SF1442_rev.pdf
PDF 77 KB Posted
- Attached to
- Childcare Playgrounds Artificial Turf Installation, 601 E. 12th St Federal contract opportunity
- Solicitation number
- GS-06-P-17-TD-C-0001
About this file
Solicitation Offer and Award
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C201-SAT_GC_LPTA_Solicitation.pdf | ||
| C101_Small_Business_Set-Aside_GC_Agreement.pdf | ||
| Construction_Wage_Rate.pdf | ||
| ORCA.pdf | ||
| SOW_-Playground_Artificial_Turf_Installation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
(Construction, Alteration, or Repair)
(Title, identifying number, date)
(If "YES", indicate within how many calendar days after award in Item 12b.)
(hour)
E: Tonya Emerson (Include area code) (NO COLLECT CALLS)
(IFB)
(RFP)
November 1, 2016 (11/01/2016).
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
(To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Include ZIP Code) (Include area code)
(Include only if different than Item 14.)
(Type or print)
(Type or print) (Type or print)
(Contractor is not required to sign this document.)(Contractor is required to sign this document and return copies to issuing office.)
(4 copies unless otherwise specified)
PAGE
GENERAL SERVICES ADMINISTRATION
OF
ITEM NO., FORM OR
STOCK NUMBER DESCRIPTION OF ARTICLES OR SERVICES QUAN-
TITY
UNIT
OF
ISSUE
UNIT
PRICE
AMOUNT
Labor, Materials, on this
Contractors/subcontractors must
$30,000.00. General Requirements
Forms All
Replace the existing turf and
Cost Breakdown for Supervision, Required if Proposal Grater Than will provide Detailed Itemized
Solicitation - MO127ZZ while on premises. Contractor
Wage Determination) Proposal playground. Payment Protection
PoP: 12/05/2016 - 03/20/2017
Clauses and Current Davis Bacon
Childcare Turf Replacement playgrounds of the childcare
Performance: 80 Days
& wear ID badges at all times have current security clearance on the north and south
EA
Drawings, Construction Contract solicitation. Period of
(Include Scope of Work, add turf to the real grass area
File details come from the government source that posted it. Updated .