FRSP_SOW_-Remove_Hazard_Trees_FY23.pdf
PDF 139 KB Posted
- Attached to
- FRSP HAZARDOUS TREE REMOVAL Federal contract opportunity
- Solicitation number
- 140P4323Q0069
About this file
This statement of work outlines requirements for hazardous tree removal services at Fredericksburg and Spotsylvania National Military Park. The contractor shall remove 79 trees ranging from 12 to 40 inches in diameter at breast height across various park battlefields, visitor centers, and roadsides. Work will include accessing job sites without damaging resources, safely setting up equipment, removing trees according to safety standards, chipping and removing debris, and cutting remaining stumps below four inches above grade. The performance period is 90 days under the direction of a certified arborist. Equipment must meet safety requirements and protection mats may be required for driving vehicles in lawn areas. Some work sites are archeologically sensitive and trees near earthworks may require rigging instead of felling to avoid disturbing resources. Restricted equipment access applies to some job sites.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P4323Q0069.pdf | ||
| WD.pdf | ||
| Combo.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fredericksburg and Spotsylvania NMP (FRSP) Statement of Work
Remove Hazardous Trees FY23
1. BACKGROUND
The proposed work will include hazard tree removal of trees identified by park staff on roadsides and grounds parkwide.
Through tree assessments performed by National Park Service staff, the park has identified high risk trees in the park. The work identified will need to be completed through tree felling, tree dismantling, and /or rigging operations, chipping and hauling dependent upon the individual jobsite specific requirements.
2. PURPOSE
The purpose of this contract is to provide technical services for the removal and disposal of high risk or dead trees along roadsides, trails, buildings, and common areas without damage to the resource including but not limited to trees, earthworks, and markers.
3. SCOPE OF WORK
The contractor shall provide all services including labor, equipment, and tools required to remove identified high risk trees, trim the roadsides and protect the resource while accessing the work sites and adjacent to trees being removed in the park. The work shall include the access of sensitive sites where site protection may be needed to prevent damage to the resource, the removal of trees through tree felling operations if it is determined that there is adequate room for falling (after considering the resource and any below ground resources), tree dismantling and or rigging operations for trees without adequate room for felling, debris staging and removal from site, traffic control on road sides where work will be performed, and the control of jobsites where pedestrian traffic may be a factor.
4. REQUIREMENTS
4.1 Access / Exit Battlefields and associated job sites
4.1.1 The contractor shall communicate with the
Contracting Officer Representative (COR) or park contact to be directed to the best access to the job sites.
4.1.2 The contractor shall access the job sites without
causing damage to anything within or surrounding the jobsites or the access to them following the guidance of the COR or park contact.
4.2 Equipment set up
4.2.1 Once the job site has been accessed the contractor
will only travel with their equipment in areas approved by the COR or park contact.
4.2.2 Once the individual trees have been accessed the
equipment shall be set up in a way as to not cause damage to the resource including but not limited to trees, graves, roads, earthworks and markers.
4.3 Tree removal process
4.3.1 Trees shall be removed in accordance with OSHA
1910 General Industry Standards and ANSI Z
133.1 Safety Standards for Arboricultural
Operations and shall not cause damage to any part of the resource including but not limited to trees, earthworks and markers.
4.4 Debris cleanup and removal
4.4.1 Any debris of a size that can be chipped shall be
chipped and removed from the job site by the end of the performance period or as directed by the
COR.
4.4.2 Any debris too large to chip shall be removed from
the site by the end of the performance period or as directed by the COR.
5. DELIVERABLES
Base:
• Wilderness Battlefield- Remove 8 trees- trees to be removed are 12” DBH, 21” DBH, 2 at 22” DBH, 24” DBH, 25” DBH, 27”
DBH, 30” DBH
• Chancellorsville Visitor Center- Remove 4 trees- trees to be removed are 2 at 24” DBH, 30” DBH, 32” DBH
• Rt 3 and River Rd- Remove 3 trees- 22” DBH, 34” DBH, 38”
DBH
• Chancellor House Site- Remove 1 tree 36” DBH
• Fredericksburg Visitor Center-Remove 1 tree 35” DBH
• South Lee Drive(Prospect Hill)-Remove 1 tree 40” DBH
• Park boundary(Old Plank Rd)-Remove 1 tree approx. 20” DBH
• Remove 25 trees on roadsides 12-17” DBH Parkwide
• Remove 5 tree on roadsides 24-35” DBH Parkwide
Option 1
Remove 25 additional trees on roadsides 12-17” DBH Parkwide
Option 2
Remove 5 additional trees on roadsides 24-35” DBH Parkwide
Total number of trees to be removed-79
5.2 All stumps shall be cut to 4” or lower above grade
5.3 The contractor shall remove all logs, brush, chips and wood created debris from the tree removals from the job sites by the end of the performance period or sooner – as directed by the COR.
6. PLACE OF PERFORMANCE
Maintenance Division:
207 Freedom Court, Fredericksburg VA 22408 Area of Work/Job Site:
All Park Battlefields, Chancellorsville Visitor Center, National Cemetery
7. PERFORMANCE PERIOD
7.1 90 days
8. SPECIAL CONSIDERATIONS
8.1 The contractor understands that all work shall be under the direction and general supervision of an Arborist(s) certified by the International Society of Arboriculture (ISA), or equivalent state certification, who, possess verifiable experience and technical competence in tree physiology, identification, diagnosis of disorders, and current tree care and safety practices in accordance with accepted industry standards. The Arborist shall be the primary contact with the Government's technical representative and shall be responsible for controlling the quality of work and inspecting all completed work to ensure that contract performance requirements are met.
8.2 The contractor understands that all tree workers shall, through related training and on the job experience, be familiar with the technical aspects and hazards of tree removal operations and equipment used in such operations. All tree workers shall abide by any code of ethics or professional conduct established by the Tree Care Industry Association and the International Society of Arboriculture.
8.3 The contractor understands that all equipment must meet all federal OSHA, state and local safety requirements and must be properly licensed. This includes equipment such as bucket trucks, aerial lifts, cranes, chipper trucks, wood trucks etc. which may be needed to correctly perform tree removal in accordance with the specifications stated herein.
8.4 The contractor understands that NO vehicles including but not limited to (Bucket trucks, Aerial lifts, Cranes, Bobcats, Log loaders, Chipper trucks, etc.…) shall be driven on any lawn areas without the use of protection mats (Example... Alturna mat), without the permission of the COR or park contact.
8.5 The contractor understands that some of the required work is in archeologically sensitive areas.
8.6 The contractor shall use site protection to protect resources if there is a chance that the tree being removed may damage such resources.
8.7 The contractor understands that any trees located on or around Earthworks may not be fallen if there exists the possibility of disturbing the Earthworks.
8.8 The contractor understands that if trees to be removed are located on or around Earthworks and these trees need to be dismantled, they shall be rigged if there exists the possibility of disturbing the Earthworks.
8.9 The contractor understands that some job sites shall have restricted access for equipment.