CLARIFICATIONS.pdf

PDF 8 KB Posted

Attached to
RECOVERY: Flint Courthouse Chiller System Upgrades Federal contract opportunity
Solicitation number
GS-05P-10-SP-C-0004
Issued by
General Services Administration Public Buildings Service Region 5

About this file

Clarifications for all contractor questions regarding the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY: Flint Courthouse Chiller System Upgrades, newest first.
File Type Posted
WALK THRU INFORMATION.pdf PDF
Site Visit Sign-In Sheet Handout.pdf PDF
Site Visit Information.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLARIFICATIONS

FLINT CHILLER SYSTEM UPGRADES

SOLICITATION GS05P10SPC0004

Q1. What is the routing for trash and deliveries to the target space?

A1. There is hallway access in the basement to the loading dock, outside of which is where the placement of the dumpster shall be.

Q2. Can the existing support steel be reused for the new support system?

A2. The steel specifications and dimensions must adhere to the specifications and drawing documents.

Q3. No new controls were specified, was it GSA’s intent to have new controls for the chillers?

A3. No new controls are included in this project. GSA plans to separately procure and install chiller system controls.

Q4. Is there any asbestos removal required for this job?

A4. No, there is no asbestos removal required.

File details come from the government source that posted it. Updated .