About this file
Products and Services: The document outlines the services provided by ABM Facility Support Services, LLC. These include facility management and energy solutions, such as energy audits, project management, and energy upgrades of HVAC, Lighting, Controls. They also offer services in the installation and site preparation, security and detection systems, total solution support products for facilities management systems, electric and autonomous vehicles and accessories, and order-level materials.
Location: The services are provided domestically and worldwide. The point of production is the same as the company address, which is 12040 Indian Creek Ct. Beltsville, MD 20705. The ordering and payment addresses are also the same.
Dates: The contract period is from 22 January 2019 to 21 January 2024. The time of delivery is to be determined at the task order level. The prompt payment terms are net 30 days.
People: The document mentions several people associated with ABM Facility Support Services, LLC. These include Andrew Sherman, Ph.D., PMP®, VP, who is in charge of contract administration. His contact number is 301-875-6670 and his email is andrew.sherman@abm.com. The business contact is Ted O’Shea, VP Federal Energy, who can be reached at 202-308-1717 or ted.oshea@abm.com. The technical contact is Mark “Dusty” Wheeler PE, BEMP, Director Federal Energy, who can be contacted at 703-789-3265 or dusty.wheeler@abm.com.
ABM Facility Support Services, LLC Pricelist and/or Vendor Terms and Conditions for GS07F5542P, a Federal Supply Schedule awarded to ABM Facility Support Services, LLC, under Law Enforcement & Security Services (FSS-84)
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Error! No text of specified style in document.
Confidential and Proprietary
General Services Administration Federal Acquisition Service Authorized Federal Supply Schedule FSS Price List
Multiple Award Schedule Contract Number GS-07F-5542P
Total Solutions for Facility Management and Energy Solutions
ABM Facility Support Services, LLC 2 MAS GS-07F-5542P
On-line access to contract ordering information, terms and conditions, up-to-date pricing, and the option to create and electronic delivery order is available through GSA Advantage!™, a menu-driven database system.
The INTERNET address for GSA Advantage!™ is: http://www.GSAAdvantage.gov.
MAS Contract Number: GS-07F-5542P
For more information on ordering go to the following website: https://www.gsa.gov/schedules.
Contract Period: 22 January 2019 to 21 January 2024
Contractor: ABM Facility Support Services, LLC 12040 Indian Creek Ct. Beltsville, MD 20705
Business Size: Large Business
Contract Administration: Andrew Sherman, Ph.D., PMP®, VP Phone: 301-875-6670 Website: www.abm.com E-Mail: andrew.sherman@abm.com
Business Contact: Ted O’Shea, VP Federal Energy Phone: 202-308-1717 Website: www.abm.com E-Mail: ted.oshea@abm.com
Technical Contact: Mark “Dusty” Wheeler PE, BEMP, Director Federal Energy Phone: 703-789-3265 Website: www.abm.com E-mail: dusty.wheeler@abm.com
Price list current as of Modification #PS-0080 Effective September 21, 2023
Prices Shown Herein are net (discount deducted)
CUSTOMER INFORMATION
1a. Table of awarded special item number(s) with appropriate cross-reference to item descriptions and awarded price(s).
SINs Recovery SIN Title 238910 238910RC Installation and Site Preparation Services 334290 334290RC Security and Detection Systems 334512 334512RC Total Solution Support Products for
Facilities Management Systems 3361E 3361ERC Electric and Autonomous Vehicles and
Accessories
OLM OLMSTLOC
OLMRC
Order-Level Materials (OLM’s)
1b. Identification of the lowest priced model number and lowest unit price for that model for each special item number awarded in the contract. This price is the Government price based on a unit of one, exclusive of any quantity/dollar volume, prompt payment, or any other concession affecting price. Those contracts that have unit prices based on the geographic location of the customer, should show the range of the lowest price, and cite the areas to which the prices apply. CPGW1-LTE, $0.01
1c. If the Contractor is proposing hourly rates, a description of all corresponding commercial job titles, experience, functional responsibility and education for those types of employees or subcontractors who will perform services shall be provided. If hourly rates are not applicable, indicate “Not applicable” for this item. See Page 10
2. Maximum order:
SINs Maximum Order
238910 $250,000 334290 $250,000 334512 $250,000 3361E $2,000,000
OLM $250,000
3. Minimum order: $100
4. Geographic coverage (delivery area). Domestic and Worldwide
5. Point(s) of production (city, county, and State or foreign country). Same as Company Address
6. Discount from list prices or statement of net price. Government Net Prices (discounts already deducted.)
7. Quantity discounts. None
8. Prompt payment terms. Net 30 days. Information for Ordering Offices: Prompt payment terms cannot be negotiated out of the contractual agreement in exchange for other concessions.
9. Foreign items (list items by country of origin). Not Applicable
10a. Time of delivery. (Contractor insert number of days.) To Be Determined at the Task Order level
10b. Expedited Delivery. Items available for expedited delivery are noted in this price list. To Be Determined at the Task Order level
10c. Overnight and 2-day delivery. The Contractor will insert the sentence “Items available for expedited delivery are noted in this price list.” under this heading. The Contractor may use a symbol of its choosing to highlight items in its price list that have expedited delivery: Contact ABM - Andrew Sherman, Ted O’Shea, or Mark “Dusty” Wheeler
10d. Urgent Requirements. The Contractor will indicate whether overnight and 2-day delivery are available. Also, the Contractor will indicate that the schedule customer may contact the Contractor for rates for overnight and 2-day delivery: Contact ABM –Andrew Sherman, Ted O’Shea, or Mark “Dusty” Wheeler
11. F.O.B. point(s). Destination
12a. Ordering address(es). ABM Facility Support Services, LLC. 12040 Indian Creek Ct., Beltsville MD 20705
12b. Ordering procedures: See Federal Acquisition Regulation (FAR) 8.405-3.
13. Payment address(es). ABM Facility Support Services, LLC. 12040 Indian Creek Ct., Beltsville MD 20705
14. Warranty provision. Standard Commercial Warranty Terms & Conditions
15. Export packing charges, if applicable. Not Applicable
16. Terms and conditions of rental, maintenance, and repair (if applicable). Not Applicable
17. Terms and conditions of installation (if applicable). Not Applicable
18a. Terms and conditions of repair parts indicating date of parts price lists and any discounts from list prices (if applicable). Not Applicable
18b. Terms and conditions for any other services (if applicable). Not Applicable
19. List of service and distribution points (if applicable). Not Applicable
20. List of participating dealers (if applicable). Not Applicable
21. Preventive maintenance (if applicable). Not Applicable
22a. Special attributes such as environmental attributes (e.g., recycled content, energy efficiency, and/or reduced pollutants). Not Applicable
22b. If applicable, indicate that Section 508 compliance information is available for the information and communications technology (ICT) products and services and show where full details can be found (e.g. contractor’s website or other location.) ICT accessibility standards can be found at: https://www.Section508.gov/. Not Applicable
23. Unique Entity Identifier (UEI) number. GS-07F-5542P
24. Notification regarding registration in System for Award Management (SAM) database. Contractor registered and active in SAM
Service Contract Labor Standards Matrix:
SCA/SCLS Matrix SCLS Eligible Contract Labor Category/Fixed Price Service
SCLS Equivalent Code Title WD Number
Electrician Electrician 2015-4269 Journeyman Maintenance 2015-4269
The Service Contract Labor Standards, formerly the Service Contract Act (SCA), apply to this contract and it includes SCLS applicable labor categories. Labor categories and fixed price services marked with a (**) in this pricelist are based on the U.S. Department of Labor Wage Determination Number(s) identified in the SCLS/SCA matrix. The prices awarded are in line with the geographic scope of the contract (i.e., nationwide).
Hourly Rate Pricing for SIN’s 238910, 334290,334512 & 3361E effective worldwide
Job Classification Hourly Engineer I $122.52 Engineer II $155.06 Engineer III $179.95 Project Manager $153.15 Field Technician $177.08 Electrical Engineer $268.75 Program Manager $268.75 Project Manager $248.07 Electrician-Journeymen $289.42
ABM Facility Support Services, LLC 5 MAS GS-07F-5542P
EXECUTIVE SUMMARY
ABM (NYSE: ABM) is a leading provider of facility solutions with revenues of approximately $6.5 billion and more than 130,000 employees in 350+ offices throughout the United States and various international locations. ABM's comprehensive capabilities include janitorial, electrical & lighting, energy solutions, facilities engineering, HVAC & mechanical, landscape & turf, mission critical solutions and parking, provided through stand-alone or integrated solutions. ABM provides custom facility solutions in urban, suburban and rural areas to properties of all sizes -from schools and commercial buildings to hospitals, data centers, manufacturing plants and airports. ABM Industries Incorporated, which operates through its subsidiaries, was founded in 1909.
ABM is the leading integrated facilities management company, having worked within the Federal Government for over 70 years as a facility management partner and performing infrastructure improvement projects for over 35 years. We understand the multiple, complex challenges government entities face to increase energy assurance, optimize demand, increase the use of renewable energy and energy production, implement infrastructure improvements and perform maintenance with limited resources. We have helped government agencies implement their capital improvements at reduced financial and operational risk, and we can help you achieve your security, energy reduction, water, and sustainability goals while enhancing your mission effectiveness.
ABM has deep ENABLE experience. ABM assisted DOE with the development of the ENABLE program and was awarded four of the first ENABLE projects—the U.S. Embassy in Belize, Laughlin Air Force Base in Del Rio, Texas, the National Oceanic Atmospheric Administration National Marine Sanctuaries, and GSA Region 9 Colorado ESPC. Those projects ranged in size from $1M - $12M and implemented a broad array of Energy Control Measures (ECM) under the ESPC ENABLE Hybrid approach. As thought leaders, ABM worked closely with the Department of Energy developing and using the ENABLE toolkit including eProject Builder and the Investment Grade Audit Tool. Based on our in-depth knowledge of the ENABLE process, we can anticipate the requirements to move expeditiously through technical, pricing and compliance reviews.
ABM ENERGY SOLUTIONS INFORMATION
Energy solutions from ABM are powered by technical services self-performed through our nationwide network of local mechanical, electrical and lighting contracting offices. Energy Savings Performance Contracts (ESPCs) from ABM deliver guaranteed savings backed by an established, national leader in comprehensive facilities services, mission critical needs, and energy conservation measures. Our financial and technical expertise help federal agencies reduce energy and operating costs without negative budget impacts or additional appropriations needed. We are fully aware of the need to understand the mission requirements of the facilities when developing, implementing and maintaining critical system infrastructure. ABM has the expertise necessary to design, install and operate energy solutions that enhance mission assurance through energy assurance. ABM energy solutions include energy audits, operations and maintenance, measurement and verification, and energy program management. Our energy efficiency and water conservation capabilities are accomplished by experienced teams in technical services, including electrical and lighting, power distribution, distributed generation (including combined heat & power, renewable energy and energy storage systems), HVAC and mechanical, and integrated energy management control systems. ABM endeavors to self-perform 85% of our projects with ABM employees and regularly help facilities achieve sustainability goals, comply with regulations, and meet requirements set by the Department of Energy for ESPC projects.
ABM Facility Support Services, LLC 6 MAS GS-07F-5542P
Self-performing ESPC projects offers a unique benefit. From initial engineering to final commissioning to continued maintenance for optimal performance, ABM is the single point of contact and is accountable for every aspect of the program. This increased accountability increases our ability to maintain quality control through the various program phases — requirements definition, project development, implementation, and on-going performance period. This improves efficiency and lowers project costs, meaning you can extend your energy savings much further and direct more capital into facility infrastructure improvements. We instill confidence in our clients by executing and managing to the highest standards with ABM people using ABM technology.
Strategically Located to Serve You ABM’s branch offices are strategically placed to provide experienced local management, reliable supervision and a sustainable, highly skilled service team that will deliver personalized service.
ABM Facility Support Services, LLC 7 MAS GS-07F-5542P
Providing Solutions to Your Challenges:
ABM works with you to address many of your ongoing challenges including:
• Shrinking budgets and capital constraints
• Increasing operational costs
• Aging facilities and critical energy infrastructure
• Critical systems, maintenance, and staffing limitations
• Energy resilience and cyber security threats to mission
• Adherence to Executive Orders and legislation dictating ESPC and Renewable Energy Implementation
• Lengthy, expensive Request for Proposal process for traditional ESPCs
Guaranteed Performance ABM measures and verifies energy savings against established and agreed-upon baselines with metered data and a proven process that eliminates risk through guaranteed savings. Additionally, we aim for 100 percent client satisfaction, and we encourage you to contact our references, so they can speak on our behalf. It’s not what we promise to do; it’s our record of doing what we promise.
Removing Financial Barriers for Facility Upgrades ABM provides highly competitive financial solutions for funding infrastructure upgrades without any capital budget funds and a net-zero impact to the existing operating budget of Federal agencies. Facility improvements are funded by the energy and operational savings resulting from the infrastructure upgrades performed by ABM. Due to ABM’s financial strength, we have the ability to self-fund Federal ESPC projects up to $30M per project from our own balance sheet. In addition to self-funding options, ABM also has long standing relationships with multiple Federal energy project financiers through which our customers receive competitively priced financing for their energy projects. This collective group of financiers have financed more than 90 percent of all Federal energy projects to date.
Furthermore, ABM has experience developing renewable energy Power Purchase Agreement (PPA) projects.
ABM understands how to include a PPA in an ESPC. This structure is commonly referred to as an Energy Services Agreement (ESA). It is typically difficult for ESCOs to finance small to mid-size PPA projects due to the complexity of attracting the requisite tax equity investor to a project with smaller investment size. ABM solved this potential issue by broadening our network of financiers to include those with commercial scale renewable energy finance expertise.
A key differentiator for ABM in the energy services market is that we self-perform the work, not only saving the customer significant costs but also eliminating the worries associated with contractors. It means that an energy project will not only achieve results, but it will also exceed performance expectations for energy savings, timeliness, lack of intrusiveness, and professionalism. We have acted as the Engineering, Procurement and Construction (EPC) contractor on ground-mount solar projects totaling more than $14M of construction over the last three years and have completed over $1 Billion of energy services projects over the last 15 years. Our scope of work includes design, construction, commissioning, operations, maintenance and repairs.
In addition to our work as a solar EPC mentioned above, ABM also performs an extensive amount of power generation work with our NETA certified high-voltage technician staff. A significant portion of that work is done on
ABM Facility Support Services, LLC 8 MAS GS-07F-5542P electrical spot systems and is detailed below. Our electrical team has completed commissioning on hundreds of power generation projects over the last 30 years. In total our electrical technicians have worked on a total of 250MW of power generation projects. We currently manage and maintain over 11+ Million square feet of critical electric distribution systems.
ABM also has experience in buying out existing ESPC projects. Whether it be due to underperforming ECMs or unfavorable interest rates, purchasing these projects and rolling them into a new ESPC project allows our clients to realize increased energy savings and improved ECM performance under more favorable finance terms.
By using ABM to finance and perform your energy and infrastructure upgrades, you will achieve unsurpassed energy efficiency, reliability and quality without impacting your existing operations budget.
Experience in All 19 Technical Categories Our experience in all 19 of the DOE Technical Categories (TC), combined with our self-performance abilities, creates a flattened project approach, which ensures our clients receive a project that is implemented more efficiently, with more accountability, and at a lower cost.
• TC.1 Boiler Plant Improvements
• TC.2 Chiller Plant Improvements
• TC.3 Building Automation Systems (BAS) / Energy Management Control Systems (EMCS)
• TC.4 Heating, Ventilating, and Air Conditioning (HVAC) Improvements
• TC.5 Lighting Improvements
• TC.6 Building Envelope Modifications
• TC.7 Chilled Water, Hot Water, and Steam Distribution Systems
• TC.8 Electric Motors and Drives
• TC.9 Refrigeration
• TC.10 Distributed Generation
• TC.11 Renewable Energy Systems
• TC.12 Energy/Utility Distribution Systems
• TC.13 Water and Sewer Conservation Systems
• TC.14 Electrical Peak Shaving/Load Shifting
• TC.15 Energy Cost Reduction Through Rate Adjustments
• TC.16 Energy Related Process Improvements
• TC.17 Commissioning
• TC.18 Advanced Metering Systems
• TC.19 Appliance/Plug-load reductions
Other Energy Solutions ABM is the largest ESCO provider of Electric Vehicle Charging Stations and has installed hundreds of EV stations nationally at retail centers, parking garages, corporate offices, city, state and county buildings, public parking areas, auto dealers, apartment complexes, and homes. We have developed best practices and standardized
ABM Facility Support Services, LLC 9 MAS GS-07F-5542P pricing and processes. We engage with utility companies on a national scale and are working to create and propose legislation that will simplify the Electrical Permitting process across jurisdictions.
We have succeeded in creating industry first programs and awarded several California Energy Commission EV Grants, State of Maryland EV Grants, and EV Installation contracts with many local and federal government clients nationally, including the State of California Department of General Services, The US Navy Academy and the National Parks Service.
Building Value for You Our needs-based approach and customized solutions are tailored to our customers’ facilities and financial needs.
With more than 100 years of experience and a goal of 100 percent client satisfaction, ABM stands ready to help agencies overcome their facility infrastructure challenges and funding of the improvements.
ABM’s integrated solutions provide economies of scale, ease of administration, and the convenience of a single point of contact. We’ll manage the coordination of multiple solutions, so our customers don’t have to.
(The remainder of this page is intentionally blank)
ABM Facility Support Services, LLC 11 MAS GS-07F-5542P
SCLS Matrix:
SCA Eligible Labor Category: Electrician, Journeyman
SCA Equivalent Title Electrician, Maintenance
WD Number 2015-4269
Labor Category Descriptions Professional Labor Categories
Engineer 1 – Energy Project Engineer
The energy engineer acts in a leadership role. This individual defines the engineering process and leads the design team through this process to achieve the scope of work that will provide for the maximum level of energy savings to meet the customer’s need. The experience and creativity of this individual are pivotal to the success of the project. Performs technical analysis, review, measurement, and verification of financially guaranteed projects.
Provides technical analysis and review for performance monitoring or contracts and applies engineering principles and practices on assigned projects.
Minimum Requirements: Bachelor's Degree in Electrical or Mechanical Engineering. Certified Energy Manager (CEM) Certification. Minimum 3 years of experience.
Engineer 2 - Energy Project Engineer
Builds the technical design based on the needs of the client. He works with the Client to build a robust solution package to address facility issues. Verifies throughout the installation that the ECM’s are installed as originally designed to ensure energy saving projections are met.
Minimum Requirements: Bachelor's Degree in either Electrical or Mechanical Engineering. Minimum 5 years of experience.
Engineer 3 - Energy Project Engineer (Professional Engineer)
The professional engineer generally acts to lead the engineering design of a particular project. This position is required with larger projects that involve major mechanical replacements and system design modifications. The professional engineer is accountable for the stamping of drawings to meet specific process requirements.
Minimum Requirements: Bachelor's Degree in Electrical or Mechanical Engineering. Professional Engineer Certification. Minimum 10 years of experience.
Project Manager
The project manager fully controls the implementation process and is responsible for ensuring that each project reaches final completion on time, is implemented in a cost-effective manner, incorporates all planned work defect free, and is billed and collected in a timely fashion through the duration of the project.
ABM Facility Support Services, LLC 12 MAS GS-07F-5542P
Minimum Requirements: Bachelor's or Associate’s Degree or equivalent from a Technical/Trade School Heating, Ventilation, Electrical, etc. Minimum 5 years of experience.
Field Technician
Responsible for retrofit, repair and installation of various energy control measures utilizing knowledge of energy system physical and operational requirements.
Minimum Requirements: Associate’s degree or equivalent from a Technical/Trade School Heating, Ventilation, Electrical, etc. Minimum 5 years of experience.
Electrical Engineer
Electrical engineers design, develop, test, and supervise the manufacture of electrical equipment, such as electric motors, radar and navigation systems, communications systems, or power generation equipment.
Minimum Requirements: Bachelor’s Degree, 2 Years Experience
Program Manager
Project managers are responsible for planning and overseeing projects to ensure they are completed in a timely fashion and within budget. Project managers plan and designate project resources, prepare budgets, monitor progress, and keep stakeholders informed the entire way.
Minimum Requirements: Bachelor’s Degree, 7 Years Experience
Project Manager
The project manager fully controls the implementation process and is responsible for ensuring that each project reaches final completion on time, is implemented in a cost effective manner, incorporates all planned work defect free, and is billed and collected in a timely fashion through the duration of the project.
Minimum Requirements: Bachelor’s Degree, 7 Years Experience
Electrician-Journeyman
Journeyman electricians are responsible for the installation, repair, and maintenance of electrical systems.
They work with blueprints to figure out how the systems are supposed to work. Then, they use that information to troubleshoot electrical problems and come up with solutions for them.
Minimum Requirements: Bachelor’s Degree, 3 Years Experience
Facility Management and Energy Solutions - Includes, but not limited to projects using appropriated funds as well as alternative financing methods through the use of Energy Savings Performance Contracts (ESPC’s) in accordance with the National Energy Conservation Policy Act
ABM Facility Support Services, LLC 13 MAS GS-07F-5542P
(NECPA) as amended by the Energy Policy Act of 2005 (EPACT). Projects include energy audits, project management, and energy upgrades of HVAC, Lighting, Controls, See table below for Alternative Finance Rates.
ABM Facility Support Services, LLC GS-07F-5542P
Based on Spread Over US Treasury Bill Average Life Rates
Facility Management and Energy Solutions - Ancillary Supplies and/or Services - Ancillary supplies and/or services are support supplies and/or services which are not within the scope of any other SIN on this schedule. These supplies and/or services are necessary to compliment a contractor’s offerings to provide a solution to a customer requirement. This SIN may be used for orders and blanket purchase agreements that involve work or a project that is solely associated with the supplies and/or services purchased under this schedule. This SIN EXCLUDES purchases that are exclusively for supplies and/or services already available under another schedule.
Project Value Term Basis Points Term Rate Less than $2.5M 25 +2.75% 10 4.25% $2.5M - $10M 25 +2.50% 15 3.75% Over $10M 25 +2.25% 10 2.90%