Amendment 0001.doc.pdf

PDF 50 KB Posted

Attached to
Janitorial & Related Services Federal contract opportunity
Solicitation number
GS05P09SIC0056
Issued by
General Services Administration Public Buildings Service

About this file

Amendment 0001

View the file

Other files for this federal contract opportunity

Other files attached to Janitorial & Related Services, newest first.
File Type Posted
Amendment 0003.pdf PDF
Amendment 0002.doc DOC document
https://www.fbo.gov/spg/GSA/PBS/5PT1/GS05P09SIC0056/packages.html HTML file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 5

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

0001 03/17/09

6. ISSUED 7. ADMINISTERED BY (If other than Item 6)

General Services Administration Office of Tenant Operations, 230 S. DEARBORN STREET, RM 3180, DPN 31-4

CHICAGO, IL 60604

General Services Administration Office of Tenant Operations

230 S. DEARBORN STREET, RM 3180 DPN 31-4

CHICAGO, IL 60604

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) ( ) 9A. AMENDMENT OF SOLICITATION NO.

GS05P09SIC0056

X 9B. DATED (SEE ITEM II)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, X is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 3 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

( ) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINSTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _____ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Solicitation GS05P09SIC0056 – Janitorial and Related Services, Metcalfe Federal Building, 77 W. Jackson, Chicago, Illinois

This amendment is being issued to revise the line item pricing page, schedule the pre-proposal conference, and add the contractor proposal worksheet. The pre-proposal conference will be held Thursday, March 26, 2009, 10:00 am, Metcalfe Federal, Chicago, Illinois. Also the date March 31, 2009 on the first sheet of the solicitation is deleted.

Except as provided herein, all terms and conditions of the document reference in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of person authorized to sign)

BY ________________________________________________________

(Signature of Contracting Officer)

5PMC COMPUTER GENERATED FORM STANDARD FORM 30 (10-83)

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT SOLICITATION NO. AMENDMENT NO. PAGE OF PAGES

CONTINUATION OF STANDARD FORM 30 GS05P09SIC0056 0001 2 5

PRE PROPOSAL ATTENDANCE CONFIRMATION FORM

If you plan to attend the pre proposal conference, please indicate so below and return this form to the contact person indicated below.

Please ensure that this form is received no later than 4:00 p.m. (CST) on Wednesday, March 25, 2009:

General Services Administration

Property Management Division (5PT1) Greater Chicago-land Service Center Procurement Team Attn: Deborah Durkins 230 South Dearborn Street (M/S 31-2) Room 3180 Chicago, IL 60604

Phone: (312) 886-6932

Fax: (312) 353-9307

Number of attendees: _______

Name(s): ____________________________________________________

In case of last minute changes in the time or place of the conference, I may be reached at:

Name: ____________________________________________________

Company: _______________________________________________

Phone: _______________________________________________

CONTINUATION OF STANDARD FORM 30 GS05P09SIC0056 0001 3 5

CONTRACTOR'S NAME:

LOCATION:

DESCRIPTION OF SERVICE:

CONTRACT PERIOD:

Press Button to Clear Cells Below

SECTION I - DIRECT LABOR COST NUMBER OF EMPLOYEES:

1. Janitorial Labor manhours X $ per hour = $ -

2. Supervisory Labor manhours X $ per hour = $ -

3. Vacations: Vacation Hours:

a. (Janitor) manhours X $ per hour = $

b. (Supervisor) manhours X $ per hour = $ -

4. Holidays: Holiday Hours:

a. (Janitor) manhours X $ per hour = $ -

b. (Supervisor) manhours X $ per hour = $ -

5. TOTAL MANHOURS: 0

6. TOTAL LABOR COST (Add labor, vacation and holidays): $ -

7. Health and Welfare 0 hours X $ per hour = $ -

8. Workman's Compensation % of Total Labor Cost = $ -

9. Social Security Tax % of Total Labor Cost = $ -

10. Federal Unemployment Tax % of 1st $7,000 per employee = $ -

11. State Unemployment Tax $ -

12. Other Fringe Benefits (pension, education, etc.)

hours X $ per hour = $ -

13. TOTAL FRINGE BENEFIT COST $ -

14. TOTAL DIRECT COSTS (Add labor, fringe benefits and payroll tax) $ -

SECTION II - OTHER DIRECT COSTS

15. Materials ( % of Direct Labor Costs) $ -

16. Equipment ( % of Direct Labor Costs) $ -

17. Subcontracts (please attach separate list) $

18. TOTAL OTHER DIRECT COSTS $ -

SECTION III - INDIRECT COSTS

19. General and Administrative ( % of Direct & Other Costs) $ -

20. Profit ( % of Total Costs and G&A) $ -

21. TOTAL INDIRECT COSTS $ -

22. TOTAL COST FOR BASIC SERVICE (for a one-year period) $ -

(Sum of Direct, Other Direct and Indirect Costs)

B.1.1 OFFER FOR ABOVE STANDARD SERVICES

(See paragraph C.5)

ITEM BASE

YEAR

1ST

OPTION

2ND

OPTION

3RD

OPTION

4TH

OPTION

1. Floor Maintenance Services (Office)

(a) Carpet Cleaning by Extraction per 100 SF

(b) Strip and Apply Four Coats of Finish per 100 SF

(c) Stripping and Sealing per

2. Floor Maintenance Services (Corridors)

(a) Strip and Apply Four Coats of Finish per 100 SF

(b) Stripping and Sealing per

100 SF

(c) Carpet Cleaning By Extraction per 100 SF

3. Floor Maintenance Services (Lobbies)

(a) Hone Ground Floor Lobby Granite Squares – Hone smooth granite squares with 3500 grit using a floor honing machine & following industry standards. per 100 SF

(b) Hone Second Floor Granite Squares using a floor honing machine & following industry standards. per 100 SF

(c) Hone Third Floor Granite Squares using a floor honing machines & following industry standards. per 100 SF

4. Windows Washing (per job).

Job Includes both sides of all building windows 3rd fl and above including spandrel glass

(a) Wash outside of exterior windows

(b)Wash inside of exterior windows

5. High Cleaning 84 inches and above. per 100 SF

6. Wash Blinds and coverings (per each)

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT SOLICITATION NO. AMENDMENT NO. PAGE OF PAGES

CONTINUATION OF STANDARD FORM 30

0001 4 5

ITEM BASE

YEAR

1ST

OPTION

2ND

OPTION

3RD

OPTION

4TH

OPTION

7 Scrub and Rinse Loading Docks, Platforms, Trash Rooms, Garage Ramps and Driveways.

8. Snow Removal (per hour).

Services for hauling snow from the facility as directed by the COR. Include costs for truck and driver. See Note 2

9. Additional trash pick up of the 30 yard open top trash compactor. (per job)

10. Laborer (per hour).

Services for miscellaneous labor. See Note 3

CONTINUATION OF STANDARD FORM 30

0001 5 5

File details come from the government source that posted it. Updated .