FLOATING DOCK REMOVAL SCOPE OF WORK.docx
DOCX document 63 KB Posted
- Attached to
- Removal of concrete floating docks Federal contract opportunity
- Solicitation number
- 16909535
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Visit Information.pdf | ||
| construction FAR matrix.pdf | ||
| DOL wages Buffalo New York.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Homeland Security United States Coast Guard Maintenance and Logistics Command Atlantic
Scope of Services For Floating Dock Removal - 843888
At U.S. Coast Guard
SECTOR
BUFFALO, NEW YORK
18DEC2020
Commanding Officer United States Coast Guard
SECTOR BUFFALO
Buffalo, N.Y. 14203
Submitted: DCC McNeil
TABLE OF CONTENTS
| Section |
| Title |
| Page |
| 01010 |
| Scope of Work |
| 3 |
| 01020 |
| Coordination |
| 4 |
| 01030 |
| Safety Program |
| 4 |
| 01040 |
| General Cleanup & Site Restoration of Work Areas |
| 5 |
SECTION 01010
SCOPE OF WORK
1. SCOPE OF WORK: Contract work shall encompass the following items of work as described in these specifications. This summary is not all-inclusive and delineates only those work items deemed as major to the contract. Ancillary work items not listed below, though necessary to attain the completed project, shall be included in the contract. Specifically, the contractor shall:
1. Floating Dock Removal:
a. Remove approximately 350 LF of existing floating dock sections.
b. Dispose of floating dock.
c. Pilings will remain once floating dock has been removed.
SECTION 01020
COORDINATION
1. INTERFERENCE WITH COAST GUARD OPERATIONS: Accomplish work in a manner that causes minimal impact on normal operations. Sector Buffalo will minimize the amount of traffic through the work area while work is being conducted.
2. THE CONTRACTING OFFICEER’S TECHNICAL REPRESENTATIVE
The Contracting Officer’s Technical Representative is:
a. CWO D. Howes
3. GOVERNMENT FACILITIES AND UTILITIES: Electrical Power is not available on site, compressed air is not. Restrooms will also be available at Sector Main Building.
4. MATERIALS AND LOCATIONS:
1. Materials shall be delivered to the jobsite in their original unopened packages, clearly marked with the manufacturer’s name, brand name, and description of contents. Storage shall be in accordance with manufacturer’s recommendations.
2. Contractor is required to comply with Federal, State and Local laws, codes and regulations. All subject Safety Data Sheets shall be available upon request.
5. SCHEDULE OF WORK: Upon arrival and completion of the workday the contractor must check in and out onboard Sector Buffalo. Completion of work shall be accomplished within 15 Calendar days from receipt of notice to proceed. Normal work hours are 7:30 am to 3:30 pm. Weekends will be available on request by contractor. Alternate work hours must be approved by the Contracting Officer’s Technical Representative, (COTR).
SECTION 01030
SAFETY PROGRAM
1. GENERAL: The Contractor is wholly responsible for work site safety. The Contractor shall implement a safety program that protects the lives and health of personnel in the construction area, prevents damage to property, and avoids work interruptions. To accomplish this end, the Contractor shall provide appropriate safety barricades, signs, signal lights, etc. as well as complying with the requirements of all Federal, State and Local safety laws, rules and regulations.
2. Workmen shall wear proper personal protective equipment when required by Federal, State and Local safety laws.
3. The Contractor shall ensure all members of the working party have a valid identification to be displayed at the main gate at each entry.
SECTION 01040
GENERAL CLEANUP & SITE RESTORATION OF WORK AREAS
1. GENERAL: The Contractor shall remove and properly dispose of all trash and debris incidental to the contract work, from the limits of government property, as well as all adjacent affected areas. The Contracting Officer Technical Representative shall determine the extent and interval of these cleanups.
2. SITE RESTORATION: If at any time while performing the contract the Contractor causes damage or destruction to any portion of any Government facility or grounds; e.g., bulkheads, pavement, lawns, shrubbery, etc., it shall be the Contractor's responsibility to replace and/or restore the damage as approved by the Contracting Officer’s Technical Representative at no additional cost to the Government.
3. POST CONSTRUCTION CLEANUP: Upon completion of the job, the Contractor shall clean up the job site, returning it to a state of cleanliness equal to or exceeding that in which it was found. The Contractor shall properly dispose of any trash, extra materials, dirt, debris, or other litter that remains as well, with the exception of the old metal materials removed from the buildings. If the job site appearance is not to the satisfaction of the Contracting Officer’s Technical Representative, final acceptance will not be approved.
END OF SPECIFICATION