Amend0001.pdf
PDF 241 KB Posted
- Attached to
- "RECOVERY" Boiler and Heating System Upgrade Federal contract opportunity
- Solicitation number
- GS-05P-10-SV-C-0003
About this file
Amendment 0001 is issued to answer 3 contractor Q A's and to update the Davis Bacon Wage Rates which have changed since the solicitation was issued. Also a reminder that a HUBZone Evaluation Preference is applicable to this solicitation.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATiON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED
(SEE
ITEM
11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
Questions and Answers
Q1. The specification conflicts by saying: "01100 1.2 A: The general contractor must have work clean and in full operation by 7:30 am each day" versus "02031 requires a barrier sufficient to provide negative air pressure to be constructed during abatement activities."
A1. 01100 1.2 A is a general statement to ensure that public and Government employee areas are clean and safe. All areas to be used by the public or the Government shall be clean and in full operation by 7:30 each day unless that area is cordoned off by a barrier, i.e. during asbestos removal.
Q2. 01140 4.2 C 6 states space will be made available to the contractor while C 7 states space will not be made available.
A2. Space will be made available for the Contractor's secure job box; however, there is no guarantee that space will be available for the storage of other equipment. This will be discussed further at the pre-construction meeting.
Q3. Is the contractor required to provide the building with temporary heat while construction on the boilers is in progress?
A3. All work is to be completed during the non-heating season. The Contractor will have 120 consecutive days after the NTP to complete the project. Example: If the NTP is given May 1st, they will have until August 29th to complete the job, all work being done during the non-heating season. If the NTP is given late and the Contractor feels the project can not be completed before the heating season then we will have to wait until the beginning of the next non-heating season.
However after the Notice to Proceed is issued, if the performance is delayed past 120 days due to the Contractor and work will not be completed by the beginning of the heating season, then the contractor will be required to pay for temporary heating. If the contract is delayed due to the Government, the Government will reimburse the cost of temporary heating.
The contractor should not account for the cost of temporary heating in their proposal.
General Decision Number: MI080005 12/04/2009 MI5
Superseded General Decision Number: MI20070005
State: Michigan
Construction Types: Building and Heavy
Counties: Bay, Genesee, Lapeer, Saginaw, St Clair and Tuscola Counties in Michigan.
BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories); HEAVY CONSTRUCTION PROJECTS (does not include airport or bridge construction projects, or sewer or water line work if it is incidental to a highway construction project)
Modification Number Publication Date 0 02/08/2008 1 02/15/2008 2 03/07/2008 3 03/21/2008 4 04/04/2008 5 05/02/2008 6 06/06/2008 7 06/13/2008 8 06/20/2008 9 07/11/2008 10 07/18/2008 11 07/25/2008 12 08/08/2008 13 08/15/2008 14 08/22/2008 15 09/05/2008 16 10/17/2008 17 10/31/2008 18 11/07/2008 19 11/28/2008 20 12/05/2008 21 12/12/2008 22 12/26/2008 23 01/16/2009 24 01/23/2009 25 02/20/2009 26 03/06/2009 27 04/03/2009 28 05/01/2009 29 06/12/2009 30 07/03/2009 31 07/24/2009 32 08/14/2009 33 08/28/2009 34 09/25/2009 35 10/16/2009
36 11/06/2009 37 11/13/2009 38 12/04/2009
ASBE0025-002 06/01/2009
ST. CLAIR COUNTY:
Rates Fringes
ASBESTOS WORKER/INSULATOR
Includes the application of all insulating materials, protective coverings, coatings, and finishings to all types of mechanical systems..........$ 30.77 22.28
FOOTNOTE: Work requiring a spray coating in the application:
Five percent (5%) per hour additional.
ASBE0047-010 07/01/2009
Rates Fringes
ASBESTOS WORKER/INSULATOR
Includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems..........$ 28.42 15.41
BOIL0169-004 07/01/2008
Rates Fringes
BOILERMAKER......................$ 31.953 20.869
BRMI0007-001 08/01/2008
BAY, SAGINAW AND TUSCOLA COUNTIES:
Rates Fringes
Marble, terrazzo and tile finisher.........................$ 16.72 6.93 Marble, terrazzo and tile setter...........................$ 21.94 9.75
BRMI0009-012 08/01/2008
Rates Fringes
Bricklayer, Caulker, Cleaner, Pointer..........................$ 27.58 14.07 Cement Mason and plasterer.......$ 23.32 9.65
CEMENT MASON/CONCRETE FINISHER...$ 22.72 9.15
FINISHER.........................$ 19.13 8.37
PLASTERER........................$ 23.98 8.94
Tile, Marble & Terrazzo Worker...$ 22.00 11.54
FOOTNOTE:
Paid Holiday: Fourth of July, if the worker was employed by the contractor in any period of seven working days before said holiday within the current calendar year.
BRMI0009-014 08/01/2008
LAPEER COUNTY:
Rates Fringes
Bricklayer, Caulker, Cleaner, Pointer & Stonemason.............$ 29.95 14.26 Cement Mason and plasterer.......$ 26.69 12.24
FINISHER.........................$ 22.43 9.80
Tile, Marble & Terrazzo Worker...$ 26.49 11.77
FOOTNOTE:
Paid Holiday: Fourth of July, if the worker was employed by the contractor in any period of seven working days before said holiday within the current calendar year.
BRMI0010-002 06/01/2009
ST. CLAIR COUNTY:
Rates Fringes
BRICKLAYER
Bricklayer.................$ 34.05 15.33 Cement mason...............$ 29.96 11.89 Plasterer..................$ 30.14 13.30
FOOTNOTES:
Paid Holiday: Fourth of July, if the worker was employed by the contractor in any period of seven working days before said holiday within the current calendar year.
BRMI0010-004 08/01/2008
BAY, SAGINAW AND TUSCOLA COUNTIES:
Rates Fringes
BRICKLAYER.......................$ 25.56 12.97
CEMENT MASON/CONCRETE FINISHER...$ 23.83 11.94
FINISHER.........................$ 16.72 6.93
PLASTERER........................$ 24.76 13.02
Tile, Marble & Terrazzo Worker...$ 21.94 9.75
FOOTNOTE:
Paid Holiday: Fourth of July, if the worker is employed by the contractor in any period of seven working days before said holiday within the current calendar year.
BRMI0032-002 06/01/2009
ST. CLAIR COUNTY:
Rates Fringes
MARBLE FINISHER..................$ 24.86 16.51
MARBLE MASON.....................$ 31.34 16.51
TERRAZZO FINISHER................$ 25.33 16.51
TERRAZZO WORKER/SETTER...........$ 30.80 16.51
TILE FINISHER....................$ 24.88 16.51
TILE SETTER......................$ 30.75 16.51
FOOTNOTES: Work on scaffolding over 15 ft.: $1.25 per hour additional.Swing stage work: $1.50 per hour additional.Terrazzo grinding: $0.50 per hour above the terrazzo finisher rate. Terrazzo work grinding vertical work and stairs: $1.50 per hour above the terrazzo finisher rate.
CARP0687-002 06/01/2007
ST. CLAIR COUNTY:
Rates Fringes
CARPENTER (Drywall Hanger).......$ 26.88 15.27 Diver............................$ 33.19 17.95 Pile Driver......................$ 26.597 25.08%+8.916
FOOTNOTES:
Piledrivers: Loftsperson or sticker:$0.55 per hour additional. Loftsperson or sticker on heights over 150 feet: $0.80 per hour additional. Welder: $0.55 per hour additional.
CARP0706-001 06/01/2008
Rates Fringes
CARPENTER
(Including drywall hangers).$ 25.64 12.87
CARP0706-002 06/01/2008
BAY, SAGINAW AND TUSCOLA COUNTIES:
Rates Fringes
CARPENTER
(Including drywall hangers).$ 25.08 12.83
CARP1045-002 06/01/2008
ST. CLAIR COUNTY:
Rates Fringes
LATHER...........................$ 23.69 13.52
CARP1045-006 06/01/2008
GENESEE AND ST. CLAIR COUNTIES:
Rates Fringes
FLOOR LAYER: CARPET (SOFT)
FLOOR............................$ 29.10 14.117
CARP1045-017 07/17/2008
BAY, SAGINAW AND TUSCOLA COUNTIES:
Rates Fringes
LATHER...........................$ 24.29 13.66
CARP1045-018 07/17/2008
GENESEE AND LAPEER COUNTIES:
Rates Fringes
LATHER...........................$ 24.85 13.70
ELEC0017-002 06/02/2008
LAPEER, ST. CLAIR AND TUSCOLA COUNTIES:
Rates Fringes
Line Construction Cable splicer; Line technician when helio-arc welding.....................$ 39.03 4.80+26% Combination driver/groundman............$ 26.05 4.80+26% Combination equipment operator and groundman......$ 27.61 4.80+26% Groundman...................$ 23.99 4.80+26% lineman.....................$ 37.47 4.80+26%
TECHNICIAN
(all commercial work except line construction)...$ 33.85 4.80+26%
ELEC0058-001 03/01/2006
ST. CLAIR COUNTY:
ELECTRICIAN
Work on sound and communications/limited-energy systems (including inter-communication public address, paging, music, security systems, nurse call systems, telecommunications (voice and data), fiber optic cabling systems, sound systems, broadband systems, computer network systems, CCTV systems, fire detection/signaling systems, and temperature control systems)............$ 27.83 3% + 6.25 All other work..............$ 33.00 3% +14.16
ELEC0557-001 06/01/2009
AGINAW COUNTY; TUSCOLA COUNTY (Townships of Almer, Arbela, Columbia, Dayton, Denmark, Elkland, Ellington, Elmwood, Fairgrove, Fremont, Gilford, Indianfields, Juniata, Kingston, Koylon, Novesta, Tuscola, Vassar, Watertown and Wells):
Rates Fringes
ELECTRICIAN......................$ 31.13 15.52
FOOTNOTE: High work: Electrical work thirty-five feet (35') (to the work) above the ground or permanent floor, where a hazard exists:15% per hour additional.
ELEC0692-002 06/01/2009
BAY COUNTY AND TUSCOLA COUNTY (Townships of Akron and Wisner):
Rates Fringes
ELECTRICIAN......................$ 29.46 7.20+26.33%
ELEC0876-002 06/02/2008
BAY, GENESEE AND SAGINAW COUNTIES:
Rates Fringes
LINE CONSTRUCTION
Cable splicer...............$ 33.85 4.75+23.75% Light equipment operator/ground person/truck driver/ground person (winch, A-frame, diggers when used for distribution line truck and used for distribution work. Distribution truck driver, 5th wheel type trucks, bucket trucks, ladder trucks and all live boom trucks, all equipment 85 hp or under).............$ 21.42 4.75+23.75% Line technician.............$ 32.51 4.75+23.75% Operator/groundman (digger, tractor and setting rig with tracks or rough terrain vehicle, large bombardier, backhoe over 85 hp, hydraulic crane 10 ton or over).......$ 24.45 4.75+23.75% Truck driver/groundman (trucks with winch or boom or dump, other than distribution work)..........$ 20.39 4.75+23.75%
FOOTNOTE: Operators of 5/8 yd. rated capacity backhoe or over, and operators of 25 ton, rated capacity, crane or over, and operators of heavy duty tension or pulling machinery on 345 KV and above, shall receive the line technician rate of pay.
ELEC0948-001 06/04/2007
GENESEE AND LAPEER COUNTIES; TUSCOLA COUNTY (Township of Millington):
Rates Fringes
ELECTRICIAN......................$ 34.89 6.60+22%
Sound & Communication Technician.......................$ 22.10 6.60+15.5%
FOOTNOTES: Work on towers or stacks: double the straight time rate of pay. Work in other hazardous locations located 40 or more feet from the floor or ground to the work: 10% per hour additional. Work under compressed air in tunnels or shafts below the ground level: 15% per hour additional.
Work in an area where injurious gases or fumes are present and when instructed to wear gas masks: 15% per hour additional while working in that area and being required to wear gas masks.
ELEV0036-002 01/01/2009
ELEVATOR MECHANIC................$ 41.22 18.285
FOOTNOTE: Vacation Pay: 8% with 5 or more years of service, 6% for 6 months to 5 years service. Paid Holidays: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and Friday after, and Christmas Day.
ELEV0085-002 01/01/2009
BAY, GENESEE, LAPEER, SAGINAW, AND TUSCOLA COUNTIES:
Rates Fringes
ELEVATOR MECHANIC................$ 41.50 18.285
FOOTNOTE: Vacation Pay: 8% with 5 or more years of service, 6% for 6 months to 5 years service. Paid Holidays: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and Friday after, and Christmas Day.
ENGI0324-008 10/01/2008
ALCONA, ALGER, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY,
BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX,
CHEBOYGAN, CHIPPEWA, CLARE, CLINTON, CRAWFORD, DELTA,
DICKINSON, EATON, EMMET, GENESEE, GLADWIN, GOGEBIC, GRAND
TRAVERSE, GRATIOT, HILLSDALE, HOUGHTON, HURON, INGHAM, IONIA,
IOSCO, IRON, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT,
KEWEENAW, LAKE, LAPEER, LEELANAU, LENAWEE, LIVINGSTON, LUCE,
MACKINAC, MACOMB, MANISTEE, MARQUETTE, MASON, MECOSTA,
MENOMINEE, MIDLAND, MISSAUKEE, MONTCALM, MONTMORENCY, MONROE,
MUSKEGON, NEWAYGO, OAKLAND, OCEANA, OGEMAW, ONTONAGON, OSCEOLA,
OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST.
CLARE, ST. JOSEPH, SANILAC, SCHOOLCRAFT, SHIAWASSEE, TUSCOLA,
VAN BUREN, WASHTENAW, WAYNE AND WEXFORD COUNTIES
Rates Fringes
POWER EQUIPMENT OPERATOR
(Sewer Relining)
GROUP 1.....................$ 27.82 11.35
GROUP 2.....................$ 26.29 11.35
SEWER RELINING CLASSIFICATIONS
GROUP 1: Operation of audio-visual closed circuit TV system, including remote in-ground cutter and other equipment used in connection with the CCTV system
GROUP 2: Operation of hot water heaters and circulation systems, water jetters and vacuum and mechanical debris removal systems
ENGI0324-010 09/01/2009
ST. CLAIR COUNTY:
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1....................$ 37.99 17.80
GROUP 2....................$ 36.49 17.80
GROUP 3....................$ 34.99 17.80
GROUP 4....................$ 34.69 17.80
GROUP 5....................$ 33.87 17.80
GROUP 6....................$ 33.01 17.80
GROUP 7....................$ 32.04 17.80
GROUP 8....................$ 30.33 17.80
GROUP 9....................$ 23.02 17.80
GROUP 10....................$ 21.99 17.80
FOOTNOTES: Tower cranes: to be paid the crane operator rate determined by the combined length of the mast and the boom.
If the worker must climb 50 ft. or more to the work station, $.25 per hour additional. Derrick and cranes where the operator must climb 50 ft. or more to the work station, $.25 per hour additional to the applicable crane operator rate.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Crane with boom & jib or leads 400' or longer
GROUP 2: Crane with boom & jib or leads 300' or longer
GROUP 3: Crane with boom & jib or leads 220' or longer
GROUP 4: Crane with boom & jib or leads 140' or longer
GROUP 5: Crane with boom & jib or leads 120' or longer
GROUP 6: Regular crane operator, job mechanic, and concrete pump with boom operator
GROUP 7: Regular engineer, Hydro-Excavator, Remote Controlled Concrete Breaker
GROUP 8: Engineer when operating forklift, lull, extend-a-boom forklift
GROUP 9: Engineer when operating compressor or welding machine
GROUP 10: Fire tender or oiler
ENGI0324-011 06/01/2009
POWER EQUIPMENT OPERATOR
(Steel Erection)
GROUP 1....................$ 42.47 18.35
GROUP 2....................$ 43.47 18.35
GROUP 3....................$ 40.97 18.35
GROUP 4....................$ 41.97 18.35
GROUP 5....................$ 39.47 18.35
GROUP 6....................$ 40.47 18.35
GROUP 7....................$ 39.20 18.35
GROUP 8....................$ 40.20 18.35
GROUP 9....................$ 38.75 18.35
GROUP 10....................$ 39.75 18.35
GROUP 11....................$ 38.02 18.35
GROUP 12....................$ 39.02 18.35
GROUP 13....................$ 37.66 18.35
GROUP 14....................$ 38.66 18.35
GROUP 15....................$ 37.02 18.35
GROUP 16....................$ 30.21 18.35
GROUP 17....................$ 28.80 18.35
GROUP 18....................$ 35.57 18.35
FOOTNOTE:
Paid Holidays: New Year's Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Engineer when operating combination of boom and jib 400' or longer
GROUP 2: Engineer when operating combination of boom and jib 400' or longer on a crane that requires an oiler
GROUP 3: Engineer when operating combination of boom and jib 300' or longer
GROUP 4: Engineer when operating combination of boom and jib 300' or longer on a crane that requires an oiler
GROUP 5: Engineer when operating combination of boom and jib 220' or longer
GROUP 6: Engineer when operating combination of boom and jib 220' or longer on a crane that requires an oiler
GROUP 7: Engineer when operating combination of boom and jib 140' or longer
GROUP 8: Engineer when operating combination of boom and jib 140' or longer on a crane that requires an oiler
GROUP 9: Tower crane and derrick operator (where operator's work station is 50 ft. or more above first sub-level)
GROUP 10: Tower crane and derrick operator (where operator's work station is 50 ft. or more above first sub-level) on a crane that requires an oiler
GROUP 11: Engineer when operating combination of boom and jib 120' or longer
GROUP 12: Engineer when operating combination of boom and jib 120' or longer on a crane that requires an oiler
GROUP 13: Crane operator; job mechanic; 3 drum hoist and excavator
GROUP 14: Crane operator on a crane that requires an oiler
GROUP 15: Hoisting operator; 2 drum hoist and rubber tire backhoe
GROUP 16: Compressor or welder operator
GROUP 17: Oiler
GROUP 18: Forklift and 1 drum hoist
ENGI0324-013 09/01/2009
AREA 1: Genesee, Lapeer and St. Clair AREA 2: Bay, Midland, Saginaw, Huron and Sasnilac
Rates Fringes
Paving Equipment Operator (Undergound construction-includes sewer)
AREA 1:
GROUP 1....................$ 29.28 17.85
GROUP 2....................$ 24.55 17.85
GROUP 3....................$ 23.82 17.85
GROUP 4....................$ 23.25 17.85
POWER EQUIPMENT OPERATOR
(Underground construction-includes sewer)
AREA 2:
GROUP 1....................$ 27.57 17.85
GROUP 2....................$ 22.68 17.85
GROUP 3....................$ 22.18 17.85
GROUP 4....................$ 21.90 17.85
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Backfiller tamper; Backhoe; Batch plant operator (concrete); Clamshell; Concrete paver (2 drums or larger);
Conveyor loader (Euclid type); Crane (crawler, truck type or pile driving); Dozer; Dragline; Elevating grader;
Endloader; Gradall (and similar type machine); Grader;
Mechanic; Power shovel; Roller (asphalt); Scraper (self-propelled or tractor drawn); Side boom tractor (type D-4 or equivalent and larger); Slip form paver; Slope paver; Trencher (over 8 ft. digging capacity); Well drilling rig; Concrete pump with boom operator; Hydro Excavator
GROUP 2: Boom truck (power swing type boom); Crusher; Hoist;
Pump (1 or more-6-in. discharge or larger-gas or diesel-powered or powered by generator of 300 amperes or more-inclusive of generator); Side boom tractor (smaller than type D-4 or equivalent); Tractor (pneu-tired, other than backhoe or front end loader); Trencher (8-ft. digging capacity and smaller) ; Vac Truck
GROUP 3: Air compressors (600 cfm or larger); Air compressors (2 or more-less than 600 cfm); Boom truck (non-swinging, non-powered type boom); Concrete breaker (self-propelled or truck mounted - includes compressor); Concrete paver (1 drum-l/2 yd. or larger); Elevator (other than passenger);
Maintenance person; Pump (2 or more-4-in. up to 6-in.
discharge-gas or diesel powered-excluding submersible pumps); Pumpcrete machine (and similar equipment); Wagon drill (multiple); Welding machine or generator (2 or more-300 amp. or larger-gas or diesel powered)
GROUP 4: Boiler; Concrete saw (40 hp or over); Curing machine (self-propelled); Farm tractor (with attachment); Finishing machine (concrete); Fire person; Hydraulic pipe pushing machine; Mulching equipment; Oiler; Pumps (2 or more up to 4-in. discharge, if used 3 hours or more a day, gas or diesel powered-excluding submersible pumps); Roller (other than asphalt); Stump remover; Trencher (service); Vibrating compaction equipment, self-propelled (6 ft. wide or over);
End dump operator; Sweeper (Wayne type and similar equipment); Water Wagon, Extend-a-boom Forklift
ENGI0324-014 05/01/2009
BAY, GENESEE, LAPEER, SAGINAW AND TUSCOLA COUNTIES:
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 28.39 17.80
GROUP 2.....................$ 28.14 17.80
GROUP 3.....................$ 27.04 17.80
GROUP 4.....................$ 22.24 17.80
GROUP 5.....................$ 21.64 17.80
GROUP 6.....................$ 19.19 17.80
GROUP 7.....................$ 17.49 17.80
FOOTNOTES:
Certified Crane Operator Premiums:
a) Swing Boom Truck Operator over 12 tons-$.50 per hour
b) Hydraulic Crane Operator 75 tons and under-$.75 per hour
c) Hydraulic Crane Operator over 75 tons-$1.00 per hour
d) Lattiee Boom Crane Operator-$1.50 per hour
Crane operator with main boom and jib 300' or longer: $1.50 per hour above the group 1 rate. Crane operator with main boom and jib 400' or longer: $3.00 per hour above the group 1 rate.
PAID HOLIDAYS: New Year's Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Crane operator with main boom and jib 400', 300', or 220' or longer. Tower crane operator with CCO certification for combined length of mast and boom 220' or longer
GROUP 2: Crane operator with main boom and jib 140' or longer, tower cranes (Operators without CCO certification, or less than 220' length), gantry crane, whirley derrick
GROUP 3: Regular equipment operator; crane, stiff leg derrick, scraper, dozer, grader, front end loader, hoist, job mechanic, concrete pump truck, hydro excavators
GROUP 4: Air tugger (single drum), material hoist, boiler operator, sweeping machine, winch truck, Bobcat and similar equipment, fork truck (over 20 ft. lift), elevators( when operated by an operating engineer
GROUP 5: Pump, 6 in. or over; Well points, freeze systems, boom truck (non-swinging); end dumps and laser/power screed; concrete wire saw (20 h.p. and over), brokk concrete breaker
GROUP 6: Air compressor, welder, generator, conveyor, pump under 6", grease person and fork truck (20 ft. lifting capacity or less when working on masonry work)
GROUP 7: Oiler, fire tender and heater operator
ENGI0325-007 10/01/2009
AREA 1: BAY, SAGINAW, TUSCOLA, HURON AND SANILAC COUNTIES
AREA 2: GENESEE, LAPEER AND ST. CLAIR COUNTIES
Rates Fringes
Power equipment operators -hazardous waste removal:
(AREA 1)
LEVEL A:
Engineer when operating crane with boom and jib or leads 140' or longer....$ 32.77 17.80
Engineer when operating crane with boom and jib or leads 220' or longer....$ 33.07 17.80
GROUP 1....................$ 30.12 17.80
GROUP 2....................$ 25.72 17.80
Regular crane operator, mechanic, dragline operator, boom truck operator, concrete pump with boom operator, Power Shovel Operator......$ 31.09 17.80
LEVEL B AND C:
Engineer when operating crane with boom and jib or leads 140' or longer....$ 31.71 17.80 Engineer when operating crane with boom and jib or leads 220' or longer....$ 32.03 17.80
GROUP 1....................$ 29.17 17.80
GROUP 2....................$ 24.78 17.80
Regular crane operator, mechanic, dragline operator, boom truck operator, concrete pump with boom operator, Power Shovel Operator............$ 30.14 17.80
LEVEL D WHEN CAPPING
LANDFILL:
Engineer when operating crane with boom and jib or leads 140' or longer....$ 30.27 17.80 Engineer when operating crane with boom and jib or leads 220' or longer....$ 30.57 17.80
GROUP 1....................$ 27.62 17.80
GROUP 2....................$ 23.23 17.80
Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operators.....$ 28.59 17.80
LEVEL D:
Engineer when operating crane with boom and jib or leads 140' or longer....$ 30.52 17.80 Engineer when operating crane with boom and jib or leads 220' or longer....$ 30.82 17.80
GROUP 1....................$ 27.87 17.80
GROUP 2....................$ 23.48 17.80
Regular crane operator, mechanic, dragline operator, boom truck operator, concrete pump with boom operator, Power Shovel Operator............$ 28.84 17.80
Power equipment operators -hazardous waste removal:
(AREA 2)
LEVEL A:
Engineer when operating crane with boom and jib or leads 140' or longer....$ 34.38 16.75 Engineer when operating crane with boom and jib or leads 220' or longer....$ 34.68 16.75
GROUP 1....................$ 31.73 16.75
GROUP 2....................$ 27.50 16.75
Regular crane operator, mechanic, dragline operator, boom truck operator, power shovel operator, concrete pump with boom operator.........$ 32.70 16.75
LEVEL B AND C:
Engineer when operating crane with boom and jib or leads 140' or longer....$ 33.43 16.75 Engineer when operating crane with boom and jib or leads 220' or longer....$ 33.73 16.75
GROUP 1....................$ 30.78 16.75
GROUP 2....................$ 26.55 16.75
Regular crane operator, mechanic, dragline operator, boom truck operator, concrete pump with boom operator, power hhovel operator............$ 31.75 16.75
LEVEL D WHEN CAPPING
LANDFILL:
Engineer when operating crane with boom and jib or leads 140' or longer....$ 31.88 16.75 Engineer when operating crane with boom and jib or leads 220' or longer....$ 32.18 16.75
GROUP 1....................$ 29.23 16.75
GROUP 2....................$ 25.00 16.75
Regular crane operator, mechanic, dragline operator, boom truck operator, concrete pump with boom operator, power shovel operator............$ 29.58 16.75
LEVEL D:
Engineer when operating crane with boom and jib or leads 140' or longer....$ 32.13 16.75 Engineer when operating crane with boom and jib or leads 220' or longer....$ 32.43 16.75
GROUP 1....................$ 29.48 16.75
GROUP 2....................$ 25.25 16.75
Regular crane operator, mechanic, dragline operator, boom truck operator, concrete pump with boom operator, power shovel operator............$ 30.45 16.75
HAZARDOUS WASTE REMOVAL CLASSIFICATIONS
GROUP 1: Backhoe, batch plant operator, clamshell, concrete breaker when attached to hoe, concrete cleaning decontamination machine operator, concrete pump, concrete paver, crusher, dozer, elevating grader, endloader, farm tractor (90 h.p. and higher), gradall, grader, heavy equipment robotics operator, loader, pug mill, pumpcrete machines, pump trucks, roller, scraper (self-propelled or tractor drawn), side boom tractor, slip form paver, trencher, ultra high pressure waterjet cutting tool system operator, vactors, vacuum blasting machine operator, vertical lifting hoist, vibrating compaction equipment (self- propelled), well drilling rig, slope paver and hydro excavator
GROUP 2: Air compressor, concrete breaker when not attached to hoe, elevator, end dumps, equipment decontamination operator, farm tractor (less than 90 h.p.), forklift, generator, heater, mulcher, pigs (portable reagent storage tanks), power screens, pumps (water), stationary compressed air plant, sweeper, welding machine and water wagon
ENGI0326-004 05/01/2009
Rates Fringes
Power equipment operators -gas distribution and duct installation work:
MACOMB, MONROE, OAKLAND,
ST. CLAIR, WASHTENAW and
WAYNE COUNTY:
GROUP 1....................$ 25.98 17.80
GROUP 2....................$ 25.85 17.80
GROUP 3....................$ 24.72 17.80
GROUP 4....................$ 24.15 17.80
REMAINDER OF COUNTIES:
GROUP 1....................$ 25.07 17.80
GROUP 2-A..................$ 24.97 17.80
GROUP 2-B..................$ 24.75 17.80
GROUP 3....................$ 23.97 17.80
GROUP 4....................$ 23.47 17.80
SCOPE OF WORK:
The construction, installation, treating and reconditioning of pipelines transporting gas vapors within cities, towns, subdivisions, suburban areas, or within private property boundaries, up to and including private meter settings of private industrial, governmental or other premises, more commonly referred to as "distribution work", starting from the first metering station, connection, similar or related facility, of the main or cross country pipeline and including duct installation.
POWER EQUIPMENT - GAS DISTRIBUTION CLASSIFICATIONS
Macomb, Monroe, Oakland, St.Clair, Washtenaw and Wayne:
GROUP 1: Backhoe, crane, grader, mechanic, dozer (D-6 equivalent or larger), side boom (D-4 equivalent or larger), trencher(except service), endloader (2 yd.
capacity or greater).
GROUP 2: Dozer (less than D-6 equivalent), endloader (under 2
yd. capacity), side boom (under D-4 capacity), backfiller, pumps (1 or 2 of 6-inch discharge or greater), boom truck (with powered boom), tractor (wheel type other than backhoe or front endloader).
GROUP 3: Tamper (self-propelled), boom truck (with non-powered boom), concrete saw (20 hp or larger), pumps (2 to 4 under 6-inch discharge), compressor (2 or more or when one is used continuously into the second day), trencher(service), GROUP 4: Oiler, hydraulic pipe pushing machine, grease person and hydrostatic testing operator.
REMAINDER OF COUNTIES:
GROUP 1: Mechanic, crane (over 1/2 yd. capacity), backhoe (over 1/2 yd. capacity), grader (Caterpillar 12 equivalent or larger)
GROUP 2-A: Trencher(except service), backhoe (1/2 yd.
capacity or less)
GROUP 2-B: Crane (1/2 yd. capacity or less), compressor (2 or more), dozer (D-4 equivalent or larger), endloader (1 yd.
capacity or larger), pump (1 or 2 six-inch or larger), side boom (D-4 equivalent or larger).
GROUP 3: Backfiller, boom truck (powered), concrete saw (20 hp or larger), dozer (less than D-4 equivalent), endloader (under 1 yd. capacity), farm tractor (with attachments), pump (2 - 4 under six-inch capacity), side boom tractor (less than D-4 equivalent), tamper (self-propelled), trencher(service) and Grader(maintenance).
GROUP 4: Oiler, grease person, hydrostatic testing operator
* IRON0025-005 06/01/2009
IRONWORKER
Decking.....................$ 24.39 24.32 Fence Erector; Sound Barrier & Guardrail Erection/Installation;
Exterior Signage Work
GENESEE COUNTY.............$ 24.25 6.40
OTHER COUNTIES.............$ 20.25 6.40
Machinery Movers, Riggers, Machinery Erectors..........$ 27.97 28.86 Ornamental, structural, precast erector.............$ 29.26 27.62 Reinforced..................$ 26.83 24.26 Siding......................$ 21.51 20.22
IRON0025-008 04/01/2008
Rates Fringes
IRONWORKER (Pre-engineered metal building)
BAY, SAGINAW AND TUSCOLA
COUNTIES....................$ 20.13 19.97
GENESEE, LAPEER AND ST.
CLAIR COUNTIES..............$ 21.35 20.27
IRON0025-023 06/01/2009
Rates Fringes
IRONWORKER
Machinery mover, rigger and machinery erector.......$ 27.97 28.86
LABO0005-012 10/01/2008
AREA 1: BAY, SAGINAW AND TUSCOLA COUNTIES
AREA 2: GENESEE AND LAPEER COUNTIES
AREA 3: ST. CLAIR COUNTY
Rates Fringes
Laborers - hazardous waste abatement:
AREA 1
Level A, B or C............$ 21.86 9.75 Work performed in conjunction with site preparation not requiring the use of personal protective equipment;
Also, Level D..............$ 20.86 9.75
AREA 2
Level A, B or C............$ 22.28 9.88 Work performed in conjunction with site preparation not requiring the use of personal protective equipment;
Also, Level D..............$ 21.28 9.88
AREA 3
Work performed inside the building and up to and including 5 ft. outside the building: (Work performed in conjunction with site preparation) not requiring the use of personal protective equipment; Also, Level D...$ 24.83 11.38 Work performed inside the building and up to and including 5 ft. outside the building: Level A, B or C.......................$ 25.83 11.38 Work performed over 5 ft.
outside the building:
(Work performed in conjunction with site preparation) not requiring the use of personal protective equipment; Also, Level D...$ 20.30 9.80 Work performed over 5 ft.
outside the building:
Level A, B or C............$ 21.30 9.80
LABO0259-010 08/01/2009
Rates Fringes
Asbestos Laborer Includes removing and disposing of all insulation materials from walls, ceilings, floors, columns, and all other non-mechanical surfaces;
and removal of insulating materials from mechanical systems that are to be demolished;loading/unloading of bagged and tagged materials at the disposal site (includes lead paint abatement clean-up).........$ 24.23 11.30
LABO0259-012 09/01/2009
Rates Fringes
Laborers - tunnel, shaft and caisson:
GROUP 1.....................$ 21.37 10.95
GROUP 2.....................$ 21.46 10.95
GROUP 3.....................$ 21.56 10.95
GROUP 4.....................$ 21.72 10.95
GROUP 5.....................$ 21.98 10.95
GROUP 6.....................$ 22.29 10.95
GROUP 7.....................$ 14.56 10.95
SCOPE OF WORK: Tunnel, shaft and caisson work of every type and descripton and all operations incidental thereto, including, but not limited to, shafts and tunnels for sewers, water, subways, transportation, diversion, sewerage, caverns, shelters, aquafers, reservoirs, missile silos and steel sheeting for underground construction.
LABORER CLASSIFICATIONS
GROUP 1: Tunnel, shaft and caisson laborer, dump, shanty, hog house tender, testing (on gas)
GROUP 2: Manhole, headwall, catch basin builder, bricklayer tender, mortar, material mixer, fence erector and guard rail builder
GROUP 3: Air tool operator (jackhammer, bush hammer and grinder), first bottom, second bottom, cage tender, car pusher, carrier, concrete, concrete form, concrete repair, cement invert laborer, cement finisher, concrete shoveler, conveyor, floor, gasoline and electric tool operator, gunite, grout operator, welder, heading dinky person, inside lock tender, pea gravel operator, pump, outside lock tender, scaffold, top signal person, switch person, track, tugger, utility person, vibrator, winch operator, pipe jacking, wagon drill and air track operator and concrete saw operator (under 40 h.p.)
GROUP 4: Tunnel, shaft and caisson mucker, bracer, liner plate, long haul dinky driver and well point
GROUP 5: Tunnel, shaft and caisson miner, drill runner, key board operator, power knife operator, reinforced steel or mesh (e.g. wire mesh, steel mats, dowel bars, etc.)
GROUP 6: Dynamite and powder
GROUP 7: Restoration laborer, seeding, sodding, planting, cutting, mulching and top soil grading; and the restoration of property such as replacing mailboxes, wood chips, planter boxes, flagstones, etc.
LABO0334-007 09/01/2009
Rates Fringes
Laborers - open cut:
BAY, SAGINAW, TUSCOLA
COUNTIES:
GROUP 1....................$ 18.22 10.95
GROUP 2....................$ 18.35 10.95
GROUP 3....................$ 18.46 10.95
GROUP 4....................$ 18.53 10.95
GROUP 5....................$ 18.65 10.95
GROUP 6....................$ 15.87 10.95
GROUP 7....................$ 14.21 10.95
GENESEE, LAPEER AND ST.
CLAIR COUNTIES:
GROUP 1....................$ 19.21 10.95
GROUP 2....................$ 19.35 10.95
GROUP 3....................$ 19.47 10.95
GROUP 4....................$ 19.52 10.95
GROUP 5....................$ 19.66 10.95
GROUP 6....................$ 16.96 10.95
GROUP 7....................$ 14.11 10.95
SCOPE OF WORK: Open cut construction work shall be construed to mean work which requires the excavation of earth including industrial, commercial and residential building site excavation and preparation, land balancing, demolition and removal of concrete and underground appurtenances, grading, paving, sewers, utilities and improvements;
retention, oxidation, flocculation and irrigation facilities, and also including but not limited to underground piping, conduits, steel sheeting for underground construction, and all work incidental thereto, and general excavation. Open cut construction work shall also be construed to mean waterfront work, piers, docks, seawalls, breakwalls, marinas and all incidental work. Open cut construction work shall not include any structural modifications, alterations, additions and repairs to buildings, or highway work, including roads, streets, bridge construction and parking lots or steel erection work and excavation for the building itself and back filling inside of and within 5 ft. of the building and foundations, footings and piers for the building. Open cut construction work shall not include any work covered under Tunnel, Shaft and Caisson work.
OPEN CUT LABORER CLASSIFICATIONS
GROUP 1: Construction laborer
GROUP 2: Mortar and material mixer, concrete form person, signal person, well point person, manhole, headwall and catch basin builder, guard rail builder, headwall, seawall, breakwall, dock builder and fence erector
GROUP 3: Air, gasoline and electric tool operator, vibrator operator, driller, pump person, tar kettle operator, bracer, rodder, reinforced steel or mesh person (e.g. wire mesh, steel mats, dowel bars, etc.), welder, pipe jacking and boring person, wagon drill and air track operator and concrete saw operator (under 40 h.p.), windlass and tugger person and directional boring person, cement finisher
GROUP 4: Trench or excavating grade person
GROUP 5: Pipe layer (including crock, metal pipe, multi-plate or other conduits)
GROUP 6: Grouting person, audio-visual television operations and all other operations in connection with closed circuit television inspection, pipe cleaning and pipe relining work, installation and repair of water service pipe and appurtenances
GROUP 7: Restoration laborer, seeding, sodding, planting, cutting, mulching and top soil grading; and the restoration of property such as replacing mailboxes, wood chips, planter boxes, flagstones, etc.
LABO0334-017 07/01/2009
Rates Fringes
Landscape Laborer
ALL COUNTIES, EXCEPT
WASHTENAW,,GENESEE,
LAPEER, SHIAWASSEE,
OAKLAND, WAYNE, MONROE,
LIVINGSTON, ST. CLAIR,
MACOMB
GROUP 1....................$ 18.63 6.00
All COUNTIES, EXCEPT
WASHTENAW,,GENESEE,
LAPEER, SHIAWASSEE,
OAKLAND, WAYNE, MONROE,
LIVINGSTON, ST. CLAIR,
MACOMB
GROUP 2....................$ 14.43 6.00
WASHTENAW,GENESEE, LAPEER,
SHIAWASSEE, OAKLAND,
WAYNE, MONROE, LIVINGSTON,
ST. CLAIR, MACOMB
GROUP 2....................$ 15.14 6.00
WASHTENAW,GENESEE,
LAPEER,SHIAWASSEE,
OAKLAND, WAYNE, MONROE,
LIVINGSTON, ST. CLAIR,
MACOMB
GROUP 1....................$ 19.36 6.00
LANDSCAPE LABORER CLASSIFICATIONS
GROUP 1: Landscape specialist, including air, gas and diesel equipment operator and lawn sprinkler installer
GROUP 2: Landscape laborer: small power tool operator, material mover,truck driver and lawn sprinkler installer tender
LABO0463-002 06/01/2009
ST. CLAIR COUNTY:
Rates Fringes
Laborers:
Signal man and top man(sewer work); tunnel muckers; jackhammer and air spade operators;
tunnel men (concrete shovelers, car pushers);
bottom men(sewer work);
windlass operators(caisson work); mason tender;
demolition laborer, when full time fire watch is required by the contractor signatory to this agreement, the laborers will be utilized to supply fire watch, Industrial deep cleaning; cement finisher tender; carpenter tender; Watchman; Mortar mixer (with training) (by hand or machine); air, electric, gas tool operator; air and electric bush hammer; Plasterer tender; concrete gas; pump operators (all 3" pumps and below); concrete gas buggy; concrete saw operator; crock and pipe layers(conduit and vitrified tile, except 4" drain tile around buildings) and caisson work inside building........$ 23.47 13.25
FOOTNOTES:
Height pay: Work on stacks, towers, power houses and silos shall be paid at the rate of pay as follows: 25 ft. to 100 ft.: $.30 per hour above the group 1 rate. For each additional fifty feet (50') height: $.30 additional per hour for each additional fifty foot(50') height.
Demolition burner: $1:00 per hour additional
LABO1075-002 06/01/2009
GENESEE AND LAPEER COUNTIES:
Rates Fringes
Laborers:
(Includes carpenter tender; mason tender;
cement finisher tender;
plasterer tender; signal person and top person (sewer work); air, fuel or electric powered tool operator; crock and pipe layer (conduit and vitrified tile, except 4" drain tile around buildings; caisson worker inside building; tunnel mucker; jackhammer and air spade operator; tunnel person (concrete shoveler, car pusher); bottom person (sewer work); windlass operator (caisson work);
watchman; morter mixer;
air and electric bush hammers; concrete saw operator; concrete gas buggy; demoition laborer;
firewatch; industrial deep cleaning and pump operators(all 3 inch pumps and below)..................$ 21.64 11.21
FOOTNOTE: Demolition burner: $1.00 per hour additional.
Height Pay:
Height premium pay on all stacks, towers, church spires, power houses and silos shall be paid at the following rate:
25 feet to 100 feet: $.30 above the class A rate.
For each additional 50' height: Additional $.30 per hour for each additional 50' height.
LABO1076-006 04/01/2009
ALCONA, ALGER, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY,
BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX,
CHEBOYGAN, CHIPPEWA, CLARE, CLINTON, CRAWFORD, DELTA,
DICKINSON, EATON, EMMET, GENESEE, GLADWIN, GOGEBIC, GRAND
TRAVERSE, GRATIOT, HILLSDALE, HOUGHTON, HURON, INGHAM, IONIA,
IOSCO, IRON, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT,
KEWEENAW, LAKE, LAPEER, LEELANAU, LENAWEE, LIVINGSTON, LUCE,
MACKINAC, MACOMB, MANISTEE, MARQUETTE, MASON, MECOSTA,
MENOMINEE, MIDLAND, MISSAUKEE, MONTCALM, MONTMORENCY, MONROE,
MUSKEGON, NEWAYGO, OAKLAND, OCEANA, OGEMAW, ONTONAGON, OSCEOLA,
OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST.
CLARE, ST. JOSEPH, SANILAC, SCHOOLCRAFT, SHIAWASSEE, TUSCOLA,
VAN BUREN, WASHTENAW, WAYNE AND WEXFORD COUNTIES
Rates Fringes
LABORER (Distribution rates) Telephone Work (Zone 1)....$ 17.79 10.95 Telephone Work (Zone 2)....$ 16.41 10.95 Telephone Work: (Zone 3)....$ 12.49 10.95 Telephone Work: (Zone 4)....$ 12.86 10.95 Telephone Work: (Zone 5)....$ 12.16 10.95 Zone 1: All other work......$ 17.79 10.95 Zone 2: All other work......$ 16.41 10.95 Zone 3: All other work......$ 14.69 10.95 Zone 4: All other work......$ 14.06 10.95 Zone 5: All other work......$ 14.06 10.95
SCOPE OF WORK:
Construction, installation, treating and reconditioning of distribution pipelines transporting coal, oil, gas, or other similar materials, vapors or liquids, including portions of such pipelines within private property boundaries, up to and including the meter settings on residential, commercial, industrial, institutional, private and public structures. All work covering pumping stations and tank farms not covered under another rate. Distribution work also includes all other distribution lines for public utilities except sewer, water and cable television, but including telephone lines and duct.
Duct Work Pay: $.40 per hour above the base pay rate.
Zones:
Zone 1-Macomb,Oakland and Wayne Zone 2-Monroe and Washtenaw
Zone 3-Bay, Genesee, Lapeer, Midland, Saginaw, Sanilac, Shiawassee and St. Clair Zone 4-Alger, Baraga, Chippewa, Delta, Dickinson,Gogebic, Houghton, Iron, Keweenaw, Luce, Mackinaw, Marquette, Menominee, Ontonagon and Schoolcraft
Zone 5-Remaining counties in Michigan
LABO1098-009 06/30/2009
Laborers:
GROUP 1.....................$ 18.71 10.95
GROUP 2.....................$ 19.21 10.95
GROUP 3.....................$ 19.71 10.95
LABORER CLASSIFICATIONS
GROUP 1: All construction laborers except workers falling within specified classifications; Also, pumps with a 3-in.
or less discharge and not hooked up in battery; mechanized buggy operators & mortar mixer (when done by hand), mason tender, carpenter tender, cement finisher tender, fire watch, mechanized morter mixing, air, electric and gas-driven tools, concrete vibrators, plasterer tenders and plaster mixers, crock and/or pipelayers, signal men and top men on caisson work. Demolition Laborer
GROUP 2: Air or electric driven pavement breakers, Tunnel miner, tunnel mucker and tunnel and shaft underpinning contributing to the structural support of buildings and jackhammers over 50 lbs.
GROUP 3: Driller & blaster, burner & welder; Also, refractory work: Work inside or outside digesters, tanks, lime kilns, chests, boilers and boiler tubes, heat treat ovens, and smoke stacks, including the handling of acid, chlorine, chemicals, epoxies, liquids and cleaning of existing precipitators, hydro blasting, hydro washing, and sandblasting
PAIN0357-002 06/01/2009
ST. CLAIR COUNTY:
Rates Fringes
GLAZIER..........................$ 29.20 16.01
PAID HOLIDAYS: New Year's Day, Decoration Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day;
provided that the employee has worked the last full regular scheduled work day prior to the holiday, and the first full regular scheduled work day following the holiday, provided the employee is physically able to work.
PAIN0826-002 07/01/2009
BAY, GENESEE, LAPEER, SAGINAW AND TUSCOLA COUNTIES:
Rates Fringes
GLAZIER..........................$ 27.63 12.47
PAID HOLIDAYS: New Years Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day.
FOOTNOTES:
High pay: Work from any mechanical lift, regardless of the height off of the surface: $0.75 per hour additional.
Working from scaffolding shall be paid at the premium rate only when the working platform is at twenty (20) feet or above. All swing stage work to be paid at the premium rate.
Working from a ladder at twenty (20) feet or above qualifies for the premium rate. Premium pay is only to be paid for the actual time worked on the lift device, scaffold, or ladder.
* PAIN1052-001 12/01/2009
GENESEE COUNTY; AND LAPEER COUNTY (west of Hwy. M-53):
Rates Fringes
PAINTER..........................$ 22.25 10.77
FOOTNOTES:
Lead abatement work: $1.50 per hour additional. Application of paint by pressure roller: $.80 per hour additional. Sand blasting, steam cleaning, acid cleaning, and all work ordinarily performed as such: $1.00 per hour additional.
Swing stage, boatswain chair, window jacks and all work performed over a falling height of 30 ft.: $.30 per hour additional. For each aditional 15 ft. of height: $.10 per hour additional. All industrial spray gun work, pick pullers and those handling needles also for cleaning by blowing off by air pressure: $1.00 per hour additional.
Commercial spray rate shall be paid only on deck and truss:
$.30 per hour additional. All work such as steeplejack, tanks, gas holders, stacks, flag poles, radio towers and beacons, power line towers, bridges, etc.: $.65 per hour additional, paid from the ground up. Application of paint by use of a mitt: $.35 per hour additional.
* PAIN1052-004 12/01/2009
GENESEE COUNTY; AND LAPEER COUNTY (west of Hwy. M-53):
Rates Fringes
DRYWALL FINISHER/TAPER
Drywall sanding.............$ 24.27 10.67 Hand work...................$ 24.67 10.67 Machine work................$ 24.97 10.67
PAIN1474-004 06/01/2009
LAPEER COUNTY (east of Hwy. M-53); ST. CLAIR AND TUSCOLA
COUNTIES:
PAINTER (Including drywall finisher)........................$ 23.90 11.51
FOOTNOTES:
Lead abatement work: $1.00 per hour additional.
Paperhanging: $1.00 per hour additional.Work with any hazardous material: $1.00 per hour additional.Sandblasting, steam cleaning and acid cleaning: $1.00 per hour additional.Ladder work at or above 40 ft., scaffold work at or above 40 ft., swing stage, boatswain chair, window jacks and all work performed over a falling height of 40 ft.:
$1.00 per hour additional.Spray gun work, pick pullers and those handling needles, blowing off by air pressure, and any person rigging (setting up and moving off the groupnd):
$1.00 per hour additional.Steeplejack, tanks, gas holders, stacks, flag poles, radio towers and beacons, power line towers, bridges, etc.: $1.00 per hour additonal, paid from the ground up.
PAIN1803-001 06/01/2009
BAY AND SAGINAW COUNTIES:
Rates Fringes
PAINTER
Work performed on water, bridges over water or moving traffic, radio and powerline towers, elevated tanks, steeples, smoke stacks over 40 ft. of falling heights, recovery of lead-based paints and any work associated with industrial plants, except maintenance of industrial plants......................$ 23.20 10.85 All other work, including maintenance of industrial plants......................$ 21.78 10.75
FOOTNOTES:
Spray painting, sandblasting, blowdown associated with spraying and blasting, water blasting and work involving a swing stage, boatswain chair or spider: $1.00 per hour additional.All work performed inside tanks, vessels, tank trailers, railroad cars, sewers, smoke stacks, boilers or other spaces having limited egress not including buildings, opentop tanks, pits, etc.: $1.25 per hour additional. Work involving the installation of wallcoverings: $0.30 cents per hour additional.
PAIN1803-009 06/01/2009
BAY AND SAGINAW COUNTIES:
DRYWALL FINISHER/TAPER...........$ 22.79 11.70
PLAS0016-001 06/01/2008
GENESEE COUNTY:
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 25.94 10.55
PLAS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .