Awarded Special Item Numbers
SIN MODEL PRICE
811 004 Lab. GRP #1 Demo $83.47 per Hour
003 97 Stocker/Scrapper $49.65 per Hour
1c. Descriptions of Labor Categories: Maintenance of Utility Systems and Ancillary Repair and
Alterations
2. Maximum Order*: 250,000.00
*If the best value selection places your order over the Maximum order identified on this catalog/pricelist, you have an opportunity to obtain a better schedule contract price. Before placing your order, contact the aforementioned contractor for a better price. The contractor may (1) offer a new price for this requirement (2) offer the lowest price available under this contract or (3) decline the order. A delivery order that exceeds the maximum order may be placed under the schedule contract in accordance with FAR 8.404.
3. Minimum Order: 100.00
4. Geographic Coverage: The Continental United States (CONUS)
5. Points of Production: Same as Contractors Address
6. Discounts from Price List: 5% and 10% depending on Labor Category
7. Quantity/Volume Discounts: additional 1% of orders over $500,000.00
8. Prompt Payment Terms: 1% 15 days Net 30
8a. Information for Ordering Offices: Prompt Payment terms cannot be negotiated out of the contractual agreement in exchange for other concessions.
9. Foreign Items: Not Applicable
10a. Time of Delivery: 30 Days after Receipt of Order
10b. Expedited Delivery: Call for Pricing
10c. Overnight and 2‐Day delivery: Call for Pricing
10d. Urgent Requirements: When the delivery period above does not meet the customer’s bona fide urgent deliver requirements, customers are encouraged, if time permits, to contact the contractor for the purpose of requesting accelerated delivery. The contractor shall reply within 3 workdays after the receipt. (Telephonic replies shall be confirmed by the contractor in writing. ) If the contractor offers an accelerated delivery time acceptable to the customer, any orders placed pursuant to the agreed upon accelerated delivery time frame shall be delivered within this shorter delivery time and in accordance with all other terms and conditions of the contract.
11. FOB Point: Destination
12a. Ordering Address: Ponciano Construction, Inc.
525 S. Grade Rd.
12b. Ordering Procedures: Ordering activities shall use the ordering procedures described in
Federal Acquisition Regulations 8.405 when placing an order or establishing a BPA for products.
The ordering procedures, information on Blanket Purchase Agreements (BPAs) and a sample
BPA can also be found at the GSA/FSS Schedule Homepage (fss.gsa.gov/schedules)
13. Payment Address: Ponciano Construction, Inc.
525 S. Grade Rd.
14. Warranty Provision: Standard Commercial Warranty
15. Export Packing Charges: Not Applicable
16. Terms and Conditions of Rental, Maintenance, and Repair: Not Applicable
17. Terms and Conditions of Installation: Not Applicable
18a. Terms and Conditions of Repair Parts Indicating Date of Parts Price Lists and any
Discounts from List Prices: Not Applicable
18b. Terms and Conditions for Any other Services: Professional type services related to facilities maintenance work are applicable under this contract.
19. List of Service and Distribution Points: Not Applicable
20. List of Participating Dealers: Not Applicable
21. Preventative Maintenance: Not Applicable
22a. Special Attributes such as Environmental Attributes: Not Applicable
22b. Section 508 Compliance for EIT: Not Applicable
23. SAM Unique Entity Identification Number: YJGTUP1W3JX9
24. Notification regarding Registration in System for Award Management (SAM) Database:
Contractor is active in SAM until November 23, 2023.
Labor Categories Price List
Labor Category Functional Responsibility
Education Years of Experience
Principle Review: Estimate, Schedule, Project
Status, Project Budget, Project Staffing, Project Accounting. Manage:
Project Managers, Quality Control Managers, Safety
Managers, Office Staff.
Experience in Business/Financ ial Operations
25 Years
Sr. PM/Estimator Review: RFP, SOW, Estimates, Specifications, Architectural Design, Schedules CPM and 3 Week Look Ahead’s.
Create: Estimates, Budgets, CPM
Schedules, Project Status, Subcontracts.
Manage: Project
Manager, Superintendents, Subcontractors
Minimum Associates Degree
15 Years
Project Manager Review: RFP, SOW, Estimates, Schedules, Specifications, Architectural Design, CPM and 3 Week Look
Ahead’s. Create:
Budgets, CPM
Schedules, Project Status, Subcontracts.
Manage:
Superintendents, Subcontractors
Minimum Associates Degree
10 Years
Quality Control Manager
Review: RFP, SOW, Schedules, Specifications, Architectural Design, CPM and 3 Week Look
Minimum Associates
Degree/Field Experience
5 Years
Ahead’s. Create: QC Plans, Submittals, Submittal Logs, RFI’s, Estimates. Manage:
Quality Control
Site Safety Manager Review: RFP, SOW, Schedules CPM and 3 Week Look Ahead’s.
Create: Safety Plans, AHA’s. Manage: Project Safety
Minimum Associates
Degree/Field Experience
5 Years
Project Superintendent Review: RFP, SOW, Estimates, Schedules, Specifications, Architectural Design, CPM and 3 Week Look Ahead’s. Create: CPM Schedules, Project Status, Subcontracts
SOW. Manage:
Subcontractors, Production Meeting
Minimum Associates
Degree/Field Experience
5 Years
Architect Review: Design Requirements RFP, SOW, Specifications, Estimates, Schedules CPM. Create: Design Concepts, Design
Inception, Specifications. Manage:
Engineers, Designers, Submittal Review and
RFI’s.
A&E Degree (Bachelor of Architecture)
10 Years
Engineering: MP&E Review: Design Requirements RFP, SOW, Specifications, Estimates, Schedules CPM. Create: Design Concepts, Design Inception. Manage:
Engineers, Designers, Submittals, Shop Drawings and RFI’s
Engineering 5 Years
Senior Engineer Soil Review: Design Requirements RFP, SOW, Estimates, Schedules CPM. Create:
Design Concepts, Design
Inception. Manage:
Engineers and Soil
Technicians
Soil Engineering 5 Years
Soil Technician Review: RFP, SOW, Estimates, Schedules
CPM. Perform: Field Soil Testing
Training for Tasks
5 Years
Laboratory Soil Testing Perform Laboratory Testing
Engineering Degree/Trainin g for Tasks
5 Years
Concrete Technician Review: RFP, SOW, Estimates, Schedules
CPM. Perform: Field Soil Testing
Training for Tasks
5 Years
Concrete Compression Test
Review: RFP, SOW, Specifications, Architectural Design.
Perform: Laboratory Concrete Testing
Training for Tasks
5 Years
Sample Pickup Perform: Sample Pickup from Jobsite deliver to
Engineering Firm
Training for Tasks
2 Years
Engineering Letter of Affidavit
Review: RFP, SOW, Specifications, Architectural Design, Review Test Results.
Perform: Onsite
Inspection
Engineering Degree/Trainin g for Tasks
10 Years
Asbestos Testing Engineer
Review: RFP, SOW, Specifications, Architectural Design, Abatement Plan, Safety
Plan, Review Test Results. Perform:
Response Letter Compliance
Engineering Degree/Trainin g for Tasks
5 Years
Asbestos Remover Lab Mobilization, Cleanup, Site prep, removal of
Training of Tasks asbestos‐containing material & toxic waste, encapsulation, enclosure & disposal of materials by hand, equipment or machinery. Assembly of decontamination stations
Carpenter Carpenter, cabinets, insulation, hardwood floors, acoustical installer.
Training for Tasks
5 Years
Carpenter‐Welder Welding Pertaining to the Craft of Carpentry
Training for Tasks
5 Years
Carpenter – Millwright Millwright Training for Tasks
5 Years
Drywall Finisher/Taper Drywall Finishing, Taping
Training for Tasks
5 Years
Drywall Installer Install Drywall Training for Tasks
5 Years
Electrician Install & Repair of Electrical Components, Pulling Wire, Running
Conduit
Certified/Traini ng for Tasks
5 Years
Glazier Window Glazing Training for Tasks
5 Years
Lab. Grp #1: Demo, etc. Demolition Labor Training for Tasks
2 Years
Lab. Grp#1: Landscape Landscaping Labor Training for Tasks
2 Years
Lab Grp#1: Fence Erector
Install Fencing Panels & Supports
Training for Tasks
5 Years
Lab. Grp#4: Concrete Concrete core cutter, grinder, concrete saw, cutting concrete walls or flat work
Training for Tasks
2 Years
Modular Furniture Install/Assemble Modular Furniture
Training for Tasks
2 Years
Operator: Forklift, Grp #1
Operating Forklift Certified/Traini ng for Tasks
5 Years
Operator: Paving, Grp #6
Roller Operator, Skiploader Operator, Training for
Asphalt & Concrete Equipment Operator
Operator: Welder, Grp #7
Welding Pertaining to the Craft of Operator
Certified/Traini ng for Tasks
5 Years
Operator: Crane, Grp #8
Crane Operator (up to and including 25 ton capacity)
Certified/Traini ng for Tasks
10 Years
Painter Painting Training for Tasks
5 Years
Painter: Repaint Repaint of any previously painted structure
Training for Tasks
2 Years
Plaster Clean‐Up Lab Plaster Clean‐up Training for Tasks
2 Years
Plaster Tender Assist in Plaster Application
Training for Tasks
5 Years
Plumber (ALL) Plumbing Work Performed on all Work Except New Additions &
Remodeling
Training for Tasks
5 Years
Plumber (NEW) Plumbing Work Performed only on New Additions & Remodeling
Training for Tasks
10 Years
Plumber (Tenant Improve)
Plumbing Work Only on Light Commercial
Tenant Improvement & Remodel Work
Training for Tasks
5 Years
Roofer Install or Repair of Various Roofing
Materials & Stages
Certified/Traini ng for Tasks
5 Years
Sheet metal Worker New & Remodel Sheet Metal Work
Certified/Traini ng for Tasks
5 Years
Soft Floor Layer Apply Coverings to Floors
Training for Tasks
5 years
Sprinkler Fitter Install & Fix Pipes Certified/Traini ng for Tasks
5 Years
Sprinkler Fitter Fire Install & Fix Pipes in Fire Sprinkler Systems
Certified/Traini ng for Tasks
5 Years
Stocker/Scrapper Stocking & Scrapping Drywall
Training for Tasks
2 Years
Stripping/Slurry Grp #4 Striper: Layout & apply traffic stripes & markings
Training for
Soundman Wire‐Pulling, Splicing, assembling & installing devices
Certified/Traini ng for Tasks
10 Years
Soundman Technician Terminating, Operating & Performing final check‐out
Certified/Traini ng for Tasks
Ponciano GSA Price List
Labor Category
06/23/2022 ‐ 06/22/2023
06/23/2023 ‐ 06/22/2024
Principle $116.46 $123.45
Sr. PM/Estimator $96.98 $102.80
Project Manager $96.98 $102.80
Quality Control Manager $76.20 80.77
Site Safety Manager $86.90 $92.11
Project Superintendent $86.90 $92.11
Architect $240.99 $255.45
Engineering: MP&E $261.00 $276.67
Senior Engineer Soil $188.31 $199.61
Soil Technician $130.30 $138.12
Laboratory Soil Testing $272.62 $288.98
Concrete Technician $131.13 $139.00
Concrete Compression Test $81.55 $86.44
Sample Pickup $193.05 $204.63
Engineering Letter of Affidavit
$193.05 $204.63
Asbestos Testing Engineer $247.77 $262.64
Asbestos Remover Lab $94.79 $100.48
Carpenter $96.06 $101.82
Carpenter‐Welder $96.06 $101.82
Carpenter – Millwright $96.62 $102.42
Drywall Finisher/Taper $92.60 $98.16
Drywall Installer $76.15 $80.72
Electrician $114.30 $121.16
Glazier $105.05 $111.35
Lab. Grp #1: Demo, etc. $83.47 $88.48
Lab. Grp#1: Landscape $113.53 $120.34
Lab Grp#1: Fence Erector $87.49 $92.74
Lab. Grp#4: Concrete $49.65 $52.63
Modular Furniture $49.65 $52.63
Operator: Forklift, Grp #1 $113.17 $119.96
Operator: Paving, Grp #6 $115.64 $122.58
Operator: Welder, Grp #7 $118.60 $125.72
Operator: Crane, Grp #8 $113.66 $120.48
Painter $72.74 $77.10
Painter: Repaint $67.27 $66.01
Plaster Clean‐Up Lab $83.33 $88.33
DBA Matrix
Labor Category DBA Wage Classification
Code
Wage Determination
Mod No.
Date County
Modular Furniture Installer
CARP0721‐001 CA20230022 4 03/17/2023
Los Angeles
Carpenter (1) CARP00213‐001 CA20230022 4 03/17/2023 Los Angeles
Carpenter (2) CARP00213‐001 CA20230022 4 03/17/2023 Los Angeles
Carpenter – Millwright
CARP00213‐001 CA20230022 4 03/17/2023 Los Angeles
Drywall Installer CARP0213‐004 CA20230022 4 03/17/2023 Los Angeles
Electrician ELEC0011‐004 CA20230022 4 03/17/2023 Los Angeles
Operator (1) ENGI0012‐003 CA20230022 4 03/17/2023 Los Angeles
Operator (6) ENGI0012‐003 CA20230022 4 03/17/2023 Los Angeles
Operator (7) ENGI0012‐003 CA20230022 4 03/17/2023 Los Angeles
Operator (8) ENGI0012‐003 CA20230022 4 03/17/2023 Los Angeles
Drywall Finisher/Taper
PAIN0036‐0001 CA20230022 4 03/17/2023 Los Angeles
Painter PAIN0036‐001 CA20230022 4 03/17/2023 Los Angeles
Repaint PAIN0036‐001 CA20230022 4 03/17/2023 Los Angeles
Plaster Clean Up LABO1414‐001 CA20230022 4 03/17/2023 Los Angeles
Labor (1) LABO0300‐003 CA20230022 4 03/17/2023 Los Angeles
Labor (1) Landscape LABO0300‐003 CA20230022 4 03/17/2023 Los Angeles
Labor (1) Fence Erector
LABO0300‐003 CA20230022 4 03/17/2023 Los Angeles
Labor (4) Concrete LABO0300‐003 CA20230022 4 03/17/2023 Los Angeles
Glazier PAIN0036‐0015 CA20230022 4 03/17/2023 Los Angeles
Asbestos Remove Lab ASBE0005‐002 CA20230022 4 03/17/2023 Los Angeles
Modular Furniture Installer
CARP0721‐001 CA20230001 1 01/13/2023 San Diego
Carpenter (1) CARP0619‐003 CA20230001 1 01/13/2023 San Diego
Carpenter (2) CARP0619‐003 CA20230001 1 01/13/2023 San Diego
Carpenter – Millwright
CARP0619‐003 CA20230001 1 01/13/2023 San Diego
Drywall Installer CARP0619‐002 CA20230001 1 01/13/2023 San Diego
Electrician ELEC0569‐001 CA20230001 1 01/13/2023 San Diego
Operator (1) ENGI0012‐003 CA20230001 1 01/13/2023 San Diego
Operator (6) ENGI0012‐003 CA20230001 1 01/13/2023 San Diego
Operator (7) ENGI0012‐003 CA20230001 1 01/13/2023 San Diego
Operator (8) ENGI0012‐003 CA20230001 1 01/13/2023 San Diego
Drywall Finisher/Taper
PAIN0036‐0010 CA20230001 1 01/13/2023 San Diego
Painter PAIN0036‐001 CA20230001 1 01/13/2023 San Diego
Repaint PAIN0036‐001 CA20230001 1 01/13/2023 San Diego
Plaster Clean Up PLAS0200‐005 CA20230001 1 01/13/2023 San Diego
Labor (1) LABO0089‐001 CA20230001 1 01/13/2023 San Diego
Labor (1) Landscape LABO0089‐001 CA20230001 1 01/13/2023 San Diego
Labor (1) Fence Erector
LABO0089‐001 CA20230001 1 01/13/2023 San Diego
Labor (4) Concrete LABO0089‐001 CA20230001 1 01/13/2023 San Diego
Glazier PAIN0036‐0012 CA20230001 1 01/13/2023 San Diego
Asbestos Remove Lab ASBE0005‐004 CA20230001 1 01/13/2023 San Diego
File details come from the government source that posted it. Updated .