Amendment_01.pdf

PDF 100 KB Posted

Attached to
Elevator Modernization Federal contract opportunity
Solicitation number
GS05P17SCV0096
Issued by
General Services Administration Public Buildings Service Region 5

About this file

Amendment 01

View the file

Other files for this federal contract opportunity

Other files attached to Elevator Modernization, newest first.
File Type Posted
RFP_GS05P17SCV0096.pdf PDF
Rosa_Elevator_Final_Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name and Title of Signer (Type or Print) 16A. Name and title of Contracting Officer (Type or Print)

MARTIN L. HARRIS (217) 492-5041

CONTRACTING OFFICER

martin.harris@gsa.gov

15B. Contractor/Offeror 15C. Date Signed 16B. United States of America

(Signature of Contracting Officer)

16C. Date Signed

(Signature of person authorized to sign)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITIONS UNUSABLE Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. Contract ID Code Page of Pages

1 3

2. Amendment/Modification No. 3. Effective Date 4. Requisition/Purchase Req. No. 5. Project No. (if applicable)

01 06/30/2017

6. Issued By Code 7. Administered By (If other than Item 6) Code General Services Administration SEE BLOCK 6 Acquisition Management Division 520 South Eighth Street Springfield IL 62703

8. Name and Address of Contractor (No., Street, County, and Zip Code) (X) 9A. Amendment of Solicitation No.

X

RFP GS05P17SCV0096

9B. Date (See Item 11)

06/06/2017 10A. Modification of Contract/Order No.

10B. Date (See Item 13)

Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers X is extended is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 3 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG-

MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT

IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A.

B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.)

Set fourth item 14, pursuant to the authority of FAR 43.103 (b)

C. This supplemental agreement is entered into pursuant to authority of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

RFP GS05P17SCV0096, Elevator Modernization, Rosa Parks Federal Building, Detroit, Michigan

This amendment provides a project question and answer sheet and the sign-in sheet from the pre-bid walkthrough The RFQ due date has been extended from July 6, 2017 to July 11, 2017.

Rosa Parks Elevator Modernization Pre Bid Q&A’s

Detail 3 on sheet E-1-02 indicated a 2” conduit with multi-conductor elevator cable along with fiber down to the basement. Please clarify the following in regards to this detail:

Q1) Is the 2” conduit a sleeve through the floor or does it need to run in the shaft to the basement?

A1) Conduit for elevator related wiring can be run down the hoistway. Conduit for wiring unrelated to the elevator is not permitted.

Q2) Is fiber needed since it does not currently exist? If yes what will it be for?

A2) A fiber is not needed.

Q3) If fiber is needed, what would be required and where would it terminate?

A3) N/A

Q4) Is a new phone line required or just modification of existing for the new cab?

A4) The elevator telephone wiring is included in the elevator specification and provided by the elevator contractor from the machine room to the car. The building or telephone company will terminate their wiring and dial tone in the elevator machine room at the elevator control panel. Provide a pathway for this connection to occur.

Q5) Can the fire alarm station cable run in conduit in the elevator shaft?

A5) The only wiring or piping permitted to be run in a hoistway are those directly related to the operation of the elevator. Communications wiring to the elevator cab is permitted through the traveling cable. Fire alarm wiring would not be permitted, except for hoistway devices like smoke detectors.

Q6) Where does the current sump pump discharge to?

A6) The boiler house

Q7) If it is unknown where the existing sump pump discharge runs to, can we abandon this pipe in place by capping the line?

A7) N/A

Mark Bespalko GSA 313.226.7413 mark.bespalko@gsa.gov