First Article.pdf
PDF 91 KB Posted
- Attached to
- ICBM Rail-Pusher Set Federal contract opportunity
- Solicitation number
- FA8212-21-Q-0023
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| EDL_004626353 updated.pdf | ||
| FA8212-21-Q-0023-0002.pdf | ||
| 8631598_98747_EO 15A0494-H.pdf | ||
| 8631598_98747_EO 16A0448-H.pdf | ||
| FA8212-21-Q-0023-0001.pdf | ||
| FA8212-21-Q-0023.pdf | ||
| CDRL.pdf | ||
| Transportation Data.pdf | ||
| Engineering Data Requirements.docx | DOCX document | |
| Special Packaging.pdf | ||
| Packaging Requirements.pdf | ||
| IUID.pdf | ||
| Engineering Data List.pdf | ||
| Item Description.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRST ARTICLE REQUIREMENTS 1. DATE
16 MAR 2021(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)
2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER
81205 / 8631599-10
4. NSN
1440004626353AH
5. FIRST ARTICLE QUANTITY
THE FIRST ARTICLE IS 1 UNIT(S) OF LOT / ITEM 1
AND WILL BE: X PART OF PRODUCTION QUANTITY IN ADDITION TO PRODUCTION QUANTITY
6. ARTICLES
WILL X WILL NOT SERVE AS A MANUFACTURING STANDARD
7. LONG LEAD TIME ITEMS
REQUIRED X NOT REQUIRED
(See FAR 52.209-3 OR -4, alternate II)
8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)
REQUIRED X NOT REQUIRED
"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."
9. TEST / INSPECTION REQUIREMENTS
A.
X
CONTRACTOR TESTING
GOVERNMENT TESTING
Performance or other characteristics which the First Articles must meet are
IAW all required Engineering drawings and specifications
B. The detailed technical requirements for First Article approval tests are contained in
IAW all required Engineering drawings and specifications
(Cite Spec and Para number)
C. TEST PLAN REQUIRED
Number of days for government approval / disapproval days.
D. Contractor's notification to ACO and
(Requesting Activity) of test time and location due days prior to start of testing.
E. X TEST REPORT REQUIRED
(1) Forwarded to
FB 2029 "First Article Do Not Post"
809 MXSS/MXDEB; Bldg 849
Non-Accountable Bay
Hill AFB, UT 84056-5713
(2) Government written notice of approval / disapproval due 90 days after receipt of contractor's report.
F. FIRST ARTICLE DELIVERY
(1) Due within 90 calendar days from date contract.
(2) Notify 30 calendar days prior to shipment.
(3) Delivered to government at
FB 2029 "First Article Do Not Post"
809 MXSS/MXDEB; Bldg 849
Non-Accountable Bay
Hill AFB, UT 84056-5713
(Set Forth Consignee and Address)
(4) Government written notice of approval / disapproval within 90 days after receipt of first article package.
G. Estimated cost of government testing / inspection evaluation.
$2,000.0000
Page 1 of 2AFMC IMT 260, 20020830, V-3 Version 3Generated by PRPS using Jasper Reports on 01 Jun 2021
FIRST ARTICLE REQUIREMENTS 1. DATE
16 MAR 2021(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)
10. DISPOSITION OF FIRST ARTICLES
X Approved First Articles will be forwarded to
PER CONTRACT REQUIREMENTS
(insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.
First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.
X Disapproved First Articles will be returned to the contractor
X will be retained by 809 MXSS/MXDEB pending disposition instructions from the contractor.
On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).
a. Approved First Articles will be returned to the contractor for shipment with production item.
b. Disposition of disapproved First Articles will remain the same as marked above.
Other Disposition:
11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL
a. X Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, DoD, X Air Force.
b. X Offerors currently in production of the same or similar article for a Government, DoD, X Air Force contract and who have received First Article approval under the existing contract.
c. X Offerors who have previously furnished production quantities of the same or similar articles to the Government, DoD, X Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.
d. X Provided not more than 36 months have elapsed since completion of the contract.
e. First Article testing will not be waived.
f. X See Remarks in block 12 below.
NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:
A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION
12. REMARKS
Swenson, Mark TNAME: 16 MAR 2021DATE:
1)The contractor shall produce a report on the subject item with all dimensions and tolerances specified on the manufacturing data listed in one column and the actual corresponding reading obtained from the inspection of the part listed in another column.
2)Materials utilized in the manufacture of "First Article" items shall be identified and certified along with a copy of material purchase requests as confirming to applicable data requirements.
3) Material processing, including finish requirements (plating, casting, forging, heat treatment, welding, inspection, anodize, painting, etc.) utilized in the manufacture of "First Article" items shall be identified and certified along with a copy of material purchase requests as confirming to applicable data requirements. A copy of the purchase order certifying the process accomplished at other than contractor facility shall be included.
13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING TEST
(Name, Organization, Phone)
Swenson, Mark T
414 GUEA
801-777-8347
777-8347
14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING
TEST (Name, Organization, Phone)
Swenson, Mark T
414 GUEA
801-777-8347
777-8347
Page 2 of 2AFMC IMT 260, 20020830, V-3 Version 3Generated by PRPS using Jasper Reports on 01 Jun 2021