Federal Supply Schedule GS07F9010D

PDF 83 KB

Attached to
Federal Supply Schedule GS07F9010D Federal contract IDV
Contract number
GS07F9010D
Issued by
GSA Federal Acquisition Service

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price List Effective 8/1/2011

GS-07F-9010D

Contract Period Ending: July 31, 2016

SERVICE OPTIONS FOR CONVEYORIZED X-RAY SCREENING SYSTEMS

*Labor Rate – May apply to certain Service Options List Price Discount to MFC GSA Price

Current Established Labor Rate as cost of Per Diem $165.00 3% $161.00

Lease to Ownership and Lease with Option to Purchase for all X-ray units. Terms & Conditions:

Option I: Direct from Company 1-Year Plan:

GSA Price added to our Platinum Program Extended Warranty = Sum.

10% of that Sum is added, then divided by 12 (months). The number derived is the monthly payment.

If the customer is only interested in a 1-year lease, the customer is only responsible for this base cost (monthly payment), plus freight charges back to the factory.

If the customer then makes a 13th payment, then the customer has purchased the machine.

2-Year Plan:

GSA Price added to our Platinum Program Extended Warranty = Sum.

20% of that Sum is added, then divided by 24 (months). The number derived is the monthly payment.

3-Year Plan:

GSA Price added to our Platinum Program Extended Warranty = Sum.

30% of that Sum is added, then divided by 36 (months). The number derived is the monthly payment.

Option II: Direct from Commercial Leasing Company AUTOCLEAR LLC would obtain three (3) quotes from different Leasing companies for the customer for the best option.

Commercial Leasing Company submits payment to AUTOCLEAR LLC for sale of the equipment then works directly with the customer to come up with a payment plan.

Installation and De-Installation of all X-ray Units. (Both options are based on the Per Diem rate.)

Terms & Conditions:

Installation: Arrival at customer site at the agreed-upon and scheduled time by an AUTOCLEAR LLC Service Technician.

Connecting the monitor and Operator Control Panel to the X-ray unit.

Connecting any parcel collector or rollerbed (entrance or exit).

Plugging in X-ray unit to appropriate electrical outlet. (Does not include electrical upgrading.)

Calibrate equipment so that it is performing to standard specifications.

One and one-half hours of onsite operator training for familiarization of unit to operator(s).

Training manual and radiation certificate is presented to the end user.

Established Labor Rate as cost of Per Diem (with a 4-hour minimum) * Travel expenses not included.

De-Installation: Arrival at customer site at the agreed-upon and scheduled time by an AUTOCLEAR LLC Service Technician.

Unplugging of X-ray unit from electrical source.

Disconnecting any parcel collector or rollerbed (entrance or exit).

Readying of equipment for pickup from customer site, through scheduled trucking/freight company, and taken to the closest EPA Registered Landfill or disposal recycling location.

Established Labor Rate as cost of Per Diem (with a 4-hour minimum) * Travel expenses not included.

Price List Effective 8/1/2011

GS-07F-9010D

Contract Period Ending: July 31, 2016

Maintenance for all X-ray Units. (Maintenance is to recalibrate the unit back to a usable state.)

Terms & Conditions:

Maintenance: All technical labor to restore equipment to its original condition. This includes all parts and labor, with the exception of abused or physically damaged items not included in the Per Diem rate set by the Government.

First available response, (as compared to non-maintenance agreement) 4 hours by phone and 8 to 48 hours on-site based on availability of parts and technicians.

All travel costs with performing Maintenance will be reimbursed at the U.S. Government site location Per Diem rate.

Established Labor Rate as Cost of Per Diem (with a 4-hour minimum.) *

Maintenance Prices:

Model of X-ray System List Price MAINTENANCE GOLD Plan

Discount to

MFC

GSA Price MAINTENANCE GOLD Plan

4535 (100kV) $4,450.00 3% NA 5333 (100kV) $4,620.00 3% $4,515.00 5333(160kV) $4,760.00 3% $4,652.00 400+ (100kV) $4,760.00 3% $4,652.00 6040 (160kV) $6,440.00 3% $6,294.00 6040-DV (160kV) $15,000.00 3% NA 6444BZD (160kV) $17,100.00 3% NA 7555 (160kV) $7,280.00 3% $7,115.00 8880BZD (160kV) $14,500.00 3% NA 10080T (160kV) $7,350.00 3% $7,183.00 100100T (160kV) $7,490.00 3% $7,320.00 100100T (180kV) $12,761.00 3% NA 100100B (160kV) $9,450.00 3% $9,235.00 100100B-DV (160kV) $17,804.00 3% NA 100100BZD (160kV) $13,940.00 3% NA 150150 (160kV) $14,350.00 3% $14,024.00 150180 (160kV) $24,400.00 3% $23,846.00 150180 (180kV) $27,118.00 3% NA Mailguard™ $1,540.00 3% $1,505.00

File details come from the government source that posted it. Updated .