Products and Services:
- The document outlines a wide range of environmental, engineering, and remediation services provided by Prudent Technologies, Inc. These services include environmental consulting, environmental science/studies, environmental compliance, geology/hydrogeology, industrial hygiene, remedial design/remediation, hazardous waste/contaminated material management/removal/disposal, and tank/UST services.
Location:
- The services are provided by Prudent Technologies, Inc. from their offices nationwide. The points of production are in Kansas City, Jackson County, MO USA, and other domestic U.S. offices of PRUDENT. The ordering address is Prudent Technologies, Inc. (PRUDENT); 8080 Ward Parkway, Suite 201, Kansas City, MO 64114.
Dates:
- The contract duration is from 30 January 2012 – 29 January 2017 with options through 29 January 2032. The time of delivery is to be negotiated with the ordering agency on each task/delivery order.
People:
- The points of contact for the contract are Mark G. Snyder, PE, BCEE, D.WRE, Executive Vice President of Prudent Technologies, Inc. (PRUDENT), and Mary K. Ziegler, Contracts Manager of Prudent Technologies, Inc. (PRUDENT). Their contact information is provided in the document.
Prudent Technologies, Inc. (DBA Prudent Environmental Services) Pricelist and/or Vendor Terms and Conditions for GS10F0176Y, a Federal Supply Schedule awarded to Prudent Technologies, Inc. (DBA Prudent Environmental Services), under The Professional Services Schedule (PSS)
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GSA Contract No. GS-10F-0176Y
How to Access the PRUDENT Environmental Services Contract The general steps or order services from the PRUDENT’s GSA Environmental Services Contract are outlined below. You may also consult with your internal contracting support, contact our GSA Contracting Officer, Ms. Denise Blue at (253) 931-7798, denise.blue@gsa.gov, or those PRUDENT personnel noted below if you have specific questions. You may also review the GSA Federal Supply web site at www.fss.gsa.gov for information on order procedures.
Points of Contact
Mark G. Snyder, PE, BCEE, D.WRE
Executive Vice President
Prudent Technologies, Inc. (PRUDENT)
8080 Ward Parkway, Suite 201 Kansas City, MO 64114
T (816) 363-3703, Ext. 213
F (816) 363-3707 email: msnyder@prudentweb.com Mary K. Ziegler Contracts Manager
Prudent Technologies, Inc. (PRUDENT)
8080 Ward Parkway, Suite 201 Kansas City, MO 64114
T (816) 363-3703, Ext. 207
F (816) 363-3707 email: mziegler@prudentweb.com
Environmental, Engineering & Remediation Services
Environmental Consulting
· PA / SI
· Pollution Prevention
· Regulatory Compliance
· Site Assessment
· Risk Assessments
· RI / FS / EECA
· Phase I ESAs
Environmental Science / Studies
· Cultural Resource Management
· Wetlands Delineation & Ecology
· Environmental Impact Statements
· Environmental Assessments
· NEPA Studies
Environmental Compliance
· Hazardous Waste
· Title V and State Air Permits
· Air Emission Inventories
· Green House Gas Emissions
· Hazardous Material Compliance
· EPCRA
· Storm Water Plans / SPCC
· Federal Compliance Certification
· Pollution Prevention
Geology / Hydrogeology
· Surface and Subsurface Investigations
· Contaminant Fate and Transport
Industrial Hygiene
· Asbestos Inspection/Assessment
· Abatement Oversight
· Risk Assessments
· Health & Safety / CIH Services
Remedial Design / Remediation
· Soil and Groundwater Remediation
· Asbestos / Lead Abatement
· Bioremediation
· Chemical Oxidation
· Soil Vapor Extraction
· Landfill Closure
· Explosives Decontamination
Remediation
· Construction Management
· Design / Build
· Heavy Civil Construction
· Concrete Work
· Demolition
· Land Development
· Re-insulation
· Site Restoration
· Utilities
Hazardous Waste / Contaminated Material
Management / Removal / Disposal
· Remedial Construction
· Oversight
· PCB Removal / Disposal
· Radioactive / Mixed Waste Removal / Disposal
· Lead Based Paint Inspection / Abatement
· Mercury Spill Cleanup
· Range Cleanup
· MGP Site Remediation
Tank/UST Services
· Tank / UST Survey / Assessment
· Monitoring
· Remedial Systems Operation / Maintenance
· Tank / UST Remedial Design/Oversight
· Tank / UST Closure
Customer Information
1.
(a) Awarded Special Item Numbers (SINs):
SIN 899-1, 899-1RC Environmental Consulting Services
SIN 899-3, 899-3RC Environmental Training Services
SIN 899-5, 899-5RC Materials and Waste Recycling and Disposal Services
SIN 899-8, 899-8RC Remediation and Reclamation Services
(b) Not Applicable (See table with approved labor rates)
(c) Not Applicable (See table with approved labor rates)
2.
Maximum Order: $1,000,000. Requirements exceeding the maximum order may be handled pursuant to clause I-FSS-125 (August 1995)
3.
Minimum Order: $100.
4.
Geographic Coverage: PRUDENT offices nationwide.
5.
Points of Production (City, county, state of foreign country): Kansas City, Jackson
County, MO USA, and other domestic U.S. offices of PRUDENT.
6.
Discount from List Prices or Statement of Net Price: All prices herein are net. Discounts applied on volumes greater than $500,000 per contract.
7.
Quantity Discounts: Contractor will offer volume discounts on large dollar orders. Exact discount and terms will be negotiated on individual issued task orders. (see 6 above.)
8.
Prompt Payment Terms: 0.5% 10 days; Net 30; 1% 5 days; Net 30
9.
(a) Government Commercial Credit Cards: Government commercial credit cards are accepted for orders below the micro-purchase threshold.
(b) Government Commercial Credit Cards: Contact the contractor’s representative for orders above the micro-purchase threshold.
10.
Foreign Items: None
11.
(a) Time of Delivery: To be negotiated with ordering agency on each task/delivery order.
(b) Expedited Delivery: To be negotiated with ordering agency on each task/delivery order.
(c) Overnight and 2-Day Delivery: Items are available for expedited delivery based upon negotiation with ordering agency on each task/delivery order.
(d) Urgent Requirements: The “Urgent Requirements” clause of this contract is applicable and the ordering agency can contact the contractor’s representative to affect a faster delivery, at the cost to the ordering agency.
12.
F.O.B. Points: To be negotiated with the ordering agency on each task/delivery order.
13.
(a) Ordering Address: Prudent Technologies, Inc. (PRUDENT); 8080 Ward Parkway, Suite 201, Kansas City, MO 64114 Attention: Mr. Mark G. Snyder, PE, BCEE, D.WRE, Executive Vice President, T 816.363.3703 Ext 213, F 816.363.3707, email msnyder@prudentweb.com
(b) Ordering Procedures: See GSA Advantage!® at gsa.gov
14.
Payment Address: Prudent Technologies, Inc. 8080 Ward Parkway, Suite 201, Kansas
City, MO 64114
15.
Warranty Provision: Not Applicable
16.
Export Packing Charges, If Applicable: Not applicable.
17.
Terms and Conditions of Government Purchase Card acceptance: See #9 above.
18.
Terms and Conditions of Rental, Maintenance, and Repair: Not applicable.
19.
Terms and Conditions of installation: Not applicable.
20.
Terms and Conditions of Repair Parts Indicating Date of Parts Price Lists and Any
Discounts from Price Lists: Not applicable.
(a)Terms and Conditions for Any Other Services: Not applicable.
21.
List of Service and Distribution Points: Not applicable.
22.
List of Participating Dealers: Not applicable.
23.
Preventive maintenance: Not applicable.
24.
Environmental Attributes: Offer total turnkey environmental support.
25.
Data Universal Number System (DUNS) Number: 136022030
26.
Notification Regarding Registration in the Central Contractor (CCR) Database:
PRUDENT is registered in the Central Contractor Registration (CCR) database.
Contract Number:
GS-10F-0176Y
Contract Duration:
30 January 2012 – 29 January 2017 Options through 29 January 2032 Special Item Number:
899-1
899-1RC
899-3
899-3RC
899-5
899-5RC
899-8
899-8RC
Contractor Points of Contact:
Mark G. Snyder, PE, BCEE, D.WRE
Executive Vice President
Prudent Technologies, Inc. (PRUDENT)
8080 Ward Parkway, Suite 201 Kansas City, MO 64114
T (816) 363-3703, Ext. 213
F (816) 363-3707 email: msnyder@prudentweb.com Mary K. Ziegler Contracts Manager
Prudent Technologies, Inc. (PRUDENT)
8080 Ward Parkway, Suite 201 Kansas City, MO 64114
T (816) 363-3703, Ext. 207
F (816) 363-3707 email: mziegler@prudentweb.com Contract Administration
8080 Ward Parkway, Suite 201 Kansas City, MO 64114
T (816) 363-3703 F (816) 363-3707
Business Size:
Small Business Small Disadvantaged Business
DUNS Number:
136022030
Pricing Structure (Hourly Rates)
| Labor Category Title |
| Initial Award Year 4 |
1/30/15 - 1/29/16 Initial Award Year 5
1/30/16 - 1/29/17
| Site Supervisor - Field |
| $ 81.16 |
| $ 82.53 |
| H&S Director - Field |
| $ 104.49 |
| $ 106.26 |
| Engineer 1 - Field |
| $ 104.49 |
| $ 106.26 |
| Occupational Health and Safety Technologist - Field |
| $ 104.49 |
| $ 106.26 |
| Sr. Industrial Hygienist - Field |
| $ 126.80 |
| $ 128.96 |
| Administrative 1 |
| $ 53.42 |
| $ 54.33 |
| Administrative 4 |
| $ 106.10 |
| $ 107.91 |
| Engineer 7 |
| $ 223.64 |
| $ 227.44 |
| Environmental Technician 1 |
| $ 54.67 |
| $ 55.60 |
| Environmental Technician 2 |
| $ 78.52 |
| $ 79.86 |
| Environmental Technician 3 |
| $ 84.24 |
| $ 85.67 |
| Geologist 3 (Professional 3) |
| $ 100.14 |
| $ 101.84 |
| Geologist 5 (Professional 5) |
| $ 141.89 |
| $ 144.30 |
| Project Manager 1 |
| $ 195.56 |
| $ 198.88 |
| Project Manager 2 |
| $ 201.77 |
| $ 205.20 |
| Certified Industrial Hygienist (CIH) |
| $ 141.34 |
| $ 143.74 |
| Operator |
| $ 48.10 |
| $ 48.91 |
| Truck Driver |
| $ 43.29 |
| $ 44.02 |
| Laborer |
| $ 38.48 |
| $ 39.13 |
SCA Rates
The Service Contract Act (SCA) is applicable to this contract and it includes SCA applicable labor categories. The pricing for the indicated SCA labor categories are based on the U. S. Department of Labor Wage Determination Number (s) identified in the matrix, below. The prices offered are based on the preponderance of where work is performed and should the contractor perform in an area with lower SCA rates, resulting in lower wages being paid, the task order prices will be discounted accordingly.
| SCA Eligible Labor Category |
| SCA Equivalent Code Title |
| Wage Determination No |
| Administrative 1 |
| 01020 – Administrative Assistant |
| 2005-2521 |
| Administrative 4 |
| 01020 – Administrative Assistant |
| 2005-2521 |
| Environmental Technician 2 |
| 30090-Environmental Technician |
| 2005-2307 |
| Environmental Technician 3 |
| 30090-Environmental Technician |
| 2005-2307 |
| Equipment Operator |
| 23440 - Heavy Equipment Operator |
| 2005-2512 |
| Truck Driver |
| 31363 - Truck driver, Heavy |
| 2005-2512 |
| Laborer |
| 11210 - Laborer |
| 2005-2512 |
GSA Awarded Labor Categories & Requirements
| SIN |
| Labor Category |
| Functional Responsibility |
| Experience in Years |
| Educational Requirements |
| Any applicable training/certification requirements |
| 899-1,3,5,8 |
| Site Supervisor - Field |
| Oversees and coordinates the activities for field personnel including laborers, equipment operators, truck drivers. Coordinates field operations with Project Manager and other professional staff. |
| 10 |
| High School Diploma or Equivalent |
| HAZWOPER - OSHA 40-hour training and current 8-hour refresher |
| 899-1,3,5,8 |
| H&S Director - Field |
| Implementation and oversight of the health and safety (H&S) program, developing site H&S Plans, and implementing client H&S specifications. Other duties include managing project H&S staffing needs; investigating accidents/incidents; performing safety audits; conducting H&S meetings; and preparing H&S reports. CSP or CIH is required. |
| 8 |
| BS in Business, Management, or an appropriate technical discipline |
| HAZWOPER - OSHA 40-hour training and current 8-hour refresher, first aid/CPR training, and respirator fit test training |
| 899-1,3,5,8 |
| Engineer I - Field |
| Entry level engineer. Applies the imaginative talents in the field of their degree and requires consistent exercise of discretion and judgment. |
| 1 |
| BS - Engineering |
| HAZWOPER - OSHA 40-hour training and current 8-hour refresher |
| 899-1,3,5,8 |
| Occupational Health and Safety Technologist - Field |
| Ensures the safety of project sites, facilities, and personnel through the formulation and implementation of site safety and emergency plans that comply with Prudent, OSHA, and EPA policies and regulations. Specific duties include: investigating accidents/incidents, developing hazard analyses, developing and implements in-house safety and health training courses. |
| 3 |
| BS in Management or related technical discipline. |
| HAZWOPER - OSHA 40-hour training and current 8-hour refresher, first aid/CPR training, and respirator fit test training |
| SIN |
| Labor Category |
| Functional Responsibility |
| Experience in Years |
| Educational Requirements |
| Any applicable training/certification requirements |
| 899-1,3,5,8 |
| Sr. Industrial Hygienist - Field |
| Non-CIH, Develops, implements, and oversees all health and safety related aspects of project work. Signs off on site-specific HASPs. Approves changes to established Health and Safety Program. Readily available for consultation as required. |
| 10 |
| BS/MS/PhD |
| HAZWOPER - OSHA 40-hour training and current 8-hour refresher. Must be register or equivalent if registration is not appropriate for their profession |
| 899-1,3,5,8 |
| Administrative 1 |
| Non field positions Supports project and technical staff in the appropriate level of expertise |
| 1 |
| High School Diploma or Equivalent |
| 899-1,3,5,8 |
| Administrative 4 |
| Non field positions. Supports project and technical staff in complex or 1-time assignments. May assist with the negotiations of contracts/subcontracts. Interacts with government procurement counterparts: Includes Contract Managers, Procurement Managers, Cost Estimators, SR. CAD Operator |
| 10 |
| High School Diploma or Equivalent |
| 899-1,3,5,8 |
| Engineer 7 |
| Responsible for the engineering design on larger projects the firm undertakes. Provides consultation to other engineers and develops engineering conceptual designs. Considered as experts in their field and often act as consultants on multiple projects. |
| 15 |
| BS/MS/PhD - Engineering |
| HAZWOPER - OSHA 40-hour training and current 8-hour refresher; Professional Engineer Registration |
| 899-1,3,5,8 |
| Environmental Technician 1 |
| Performs simple routine tasks under close supervision or from detailed procedures. Work is checked in progress or on completion. Assembles or installs equipment or parts requiring simple wiring, soldering, or connecting. Performs simple or r outline tasks or tests such as tensile or hardness tests; operates and adjusts simple test equipment; records test data. Gathers and maintains specified records of engineering data such as tests, drawings, etc.; performs computations by substituting numbers in specified formulas; plots data and draws simple curves and graphs. |
| 1 |
| High School Diploma or Equivalent |
| HAZWOPER - OSHA 40-hour training and current 8-hour refresher |
| 899-1,3,5,8 |
| Environmental Technician 2 |
| Performs standardized or prescribed assignments involving a sequence of related operations. Follow standard work methods on recurring assignments but receives explicit instructions on unfamiliar assignments; technical adequacy of routine work is reviewed on completion; non-routine work may also be reviewed in progress. Following specific instructions, assembles or constructs simple or standard equipment or parts; may service or repair simple instruments or equipment. Conducts a variety of tests using established methods. Prepares test specimens, adjusts and operates equipment, and records test data, pointing out deviations resulting from equipment malfunction or observational errors. Extracts engineering data from various prescribed but non-standardized sources; processes the data following well-defined methods including elementary algebra and geometry; presents the data in prescribed form. |
| 2 |
| High School Diploma or Equivalent |
| HAZWOPER - OSHA 40-hour training and current 8-hour refresher |
| SIN |
| Labor Category |
| Functional Responsibility |
| Experience in Years |
| Educational Requirements |
| Any applicable training/certification requirements |
| 899-1,3,5,8 |
| Environmental Technician 3 |
| Performs assignments that are not completely standardized or prescribed. Selects or adapts standard procedures or equipment, using fully applicable precedents. Receives initial instructions, equipment requirements, and advice from supervisor or engineer as needed; performs recurring work independently; work is reviewed for technical adequacy or conformity with instructions. Constructs components, sub-units, or simple models or adapts standard equipment. May troubleshoot and correct malfunctions. Follows specific layout and scientific diagrams to construct and package simple devices and sub-units of equipment. Conducts various tests or experiments which may require minor modifications in test setups or procedures as well as subjective judgments in measurement; selects, sets up, and operates standard test equipment and records test data. Extracts and compiles a variety of engineering data from field notes, manuals, lab reports, etc.; processes data, identifying errors or inconsistencies. |
| 4 |
| High School Diploma or Equivalent |
| HAZWOPER - OSHA 40-hour training and current 8-hour refresher |
| 899-1,3,5,8 |
| Geologist 3 (Professional 3) |
| Applies field of knowledge to the activities and other project support personnel includes Scientist / Geologist / Hydrogeologist / Industrial Hygienist |
| 4 |
| BS/MS/PhD |
| HAZWOPER - OSHA 40-hour training and current 8-hour refresher. Must be register or equivalent if registration is not appropriate for their profession |
| 899-1,3,5,8 |
| Geologist 5 (Professional 5) |
| Oversees and coordinates the activities for field of knowledge and other project support personnel. Formulates and provides technical guidance and advice on regulations, policies, and guidelines. Provides environmental planning, coordinates complex compliance and hazardous waste issues. Includes Scientist / Geologist / Hydrogeologist / Industrial Hygienist |
| 8 |
| BS/MS/PhD |
| HAZWOPER - OSHA 40-hour training and current 8-hour refresher. Must be register or equivalent if registration is not appropriate for their profession |
| 899-1,3,5,8 |
| Project Manager 1 |
| Responsible for the environmental services on larger projects the firm undertakes. Provides consultation to other environmental professionals and develops environmental conceptual models. Considered as experts in their field and often act as consultants on multiple projects. |
| 10 |
| BS/MS/PhD |
| HAZWOPER - OSHA 40-hour training and current 8-hour refresher; Must be registered or equivalent if registration is not appropriate for their profession. |
| 899-1,3,5,8 |
| Project Manager 2 |
| Responsible for the environmental services on larger projects the firm undertakes. Provides consultation to other environmental professionals and develops environmental conceptual models. Considered as experts in their field and often act as consultants on multiple projects. |
| 15 |
| BS/MS/PhD |
| HAZWOPER - OSHA 40-hour training and current 8-hour refresher; Must be registered or equivalent if registration is not appropriate for their profession. |
| SIN |
| Labor Category |
| Functional Responsibility |
| Experience in Years |
| Educational Requirements |
| Any applicable training/certification requirements |
| 899-1, 3, 5, 8 |
| Certified Industrial Hygienist (CIH) |
| CIH, Develops, implements, and oversees all health and safety related aspects of project work. Signs off on site-specific HASPs. Approves changes to established Health and Safety Program. Readily available for consultation as required. |
| 10 |
| BS |
| HAZWOPER - OSHA 40-hour training and current 8-hour refresher. Must be register as a CIH. |
| 899-1, 3, 5, 8 |
| Equipment Operator |
| Operates heavy equipment |
| 1 |
| High School Diploma or Equivalent |
| HAZWOPER - OSHA 40-hour training and current 8-hour refresher |
| 899-1, 3, 5, 8 |
| Truck Driver |
| Drives various trucks including those with GVWR in excess of 26,000 lbs. |
| 1 |
| High School Diploma or Equivalent |
| HAZWOPER - OSHA 40-hour training and current 8-hour refresher, Commercial Driver’s License (CDL) |
| 899-1, 3, 5, 8 |
| Laborer |
| Provides general labor support not in a specific trade |
| 1 |
| High School Diploma or Equivalent |
| HAZWOPER - OSHA 40-hour training and current 8-hour refresher |