GS-09-P-16-WB-C-7002_Generated_PDF_with_TOC.pdf
PDF 6 MB Posted
- Attached to
- Pre-Trial. ca0260zz. reconfiguration Federal contract opportunity
- Solicitation number
- GS-09-P-16-WB-C-7002
About this file
Not Listed
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation_Amendment_GS-09-P-16-WB-C-7002_0001.pdf | ||
| Solicitation_Package_(GS-09-P-16-WB-C-7002).zip | ZIP file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table Of Contents
Section Description Page Number Standard Form Standard Form 1 Volume 2 - Specifications Volume 2 - Specifications 4 Volume 3 - Drawings Volume 3 - Drawings 13 Volume 4 - Other Attachments Volume 4 - Other Attachments 17
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
12/19/2016
15:00
N1374492
03/11/2016
9P3PSFJ
GSA, PBS, SAN FRANCISCO SERVICE CENTER
CENTRAL CALIFORNIA OFFICE, 9PFJ
280 South 1st, Suite 378 San Jose, CA 95113
GS-09-P-16-WB-C-7002
The contractor shall provide all labor, materials, equipment and supervision to complete the following: Pre-Trial Office Space Reconfiguration per the attached Scope of Work
GSA, SFSC, CENTRAL CA FIELD OFFICE
280 South 1st, Suite 378 San Jose, CA 95113
EQ9P3PSFJ-16-5035
408-535-5311Suzanne Paulette
Standard Form Page 1
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
27. PAYMENT WILL BE MADE BY
10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
Please see attached
GSA, PBS, SAN FRANCISCO SERVICE CENTER
CENTRAL CALIFORNIA OFFICE, 9PFJ
280 South 1st, Suite 378 San Jose, CA 95113
WB000
Amanda Sweeney
GSA, PBS, SAN FRANCISCO SERVICE CENTER
CENTRAL CALIFORNIA OFFICE, 9PFJ
280 South 1st, Suite 378 San Jose, CA 95113
Standard Form Page 2
PAGE
GENERAL SERVICES ADMINISTRATION
OF
ITEM NO., FORM OR
STOCK NUMBER DESCRIPTION OF ARTICLES OR SERVICES QUAN-
TITY
UNIT
OF
ISSUE
UNIT
PRICE
AMOUNT
PoP: 03/21/2016 - 10/31/2016 labor, material, equipment and scope of work
The contractor shall provide all reconfiguration per the attached
Pre-Trial.ca0260zz.reconfiguration work: Pre-Trial office space following scope of
LS
supervision to complete the
Standard Form Page 3
General Services Administration, Pacific Rim Region
Central California Office
280 South First Street, Room 2052
SCOPE OF WORK
Date: January 05, 2016 Project Name: USDOJ Pre-trial Reconfiguration Project Project Location: 280 South First Street, San Jose, Ca Suite 1150 Project Number: N1374492
PROJECT OVERVIEW
Design and construct the USDOJ Pre-trial suite to the new proposed configuration.
Provide all labor, materials and equipment to:
The contractor is responsible for completing a design that meets all National, State and local codes.
The contractor will submit the 30% design documents for final review before the start of construction.
Contractor will construct a plywood construction barrier to contain all construction debris, dust, odors and minimize noise.
Salvage/recover existing frames and doors for re-use where possible.
Finish and install new metal frame with solid wood door to match existing doors where needed.
Salvage/recover existing interior window frames and glass for re-use per the design. This also includes the glass in in the intake area.
Modify the woodwork in the intake area to fit the new intake area layout.
Demo interior walls
Construct new interior walls per the new design which is based on the USDOJ proposed re-configuration plan.
Paint all walls in the entire suite. (new space as well as the existing space) Paint spec: Dunn-Edwards / Color: Porous Stone / Color number: DE 6220 / LRV 57
Remove and replace ALL carpet in the entire suite (new space as well as the existing space) Carpet spec: SHAW / Style: 5T044 MESH TILE / Color: 93761 muti-level pattern loop
Remove and replace ALL base cover in the entire suite (new space as well as the existing space). Cove Base spec: Burke Flooring / Uni-color 527 Clay / Rubber
Myte – Type TP
Install new electrical outlets in the new walls.
Volume 2 - Specifications Page 4
280 South First Street, Room 2052
San Jose, CA 95113
Install new tele/data outlets with CAT 5E cabling back the agency server room.
Agency will complete the jacks, connectors as well termination.
Disconnect existing lighting circuits
Relocate existing light fixtures to the new location based on the new design.
Install new light switches in each new room.
Re-circuit the existing fixtures to the new light switch in each new room
Relocate existing fire alarm devices where possible. Install a new device as needed.
Relocate existing fire suppression sprinkler heads and Install a new device as needed.
Relocate existing HVAC vents/diffusers and Install a new as needed. Contractor will re-balance the HVAC system.
Relocate existing security key pad at the waiting room door.
ATTACHMENTS
1. PDF copy of the floor plan at 1/8”=1ft scale. This document can be used to confirm measurements of the existing space as well used to generate the background documents for the design. This is a reference documents only and is not intended to be used as the final design document.
2. Sketch of the new proposed floor plan with the space designation. This is a reference documents only and is not intended to be used as the final design document.
3. Copy of the original hand sketched floor plan. This is a reference documents only and is not intended to be used as the final design document.
WORK HOURS
This project will be performed during normal business hours and coordinated in advance with onsite personnel.
COST PROPOSAL
Contractor shall submit a bid proposal on the requested date to the Contracting Officer.
Cost proposal must be submitted in Construction Specification Institute (CSI) Master Format 2004 format and clearly show unit cost breakdowns.
Volume 2 - Specifications Page 5
280 South First Street, Room 2052
ADD ALTERNATE PRICING
1. Provide alternate pricing for removing the existing 2X4 ceiling grid system and installing new 2X2 ceiling grid system with tiles. Ceiling grid spec’s: 1775 Humiguard
Plus from the Armstrong’s “Dune” Series with a humidity-resistant coating and a tegular edge is the new ceiling tile that will be installed in the entire building. The ceiling tile fits in a 9/16" suspension system. The Dune’s NRC rating is
0.50 (P100 baseline standard is 0.80 or greater).
1. Provide alternate pricing to place the existing 2X4 fixtures with new 2X2 LED light fixtures. Contractor is responsible for confirming provide a new reflected ceiling plan to verify the quantity of 2X2 LED fixtures required base on the new floor plan.
Light fixture spec’s: Lithonia 2ALL2 40L EZ1 LP835 N100 /Lithonia 2ALL2 40L EZ1
LP840 N100 or comparable alternate for less.
2. Provide alternate pricing to remove the double store front doors on the South exterior windows.
PROJECT TEAM
The GSA management team for this project will be:
Contracting Officer: Amanda Sweeney: amanda.sweeney@gsa.gov Project Manager / COR: Arthur Grant: arthur.grant@gsa.gov Procurement Technician: Suzanne Paulette: suzanne.paulette@gsa.gov
MATERIAL SUMBITTALS
a. Work schedule prior to start of the project.
b. 35% design drawing prior to the start of construction.
c. Product data for all major construction materials and equipment.
d. Fire alarm device shop drawing.
e. Sprinkler shop drawings.
f. Closeout package to include, As Built drawings, O&M manuals and testing results
PERMITS / DRAWINGS
The contractor shall be responsible all permits/drawings for all work related to lease facilities and or federal/court buildings in accordance with, local, city, state and federal building requirements.
The Public Buildings Amendments of 1988, 40 U.S.C. 3312 (formerly section 21 of the Public Buildings Act of 1959, 40 U.S.C. 619), require that each building constructed or altered by GSA or any other federal agency shall, to the maximum extent feasible, be in compliance with one of the nationally recognized model building codes and with other applicable nationally recognized codes.
Volume 2 - Specifications Page 6
280 South First Street, Room 2052
CLEAN UP
a. The contractor will ensure construction dust does not migrate from the immediate work area to other parts of the building, including access routes.
Use sticky mats and plastic barriers as needed. The work site shall be cleaned (trash removed, floors swept and mopped or vacuumed, etc.) daily.
b. At project completion, the contractor will professionally clean the site for user occupancy.
SECURITY
Prior to start of work, the contractor shall comply with GSA Building Security requirements. The contractor must complete a Contractor Information Worksheet for all employees and sub-contractors who will be working onsite.
SUSTAINABLE PRODUCT REQUIREMENTS
GSA purchases for products and services must meet sustainable product requirements.
Every contractor shall comply with these sustainable product requirements by using products that meet the criteria and standards listed in the PBS Sustainable Product Requirements document at the time of contract award, and or exercise of option modification. The contractor is also responsible for providing sufficient documentation to confirm that the products provided have the required sustainable criteria, upon the Government's request. See attached PBS Sustainable Products Requirements List.
a. Environmental Protection Agency (EPA) Comprehensive Procurement Guideline
(CPG) designated products.
b. 10 B. ENERGY STAR® or Federal Energy Management Program (FEMP) designated products.
c. Electronic Product Environmental Assessment Tool (EPEAT) registered products2.
d. US Department of Agriculture (USDA) designated Bio Preferred/Bio based products.
e. EPA Water Sense or other water efficient products.
f. Non-ozone-depleting products or alternatives listed under the EPA Significant New
Alternatives Policy (SNAP).
g. The PBS Sustainable Products Requirements List must is included,(see Attachment A) to the Scope of Work. Any exceptions to the required green language or clauses require a written justification (see Attachment B) documented in the contract file.
Volume 2 - Specifications Page 7
280 South First Street, Room 2052
SAFETY
The contractor will provide a hazard free work site, complying with all Occupational Safety and Health Administration (OSHA), National Electrical Code, and all other applicable safety standards.
a. Briefings: Prior to any worker for the Prime or subcontractors beginning work, they shall undergo a safety briefing provided by the Prime Contractor’s Competent Person per OSHA requirements. This briefing shall include information on the construction limits, safety guidelines, means of egress, etc.
b. Site and Building Access: Maintain free and unobstructed access to facility emergency services and for fire, police and other emergency response forces.
c. Means of Egress: Do not block building exits, including paths from exits to roads.
d. Fire Extinguishers: Provide and maintain extinguishers in construction and storage areas in accordance with 29 CFR 1926.
e. Flammable and Combustible Liquids: Store, dispense and use liquids in accordance with 29 CFR 1926.
f. Existing Fire Protection: Do not impair automatic sprinklers, smoke and heat detection, and fire alarm systems without prior approval of the Contracting Officer/GSA Project Manager.
g. Smoking: Smoking is prohibited except in designated smoking areas. Smoking is prohibited in and adjacent to construction sites.
h. Daily Cleanup: Dispose of waste and debris from buildings daily.
HAZARDOUS MATERIALS
The Contractor shall maintain on-site and submit to the Contracting Officer/GSA Project Manager, Material Safety Data Sheets (MSDS), meeting the requirements of 29 CFR 1910.1200(g) and the latest version of Federal Standard No. 313, for all hazardous materials brought to the work site.
DOCUMENT DISPOSITION INSTRUCTIONS FOR NON-BIDDING RECIPIENTS
a) If you are not intending to submit a price proposal, contractor shall return the solicitation packet, scope of work and all drawings to this office.
b) If you are not the intended recipient, you are hereby notified that any reading, copying, use or distribution (whether materially, verbally or electronically) of this document is strictly prohibited and illegal. Solicitation documents no longer needed by plan holder shall be destroyed or returned to the following address: 280 South First Street, Room 2052 San Jose, CA
95113
Volume 2 - Specifications Page 8
DUNE™
Square Lay-in & Tegular fine texture
Dune™ Square Lay-in panels with Prelude® XL® 15/16" suspension system (Pgs. 279-280)
Dune Tegular panels with Interlude® XL HRC 9/16" suspension system (Pg. 274)
TYPICAL APPLICATIONS
• Offices
• Corridors
• Retail
• Hospitality
KEY SELECTION ATTRIBUTES
• Upgrade look at a modest price
• Ceiling-2-Ceiling™ Post-consumer
Recycled Content options: Items
1773HRC, 1774HRC, 1775HRC,
1776HRC, 1777HRC
(check armstrong.com/greengenie)
• USDA Certified Biobased Product – 100%
• Durable – Scratch-resistant
• Non-directional visual reduces scrap and installation time
• 30-Year Limited System Warranty against visible sag (excludes items 1796 and 1798), mold and mildew
COLOR
White
This durable, fine-textured panel offers a non-directional visual.
TechLineSM 877 ARMSTRONG armstrong.com/commceilings
DETAILS (Other Suspension Systems compatible. Refer to listing on page 180.)
1. Dune™ Tegular
2. Dune™ Square Lay-in with Prelude 15/16" suspension system
3. Dune™ Tegular with Suprafine® 9/16" suspension system
4. Dune™ Tegular with Silhouette® XL® 9/16" suspension system with 1/4" reveal
5. Dune™ Tegular with Interlude® XL® HRC 9/16" suspension system 1 2 3 4 5
1772, 1773, 1774, 1775, 1776
Volume 2 - Specifications Page 9
DUNE™
Square Lay-in & Tegular fine texture
VISUAL SELECTION PERFORMANCE SELECTION Dots represent high level of performance.
30-Year Performance Guarantee & Warranty When installed with Armstrong® Suspension System.
Details at armstrong.com/warranty (Excludes items 1796, 1798, and large other size panels)
Weight; Square Feet/Carton 1772 – 0.94 lbs/SF; 64 SF/ctn 1773 – 0.88 lbs/SF; 64 SF/ctn 1796 – 1.33 lbs/SF; 67 SF/ctn 1798 – 1.14 lbs/SF; 50 SF/ctn 1850 – 1.19 lbs/SF; 48 SF/ctn 1851 – 1.22 lbs/SF; 64 SF/ctn 1774, 1775 – 0.75 lbs/SF; 64 SF/ctn 1776, 1777 – 0.75 lbs/SF; 64 SF/ctn 1852, 1853 – 1.20 lbs/SF; 48 SF/ctn
Minimum Order Quantity 1 carton, excludes other size panels
Metric Items Available 1772M, 1850M, 1773M, 1851M, 1796M, 1798M, 1775M, 1777M – Metric items are subject to extended lead times and minimum quantities.
Contact your representative for more details.
PHYSICAL DATA
Material Wet-formed mineral fiber
Surface Finish Factory-applied latex paint
Fire Performance ASTM E84 and CAN/ULC S102 surface burning characteristics. Flame Spread Index 25 or less.
Smoke Developed Index 50 or less (UL labeled.)
Fire Guard: A fire-resistive ceiling when used in applicable UL assemblies
ASTM E1264 Classification Type III, Form 2, Pattern C E Fire Class A
Humidity/Sag Resistance HumiGuard® Plus ceiling panels maintain superior sag resistance. Recommended for areas subject to high humidity, up to, but not including, standing water and outdoor applications. Excludes items 1796, 1798, and large other size panels.
Anti-Mold/Mildew Ceiling panels with BioBlock® coating contain a mold-inhibiting agent that resists the growth of mold and mildew.
VOC Emissions Third-party certified compliant with California Department of Public Health CDPH/EHLB/Standard Method Version 1.1, 2010. This standard is the guideline for low emissions in LEED, CalGreen Title 24, ANSI/ASHRAE/USGBC/IES Standard 189; ANSI/GBI Green Building Assessment Protocol.
Primary (Embodied) Energy See all LCA information on our EPD’s.
High Recycled Content Contains greater than 50% total recycled content.
Total recycled content based on product composition of post-consumer and pre-consumer (post-industrial) recycled content per FTC guidelines.
Insulation Value R Factor – 1.6 (BTU units) R Factor – 0.28 (Watts units)
100%
Edge Profile
Susp. Dwg.
Pgs. 295-299 armstrong.com/ catdwgs
Item No.
Dimensions (Inches)
UL Classified
Acoustics
To ta l Ac ou st ic s1
Fi re
Ra tin g
Li gh t Re fle ct
An ti-
M ol d
M ild ew
Sa g
Re si st
Ce rt ifi ed
L ow
VO
C Em is si on s
Sc ra tc h
Re cy cl ed
Co nt en t
Re cy e
Pr og ra m
-Y r W ar ra nt y
NRC + =
DUNE™ Square Lay-in Bio-
Block Humi-
Guard+ Durability
15/16" Square Lay-in
Square Lay-in 9/16" Angled Tegular 15/16" Angled Tegular Ultima Plank ShipLap Long Edge Detail
Ultima Plank ShipLap K2C2 Short
15/16" Chamford Tegular Cirrus Proles Chamfered
Tongue and GrooveConcealed Beveled K4C4
Classic Step Tegular Ultima Plank ShipLap Long Edge Detail
Ultima Plank ShipLap Beveled Tegular Short
15/16 Classic Step Tegular ~8-ID (99) (drw 10)
9/16" Beveled Tegular 15/16" Beveled Tegular 9/16" Square Cut Tegular 15/16" Square Tegular
9/16" Chamfered Tegular Cirrus Proles Chamfered
Concealed Soft Look Radiused Tegular
9/16" Cubic Graphis NeoCubic
9/16" Flush Tegular Ledges
15/16" Flush Tegular Ledges
9/16" Wrapped Tegular Graphis Wrapped Linear and Cubic
9/16" Wrapped Linear and Mixed Corner “B”
(Flumes, Graphis Linear Corner & Dots & Squares)
Concealed Square Edge K4C4
Linear Cubic Beveled Crossgate
A B 15/16" Vector
C D 15/16" Vector C & D
A B C D
1 1772 24 x 24 x 5/8" 0.50 30 – Class A
0.83
• • • • Std • •
1 1850 24 x 24 x 5/8" 0.50 35
– Fire Guard™
0.83
• • • • Std • •
1 1773
1773HRC
24 x 48 x 5/8" 0.50 30 – Class A
0.83
• • • • Std • •
1 1851 24 x 48 x 5/8" 0.50 35
– Fire Guard
0.83
• • • • Std • •
1 1796 20 x 60 x 3/4" 0.50 35
– Class A
0.83
• Std • • • • 1-Yr
1 1798 30 x 30 x 3/4" 0.50 35
– Class A
0.83
• Std • • • • 1-Yr
1 Other Size Panels
W: 12" – 30" / L: 18" – 72" 5/8" or 3/4" Thick
N/A N/A – Class A
0.83
• Std • • Std • 1-Yr
DUNE Tegular
15/16" Angled Tegular
Square Lay-in 9/16" Angled Tegular 15/16" Angled Tegular Ultima Plank ShipLap Long Edge Detail
Ultima Plank ShipLap K2C2 Short
15/16" Chamford Tegular Cirrus Proles Chamfered
Tongue and GrooveConcealed Beveled K4C4
Classic Step Tegular Ultima Plank ShipLap Long Edge Detail
Ultima Plank ShipLap Beveled Tegular Short
15/16 Classic Step Tegular ~8-ID (99) (drw 10)
9/16" Beveled Tegular 15/16" Beveled Tegular 9/16" Square Cut Tegular 15/16" Square Tegular
9/16" Chamfered Tegular Cirrus Proles Chamfered
Concealed Soft Look Radiused Tegular
9/16" Cubic Graphis NeoCubic
9/16" Flush Tegular Ledges
15/16" Flush Tegular Ledges
9/16" Wrapped Tegular Graphis Wrapped Linear and Cubic
9/16" Wrapped Linear and Mixed Corner “B”
(Flumes, Graphis Linear Corner & Dots & Squares)
Concealed Square Edge K4C4
Linear Cubic Beveled Crossgate
A B 15/16" Vector
C D 15/16" Vector C & D
A B C D
12 1774
1774HRC
24 x 24 x 5/8" 24 x 24 x 5/8"
0.50 35
– Class A
0.83
• • • • Std
12 1853 24 x 24 x 5/8" 0.50 35
– Fire Guard
0.83
• • • • Std • •
12 1776
1776HRC
24 x 48 x 5/8" 24 x 48 x 5/8"
0.50 35
– Class A
0.83
• • • • Std
12 Other Size Panels
W: 12" – 30" / L: 18" – 72" 5/8" Thick
N/A N/A – Class A
0.83
• Std • • Std • 1-Yr
9/16" Beveled Tegular
Square Lay-in 9/16" Angled Tegular 15/16" Angled Tegular Ultima Plank ShipLap Long Edge Detail
Ultima Plank ShipLap K2C2 Short
15/16" Chamford Tegular Cirrus Proles Chamfered
Tongue and GrooveConcealed Beveled K4C4
Classic Step Tegular Ultima Plank ShipLap Long Edge Detail
Ultima Plank ShipLap Beveled Tegular Short
15/16 Classic Step Tegular ~8-ID (99) (drw 10)
9/16" Beveled Tegular 15/16" Beveled Tegular 9/16" Square Cut Tegular 15/16" Square Tegular
9/16" Chamfered Tegular Cirrus Proles Chamfered
Concealed Soft Look Radiused Tegular
9/16" Cubic Graphis NeoCubic
9/16" Flush Tegular Ledges
15/16" Flush Tegular Ledges
9/16" Wrapped Tegular Graphis Wrapped Linear and Cubic
9/16" Wrapped Linear and Mixed Corner “B”
(Flumes, Graphis Linear Corner & Dots & Squares)
Concealed Square Edge K4C4
Linear Cubic Beveled Crossgate
A B 15/16" Vector
C D 15/16" Vector C & D
A B C D
29, 44, 48, 52, 56, 60
1775HRC
24 x 24 x 5/8" 24 x 24 x 5/8"
0.50 35*
– Class A
0.83
• • • • Std
29, 44, 48, 52, 56, 60
1852 24 x 24 x 5/8" 0.50 35
– Fire Guard
0.83
• • • • Std • •
29, 44, 48, 52, 56, 60
1777HRC
24 x 48 x 5/8" 24 x 48 x 5/8"
0.50 35
– Class A
0.83
• • • • Std
29, 44, 48, 52, 56, 60
Other Size Panels
W: 12" – 30" / L: 18" – 72" 5/8" Thick
N/A N/A – Class A
0.83
• Std • • Std • 1-Yr
1 Total Acoustics™ ceiling panels have an ideal combination of noise reduction and sound-blocking performance in one product.
SUSPENSION SYSTEMS
15/16" 9/16"
Prelude®
Prelude XL® Fire Guard
Silhouette 1/4" Reveal
Silhouette® 1/8" Reveal
Suprafine®
Suprafine® XL® Fire Guard™
Interlude® Sonata® Trimlok®
* CAC reduced two points on these suspension systems
HRC items contain 15% or greater post-consumer recycled ceilings
LOCATION DEPENDENT
RECYCLED
CONTENT
LEED®
en er gy m an ag em en t re cy cl ab le ex te nd pr od uc er r es p.
at er ia l in gr ed ie re po rt in g re cy co en t so ur ci ng o f ra w m at er ia ls lo w e m it tin g/ er ia ls lig ht in g qu al it y bi ob as er ia ls re gi on al er ia ls de si gn fo r fle xi bi lit y co ns tr uc tio n w as te m gm t
EP
D ac ou st ic s
Calculate LEED contribution at armstrong.com/greengenie56%U
P
TO
LEED® is a registered trademark of the U.S. Green Building Council All other trademarks used herein are the property of AWI Licensing Company and/or its affiliates © 2015 AWI Licensing Company Printed in the United States of America
TechLineSM / 1 877 ARMSTRONG armstrong.com/commceilings
(search: dune)
M
IN
ER
A
L FIB
ER
BPCS-4351-715
Volume 2 - Specifications Page 10
Volume 2 - Specifications Page 11
270009867 Rectangle
270009867 Rectangle
270009867 Rectangle
270009867 Rectangle
270009867 Rectangle
270009867 Rectangle
270009867 Rectangle
Volume 2 - Specifications Page 12
Volume 3 - Drawings Page 13
ArthurJGrant Typewritten Text
ArthurJGrant Typewritten Text
ArthurJGrant Typewritten Text
MAIN LOBBY / COURTHOUSE
ArthurJGrant Typewritten Text Waiting Area
ArthurJGrant Typewritten Text Intake / Recept.
Area
ArthurJGrant Typewritten Text
ArthurJGrant Typewritten Text
ArthurJGrant Typewritten Text
ArthurJGrant Typewritten Text
ArthurJGrant Typewritten Text
CLETS
Room
ArthurJGrant Typewritten Text Interview Room
ArthurJGrant Typewritten Text Breakroom / Storage Area
ArthurJGrant Typewritten Text
UA
Restroom
ArthurJGrant Typewritten Text New Office
ArthurJGrant Typewritten Text New Office
ArthurJGrant Typewritten Text Work Room
ArthurJGrant Typewritten Text New Conference Room
ArthurJGrant Typewritten Text Fire Arms Storage Room
ArthurJGrant Typewritten Text New Office
ArthurJGrant Typewritten Text
ArthurJGrant Typewritten Text Existing Office
ArthurJGrant Typewritten Text
ArthurJGrant Typewritten Text Existing Office
ArthurJGrant Typewritten Text
ArthurJGrant Typewritten Text Existing Office
ArthurJGrant Typewritten Text
ArthurJGrant Typewritten Text
ArthurJGrant Typewritten Text
ArthurJGrant Typewritten Text
ArthurJGrant Typewritten Text
ArthurJGrant Typewritten Text
ArthurJGrant Typewritten Text
ArthurJGrant Typewritten Text
ArthurJGrant Typewritten Text
ArthurJGrant Typewritten Text
ArthurJGrant Typewritten Text
ArthurJGrant Typewritten Text
ArthurJGrant Typewritten Text
ArthurJGrant Typewritten Text
ArthurJGrant Typewritten Text Existing Office
ArthurJGrant Typewritten Text Existing Office
ArthurJGrant Typewritten Text
ArthurJGrant Typewritten Text Existing Office
ArthurJGrant Typewritten Text Existing Office
ArthurJGrant Typewritten Text Stairwell
ArthurJGrant Typewritten Text
ArthurJGrant Typewritten Text
ArthurJGrant Typewritten Text Prisoner Elevator
Volume 3 - Drawings Page 14
Volume 3 - Drawings Page 15
Volume 3 - Drawings Page 16
General Decision Number: CA160029 01/15/2016 CA29
Superseded General Decision Number: CA20150029
State: California
Construction Types: Building, Heavy (Heavy and Dredging) and
Highway
Counties: Alameda, Calaveras, Contra Costa, Fresno, Kings, Madera, Mariposa, Merced, Monterey, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus and
Tuolumne Counties in California.
BUILDING CONSTRUCTION PROJECTS; DREDGING PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling); HIGHWAY CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least
$10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/08/2016
1 01/15/2016
ASBE0016-004 01/01/2015
AREA 1: CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED,
MONTEREY, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, STANISLAUS &
TOULMNE COUNTIES
AREA 2: ALAMEDA, CONTRA COSTA, SAN FRANSICO, SAN MATEO & SANTA
CLARA COUNTIES
Rates Fringes
Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all
Volume 4 - Other Attachments Page 17 insulation materials from mechanical systems, whether they contain asbestos or not)
Area 1......................$ 28.30 7.75
Area 2......................$ 32.38 7.75
ASBE0016-008 01/01/2015
AREA 1: ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN
FRANSICO, SAN MATEO, SANTA CLARA, & SANTA CRUZ
AREA 2: CALAVERAS, COLUSA, FRESNO, KINGS, MADERA, MARIPOSA,
MERCED, SAN JOAQUIN, STANISLAU, & TUOLUMNE
Asbestos Workers/Insulator
(Includes the application of all insulating materials, Protective Coverings, Coatings, and Finishes to all types of mechanical systems)
Area 1......................$ 59.38 19.83
Area 2......................$ 44.05 18.62
BOIL0549-001 01/01/2013
AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO & SANTA
CLARA COUNTIES
AREA 2: REMAINING COUNTIES
BOILERMAKER
Area 1......................$ 42.06 33.43
Area 2......................$ 38.37 31.32
BRCA0003-001 08/01/2013
MARBLE FINISHER..................$ 28.05 14.01
BRCA0003-003 08/01/2013
MARBLE MASON.....................$ 39.30 22.48
BRCA0003-005 05/01/2015
BRICKLAYER
Volume 4 - Other Attachments Page 18
( 1) Fresno, Kings, Madera, Mariposa, Merced....$ 36.18 20.14
( 7) San Francisco, San
Mateo.......................$ 39.99 24.75
( 8) Alameda, Contra
Costa, San Benito, Santa
Clara.......................$ 41.80 20.65
( 9) Calaveras, San
Joaquin, Stanislaus, Toulumne....................$ 37.31 19.73
(16) Monterey, Santa Cruz...$ 38.62 22.64
BRCA0003-008 07/01/2013
TERRAZZO FINISHER................$ 33.15 13.93
TERRAZZO WORKER/SETTER...........$ 39.95 24.39
BRCA0003-011 04/01/2015
AREA 1: Alameda, Contra Costa, Monterey, San Benito, San
Francisco, San Mateo, Santa Clara, Santa Cruz
AREA 2: Calaveras, San Joaquin, Stanislaus, Tuolumne
AREA 3: Fresno, Kings, Madera, Mariposa, Merced
TILE FINISHER
Area 1......................$ 23.49 12.32
Area 2......................$ 23.31 12.90
Area 3......................$ 23.15 11.96
Tile Layer
Area 1......................$ 41.87 13.55
Area 2......................$ 37.71 14.19
Area 3......................$ 33.13 13.59
CARP0022-001 07/01/2015
San Francisco County
Carpenters
Bridge Builder/Highway
Carpenter...................$ 42.40 25.98
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 42.55 25.98
Journeyman Carpenter........$ 42.40 25.98
Millwright..................$ 42.50 27.38
Volume 4 - Other Attachments Page 19
CARP0034-001 07/01/2014
Diver
Assistant Tender, ROV
Tender/Technician...........$ 39.60 30.73
Diver standby...............$ 44.56 30.73
Diver Tender................$ 43.56 30.73
Diver wet...................$ 89.12 30.73
Manifold Operator (mixed gas)........................$ 48.56 30.73
Manifold Operator (Standby).$ 43.56 30.73
DEPTH PAY (Surface Diving):
050 to 100 ft $2.00 per foot
101 to 150 ft $3.00 per foot
151 to 220 ft $4.00 per foot
SATURATION DIVING:
The standby rate shall apply until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. The diver rate shall be paid for all saturation hours.
DIVING IN ENCLOSURES:
Where it is necessary for Divers to enter pipes or tunnels, or other enclosures where there is no vertical ascent, the following premium shall be paid: Distance traveled from entrance 26 feet to 300 feet: $1.00 per foot. When it is necessary for a diver to enter any pipe, tunnel or other enclosure less than 48" in height, the premium will be
$1.00 per foot.
WORK IN COMBINATION OF CLASSIFICATIONS:
Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.
CARP0034-003 07/01/2014
Piledriver.......................$ 40.60 30.73
CARP0035-007 07/01/2015
AREA 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa
Clara counties
AREA 2: Monterey, San Benito, Santa Cruz Counties
AREA 3: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, San
Joaquin, Stanislaus, Tuolumne Counties
Volume 4 - Other Attachments Page 20
Modular Furniture Installer
Area 1
Installer I................$ 24.26 17.67
Installer II...............$ 20.83 18.67
Lead Installer.............$ 27.71 18.17
Master Installer...........$ 31.93 18.17
Area 2
Installer I................$ 21.61 17.67
Installer II...............$ 18.66 17.67
Lead Installer.............$ 24.58 18.17
Master Installer...........$ 28.21 19.35
Area 3
Installer I................$ 20.66 18.85
Installer II...............$ 17.89 18.85
Lead Installer.............$ 23.46 18.17
Master Installer...........$ 30.48 17.67
CARP0035-008 08/01/2014
AREA 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa
Clara counties
AREA 2: Monterey, San Benito, Santa Cruz Counties
AREA 3: San Joaquin
AREA 4: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, Stanislaus, Tuolumne Counties
Drywall Installers/Lathers:
Area 1......................$ 40.35 27.97
Area 2......................$ 34.47 27.97
Area 3......................$ 34.97 27.97
Area 4......................$ 33.62 27.97
Drywall Stocker/Scrapper
Area 1......................$ 20.18 16.30
Area 2......................$ 17.24 16.30
Area 3......................$ 17.49 16.30
Area 4......................$ 16.81 16.30
CARP0152-001 07/01/2014
Contra Costa County
Carpenter...................$ 40.35 27.53
Hardwood Floorlayer, Volume 4 - Other Attachments Page 21
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 40.50 27.53
Journeyman Carpenter........$ 40.35 27.53
Millwright..................$ 40.45 29.12
CARP0152-002 07/01/2014
San Joaquin County
Carpenter...................$ 40.35 27.53
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 34.62 27.53
Journeyman Carpenter........$ 34.47 27.53
Millwright..................$ 34.97 29.12
CARP0152-004 07/01/2014
Calaveras, Mariposa, Merced, Stanislaus and Tuolumne Counties
Carpenter...................$ 40.35 27.53
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 33.27 27.53
Journeyman Carpenter........$ 33.12 27.53
Millwright..................$ 35.62 29.12
CARP0217-001 07/01/2015
San Mateo County
Carpenter...................$ 42.40 25.98
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 42.55 25.98
Journeyman Carpenter........$ 42.40 25.98
Millwright..................$ 42.50 27.38
Volume 4 - Other Attachments Page 22
CARP0405-001 07/01/2015
Santa Clara County
Carpenter...................$ 42.40 25.98
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 42.55 25.98
Journeyman Carpenter........$ 42.40 25.98
Millwright..................$ 42.50 27.38
CARP0405-002 07/01/2015
San Benito County
Carpenter...................$ 42.40 25.98
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 36.58 25.98
Journeyman Carpenter........$ 26.52 25.98
Millwright..................$ 39.02 27.38
CARP0505-001 07/01/2015
Santa Cruz County
Carpenter...................$ 42.40 25.98
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 36.67 25.98
Journeyman Carpenter........$ 36.52 25.98
Millwright..................$ 39.02 27.38
CARP0605-001 07/01/2015
Monterey County
Volume 4 - Other Attachments Page 23
Carpenter...................$ 42.40 25.98
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 36.67 25.98
Journeyman Carpenter........$ 36.52 25.98
Millwright..................$ 39.02 27.38
CARP0701-001 07/01/2015
Fresno and Madera Counties
Carpenter...................$ 42.40 25.98
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 35.32 25.98
Journeyman Carpenter........$ 35.17 25.98
Millwright..................$ 37.67 27.38
CARP0713-001 07/01/2015
Alameda County
Carpenter...................$ 42.40 25.98
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 42.55 25.98
Journeyman Carpenter........$ 42.40 25.98
Millwright..................$ 42.50 27.38
CARP1109-001 07/01/2014
Kings County
Carpenter...................$ 40.35 27.53
Hardwood Floorlayer, Shingler, Power Saw
Volume 4 - Other Attachments Page 24
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 33.27 27.53
Journeyman Carpenter........$ 33.12 27.53
Millwright..................$ 35.62 29.12
ELEC0006-004 12/01/2015
SAN FRANCISCO COUNTY
Sound & Communications
Installer...................$ 34.82 17.85
Technician..................$ 39.65 17.99
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.
ELEC0006-007 06/01/2015
SAN FRANCISCO COUNTY
ELECTRICIAN......................$ 61.25 29.80
ELEC0100-002 06/01/2015
FRESNO, KINGS, AND MADERA COUNTIES
ELECTRICIAN......................$ 34.50 20.09
* ELEC0100-005 12/01/2015
Volume 4 - Other Attachments Page 25
FRESNO, KINGS, MADERA
Communications System
Installer...................$ 30.24 16.91
Technician..................$ 34.43 17.03
Includes the installation testing, service and maintenance, of the following systems which utilize the transmission and/or transference of voice, sound, vision and digital for commercial, education, security and entertainment purposes for the following: TV monitoring and surveillance, background-foreground music, intercom and telephone interconnect, inventory control systems, microwave transmission, multi-media, multiplex, nurse call system, radio page, school intercom and sound, burglar alarms, and low voltage master clock systems.
A. SOUND AND VOICE TRANSMISSION/TRANSFERENCE SYSTEMS
Background foreground music, Intercom and telephone interconnect systems, Telephone systems Nurse call systems, Radio page systems, School intercom and sound systems, Burglar alarm systems, Low voltage, master clock systems, Multi-media/multiplex systems, Sound and musical entertainment systems, RF systems, Antennas and Wave Guide, B. FIRE ALARM SYSTEMS Installation, wire pulling and testing
C. TELEVISION AND VIDEO SYSTEMS Television monitoring and surveillance systems Video security systems, Video entertainment systems, Video educational systems, Microwave transmission systems, CATV and CCTV
D. SECURITY SYSTEMS Perimeter security systems Vibration sensor systems Card access systems Access control systems, Sonar/infrared monitoring equipment
E. COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE
INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO
THE ABOVE LISTED SYSTEMS SCADA (Supervisory Control and
Data Acquisition) PCM (Pulse Code Modulation) Inventory
Control Systems, Digital Data Systems Broadband and
Baseband and Carriers Point of Sale Systems, VSAT Data
Systems Data Communication Systems RF and Remote Control
Systems, Fiber Optic Data Systems
WORK EXCLUDED Raceway systems are not covered (excluding
Ladder-Rack for the purpose of the above listed systems).
Chases and/or nipples (not to exceed 10 feet) may be installed on open wiring systems. Energy management systems. SCADA (Supervisory Control and Data Acquisition) when not intrinsic to the above listed systems (in the scope). Fire alarm systems when installed in raceways
(including wire and cable pulling) shall be performed at the electrician wage rate, when either of the following two
Volume 4 - Other Attachments Page 26
(2) conditions apply:
1. The project involves new or major remodel building trades construction.
2. The conductors for the fire alarm system are installed in conduit.
ELEC0234-001 05/25/2015
MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES
ELECTRICIAN
Zone A......................$ 42.15 23.36
Zone B......................$ 46.37 23.50
Zone A: All of Santa Cruz, Monterey, and San Benito Counties within 25 air miles of Highway 1 and Dolan Road in Moss
Landing, and an area extending 5 miles east and west of
Highway 101 South to the San Luis Obispo County Line
Zone B: Any area outside of Zone A
ELEC0234-003 12/01/2015
MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES
Installer...................$ 34.32 17.33
Technician..................$ 37.94 16.30 data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' involve new or major remodel building construction, for which the conductors for the fire alarm system are
Volume 4 - Other Attachments Page 27
ELEC0302-001 06/01/2015
CONTRA COSTA COUNTY
CABLE SPLICER....................$ 52.92 25.34
ELECTRICIAN......................$ 46.51 25.15
ELEC0302-003 12/01/2015
CONTRA COSTA COUNTY
Installer...................$ 34.32 17.03
Technician..................$ 39.08 17.17 data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' involve new or major remodel building construction, for which the conductors for the fire alarm system are
ELEC0332-001 06/01/2015
SANTA CLARA COUNTY
CABLE SPLICER....................$ 65.57 32.19
ELECTRICIAN......................$ 57.02 31.94
FOOTNOTES: Work under compressed air or where gas masks are required, orwork on ladders, scaffolds, stacks, "Bosun's chairs," or other structures and where the workers are not protected by permanent guard rails at a distance of 40 to
60 ft. from the ground or supporting structures: to be paid
Volume 4 - Other Attachments Page 28 one and one-half times the straight-time rate of pay.
Work on structures of 60 ft. or over (as described above):
to be paid twice the straight-time rate of pay.
ELEC0332-003 06/01/2015
SANTA CLARA COUNTY
Installer...................$ 33.32 16.30
Technician..................$ 37.94 16.43 data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' involve new or major remodel building construction, for which the conductors for the fire alarm system are
ELEC0595-001 06/01/2015
ALAMEDA COUNTY
CABLE SPLICER....................$ 56.70 33.55
ELECTRICIAN......................$ 50.40 33.36
ELEC0595-002 06/01/2015
CALAVERAS AND SAN JOAQUIN COUNTIES
CABLE SPLICER....................$ 39.09 25.68
ELECTRICIAN
(1) Tunnel work.............$ 36.49 25.48
(2) All other work.........$ 34.75 25.35
Volume 4 - Other Attachments Page 29
ELEC0595-006 06/01/2015
ALAMEDA COUNTY
Installer...................$ 33.32 16.29
Technician..................$ 37.94 16.44 data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' involve new or major remodel building construction, for which the conductors for the fire alarm system are
ELEC0595-008 12/01/2014
CALAVERAS AND SAN JOAQUIN COUNTIES
Installer...................$ 29.10 16.18
Technician..................$ 33.13 16.30 data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75'
Volume 4 - Other Attachments Page 30 involve new or major remodel building construction, for which the conductors for the fire alarm system are
ELEC0617-001 06/01/2015
SAN MATEO COUNTY
ELECTRICIAN......................$ 53.90 30.50
* ELEC0617-003 12/01/2015
SAN MATEO COUNTY
Installer...................$ 34.32 17.33
Technician..................$ 39.08 17.47 data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' involve new or major remodel building construction, for which the conductors for the fire alarm system are
* ELEC0684-001 12/01/2015
MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES
Volume 4 - Other Attachments Page 31
ELECTRICIAN......................$ 36.00 21.01
CABLE SPLICER = 110% of Journeyman Electrician
ELEC0684-004 12/01/2015
MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES
Installer...................$ 28.22 16.26
Technician..................$ 32.13 16.26 data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' involve new or major remodel building construction, for which the conductors for the fire alarm system are
ELEC1245-001 06/01/2015
LINE CONSTRUCTION
(1) Lineman; Cable splicer..$ 52.85 15.53
(2) Equipment specialist
(operates crawler tractors, commercial motor vehicles, backhoes, trenchers, cranes (50 tons and below), overhead & underground distribution line equipment)...........$ 42.21 14.32
(3) Groundman...............$ 32.28 14.03
(4) Powderman...............$ 47.19 14.60
HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and day after Thanksgiving, Christmas Day
Volume 4 - Other Attachments Page 32
ELEV0008-001 01/01/2015
ELEVATOR MECHANIC................$ 60.39 28.38
FOOTNOTE:
PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service.
PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after
Thanksgiving, and Christmas Day.
ENGI0003-008 07/01/2013
Dredging: (DREDGING:
CLAMSHELL & DIPPER DREDGING;
HYDRAULIC SUCTION DREDGING:)
AREA 1:
(1) Leverman...............$ 40.53 27.81
(2) Dredge Dozer; Heavy duty repairman.............$ 35.57 27.81
(3) Booster Pump
Operator; Deck
Engineer; Deck mate;
Dredge Tender; Winch
Operator...................$ 34.45 27.81
(4) Bargeman;…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .