MAS - Aspen Environmental Group - GS10F0229N
PDF 1 MB
- Attached to
- Federal Supply Schedule GS10F0229N Federal contract IDV
- Contract number
- GS10F0229N
- Issued by
- GSA Federal Acquisition Service
About this file
Aspen Environmental Group Pricelist and/or Vendor Terms and Conditions for GS10F0229N, a Federal Supply Schedule awarded to Aspen Environmental Group, under The Professional Services Schedule (PSS)
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Aspen Environmental Group
FEDERAL SUPPLY GROUP: PROFESSIONAL SERVICES
Schedule Title: Multiple Award Schedule
Contract No. GS-10F-0229N Contract Period: January 31, 2018 – January 30, 2023
Price list current as of Modification # PS-
A812 effective February 12, 2020”
Aspen Environmental Group Point of Contact: Vicky Tinkjian 5020 Chesebro Road, Suite 200 vtinkjian@aspeneg.com
Agoura Hills, CA 91301 www.aspeneg.com Tel. (818) 597-3407 Fax (818) 597-8001
Business Size: Small Business For more information on ordering from Federal Supply Schedule click on the FSS Schedules button at fss.gsa.gov.
Online access to contract ordering information, terms and conditions, up-to-date pricing, and the option to create an electronic delivery order are available through GSA Advantage!, a menu driven database system. The INTERNET address for GSA Advantage! is:
www.GSAAdvantage.gov .
http://www.gsaadvantage.gov/
Contents
Customer Information
About Aspen Environmental Group
541620 - Environmental Consulting Services
CEQA
NEPA
CEQA/NEPA Joint Documents
541370GIS - Geographic Information Syste ms (GIS) Services Geospatial Services
Types of Projects
Transmission and Telecommunication Renewable Energy Oil and Gas Water Supply Restoration
Price Lists
541620 Labor Descriptions Environmental Expert III Principal/Program Manager Senior Project Manager II Senior Project Manager Senior Associate, Air Quality and Greenhouse Gas/Global Climate Change Principal Environmental Consultant I Senior Environmental Scientist VIII Senior Environmental Consultant III Senior Environmental Consultant II Senior Environmental Consultant I Senior Engineer Engineer II Earth Science/Hydrology IV Earth Science/Hydrology III Registered Professional Archaeologist Principal Registered Professional Archaeologist Senior Associate Earth Science/Hydrology II Earth Science/Hydrology I Supervisory Archaeologist Cultural Resource Specialist II Cultural Resource Specialist I Biologist IV Biologist III Certified Fisheries Biologist, Senior Biologist II
Biologist I Environmental Consultant II Social Scientist/Planner IV Social Scientist/Planner III Senior Environmental Planner Social Scientist/Planner II Social Scientist/Planner I Environmental Scientist II Information Technology Document Production Senior GIS Specialist Senior GIS/Info Tech Specialist Graphics/Drafting Staff GIS/Info Tech Specialist Administrative/Project Accounting II Project Accounting I Administrative
541370GIS - Labor Descriptions Principal/Program Manager Information Technology Manager Information Technology Data Analyst Database Manager GIS Manager Senior GIS Specialist GIS Specialist II GIS Technician II GIS Technician I Graphics/Drafting Analyst Document Editing QA/QC Administrative/Project Accounting II Project Accounting I Administrative
Order Aspen’s Services
Contract No. GS-10F-0229N 1
Customer Information
Contract Number: GS-10F-0229N
Contract Period: January 31, 2018 – January 30, 2023
Contractor’s Name: Aspen Environmental Group
Contractor’s Address: 5020 Chesebro Road, Suite 200 Agoura Hills, CA 91301 (Headquarters)
Business Size: Small Business
Data Universal Numbering System (DUNS): 793060054
Contractor’s Taxpayer Identification Number: 95-4337914
1a. Special Item Number(s) for this Contract:
Description
541620 - Environmental Planning Services & Documentation
541370GIS - Geographic Information Systems
1b. Services and Rates can be found on pages 13-14 and 25-26 of this pricelist
1c. Hourly Labor Rates are not applicable for this pricelist
2. Maximum order: $1,000,000
3. Minimum order: $100
4. Geographic Scope of Contract: Domestic and Overseas
5. Point of Production: 5020 Chesebro Road, Suite 200
Agoura Hills, CA 91301
6. Discount from list price or statement of net: Government Net Prices (discounts already deducted)
7. Quantity Discounts: None offered
8. Information for Ordering Offices: Prompt payment terms cannot be negotiated out of the contractual agreement in exchange for other concessions
9a. Government Purchase Cards: Yes, Government Purchase Cards are accepted below the micro-purchase threshold.
9b. Government Purchase Cards: Yes, Government Purchase Cards are accepted above the mirco-purchase threshold.
10. Foreign Items: Not applicable
11a. Time of Delivery: As negotiated with ordering agency; specified on the task order
11b. Expedited Delivery: Items available for expedited delivery are noted in this price list. All items over minimum are available for expedited Delivery. Contact contractor for more information.
Contract No. GS-10F-0229N 2
11c. Overnight and 2-Day Delivery: Overnight and 2-day delivery are also available. Contact Contractor for rates for overnight and 2-day delivery.
11d. Urgent Requirements: Not Applicable
12. F.O.B. Point(s): Destination
13a. Ordering Address: Aspen Environmental Group
5020 Chesebro Road, Suite 200
Agoura Hills, CA 91301
Attn: Vicky Tinkjian
Phone: (818) 597-3407 www.aspeneg.com
13b. For supplies and services, the ordering procedures, information on Blanket Purchase Agreements (BPAs) are found in Federal Acquisition Regulation (FAR) 8.405-3.
14. Payment Address: Aspen Environmental Group
5020 Chesebro Road, Suite 200
Agoura Hills, CA 91301
POC: Vicky Tinkjian
15. Warranty Provision: In accordance with Standard Commercial Warranty
16. Export Packaging Charges: Not Applicable
17. Terms and Conditions of Government Purchase Card Acceptance: Yes, Government Purchase Cards are accepted above the micro-purchase threshold.
18. Terms and Conditions of Rental, Maintenance and Repair: Not Applicable
19. Terms and Conditions of Installation: Not Applicable
20. Terms and Conditions of Repair Parts Indicating Date of Parts Price Lists and Any Discounts from List Prices: Not Applicable
20a. Terms and Conditions for Any Other Services: Not Applicable
21. List of Service and Distribution Points: Not Applicable
22. List of Participating Dealers: Not Applicable
23. Perspective Maintenance: Not Applicable
24a. Special Attributes Such as Environmental Attributes: Not Applicable
24b. Section 508 Compliance:
If applicable in this contract Section 508 compliance information is available on Electronic and Information Technology (EIT) supplies and services at the following: the EIT standards can be found at www.section508.gov/ and at www.ciesurplus.com
25. Data Universal Numbering System (DUNS) Number: 793060054
26. CIE Surplus is Registered with the System for Award Management (SAM) database.
http://www.aspeneg.com/ http://www.section508.gov/ http://www.ciesurplus.com/
Contract No. GS-10F-0229N 3
About Aspen Environmental Group Aspen is an expert interdisciplinary environmental services firm focused on the provision of services to clients responsible for building, maintaining, or regulating infrastructure and public works projects. Since the company’s inception in 1991, over 98 percent of Aspen’s work has been related to infra-structure, public works, and industrial projects, particularly energy and water infrastructure. Aspen’s focus on specific types of projects provides us with the knowledge, insight, and understanding needed to efficiently prepare environ-mental analyses that meet project needs, disclose important information to the public, and fully conform to all applicable federal, state, and local requirements.
Aspen has provided environmental analysis, permitting, and compliance services for a wide variety of infrastructure, public works, and industrial projects across the western US, including water, energy, flood control, and telecommunications infrastructure, as well as many types of public facilities. One of Aspen’s primary services is compliance with the requirements of the California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA). In addition, Aspen provides expertise needed for successful compliance with the Clean Water Act, Clean Air Act, Endangered Species Act, and other federal and state environmental laws.
541620 - Environmental Consulting Services
Aspen regularly serves in the role of prime contractor to local, state, and federal agencies for CEQA and NEPA projects and routinely manages a team of specialists for the purpose of conducting detailed and comprehensive environmental impact analyses. Aspen’s project management and CEQA/NEPA experience is complemented by the expertise and experience of its staff members in collecting data and performing analyses for environmental impact assessment documents and supporting environmental documentation, including specialized services such as geographical information systems (GIS) mapping, public participation (noticing, advertising, scoping meetings, public meetings, hearings, etc.), and permit documentation for compliance with the entire range of state and federal environmental regulations. In addition, Aspen prepares Mitigation Plans and has a team of mitigation monitors to ensure adherence to all mitigation requirements during construction.
Aspen specializes in the preparation of environmental impact report (EIR) and environmental impact statement (EIS) documents and has a highly successful track record in producing technically sound and legally defensible environmental analysis documents. We provide all notices, documentation, and services needed for CEQA and NEPA compliance, as necessary. Aspen also provides comprehensive services related to regulatory permit acquisition, including expertise in the efforts necessary for project-specific approvals, including providing compliance monitoring required during pre-construction, construction, and post-construction phases.
Contract No. GS-10F-0229N 4
We have extensive experience in the management and preparation of the entire range of CEQA and NEPA compliance documents and activities, including Initial Studies (ISs), Negative Declarations (NDs), Mitigated NDs (MNDs), EIRs, and public notices and meetings for CEQA, and Environmental Assessments (EAs), Findings of No Significant Impact (FONSIs), EISs, Records of Decision (RODs), scoping meetings, public hearings, and Federal Register notices for NEPA. We have successfully prepared all of these types of documents and conducted these activities for many different agencies. The bulk of our experience has come under task-order contracts, so we have developed efficient procedures for managing these contracts.
An understanding of environmental legislation is critical to effectively manage most environmen-tal assessment projects, because most agency projects trigger necessary responses or actions to a wide range of other legislation. Aspen has substantial knowledge regarding the require-ments of the following state and federal regulations related to natural resources as a result of our past work with various public agencies:
Coastal Zone Management Act, Federal Coastal Consistency Determination, California Coastal Act
Section 10 of the River and Harbor Act (USACE)
California Fish and Game Code (Sections 1600-1607) Lake and Streambed Alteration Agreements
Federal Clean Water Act (CWA), Section 404 Permits (Nationwide, Regional General, Standard Individual), including preparation of Formal Wetland Delineation Reports, which involve Minimum Standard Guidelines
Section 401 Water Quality Certification from the applicable Regional Water Quality Control Board
(RWQCB)
Section 402 National Pollutant Discharge Elimination System (NDPES) permits from the State Water Resources Control Board, through the local RWQCB
Federal Endangered Species Act (ESA), Section 7 Consultation and Section 10 Habitat Conservation Plans (HCPs) and Incidental Take Permits, including the preparation of Biological Assessments and HCPs
Farmland Protection Policy Act
Executive Order 11988: Floodplain Management
California Public Resources Code
Clean Air Act (CAA), General Conformity Analysis
California ESA, Section 2081 Permit and other sections (2050 to 2089) of the Fish and Game Code that protect rare and endangered plants and animals, including preparation of Biological Evaluations and Mitigation Monitoring Plans
Magnuson-Stevens Fishery Conservation and Management Act
Senate Bill 610, requiring Water Supply Assessments for industrial and other large projects
Section 106 of the National Historic Preservation Act
Numerous mitigation monitoring projects entailing compliance with all permitting and mitigation requirements.
Contract No. GS-10F-0229N 5
CEQA
Aspen’s expertise and extensive experience has been gained over many years and is detailed below with respect to CEQA compliance functions, types of projects, our range of clients, and key issue areas:
Categorical Exemption documentation; ISs, NDs, MNDs, and Draft and Final EIRs;
Preparation and distribution of required notices, including Notices of Preparation, No tices of Completion, and Notices of Determination;
Project descriptions and formulation of feasible alternatives;
Field studies and research;
Engineering evaluation of projects to determine specific impact parameters;
Feasibility studies of alternatives and mitigation measures;
Mitigation measure development, evaluation, implementation, and mitigation monitoring; and
Public participation, including website creation and maintenance, notices for mail and media, public workshops and hearings, stakeholder meetings, fact sheets and brochures, graphic displays, and non- English language materials.
Our projects have included all areas of California, from urban areas with concerns related to air quality, traffic, noise, and environmental justice, to rural and wilderness areas where biological resources, recreation use, and scenic vistas were the primary concerns. In each of our completed projects, we demonstrated our ability to perform the following critical functions:
Evaluation and analysis of project alternatives, cumulative impacts, and growth-inducing effects;
Comprehensive analyses of all relevant environmental issues;
Production of high-quality environmental documents synthesizing and editing information developed by technical specialists;
Support to the Lead Agency in CEQA compliance and public participation; and
Management of technical specialists from within Aspen and from subcontractor teams.
NEPA
NEPA requires EIS preparation only for “proposals for legislation and other major federal actions significantly affecting the quality of the human environment.” A federal agency must, therefore, evaluate and screen each proposed action to determine whether NEPA applies, and if it does, whether an EIS must be prepared.
First, an agency must determine if the proposed action is categorically excluded or otherwise exempt from NEPA. Second, if the action is not excluded, the agency must determine whether the proposed action may “significantly affect the quality of the human environment.” This step involves preparing an EA to determine whether the proposed action would result in any significant environmental effects. Finally, the agency will either (1) file a FONSI if there are no impacts or they have been suitably mitigated, or (2) prepare an EIS.
Aspen staff are experts in all the technical and procedural requirements of NEPA and supporting federal legislation. Aspen has 25 years of experience managing, preparing, and processing a wide variety of environmental impact assessment documents for many local, state, and federal government entities. The factors that differentiate us from other environmental consulting firms include our extensive recent and
Contract No. GS-10F-0229N 6 relevant NEPA process work and our project management process that is designed and adjusted to very efficiently conduct projects. Aspen’s repertoire of experience, expertise, and resources make us more than capable of handling all technical and procedural requirements necessary for successful compliance with NEPA and supporting federal legislation.
CEQA/NEPA Joint Documents
Since Aspen’s formation 25 years ago, we have gained a reputation for successful management of large and challenging joint document projects, as illustrated by our completion of CEQA and NEPA compliance documents for projects such as the Tehachapi Renewable Transmission Project EIR/EIS, Sunrise Powerlink Project EIR/EIS, Devers-Palo Verde No. 2 Transmission Project EIR/EIS, the Pacific Pipeline EIR/EIS and the Alturas Transmission Line EIR/EIS. We prepared our first two joint CEQA/NEPA documents for the CPUC about 15 years ago, for the Pacific Pipeline and Alturas Transmission Line projects. S ince then, we have prepared several others, including the: Antelope-Pardee EIR/EIS, Devers-Palo Verde EIR/EIS, Tehachapi Renewable Transmission Project EIR/EIS, and Sunrise Powerlink Project EIR/EIS. We are recently prepared the EIR/EISs for the proposed West of Devers Upgrade Project and the Coolwater-Lugo Transmission Project.
Our CEQA/NEPA projects have covered all areas of California. We have staff experienced with urban areas who are especially versed in addressing the concerns of high-minority and low-income populations, and we have conducted numerous projects in low-density, rural areas where biological resources, recreation use, and scenic vistas have been the primary concerns.
Joint Environmental Reviews. Use of NEPA and CEQA Simultaneously. A project that is subject to CEQA will also be subject to NEPA when it: (1) is jointly carried out by a federal agency; (2) requires a federal discretionary permit, entitlement, authorization, or federal funding; or (3) occurs on federal land. Federal agencies are encouraged under NEPA to cooperate with State and local agencies when a project is subject to both NEPA and CEQA and to perform an independent review of any prepared CEQA documents when it is preparing its own NEPA document. A joint EIS/EIR or a joint FONSI/Negative Declaration can be produced to satisfy the requirements of both Acts, if the involved lead agencies sign a Memorandum of Understanding to apply whichever requirements are more stringent.
Supporting Environmental Regulations. Aspen has expertise in handling supporting environmental legislation (both federal and state) for NEPA and CEQA. Understanding supporting federal regulations is critical to working with agencies because each proposed project triggers a different set of related environmental requirements, depending on the type and location of the activity being proposed. Each federal agency has an obligation to inquire as to which other environmental requirements may be applicable to an action, and to list, in the EIS, all federal permits, licenses, and other entitlements that are needed.
541370GIS - Geographic Information Systems (GIS) Services
Aspen Environmental Group is a unique and innovative company providing high-end Geospatial products to its local, state, and federal agency clients and has extensive field work expertise throughout the Western US.
Aspen’s Geospatial Sciences Group has advanced technical knowledge, work experience, and qualified staff to accomplish any and all required tasks related to applied spatial intelligence gathering and analysis. Aspen also has substantial experience with Geospatial data related to land use planning, transmission, renewable energy, and watershed projects. Aspen has a wealth of experience working for federal, State, and local government agencies, as well as the private sector, performing successfully on large, on-call contracts.
Many of Aspen’s clients, including local government and regulatory agencies and developers of industrial projects, make use of GIS capabilities to enhance the efficiency with which they assess environmental issues and acquire project permits.
Contract No. GS-10F-0229N 7
GIS increases project understanding, speeds up data collection and analysis, enables comparison and selection of alternatives, and improves presentation effectiveness. Project managers can reduce budget expenditures by using GIS. The industry trend is toward digital spatial knowledge replacing paper documents and lower-technological solutions. Pinpointing exact locations in project analysis, project managers can increase productivity and can better respond to stakeholders’ inquiries; regulatory agencies can identify and map sensitive resources; and specialists can utilize geographic data for specific analysis.
Geospatial Services Mapping Cartographic Production
Spatial and Imagery Data Analysis
Geospatial Data and Project Management
Data Quality Assurance/Quality Control
Surveys and Data Collection
GPS/GNSS Data Collection
Spatial Data Modeling
Visual and 3D Simulations
Asset Management
Operation and Maintenance Support
GIS-based Sensitive Resource Modeling
Biological and Cultural Surveys, Conservation Measures, & Permitting
Database Design and Management
Client Training
Aspen can design, develop, and implement geospatial database and management systems. Aspen Team members are experienced in the use of the various regional, state, and federal database systems commonly utilized in the environmental assessment process, including biological, archaeological, air quality, and hazardous materials databases. Over the last 15 years, Aspen has established several Project Collaboration Sites to organize and share program- and project-related information among our clients and Aspen Team members. These Collaboration Sites have increased coordination, efficiency, and transparency in providing high-quality products within agreed-upon schedules and budgets.
Aspen’s technical GIS and GPS expertise can support long-term infrastructure operation and maintenance.
Aspen assisted Western’s Sierra Nevada Region Natural Resources Department in implementing the Transmission Asset Management System (TAMS) model, to combine regulatory requirements with operation and maintenance needs on a transmission right-of-way. Western’s Natural Resources Department now assists the field crews with daily work routines and keeps Western in compliance with land management requirements.
Aspen has extensive spatial database experience with other projects. Aspen was the sole contractor to the CEC to collect all high-kilovolt transmission lines above 115 kV for the entire State of California. Aspen GIS collected some 120,000 individual tower structures and 20,000 miles of transmission corridors utilizing aerial imagery, GPS, and field reconnaissance, training CEC GIS cartographic staff to update and maintain the CEC’s Comprehensive GIS Database, and completing the project on time and under budget. In addition, Aspen GIS performed an erosion and sedimentation spatially distributed GIS analysis from 2008-2010 for Angeles National Forest in support of the Tehachapi Renewable Transmission Project on all access roads, pull sites, and staging areas to determine accelerated sedimentation impacts of the project. Aspen conducted this same analysis after the Station Fire in the Angeles National Forest to determine changes in sedimentation rates after the fire.
Contract No. GS-10F-0229N 7
Types of Projects In the last 25 years, Aspen has focused almost exclusively on the infrastructure and public works sector, and a significant part of that work has involved energy facilities and related infrastructure. We have completed projects in a range of diverse environmental settings, including marine, terrestrial, riparian, and urban environments. Examples of our project experience are listed below.
Aspen is a leader in the provision of environmental services for energy projects. Aspen has analyzed thousands of miles of electrical transmission lines, as well as a variety of other energy facilities, including telecommunication lines. In addition, Aspen has also conducted environmental analysis for numerous oil and gas projects.
Aspen is one of the most accomplished companies in the provision of professional environmental consulting services for water resource projects. Water agencies have relied on Aspen to provide expert environmental services for large capital improvement projects as well as for operations and maintenance activities. Aspen has worked on water projects of all types and scales for some of California’s largest water agencies, including the Department of Water Resources, Metropolitan Water District of Southern California, and Los Angeles Department of Water and Power. Aspen’s water supply experience includes water pipelines, dams, storage reservoirs, treatment facilities, aqueducts, and pumping plants.
Aspen is also accomplished in the provision of environmental consulting services for habitat restoration projects in California and Arizona. Our restoration experience and services extend from initial planning and design to habitat evaluations, biological surveys, hydrologic and hydraulic modeling, cost and incremental benefit analysis, and alternatives analysis.
Transmission and Telecommunication
Below are some examples of Aspen’s experience related to electrical transmission and telecommunication systems.
West of Devers Upgrade Project. EIR/EIS for the removal and replacement of approximately 48 miles of existing 220-kV transmission lines with new double-circuit, 220-kV transmission lines, between the existing Devers Substation (near Palm Springs), Vista Substation (in Grand Terrace), and San Bernardino Substation.
Coolwater-Lugo Transmission Project.
Draft EIR/EIS for a 64-mile, 500-kV and 220-kV transmissio n line and substation in the upper Mojave Desert.
San Luis Transmission Project. EIS/EIR and conducting biological and cultural surveys for this 62-mile transmission line in Central CA.
Sunrise Powerlink. EIR/EIS for a new high-voltage transmission line to provide capacity to interconnect renewable energy projects in Imperial and San Diego Counties.
Contract No. GS-10F-0229N 8
Tehachapi Renewable Transmission Project. EIR/EIS for this major project to provide transmission capacity for wind energy projects in CA’s upper Mojave Desert.
Devers-Palo Verde No. 2 Transmission Project. EIR/EIS for a 230-mile, high-voltage transmission line traversing the Mojave Desert from AZ to CA’s Coachella Valley.
Antelope Transmission Project. EIR for a series of high-voltage transmission lines to provide capacity interconnect wind energy projects in CA’s Antelope Valley.
Antelope-Pardee Transmission Project. EIR/EIS for a high-voltage transmission line to provide capacity to interconnect wind energy projects in CA’s Antelope Valley.
North Area Right-of-Way Maintenance Project. Prepared O&M plans and procedures and an EA for Western, Sierra Nevada Region.
Sacramento Area Voltage Support. EIS/EIR for a new double-circuit 230-kV circuit and reconstruction of a double-circuit 230kV/115-kV transmission line into a double-circuit 230-kV line.
Jefferson-Martin 230-kV Transmission Project. EIR for a 27-mile 230-kV transmission line from San Mateo County to the City of Brisbane, CA.
Renewable Energy
Aspen has experience providing environmental services for the complete range of renewable energy facilities, including solar photovoltaic, solar thermal, wind, biomass, and geothermal energy projects. Below are some examples of Aspen’s experience related to wind energy.
Ocotillo Wind Energy Facility. EIS/EIR for the BLM and County of Imperial for a 465-megawatt (MW) wind facility on a 12,500-acre site near Ocotillo, CA.
Alta East Wind Project. EIS/EIR for a 318-MW wind facility on a 2,592-acre site in Kern County, CA.
Mesa Wind Re-power Project. EA and technical reports for a 30-MW repower project on BLM land in the San Gorgonio Pass Wind Resource Area.
Alta-Oak Creek Mojave Wind Project.
EIR for a 710-MW wind facility on a 9,120-acre site in Kern County, CA.
Alta Infill II Wind Energy Project. EIR for a 530-MW wind facility on a 5,185-acre site in Kern County, CA.
Morgan Hills Wind Energy Project. EIR for a 230-MW wind energy facility on a 3,808-acre site in Kern County, CA.
Pacific Wind Energy Project. EIR for a 151-MW wind energy facility on an 8,300-acre site in Kern County, CA.
North Sky River Wind Energy Project & Jawbone Wind Energy Project. Prepared an EIR for two adjacent wind energy projects capable of generating 339 MW of energy on a combined 13,535-acre site in Kern County, CA.
Lompoc Wind Energy Project. Final EIR for a 97.5-MW wind energy facility and associated 9-mile 115-kV power line in Santa Barbara County, CA.
Pine Tree Wind Development Project. Air quality analysis to determine the impacts associated with changes to this LADWP wind energy project in Kern County, CA.
Contract No. GS-10F-0229N 9
Tehachapi Wind Resource Area. Programmatic analysis for the development of wind energy in the Tehachapi Wind Resource Area in Kern County, CA, based on the potential development of 4,500 MW of wind generation.
Below are some examples of Aspen’s experience related to solar energy.
Desert Harvest Solar Project. EIS (prepared to a standard that complies with all requirements of the CEQA), as well as supporting technical analyses.
Panoche Valley Solar Farm Project. EIR and supporting technical analyses for San Benito County.
Topaz Solar Farm. EIR for a 550-MW photovoltaic solar power plant in Carrizo Plain, an unincorporated portion of eastern San Luis Obispo County.
California Valley Solar Ranch. EIR for a 250-MW solar photovoltaic power plant on approximately 4,000 acres of rangeland in the Carrizo Plain.
City of Palmdale Hybrid Power Plant. Assisted the CEC with the Staff Assessment.
Abengoa Mojave Solar Project. Assisted the CEC with the Staff Assessment.
Beacon Solar Energy Project. Assisted the CEC with the Staff Assessment.
Ivanpah Solar Electric Generation System Project. Assisted the CEC with the Staff Assessment.
Blythe Solar Power Project. Assisted the CEC with the Staff Assessment for the Blythe Energy Project Transmission Line Modifications. Conducted an alternative assessment, looking at different locations and technologies of the transmission line modifications.
Palen Solar Power Project. Assisted the CEC with the Staff Assessment.
Genesis Solar Energy Project. Assisted the CEC with the Staff Assessment.
Desert Sunlight Project. Desert Sunlight is a photovoltaic solar farm in the Chuckwalla Valley in eastern Riverside County located on land managed by the BLM. Aspen provided peer review of the EIS prepared by BLM's consultant.
Ridgecrest Solar Power Project. Assisted the CEC with the Staff Assessment.
Carrizo Energy Solar Farm (CESF). Supported the CEC during preparation of its Staff Assessment, for the proposed CESF in San Luis Obispo County. The CESF project was canceled and the project site was acquired by First Solar for the Topaz Solar Farm Project.
Imperial Valley Solar Project. Assisted the CEC with the Staff Assessment.
Rice Solar Energy Project. Assisted the CEC with the Staff Assessment.
San Joaquin Solar 1 & 2 Power Plant. Supported the CEC during preparation of its Staff Assessment.
Oil and Gas
Below are some examples of Aspen’s experience related to oil and gas, including exploration, transportation, refining, and storage.
Senate Bill 4 Regulations - Oil and Gas Well Stimulation Treatments in California EIR. EIR that is required by State Public Resources Code 3161(b)(3) and (4) (e.g., one of SB 4’s directives). The EIR includes six Study Regions that are addressed on a programmatic level. Aspen has been responsible for all logistics, execution and facilitation of five public scoping meetings throughout the State that were collectively attended by over 450 people, and logged over 1,300 individual comments.
Hollister Oil and Gas EIS and RMP Amendment. Preparation of a resource management plan (RMP) Amendment and associated EIS to guide management of oil and gas resources on a BLM-administered mineral estate within the Hollister Field Office. The EIS/RMP Amendment analyzes the effects of alternative oil and gas management approaches to update the reasonably foreseeable development
Contract No. GS-10F-0229N 10 scenario and the existing 2007 Hollister RMP in order to incorporate new information about well stimulation technologies, natural resource conditions, and socioeconomic trends.
PXP Tranquillon Ridge Oil and Gas Development Project EIR. EIR for the Santa Barbara County Energy Division. This project involved the development of oil and gas wells from Platform Irene into the Tranquillon Ridge Field using extended reach drilling technology.
California Department of Conservation, Division of Oil, Gas and Geothermal Resources (DOGGR) CEQA Compliance Assessment, Data Gap Analysis, and Initial Study. Comprehensive assessment of DOGGR's compliance with CEQA when issuing well drilling permits.
Kirby Hills Natural Gas Storage Facility. IS/MND for the proposed Kirby Hills natural gas storage facility that involved the conversion of a depleted gas reservoir into a storage facility for resale of natural gas.
City of Hermosa Beach Urban Drill Site. Served as a Permit Process Consultant for the City of Hermosa Beach for an urban drill site that would produce oil and gas from both onshore and offshore fields.
Environmental Information Document and Coastal Consistency Determinations for Federal Oil and Gas Leases. Multidisciplinary environmental document and 10 coastal consistency determinations evaluating the potential effects of development of federal oil and gas leases offshore of Santa Barbara, Ventura, and San Luis Obispo Counties.
Gaviota Marine Terminal/Chevron Tankering Project. EIR/EIS for a Joint Review Panel consisting of the CSLC, Santa Barbara County, USACE, and CALEPA.
Kinder Morgan Concord-to-Sacramento Pipeline Project. EIR and pipeline risk assessment for a proposed 70-mile petroleum products pipeline from Concord (Contra Costa County) to West Sacramento (Yolo County).
Kinder Morgan Carson-to-Norwalk Pipeline Project. EIR for the Sante Fe Pacific 13-mile petroleum products pipeline project through urban Los Angeles (Carson, Long Beach, Bellflower, Norwalk, Artesia, and Cerritos).
Pacific Pipeline Project. Prepared two environmental documents for the Pacific Pipeline Project:
Gaviota to Ventura County EIR. Original EIR evaluated an oil pipeline from coastal Santa Barbara County to the Los Angeles Basin, via coastal Ventura County and the Santa Clara River Valley.
Kern County to Los Angeles Refineries EIS/SEIR. Revised project, evaluated in an EIS and Subsequent EIR, originating in the southern San Joaquin Valley and following Interstate 5 over Tejon Pass joining the original route at Castaic Junction in Los Angeles County.
San Joaquin Refining Company Health Risk Assessment. Dispersion modeling using ISCST model.
Analyzed emissions and reported the toxicology for each substance. Risk analysis included pathway-specific data files for plant products, animal products, mothers' milk, and water ingestion.
Yellowstone Pipeline. EIS to evaluate the impacts of Yellowstone Pipe Line Company’s proposed 67-mile petroleum products pipeline in western Montana.
Water Supply
Below are some examples of Aspen’s experience related to water supply facilities.
Tehachapi East Afterbay Project. EIR for the DWR for a project to construct and operate a storage afterbay on the East Branch of the CA Aqueduct in the western Mojave Desert.
Taylor Yard Water Recycling Project. IS/MND for this recycled water project for the LADWP.
River Supply Conduit Project - Upper and Lower Reaches. Two EIRs and several associated studies and reports for the LADWP to address the construction of a new major pipeline for water transmission.
Contract No. GS-10F-0229N 11
Littlerock Reservoir Sediment Removal Project. Conducting the CEQA/NEPA environmental review process, providing hydraulic engineering and design services, and preparing a suite of natural resource studies to support the removal of sediment to provide greater water storage capacity for the Palmdale Water District.
Santa Ana Valley Pipeline Repairs. CEQA environmental review, permitting, and construction monitoring. Prepared and filed a CEQA Notice of Exemption with the State Clearinghouse for the repairs.
Horsethief Creek Bridge and Mojave Siphon Maintenance. Strategy development for completing the bridge construction while avoiding the peak season for arroyo toads and other sensitive wildlife present at the bridge site. Protocol and focused surveys were conducted in addition to wetland delineation, regulatory permit acquisition, pre-construction clearance surveys, worker training, and construction monitoring. Also prepared an
IS/MND.
Mulholland Pumping Station and Lower Hollywood Reservoir Outlet Chlorination Station Project. IS was prepared in support of a City of Los Angeles General Exemption for the LADWP.
Redmont Pump Station Replacement Project. IS/MND that addressed replacement of a water supply pump station located in the community of Sunland in the City of Los Angeles, for the LADWP.
Lincoln Avenue Water Permit Support and Pipeline Repair. EA/supporting documentation for the Lincoln Avenue Water Company for the renewal of Special Use Permits for existing facilities on National Forest System lands.
Piru Creek Erosion Repairs and Pyramid Dam Bridge Retrofit. CEQA documentation, prepared and processed federal and State environmental permitting, conducted biological surveys for maintenance and repair of facilities on the West Branch of the CA Aqueduct.
Simulation of Natural Flows in Middle Piru Creek. EIR for proposed changes to the seasonal flow release schedule of Pyramid Dam, located at the West Branch of the CA Aqueduct.
Restoration
Below are some examples of Aspen’s restoration experience.
Santa Ana River Main Stem Project. Multiple baseline data reports and environmental documents to support flood control and habitat restoration along the Santa Ana River on behalf of the USACE.
Currently directing restoration efforts for riparian and upland habitats at Prado Dam and Reach 9 of the Santa Ana River.
Santa Maria River Levee Improvement Project. EA and Ecosystem Restoration Plan to support repairs and expansion of the Santa Maria River levee on behalf of the USACE.
Sulphur Creek Ecosystem Restoration Project. Detailed Project Report for riparian restoration planning in the City of Laguna Niguel, CA on behalf of the USACE.
Ormond Beach Wetlands Restoration Feasibility Plan. Managed and prepared the Feasibility Plan for the California State Coastal Conservancy in Ventura County, CA.
Contract No. GS-10F-0229N 12
Yolo County Cache Creek Supplemental EIR. Supplemental EIR for the Cache Creek Resources Management Plan and Cache Creek Improvement Project in Yolo County, CA.
Bull Creek Ecosystem Restoration Project. EA and Ecosystem Restoration Report to evaluate the USACE’s proposal to restore the lower portion of Bull Creek, located in the Sepulveda Basin, Los Angeles County, CA.
Tucson (Ajo) Detention Basin Ecosystem Restoration Project. Ecosystem Restoration Report and Design Modification Report for the Tucson (Ajo) Detention Basin in the City of Tucson, AZ.
Agua Fria Ecosystem Restoration Project. Integrated Detailed Project Report and EA for three restoration sites along the lower Agua Fria River at its confluence with the Gila River for the USACE.
Muranaka Farm Flood Plain Restoration Project. Assisting the landowner with restoration activities including site preparation, planting, and regulatory compliance for the flood plain restoration project (Moorpark, CA).
Rillito River Riparian and Wetland Development Project. Biological baseline conditions report, assisted the prime contractor in the development of restoration alternatives and completed the habitat evaluation analysis for the restoration of approximately one mile of the Rillito River in Tucson, AZ.
Matilija Dam Ecosystem Restoration Project. EIS/EIR and a variety of supplemental documents to support the USACE Feasibility Study for the removal of Matilija Dam on Matilija Creek in Ventura County, CA.
Laguna Canyon Creek Initial Study and Conceptual Restoration Plan. IS and Conceptual Restoration Plan for approximately 4,000 lineal feet of Laguna Canyon Creek in the City of Laguna Beach, CA.
Old San Jose Creek Ecosystem Restoration Project. EA and Coastal Consistency Determination, as well as a Habitat Evaluation Procedure Plan for the Old San Jose Creek in San Jose, CA.
Habitat Restoration Economic Impacts Analysis. Economic and fiscal impact analysis from proposed wetlands conversion and restoration of productive agricultural lands in the Cache Slough area from agricultural and wetlands use in Solano County, CA.
Contract No. GS-10F-0229N 13
Price Lists
541620 - Environmental Planning Services and Documentation
Labor Category
Year 17:
1/31/19- 1/30/20
Year 18:
1/31/20- 1/30/21
Year 19:
1/31/21- 1/30/22
Year 20:
1/13/22- 1/30/23
Environmental Expert III $299.24 $308.97 $319.01 $329.37
Principal/Program Manager $245.53 $253.51 $261.75 $270.25
Sr. Project Manager II $231.89 $239.43 $247.21 $255.24
Sr. Project Manager $213.59 $220.54 $227.70 $235.10
Sr. Associate, Air Quality and Greenhouse Gas/Global Climate Change
$211.59 $218.47 $225.57 $232.90
Principal Environmental Consultant I $206.05 $212.75 $219.66 $226.80
Sr. Environmental Scientist VIII $201.01 $207.54 $214.29 $221.25
Sr. Environmental Consultant III $186.40 $192.46 $198.71 $205.17
Sr. Environmental Consultant II $156.65 $161.74 $167.00 $172.43
Sr. Environmental Consultant I $136.02 $140.44 $145.00 $149.72
Sr. Engineer $180.01 $185.86 $191.90 $198.13
Engineer II $140.19 $144.75 $149.45 $154.31
Earth Science/Hydrology IV $250.06 $258.19 $266.58 $275.24
Earth Science/Hydrology III $209.40 $216.21 $223.23 $230.49
Registered Professional Archaeologist Principal
$176.32 $185.05 $187.97 $194.08
Registered Professional Archaeologist Sr.
Associate
$146.10 $150.85 $155.75 $160.81
Earth Science/Hydrology II $130.33 $134.57 $138.94 $143.46
Earth Science/Hydrology I $111.74 $115.37 $119.12 $122.99
Supervisory Archaeologist $125.94 $130.03 $134.26 $138.62
Cultural Resource Specialist II $100.25 $103.51 $106.87 $110.35
Cultural Resource Specialist I $78.59 $81.14 $83.78 $86.50
Biologist IV $184.81 $190.81 $197.01 $203.42
Biologist III $185.01 $191.03 $197.23 $203.65
Certified Fisheries Biologist, Senior $146.10 $150.85 $155.75 $160.81
Biologist II $129.58 $133.79 $138.14 $142.63
Biologist I $110.46 $114.05 $117.75 $121.58
Environmental Consultant II $100.25 $103.51 $106.87 $110.35
Social Scientist/Planner IV $189.45 $195.61 $201.97 $208.53
Social Scientist/Planner III $183.16 $189.11 $195.25 $201.60
Senior Environmental Planner $146.60 $151.36 $156.28 $161.36
Social Scientist/Planner II $113.66 $117.35 $121.17 $125.10
Social Scientist/Planner I $100.27 $103.52 $106.89 $110.36
Contract No. GS-10F-0229N 14
SCA Matrix
GSA Labor Category SCA Equivalent Code - Title WD Number
Project Accounting I 01013 - Accounting Clerk III 2015-5645
Administrative 01113 General Clerk 2015-5645
Document Editing QA/QC 30463 – Technical Writer III 2015-5645
The Service Contract Labor Standards, formerly the Service Contract Act (SCA), apply to this contract and it includes SCLS applicable labor categories. Labor categories and fixed price services marked with a (**) in this pricelist are based on the U.S. Department of Labor Wage Determination Number(s) identified in the SCLS/SCA matrix. The prices awarded are in line with the geographic scope of the contract (i.e ., nationwide).
541620 Labor Descriptions
Environmental Expert III
This is a specific subject matter specialist. This position requires general environmental science/analytical experience including fifteen (15) years direct, specialized experience in the Specific Subject Matter Area.
Specialized experience includes demonstrated experience in environmental/analytical area specifically relevant to the order’s tasks. Incumbent must have served as a project manager in directly related experience areas. Applying current disciplines and methodologies to the planning, analysis, evaluation, design, development, implementation, and/or support of environmental/analytical projects. Also, responsible for establishing and enforcing technical approaches and standards in the environmental/analytical process, and the application of automated support tools.
Degrees may emphasize Environmental Science, Biological Science, Physical Science, Computer Science, Chemical Engineering, Civil Engineering, Electrical Engineering, Industrial Engineering, Materials Science Engineering, Agricultural Engineering, Computer/Software Engineering, Environmental Engineering, Systems Engineering and other engineering or scientific disciplines and/or Business Administration.
Minimum Experience: 20 years
Minimum Education: Master’s in environmental science
Environmental Scientist II $95.72 $98.83 $102.04 $105.36
Information Technology $130.69 $134.94 $139.33 $143.86
Document Production $98.51 $101.71 $105.02 $108.43
Sr. GIS Specialist $141.45 $146.05 $150.80 $155.70
Senior GIS/Info Tech Specialist $125.94 $130.03 $134.26 $138.62
Graphics/Drafting $94.66 $97.74 $100.91 $104.19
Staff GIS/Info Tech Specialist $89.67 $92.58 $95.59 $98.70
Administrative/Project Accounting II $120.29 $124.20 $128.23 $132.40
Project Accounting I $96.67 $99.81 $103.06 $106.41
Administrative $67.85 $70.05 $72.33 $74.68
Contract No. GS-10F-0229N 15
Principal/Program Manager
A professional with overall corporate management responsibility for the company or for a large program (a group of projects). The ultimate arbiter of client or subcontractor grievances.
Minimum Experience: 15 years
Minimum Education: Master’s in environmental science
Senior Project Manager II
Plans, schedules, and executes a majority of work in a largely unsupervised manner, taking personal responsibility for project quality and client acceptance, with only general guidance from Principals.
Accountable for all aspects of a project including negotiating contracts, client relations, defining the scope of work, and working with the client to establish budgets and schedules. Ultimate manager of quality control/quality assurance. Engages subcontractors, monitors their performance, and ensures they produce quality work. Ensures compliance with schedules and budgets. Develops, reviews, and signs deliverables.
Directs projects and coordinates the work of all technical specialists on the organization chart for that project.
Minimum Experience: 10 years
Minimum Education: Bachelor’s in environmental science
Senior Project Manager
Plans, schedules, and executes a majority of work in a largely unsupervised manner, taking personal responsibility for project quality and client acceptance, with only general and infrequent review and guidance from Principals.
Accountable for all aspects of a project including negotiating contracts, client relations, defining the scope of work, and working with the client to establish budgets and schedules. Ultimate manager of quality control/quality assurance. Engages subcontractors, monitors their performance, and ensures they produce quality work. Ensures compliance with schedules and budgets. Develops, reviews and signs deliverables.
Directs projects and coordinates the work of all technical specialists on the organization chart for that project. Most Aspen Project Managers have an advanced degree or at least ten years of experience.
Minimum Experience: 6 years
Minimum Education: Bachelor’s in environmental science
Senior Associate, Air Quality and Greenhouse Gas/Global Climate Change
Possesses the ability to work independently on and manage a wide range of projects and is experienced with the management and preparation of complex air quality analyses. Possesses in-depth knowledge of air quality modeling techniques and software, air emissions estimation methods, and air permitting processes as they relate to the Federal Clean Air Act and other environmental regulatory programs.
Demonstrates subject matter expertise in air quality principles, air quality impact analysis methodologies, greenhouse gas management strategies, climate change impact analysis methodologies, and related policies and regulatory programs.
Contract No. GS-10F-0229N 16
Stays current in subject matter through professional development, training, involvement in professional organizations, and attending conferences or workshops.
Assumes responsibility for project team, budget, schedule, and quality of project execution and delivery.
Reports directly to directors of the firm or clients. Represents the firm or clients in public settings, negotiations, and in business and professional organizations.
Minimum Experience: 10 years
Minimum Education: Masters degree in engineering, environmental sciences, environmental resource management
Principal Environmental Consultant I
Project/task management of the review, analysis, evaluation, development, documentation, communication, implementation and/or support of the environmental/analytical area specified in the order (planning services and documentation, compliance services, occupational training services, waste management services and software, and/or GIS).
Minimum Experience: 15 years.
Minimum Education: Master’s degree environmental science
Senior Environmental Scientist VIII
Develop regulatory compliance requirements and provide approaches to accomplish regulatory compliance during the concept or design stages.
Project/task management of the review, analysis, evaluation, development, documentation, communication, implementation and/or support of the environmental/analytical area specified in the order (planning services and documentation, compliance services, occupational training services, waste management services and software, and/or GIS).
Minimum Experience: 8 years
Minimum Education: Master’s degree environmental science
Senior Environmental Consultant III
Develop regulatory compliance requirements and provide approaches to accomplish regulatory compliance during the concept or design stages.
Project/task management of the review, analysis, evaluation, development, documentation, communication, implementation and/or support of the environmental/analytical area specified in the order (planning services and documentation, compliance services, occupational training services, waste management services and software, and/or GIS).
Minimum Experience: Minimum of 12 years’ experience in the engineering or scientific discipline applicable to the position
Minimum Education: Bachelors Degree in relevant field. May hold a PE. Provide senior-level technical oversight, assistance, and guidance regarding broad ranges…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .