Sol_G15PS00235.pdf

PDF 746 KB Posted

Attached to
Water Treatment Facility Repair Federal contract opportunity
Solicitation number
G15PS00235
Issued by
Department of the Interior US Geological Survey

About this file

G15PS00235

View the file

Other files for this federal contract opportunity

Other files attached to Water Treatment Facility Repair, newest first.
File Type Posted
Sol_G15PS00235_Amd_000001.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

USGS OAG DENVER ACQUISITION BRANCH

PO BOX 25046

204 DENVER FEDERAL CENTER

DENVER CO 80225-0046

GDB

Jason Markley

P.O. Box 25046, Denver Federal Center, MS 204 Denver, CO 80225 jmarkley@usgs.gov

Jason Markley 703-648-7297

103/03/2015

G15PS00235

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

5 30 calendar days and complete it within ________________ ________________ calendar days after receiving

03/10/2015

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

USGS OAG DENVER ACQUISITION BRANCH

PO BOX 25046

204 DENVER FEDERAL CENTER

DENVER CO 80225-0046

GDB

Jason Markley

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

G15PS00235

Suggested COR: JKURTZ1

Delivery: 12/31/2014

Delivery Location Code: 0006366919

USGS National Wildlife Health Cente

6006 Schroeder Road

Madison WI 53711 US

FOB: Destination

00010 Repair of TIB Bldg

Period of Performance: 11/18/2014 to 12/31/2014

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

G15PS00235

Section 1-Statement of Work Section 2- Drawings 52.252-2 Clauses Incorporated by Reference. (Feb 1998) 52.203-3 – Gratuities (Apr 1984) 52.203-14 – Display of Hotline Poster(s) (Dec 2007) 52.204-13 System for Award Management Maintenance (Jul 2013) 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Aug 2013) 52.211-13 Time Extensions (Sept 2000) 52.219-6 Notice of Total Small Business Set-Aside (Nov 2011) 52.219-14, Limitations on Subcontracting. (Nov 2011) 52.219-18, Alternate I (June 2003) 52.219-18, Alternate II (June 2003) 52.222-1 Notice to the Government of Labor Disputes. (Feb 1997) 52.222-3 Convict Labor. (Jun 2003) 52.222-6 Construction Wage Rate Requirements (May 2014) 52.222-7 Withholding of Funds (May 2014) 52.222-8 Payrolls and Basic Records. (May 2014) 52.222-9 Apprentices and Trainees. (Jul 2005) 52.222-10 Compliance with Copeland Act Requirements. (Feb 1988) 52.222-11 Subcontracts (Labor Standards). (May 2014) 52.222-12 Contract Termination - Debarment. (May 2014) 52.222-13 Compliance with Davis-Bacon and Related Act Regulations. (May 2014) 52.222-14 Disputes Concerning Labor Standards. (Feb 1988) 52.222-15 Certification of Eligibility. (May 2014) 52.222-21 Prohibition of Segregated Facilities. (Feb 1999) 52.222-26 Equal Opportunity. (Mar 2007) 52.222-27 Affirmative Action Compliance Requirements for Construction. (Feb 1999) 52.222-36 Affirmative Action for Workers with Disabilities. (Oct 2010) 52.222-50 Combating Trafficking in Persons. (Feb 2009) 52.223-3 Hazardous Material Identification and Material Safety Data. (Jan 1997) 52.223-5 Pollution Prevention and Right-to-Know Information. (May 2011) 52.223-6 Drug-Free Workplace (May 2001) 52.225-9 Buy American Act–Construction Materials (May 2014) 52.225-13 Restrictions on Certain Foreign Purchases. (Jun 2008) 52.232-5 Payments under Fixed-Price Construction Contracts. (Sep 2002) 52.232-27 Prompt Payment For Construction Contracts. (Jul 2013) 52.232-33 Payment by Electronic Funds Transfer-System for Award Management. (Jul 2013) 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Dec 2013) 52.233-1 Disputes. (Jul 2002) 52.233-3 Protest after Award. (Aug 1996) 52.233-4 Applicable Law for Breach of Contract Claim. (Oct 2004) 52.236-2 Differing Site Conditions. (Apr 1984) 52.236-3 Site Investigation and Conditions Affecting the Work. (Apr 1984) 52.236-5 Material and Workmanship. (Apr 1984) 52.236-6 Superintendence by the Contractor (Apr 1984) 52.236-7 Permits and Responsibilities. (Nov 1991) 52.236-8 Other Contracts. (Apr 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (Apr 1984) 52.236-11Use and Possession Prior to Completion (Apr 1984) 52.236-12 Cleaning Up. (Apr 1984) 52.236-13Accident Prevention (Nov 1991) 52.236-15 Schedules for Construction Contracts (Apr 1984)

52.236-21 Specifications and Drawings for Construction. (Feb 1997) 52.242-14 Suspension of Work (Apr 1984) 52.243-5 Changes and Changed Conditions. (Apr 1984) 52.243-6 Change Order Accounting (Apr 1984) 52.246-1 Contractor Inspection Requirements. (Apr 1984) 52.246-12 Inspection of Construction (Aug. 1996) 52.247-34 F.o.b. Destination. (Nov 1991) 52.249-2 Termination for Convenience of the Government (Fixed-Price). (Apr 2012) - Alternate I (Sep 1996) 52.249-10 Default (Fixed-Price Construction). (Apr 1984) Clauses by Full Text:

52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984) 52.000S-5079 Technical Liaison - Technical Direction (October 1997) 52.900S-1178 Wage Determination Incorporation (October 1997) 1452.204-70 Release of Claims (Jul 1996) 1452.228-70 Liability Insurance (Jul 1996) GS1326 Indemnity (Jul 2001) GS1329 INTERPRETATION OF CONTRACT REQUIREMENTS (Jul 2001) GS1338 NOTICE TO THE GOVERNMENT OF DELAYS (Jul 2001) GS1348 ACCIDENT REPORTING (Apr 2003) Unilateral Deobligations (May 2013) DOI ELECTRONIC INVOICING Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP) (September 2011)

Section 1-Statement of Work

I. GENERAL: The United States Geological Survey (USGS) has a requirement to enter into a construction service agreement at the National Wildlife Health Center (NWHC) located at 6006 Schroeder Road Madison, WI 53711.

II. BACKGROUND: The NWHC was established in 1975 to serve the nation and its natural resources by providing sound science and technical support regarding wildlife disease, and to disseminate information to promote science-based decisions affecting wildlife and ecosystem health. NWHC personnel study emerging and resurging diseases, wildlife and ecosystem health, zoonotic diseases, and environmental health and degradation. The NWHC is located on 24 acres and maintains offices and high security disease laboratories in the Main Building (MB) and the Tight Isolation Building (TIB). This request is to repair some plumbing in the TIB waste water treatment pit at NWHC.

III. WORK TO BE PERFORMED BY CONTRACTOR: This project includes the replacement of the piping in the waste water treatment collection tank located in the TIB. This work includes the demolition and disposal of the vertical piping on the interior of the collection tank, see attached drawing.

IV. DESCRIPTION: Contractor shall perform the following:

The contractor shall have certification to perform work in a confined space

The contractor shall provide and install two new vertical piping runs using type 316 stainless steel pipe

The contractor shall maintain the current size and length of the piping that is installed in the interior of the waste collection tank

V. NOTES:

All local, state, and federal environmental and safety requirements shall be met and are the responsibility of the contractor.

All equipment shall be installed in accordance with manufacturer's instructions.

Contractor shall coordinate the work with the facility to prevent interruption to ongoing research. This will be accomplished through the use and approval of the contractor's work schedule.

VI. DELIVERABLES:

Project schedule and timeline. The project schedule shall be a chart which graphically depicts the proposed sequence to accomplish each work feature or operation. It shall show start dates and completion dates for each event on a horizontal time scale. The progress schedule time scale shall begin with the Notice to Proceed and indicate the number of days to completion.

The schedule will be the reference to which the contractor's progress and efforts are compared.

In the event of a change to the schedule, contractor shall submit new schedule.

Provide submittals containing product information and highlighting how the products meet the requirements.

The Contractor shall provide 2 copies of all warranty information and 2 copies of Operational and Diagnostics Manuals.

VII. TECHNICAL REPRESENTATIVE (TR): Matthew Solchenberger (608) 212-4957

VIII. CODE COMPLIANCE: All work shall comply with all current governing specifications, including, but not limited to: NFPA, NEC, BOCA National Building codes, and OSHA standards.

IX. ADMINISTRATIVE PROCEDURES: After award and issuance of the Notice to Proceed, all site visits shall be coordinated through the TR at the NWHC

The Contractor shall not proceed with any work until approval of schedule, process, submittal list and materials are made by the TR and a Notice to Proceed has been issued by the Contracting Officer (CO).

X. TIME AND PERIOD OF PERFORMANCE: All Contractor employees shall follow the NWHC visitor sign-in procedures. The Contractor shall employ sufficient personnel and equipment to accomplish the work of this contract within (14) fourteen calendar days of the Notice to Proceed.

Work shall occur during normal work hours, M-F 7:00 am to 3:30 pm. Requests to work outside normal working hours shall be made in writing. Any work that needs to be performed after hours and during weekends will be done at no additional cost to the government.

XI. SAFETY:

On-site personnel reserve the right to stop work for any safety or environmental violation.

Contractor shall have all protective equipment necessary to proceed and shall take all necessary precautions and measures to prevent injuries to anyone working in or entering the facilities.

Contractor shall take all necessary measures and precautions to control, protect, and avoid damage to or loss of any property on the work site.

Contractor operations shall be conducted in a safe and professional manner.

Contractor shall submit immediate notification and information concerning any accidents and incidents to the TR. Detailed reports of all accidents or incidents shall be reported in writing within one week of occurrence to the TR. Contractor shall provide OSHA Form 300, A Summary of Work-Related Injuries and Illnesses pertaining to their work to the TR.

XII. DEMOLITION: The Contractor shall schedule all demolition with the TR prior to starting.

The Contractor shall remove all old material and legally dispose of it.

XIII. MECHANICAL: The Contractor shall complete all work to meet Federal, State and Local codes.

XIV. ELECTRICAL AND LIGHTING: Contractor shall comply with all applicable Occupational Safety and Health Administration (OSHA) standards, as well as electrical requirements listed in National Fire Protection Association (NFPA) regulations and meet Federal, State and Local codes.

XV. MEASUREMENTS: It is the responsibility of the Contractor to field verify all measurements & quantities. All work listed shall be coordinated with the TR.

XVI. PERMISSION FOR WELDING, CUTTING, AND BURNING: Prior to performing any welding, cutting, burning, soldering, or other process using torch or flame, or any type of demolition or construction that may produce sparks or create dust, the Contractor shall obtain permission from the on-site TR to perform these operations within the NWHC and at location on the NWHC grounds.

XVII. OUTAGES AND INTERRUPTIONS: The facility will continue normal operations during the performance of the contract. The Contractor shall notify the TR one week in advance if it becomes necessary to interrupt any function at the NWHC. Any work that requires shutting down of a facility system, such as mechanical, electrical, etc., shall be planned for early morning or late afternoon to the maximum extent possible, to minimize the impact on the facility’s operation. Work shall be performed when the demands on the system best permit, even to the extent of working outside of normal working hours at no additional cost to the government.

The Contractor shall not proceed without the written approval of the TR and not until such time as provisions are made to modify the Center operations as required. All work as mentioned above shall be coordinated with the TR. The contractor shall notify the TR, in writing, seven (7) days in advance of the intended date to perform this work.

XVIII. ORGANIZATION AT THE SITE: The Contractor shall exercise care and shall perform all work in a diligent and professional manner. The Contractor shall take all necessary measures required to ensure a clean, safe environment for the Contractor’s work force, NWHC personnel and the general public for the duration of this project. Contractor parking will be in the gravel parking lot. The Contractor shall utilize the areas only within the project limits to perform work and for the storage of equipment, materials and trailers during the life of the contract. The contractor shall not stage any materials on any grassed areas. Storage will be confined to areas approved by the TR. The Contractor shall be responsible for the security of all tools, material and equipment.

The Contractor shall be responsible for making all arrangements for the receipt of materials and supplies at the job site. All materials must be received and transported on paved or gravel surfaces.

Government personnel are not permitted to receive or to sign for items delivered to the site.

The TR shall designate areas where the Contractor can store or place materials and equipment for short-term storage. There is limited on-site storage space (both indoor and outdoor) for the Contractor’s equipment and materials. Storage and security of materials and equipment as required for the performance of the contract requirements is the responsibility of the Contractor.

XIX. TRANSPORTING OF DEBRIS AND MATERIAL: The Contractor shall provide all equipment necessary for transporting construction debris from the job site to the dumpsters that they provide and for the stocking and transporting of materials to the job site. The dumpster shall be placed on the gravel receiving area on the East side of the MB. Before removal from site, the Contractor shall provide estimates of type and weight of materials recycled or disposed of as trash.

XX. ENVIRONMENTAL PROTECTION: All work shall be accomplished in such a manner that all waste materials, pollutants, and potential pollutants shall be completely retrievable for disposal in a manner suitable to the TR and in accordance with all applicable regulations and laws. At no time shall operations be attempted or permitted where or when such operations present a possibility of fouling the facility with waste materials, pollutants, or potential pollutants.

XXI. SITE CLEANLINESS:

1. The Contractor shall clean up and dispose of daily all rubbish and accumulated waste.

2. The Contractor shall provide dust protection and shall maintain cleanliness of the work site by promptly removing debris, tools and excess material.

3. The Contractor shall remove tools and equipment and leave the premises clean at the completion of the project.

4. The Contractor shall repair or otherwise return to original condition any parts of the existing facilities or grounds which become damaged as a result of the Contractor’s work, except as otherwise specified, and shall restore the site to its original condition, as approved by the TR and at no additional cost to the Government.

5. There shall be no smoking in the NWHC buildings. All personnel that smoke will have to do so in the designated smoking area.

XXII. UTILITIES: The Government shall provide electricity and/or water to the contractor, only as a convenience, from existing Government sites. The Government will not provide electrical assistance if Contractor’s equipment does not conform to NWHC’s electrical system. Any long term or large capacity power supply requirements shall be provided by the Contractor.

The Government shall not provide equipment (such as flatbed carts, pallet movers, forklifts or vehicles) to the Contractor. The Contractor may locate portable restroom facilities for workers on the site.

Section 2- Drawings

Section 3-Clauses

52.252-2 Clauses Incorporated by Reference. (Feb 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause May be accessed electronically at this/these addresses:

https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/

52.203-3 – Gratuities (Apr 1984)

52.203-14 – Display of Hotline Poster(s) (Dec 2007)

52.204-13 System for Award Management Maintenance (Jul 2013)

52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Aug 2013)

52.211-13 Time Extensions (Sept 2000)

52.219-6 Notice of Total Small Business Set-Aside (Nov 2011)

52.219-14, Limitations on Subcontracting. (Nov 2011)

52.219-18, Alternate I (June 2003)

52.219-18, Alternate II (June 2003)

52.222-1 Notice to the Government of Labor Disputes. (Feb 1997)

52.222-3 Convict Labor. (Jun 2003)

52.222-6 Construction Wage Rate Requirements (May 2014)

52.222-7 Withholding of Funds (May 2014)

52.222-8 Payrolls and Basic Records. (May 2014)

52.222-9 Apprentices and Trainees. (Jul 2005)

52.222-10 Compliance with Copeland Act Requirements. (Feb 1988)

52.222-11 Subcontracts (Labor Standards). (May 2014)

52.222-12 Contract Termination - Debarment. (May 2014)

52.222-13 Compliance with Davis-Bacon and Related Act Regulations. (May 2014)

52.222-14 Disputes Concerning Labor Standards. (Feb 1988)

52.222-15 Certification of Eligibility. (May 2014)

52.222-21 Prohibition of Segregated Facilities. (Feb 1999)

52.222-26 Equal Opportunity. (Mar 2007)

52.222-27 Affirmative Action Compliance Requirements for Construction. (Feb 1999)

52.222-36 Affirmative Action for Workers with Disabilities. (Oct 2010)

52.222-50 Combating Trafficking in Persons. (Feb 2009)

52.223-3 Hazardous Material Identification and Material Safety Data. (Jan 1997)

52.223-5 Pollution Prevention and Right-to-Know Information. (May 2011)

52.223-6 Drug-Free Workplace (May 2001) https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/current/html/FARMTOC.html https://www.acquisition.gov/far/ https://www.acquisition.gov/far/ https://www.acquisition.gov/far/ https://www.acquisition.gov/far/ https://www.acquisition.gov/far/ https://www.acquisition.gov/far/ https://www.acquisition.gov/far/ https://www.acquisition.gov/far/ https://www.acquisition.gov/far/ https://www.acquisition.gov/far/ https://www.acquisition.gov/far/ https://www.acquisition.gov/far/ https://www.acquisition.gov/far/ https://www.acquisition.gov/far/ https://www.acquisition.gov/far/ https://www.acquisition.gov/far/ https://www.acquisition.gov/far/ https://www.acquisition.gov/far/ https://www.acquisition.gov/far/ https://www.acquisition.gov/far/ https://www.acquisition.gov/far/ https://www.acquisition.gov/far/ https://www.acquisition.gov/far/

52.225-9 Buy American Act–Construction Materials (May 2014)

52.225-13 Restrictions on Certain Foreign Purchases. (Jun 2008)

52.232-5 Payments under Fixed-Price Construction Contracts. (Sep 2002)

52.232-27 Prompt Payment For Construction Contracts. (Jul 2013)

52.232-33 Payment by Electronic Funds Transfer-System for Award Management. (Jul 2013)

52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013)

52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Dec 2013)

52.233-1 Disputes. (Jul 2002)

52.233-3 Protest after Award. (Aug 1996)

52.233-4 Applicable Law for Breach of Contract Claim. (Oct 2004)

52.236-2 Differing Site Conditions. (Apr 1984)

52.236-3 Site Investigation and Conditions Affecting the Work. (Apr 1984)

52.236-5 Material and Workmanship. (Apr 1984)

52.236-6 Superintendence by the Contractor (Apr 1984)

52.236-7 Permits and Responsibilities. (Nov 1991)

52.236-8 Other Contracts. (Apr 1984)

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (Apr 1984)

52.236-11Use and Possession Prior to Completion (Apr 1984)

52.236-12 Cleaning Up. (Apr 1984)

52.236-13Accident Prevention (Nov 1991)

52.236-15 Schedules for Construction Contracts (Apr 1984)

52.236-21 Specifications and Drawings for Construction. (Feb 1997)

52.242-14 Suspension of Work (Apr 1984)

52.243-5 Changes and Changed Conditions. (Apr 1984)

52.243-6 Change Order Accounting (Apr 1984)

52.246-1 Contractor Inspection Requirements. (Apr 1984)

52.246-12 Inspection of Construction (Aug. 1996)

52.247-34 F.o.b. Destination. (Nov 1991)

52.249-2 Termination for Convenience of the Government (Fixed-Price). (Apr 2012) - Alternate I (Sep 1996)

52.249-10 Default (Fixed-Price Construction). (Apr 1984)

Clauses by Full Text:

52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984) The Contractor shall be required to

(a) commence work under this contract within 5 calendar days after the date the Contractor receives the notice to proceed,

(b) prosecute the work diligently, and

(c) complete the entire work ready for use not later than 7 calendar days after commencement of work. The time stated for completion shall include final cleanup of the premises.

(d) The completion date is based on the assumption that the successful offeror will receive the notice to proceed by 09/08/2014. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer

(End of Clause)

52.000S-5079 Technical Liaison - Technical Direction (October 1997)

(a) The performance required herein shall be subject to the technical direction of the Technical Liaison (TL) as identified below.

As used herein, "technical direction" is defined as direction to the contractor that fills in details, suggests possible lines of approach, or otherwise supplements the scope of the work set forth herein and shall not constitute a new assignment, and does not supersede or modify any article or clause of this contract.

(b) The Technical Liaison is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or May change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause; (4) Terminate, for any reason, the contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government. Only a warranted Contracting Officer is authorized to obligate funds on this or any other contract action.

(c) The contractor shall immediately notify the Contracting Officer in writing if the Technical Liaison has taken an action (or fails to take action) or issues direction (written or oral) that the contractor considers to exceed the above limitations.

(d) The Technical Liaison assigned for this contract is:

Rob Freeman 505-846-5646 RLFreeman@usgs.gov

(e) Only the Contracting Officer May designate a different Technical Liaison.

(End of Clause)

52.900S-1178 Wage Determination Incorporation (October 1997)

In the performance of this contract, the contractor shall comply with the requirements of U.S. Department of Labor Wage Determination Number: WI150035 01/02/2015 WI35, current wage determination revision (found at http://www.wdol.gov/dba.aspx ) is incorporated and made a part of this order.

(End of clause)

1452.204-70 Release of Claims (Jul 1996)

After completion of work and prior to final payment, the Contractor shall furnish the Contracting Officer with a release of claims against the United States relating to this contract. The Release of Claims form (DI-137) shall be used for this purpose. The form provides for exception of specified claims from operation of the release.

mailto:RLFreeman@usgs.gov mailto:RLFreeman@usgs.gov http://www.wdol.gov/dba.aspx

(End of clause)

1452.228-70 Liability Insurance (Jul 1996)

(a) The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer. The named insured parties under the policy shall be the Contractor and the United States of America. The amounts of the insurance shall be not less than as follows:

$200,000 each person

$500,000 each occurrence

$1,000,000 property damage

(b) Each policy shall have a certificate evidencing the insurance coverage. The insurance company shall provide an endorsement to notify the Contracting Officer 30 days prior to the effective date of cancellation or termination of the policy or certificate; or modification of the policy or certificate which May adversely affect the interest of the Government in such insurance. The certificate shall identify the contract number, the name and address of the Contracting Officer, as well as the insured, the policy number and a brief description of contract services to be performed. The contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work.

(End of clause)

GS1326 Indemnity (Jul 2001)

The contractor herein is "an independent contractor" and shall obtain all necessary insurance to protect himself from liability arising out of this contract.

The contractor hereby agrees to indemnify and hold the Government harmless in connection with, any loss or liability from damage to or destruction of property or from injuries to or death of persons (including the agents and employees of both parties) if such damage, destruction, injury or death arises out of, or is caused by performance of work under this contract, unless such damage, destruction, injury or death is caused solely by the active negligence of the Government, its agents or employees. The contractor agrees to include this clause, appropriately modified, in all subcontracts to be performed under this contract.

(End of clause)

GS1329 INTERPRETATION OF CONTRACT REQUIREMENTS (Jul 2001)

No interpretation of any provision of this contract, including applicable specifications, shall be binding on the Government unless furnished or agreed to in writing by the Contracting Officer.

(End of clause)

GS1338 NOTICE TO THE GOVERNMENT OF DELAYS (Jul 2001)

The contractor will, upon installation of the equipment, issue a letter to the Contracting Officer's Representative with a copy to the Contracting Officer identifying the model number, serial number, and date and location of installation of delivered devices. Additional devices which are physically Separable, such as major assemblies or components, or cabinets which are not specifically itemized in the Schedule of the contract, should also be identified in the letter.

(End of clause)

GS1348 ACCIDENT REPORTING (Apr 2003)

If an accident occurs on Government-controlled facilities, the contractor shall contact the Contracting Officer's Representative and the Contracting Officer immediately. A written report must be provided to the Contracting Officer's Representative and the Contracting Officer within 48 hours. An accident is defined as an event which causes injury, illness, or loss or damage to Government-owned or private property. The contractor will cooperate with any ensuing Government accident investigation.

(End of clause)

Unilateral Deobligations (May 2013)

The contractor shall submit all invoices under the award no later than 90 calendar days after the period of performance has expired, unless a request for extension has been submitted to the Contracting Officer.

After 120 days has passed since the expiration of the performance period, the government reserves the right to issue a unilateral modification deobligating any unexpended funds, and to initiate closeout procedures.

(End of Clause)

DOI ELECTRONIC INVOICING Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP) (September 2011)

Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).

"Payment request" means any request for contract financing payment or invoice payment by the Contractor.

To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is:

https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:

Contractor-generated, Itemized Invoice Davis-Bacon Act Payroll Documents of the Prime Contractor and ALL Sub-Contractors

The Contractor must use the IPP website to register, access and use IPP for submitting requests for payment.

The Contractor Government Business Point of Contact (as listed in CCR) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of clause) http://www.ipp.gov/ http://www.ipp.gov/ http://www.ipp.gov/ http://www.ipp.gov/ http://www.ipp.gov/ http://www.ipp.gov/ http://www.ipp.gov/ http://www.ipp.gov/ http://www.ipp.gov/ mailto:ippgroup@bos.frb.org mailto:ippgroup@bos.frb.org mailto:ippgroup@bos.frb.org mailto:ippgroup@bos.frb.org mailto:ippgroup@bos.frb.org mailto:ippgroup@bos.frb.org mailto:ippgroup@bos.frb.org mailto:ippgroup@bos.frb.org mailto:ippgroup@bos.frb.org mailto:ippgroup@bos.frb.org mailto:ippgroup@bos.frb.org

File details come from the government source that posted it. Updated .