FERC-15-R-0033.docx

DOCX document 199 KB Posted

Attached to
Bulk Power System Reliability & Security Consulting Services Federal contract opportunity
Solicitation number
FERC15R0033
Issued by
Department of Energy Federal Energy Regulatory Commission

About this file

FERC-15-R-0033 FERC-15-R-0033.docx

View the file

Other files for this federal contract opportunity

Other files attached to Bulk Power System Reliability & Security Consulting Services, newest first.
File Type Posted
FERC-15-C-0183_1.docx DOCX document
FERC-15-R-0033_0001.docx DOCX document
Attachment_1_CEII_NDA.docx DOCX document
FERC-15-R-0033_0001_1.docx DOCX document
FERC-15-R-0033_1.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION APAGE 1 OF

1. REQUISITION NO.

2. CONTRACT NO.

3. AWARD/EFFECTIVE DATE

4. ORDER NO.

5. SOLICITATION NUMBER

6. SOLICITATION ISSUE DATE

a. NAME

b. TELEPHONE NO. (No Collect Calls)

8. OFFER DUE DATE/LOCAL

TIME

9. ISSUED BY

CODE

10. THIS ACQUISITION IS

UNRESTRICTED OR

SET ASIDE:

% FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

8(A)

NAICS:

SIZE STANDARD:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ

IFB

RFP

15. DELIVER TO

CODE

16. ADMINISTERED BY

CODE

17a. CONTRACTOR/OFFEROR

CODE

FACILITY CODE

18a. PAYMENT WILL BE MADE BY

CODE

TELEPHONE NO.

DUNS:

DUNS+4:

PHONE:

FAX:

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED

SEE ADDENDUM

19.

20.

21.

22.

23.

24.

ITEM NO.

SCHEDULE OF SUPPLIES/SERVICES

QUANTITY

UNIT

UNIT PRICE

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________

29. AWARD OF CONTRACT: REF. ___________________________________ OFFER

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DATED ________________________________. YOUR OFFER ON SOLICITATION

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

(REV. 2/2012)

PREVIOUS EDITION IS NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.212

7. FOR SOLICITATION

INFORMATION CALL:

STANDARD FORM 1449

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

0000034282 See SCHEDULE

FERC-15-R-0033

07-31-2015 Ryan Kirkwood

(202) 502-6409 08-21-2015 12:00pm 00039 Federal Energy Regulatory Commission Acquisition Services Division Attn: Ryan Kirkwood 888 First Street, NE, Room 4J Washington DC 20426 X Y 221121 500 Employees X N/A N/A X 00039 Federal Energy Regulatory Commission Warehouse P-1 Attn: Michelle Davis 888 First Street, NE, Warehouse P-1 Washington DC 20426 00039 Federal Energy Regulatory Commission Acquisition Services Division Attn: Ryan Kirkwood 888 First Street, NE, Room 4J Washington DC 20426 00039 Federal Energy Regulatory Commission Division of Financial Services Attn: Payment/Invoice 888 First Street, NE, Room 42-71 Washington DC 20426 DFSInvoices@ferc.gov DFSInvoices@ferc.gov X See CONTINUATION Page $0.00 See CONTINUATION Page X X X Heidi Herron

A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

Table of Contents

SECTION A1
A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS1
SECTION B - CONTINUATION BLOCK1
B.1 Price/Cost Schedule1
Item Information1
SECTION C - CONTRACT CLAUSES1
C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS (MAY 2014) ALTERNATE I (MAY 2014)1
C.2 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)11
C.3 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)11
C.4 IT SYSTEMS & SERVICE CONTRACTS-- SECURITY REQUIREMENTS-- LOCAL PROVISION11
C.5 LEGAL HOLIDAYS AND CLOSURE OF FERC FACILITIES--LOCAL PROVISION14
C.6 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)15
C.7 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL ITEMS (OCT 2014)16
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS1
SECTION E - SOLICITATION PROVISIONS1
ADDENDUM TO FAR 52.212-1 INSTRUCTIONS TO OFFEROR’S--COMMERCIAL ITEMS.1
E.1 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013)4
E.2 52.233-2 SERVICE OF PROTEST (SEP 2006)5
E.3 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL ITEMS (NOV 2014)7

SECTION B - CONTINUATION BLOCK

B.1 Price/Cost Schedule Item Information

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
00001
Contract Period: Base

POP Begin:

POP End:

Senior Engineer Period of Performance 1 year from date of award.

960.00
LH
__________________
__________________
00002
Contract Period: Base

POP Begin:

POP End:

Travel To be performed in accordance with the Federal Travel Regulation (FTR). Period of Performance 1 year from date of award.

1.00
LOT
__________________
__________________
10001
Contract Period: Option 1

POP Begin:

POP End:

Senior Engineer Period of Performance 1 year from date of award.

960.00
LH
__________________
__________________
10002
Contract Period: Option 1

POP Begin:

POP End:

Travel To be performed in accordance with the Federal Travel Regulation (FTR). Period of Performance 1 year from date of award.

1.00
LOT
__________________
__________________
20001
Contract Period: Option 2

POP Begin:

POP End:

Senior Engineer Period of Performance 1 year from date of award.

960.00
LH
__________________
__________________
20002
Contract Period: Option 2

POP Begin:

POP End:

Travel To be performed in accordance with the Federal Travel Regulation (FTR). Period of Performance 1 year from date of award.

1.00
LOT
__________________
__________________
30001
Contract Period: Option 3

POP Begin:

POP End:

Senior Engineer Period of Performance 1 year from date of award.

960.00
LH
__________________
__________________
30002
Contract Period: Option 3

POP Begin:

POP End:

Travel To be performed in accordance with the Federal Travel Regulation (FTR). Period of Performance 1 year from date of award.

1.00
LOT
__________________
__________________
40001
Contract Period: Option 4

POP Begin:

POP End:

Senior Engineer Period of Performance 1 year from date of award.

960.00
LH
__________________
__________________
40002
Contract Period: Option 4

POP Begin:

POP End:

Travel To be performed in accordance with the Federal Travel Regulation (FTR). Period of Performance 1 year from date of award.

1.00
LOT
__________________
__________________
GRAND TOTAL
__________________

FERC-15-R-0033 Section B

B - 5 Statement of Work (SOW)

For

BULK POWER SYSTEM RELIABILITY AND SECURITY CONUSLTING SERVICES

For the

Federal Energy Regulatory Commission Office of Electric Reliability

PART 1

GENERAL INFORMATION

1.1 Description of Services/Introduction: Contractor shall provide all personnel, equipment, materials, supervision, and non-personal services necessary to provide analysis, technical advice, and recommendations on topics related to the reliability and security for the nation’s bulk power system. Contractor shall perform to the standards in this contract.

1.2 Background: The Federal Energy Regulatory Commission, or FERC, is an independent agency that regulates the interstate transmission of electricity, natural gas, and oil. FERC also reviews proposals to build liquefied natural gas (LNG) terminals and interstate natural gas pipelines as well as licensing hydropower projects. FERC’s Office of Electric Reliability (OER) helps protect and improve the reliability and security of the nation’s bulk power system through effective regulatory oversight as established by Congress and the President in the Energy Policy Act of 2005. Additionally, OER oversees the development and review of mandatory reliability and security standards, and compliance with the approved mandatory standards by the users, owners, and operators of the bulk power system.

1.3 Objective: The objective of contract is to provide FERC staff with expert advice, support, and analysis of reliability standards issues and the bulk power system.

1.4 Scope: The Office of Electric Reliability participates in the reliability standards development and review process, and analyzes, monitors, and addresses issues concerning the nation’s bulk power system performance. The Contractor shall provide technical analysis of bulk power system issues as well as recommendations to address such issues. Contractor shall produce technical analysis reports and modeling studies.

1.5 Period of Performance: The period of performance shall be for one base period of twelve months with four twelve-month option periods.

1.6 General Information

1.6.1 Hours of Operation: Contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks within the SOW.

1.6.2.1 Consulting Services - Normal Work Hours: Contractor shall provide consulting services as necessary between the normal work hours of 8:00 a.m. – 5:00 p.m., Monday through Friday, excluding Federal holidays. The controlling time is the local time of FERC Headquarters (HQ).

1.6.2.2 Consulting Services - After Hours: When requested to do so, Contractor shall provide consulting services as necessary outside of the normal work hours Monday through Friday and on Saturdays, Sundays, and Federal holidays. The controlling time is the local time of FERC HQ.

1.6.3 Performance will take place at vendor’s place of business and includes travel to FERC HQ for face-to-face meetings with FERC staff, NERC and industry, expected to be on average two visits per month, each of 3 to 4 day duration over the contract period. NERC meetings may be held outside the DC area but still within the US. Travel between the vendor’s workplace and FERC HQ is not credited as work hours.

1.6.4 Travel: Contractor is responsible for making any necessary transportation or lodging arrangements for visits to FERC HQ. The Government will only reimburse Contractor for consulting service travel expenses for travel to/within the contiguous United States.

1.6.5 Type of Contract: The Government anticipates award of a labor hour contract with a 1 year base and 4 1 year option periods. Each year upon determination of specific tasks the contractor will be provided with the specified tasks for the applicable contract period (Base or Option Year).

1.6.6 Security Requirements: Contractor shall undergo and pass a background investigation conducted by the Federal Government. The awardee will be required to use a FERC-issued encrypted laptop. See IT Systems & Service Contracts Security Requirements Local Provision for more detail.

1.6.7 Post Award Conference/Periodic Progress Meetings: Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The Contracting Officer, Contracting Officer Representative (COR), and other Government personnel, as appropriate, may meet periodically with Contractor to review Contractor's performance. At these meetings, the COR will apprise Contractor of how the Government views Contractor's performance and Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.6.8 Contract Manager: Contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person, and an alternate who shall act for Contractor when the manager is absent, shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for Contractor on all contract matters relating to daily operation of this contract.

1.6.9 Reporting Procedures: On or before the last day of each month, the Contractor, by e-mail, shall provide a monthly report detailing the technical analysis of worked performed for the Office of Electric Reliability during that month.

1.6.10 Sale of Information to the Public: Except upon authorization by the COR, Contractor is prohibited from selling, distributing, or releasing to the public any FERC information or documents.

PART 2

DEFINITIONS & ACRONYMS

BPS: Bulk Power System

Business Day: Monday through Friday, excluding Federal holidays.

Contracting Officer’s Representative (COR): A representative from the requiring activity assigned by the Contracting Officer to perform surveillance and to act as liaison to Contractor.

CONUS: Locations within the 48 contiguous United States.

FERC: Federal Energy Regulatory Commission

NERC: North American Electric Reliability Corporation

NSPE: National Society of Professional Engineers

OCONUS: Locations outside of the 48 contiguous United States

OER: Office of Electric Reliability

PE License: Professional Engineering License

SOW: Statement of Work

PART 3

CONTRACTOR FURNISHED ITEMS AND SERVICES

3.1 General: The contractor shall furnish everything required to perform this SOW (e.g. paper, word processors, notebooks, software programs, and other supplies and materials).

3.2 Contractor personnel performing services in locations requiring passports and /or visas shall have passports and/or visas.

PART 4

SPECIFIC TASKS

4.1 Basic Services: Contractor shall provide technical consultation and analysis of bulk power system issues.

4.2 Reporting: Contractor shall provide written monthly reports, due on or before the fifth day of the following month, which include a summary of the analysis and/or recommendations provided during that month.

4.2.2 Retention of Information: Contractor shall retain and properly safeguard, all written or electronic, notes, emails or documents relating to consultation services provided to the Commission and its staff. The Contractor will maintain documents consistent with document retention laws and FERC policies.

4.3 Knowledge: Contractor shall provide consultants with specialized knowledge of and experience in the following:

4.3.1 Specialized Knowledge:

a. Managing and directing the planning and operations of an electric utility and considering the impacts to reliability

b. Powers Systems Operations and Planning

c. Characteristics of the three interconnections in North America

d. August 14, 2003 Northeast Blackout and corresponding report, causes, and recommendations (Active participation in the task force is highly desired)

e. Energy Policy Act of 2005

f. Federal Power Act – Section 215

g. U.S. Federal Energy Regulatory Commission (FERC or Commission)

h. Major Reliability Orders issued by the Commission, specifically FERC Orders 672, 693, and 697

i. The North American Electric Reliability Corporation (NERC)

j. Entire set of mandatory reliability standards

k. All reliability standards under development

l. Management of real-time and near real-time transmission systems information and the evaluation of reliability and electrical engineering aspects of reliability standards filings

4.3.2 Program Knowledge: The contractor shall maintain a working knowledge of software programs required to perform power system studies and be able to quickly identify modeling issues associated with programs such as:

1. PSSE

2. PSLF

3. PROMOD

4. MUST

5. Power World

4.4 Education Requirements: Contractor shall provide consultants that have obtained all of the following:

a. Bachelor of Science – Electrical Engineering

b. Master of Science – Electrical Engineering

c. Professional Engineering License

4.5 Technical Training: Contractor shall provide training sessions to FERC staff on the following subjects, as necessary, extraordinarily complex engineering, regulatory and financial activities and issues, explanation of complex operations and, planning and constructions involving power system engineering.

4.6 Confidential/Critical Energy Infrastructure Information (CEII) Information: Contractor shall have demonstrated compliance with FERC standards for maintaining data security to ensure confidential treatment of sensitive information. See IT Systems & Service Contracts Security Requirements Local Provision for more detail.

Non-Disclosure Agreement: The Contractor and all personnel assigned to the contract that require access to the FERC network and FERC controlled information or documents agree not to divulge to any unauthorized person non-public information, privileged and confidential information, or Critical Energy Infrastructure Information (CEII) obtained in performance of their duties under the contract. All documentation, electronic data and information collected or generated by the Contractor in support of this contract shall be considered Government property, and shall be returned to the Government at the end of the performance period. The Contractor will be required to sign a Non-Disclosure/Confidentiality Agreement and a CEII Non-Disclosure Agreement prior to commencement of work.

Organizational Conflict of Interest: Immediately upon assignment of a new project and prior to incurrence of any related costs, the contractor shall prepare and submit three copies of a No Conflict of Interest Statement as required by 40 CFR § 1506.5(c) to the Contracting Office and the COR. In the alternative, if the contractor decides that the appearance of a conflict of interest exists, the contractor shall submit a full disclosure statement, describing the circumstances or conditions that create the conflict and any mitigating measures the contractor intends to implement to resolve the conflict or the appearance of a conflict. If no mitigation will suffice, the contractor will not be assigned to that particular project.

PART 5

APPLICABLE PUBLICATIONS

5.1 Publications applicable to this SOW are listed below. All publications listed are available via the internet at the web address.

Energy Policy Act of 2005: http://energy.gov/sites/prod/files/2013/10/f3/epact_2005.pdf

Federal Power Act – Section 215: https://www.law.cornell.edu/uscode/text/16/824o

Blackout 2003: Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations: http://energy.gov/oe/downloads/blackout-2003-final-report-august-14-2003-blackout-united-states-and-canada-causes-and

Arizona-Southern California Outages on September 8, 2011: http://www.ferc.gov/legal/staff-reports/04-27-2012-ferc-nerc-report.pdf

B - 1

SECTION C - CONTRACT CLAUSES

C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS (MAY 2014) ALTERNATE I (MAY 2014)

(a) Inspection/Acceptance.

(1) The Government has the right to inspect and test all materials furnished and services performed under this contract, to the extent practicable at all places and times, including the period of performance, and in any event before acceptance. The Government may also inspect the plant or plants of the Contractor or any subcontractor engaged in contract performance. The Government will perform inspections and tests in a manner that will not unduly delay the work.

(2) If the Government performs inspection or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish and shall require subcontractors to furnish all reasonable facilities and assistance for the safe and convenient performance of these duties.

(3) Unless otherwise specified in the contract, the Government will accept or reject services and materials at the place of delivery as promptly as practicable after delivery, and they will be presumed accepted 60 days after the date of delivery, unless accepted earlier.

(4) At any time during contract performance, but not later than 6 months (or such other time as may be specified in the contract) after acceptance of the services or materials last delivered under this contract, the Government may require the Contractor to replace or correct services or materials that at time of delivery failed to meet contract requirements. Except as otherwise specified in paragraph (a)(6) of this clause, the cost of replacement or correction shall be determined under paragraph (i) of this clause, but the "hourly rate" for labor hours incurred in the replacement or correction shall be reduced to exclude that portion of the rate attributable to profit. Unless otherwise specified below, the portion of the "hourly rate" attributable to profit shall be 10 percent. The Contractor shall not tender for acceptance materials and services required to be replaced or corrected without disclosing the former requirement for replacement or correction, and, when required, shall disclose the corrective action taken. [Insert portion of labor rate attributable to profit.] (5)(i) If the Contractor fails to proceed with reasonable promptness to perform required replacement or correction, and if the replacement or correction can be performed within the ceiling price (or the ceiling price as increased by the Government), the Government may—

(A) By contract or otherwise, perform the replacement or correction, charge to the Contractor any increased cost, or deduct such increased cost from any amounts paid or due under this contract; or

(B) Terminate this contract for cause.

(ii) Failure to agree to the amount of increased cost to be charged to the Contractor shall be a dispute under the Disputes clause of the contract.

(6) Notwithstanding paragraphs (a)(4) and (5) above, the Government may at any time require the Contractor to remedy by correction or replacement, without cost to the Government, any failure by the Contractor to comply with the requirements of this contract, if the failure is due to—

(i) Fraud, lack of good faith, or willful misconduct on the part of the Contractor's managerial personnel; or

(ii) The conduct of one or more of the Contractor's employees selected or retained by the Contractor after any of the Contractor's managerial personnel has reasonable grounds to believe that the employee is habitually careless or unqualified.

(7) This clause applies in the same manner and to the same extent to corrected or replacement materials or services as to materials and services originally delivered under this contract.

(8) The Contractor has no obligation or liability under this contract to correct or replace materials and services that at time of delivery do not meet contract requirements, except as provided in this clause or as may be otherwise specified in the contract.

(9) Unless otherwise specified in the contract, the Contractor's obligation to correct or replace Government-furnished property shall be governed by the clause pertaining to Government property.

(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.

(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.

(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.

(e) Definitions.

(1) The clause at FAR 52.202-1, Definitions, is incorporated herein by reference. As used in this clause—

(i) Direct materials means those materials that enter directly into the end product, or that are used or consumed directly in connection with the furnishing of the end product or service.

(ii) Hourly rate means the rate(s) prescribed in the contract for payment for labor that meets the labor category qualifications of a labor category specified in the contract that are—

(A) Performed by the contractor;

(B) Performed by the subcontractors; or

(C) Transferred between divisions, subsidiaries, or affiliates of the contractor under a common control.

(iii) Materials means—

(A) Direct materials, including supplies transferred between divisions, subsidiaries, or affiliates of the contractor under a common control;

(B) Subcontracts for supplies and incidental services for which there is not a labor category specified in the contract;

(C) Other direct costs (e.g., incidental services for which there is not a labor category specified in the contract, travel, computer usage charges, etc.);

(D) The following subcontracts for services which are specifically excluded from the hourly rate: [Insert any subcontracts for services to be excluded from the hourly rates prescribed in the schedule.]; and

(E) Indirect costs specifically provided for in this clause.

(iv) Subcontract means any contract, as defined in FAR Subpart 2.1, entered into with a subcontractor to furnish supplies or services for performance of the prime contract or a subcontract including transfers between divisions, subsidiaries, or affiliates of a contractor or subcontractor. It includes, but is not limited to, purchase orders, and changes and modifications to purchase orders.

(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.

(g) Invoice.

(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include—

(i) Name and address of the Contractor;

(ii) Invoice date and number;

(iii) Contract number, contract line item number and, if applicable, the order number;

(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;

(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;

(vi) Terms of any discount for prompt payment offered;

(vii) Name and address of official to whom payment is to be sent;

(viii) Name, title, and phone number of person to notify in event of defective invoice; and

(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.

(x) Electronic funds transfer (EFT) banking information.

(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.

(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer—System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer—Other Than System for Award Management), or applicable agency procedures.

(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.

(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR part 1315.

(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.

(i) Payments.

(1) Work performed. The Government will pay the Contractor as follows upon the submission of commercial invoices approved by the Contracting Officer:

(i) Hourly rate.

(A) The amounts shall be computed by multiplying the appropriate hourly rates prescribed in the contract by the number of direct labor hours performed. Fractional parts of an hour shall be payable on a prorated basis.

(B) The rates shall be paid for all labor performed on the contract that meets the labor qualifications specified in the contract. Labor hours incurred to perform tasks for which labor qualifications were specified in the contract will not be paid to the extent the work is performed by individuals that do not meet the qualifications specified in the contract, unless specifically authorized by the Contracting Officer.

(C) Invoices may be submitted once each month (or at more frequent intervals, if approved by the Contracting Officer) to the Contracting Officer or the authorized representative.

(D) When requested by the Contracting Officer or the authorized representative, the Contractor shall substantiate invoices (including any subcontractor hours reimbursed at the hourly rate in the schedule) by evidence of actual payment, individual daily job timecards, records that verify the employees meet the qualifications for the labor categories specified in the contract, or other substantiation specified in the contract.

(E) Unless the Schedule prescribes otherwise, the hourly rates in the Schedule shall not be varied by virtue of the Contractor having performed work on an overtime basis.

(1) If no overtime rates are provided in the Schedule and the Contracting Officer approves overtime work in advance, overtime rates shall be negotiated.

(2) Failure to agree upon these overtime rates shall be treated as a dispute under the Disputes clause of this contract.

(3) If the Schedule provides rates for overtime, the premium portion of those rates will be reimbursable only to the extent the overtime is approved by the Contracting Officer.

(ii) Materials.

(A) If the Contractor furnishes materials that meet the definition of a commercial item at 2.101, the price to be paid for such materials shall not exceed the Contractor’s established catalog or market price, adjusted to reflect the—

(1) Quantities being acquired; and

(2) Any modifications necessary because of contract requirements.

(B) Except as provided for in paragraph (i)(1)(ii)(A) and (D)(2) of this clause, the Government will reimburse the Contractor the actual cost of materials (less any rebates, refunds, or discounts received by the contractor that are identifiable to the contract) provided the Contractor—

(1) Has made payments for materials in accordance with the terms and conditions of the agreement or invoice; or

(2) Makes these payments within 30 days of the submission of the Contractor's payment request to the Government and such payment is in accordance with the terms and conditions of the agreement or invoice.

(C) To the extent able, the Contractor shall—

(1) Obtain materials at the most advantageous prices available with due regard to securing prompt delivery of satisfactory materials; and

(2) Give credit to the Government for cash and trade discounts, rebates, scrap, commissions, and other amounts that are identifiable to the contract.

(D) Other Costs. Unless listed below, other direct and indirect costs will not be reimbursed.

(1) Other Direct Costs. The Government will reimburse the Contractor on the basis of actual cost for the following, provided such costs comply with the requirements in paragraph (i)(1)(ii)(B) of this clause:

None

(2) Indirect Costs (Material Handling, Subcontract Administration, etc.). The Government will reimburse the Contractor for indirect costs on a pro-rata basis over the period of contract performance at the following fixed price:

$0.00

(2) Total cost. It is estimated that the total cost to the Government for the performance of this contract shall not exceed the ceiling price set forth in the Schedule and the Contractor agrees to use its best efforts to perform the work specified in the Schedule and all obligations under this contract within such ceiling price. If at any time the Contractor has reason to believe that the hourly rate payments and material costs that will accrue in performing this contract in the next succeeding 30 days, if added to all other payments and costs previously accrued, will exceed 85 percent of the ceiling price in the Schedule, the Contractor shall notify the Contracting Officer giving a revised estimate of the total price to the Government for performing this contract with supporting reasons and documentation. If at any time during the performance of this contract, the Contractor has reason to believe that the total price to the Government for performing this contract will be substantially greater or less than the then stated ceiling price, the Contractor shall so notify the Contracting Officer, giving a revised estimate of the total price for performing this contract, with supporting reasons and documentation. If at any time during performance of this contract, the Government has reason to believe that the work to be required in performing this contract will be substantially greater or less than the stated ceiling price, the Contracting Officer will so advise the Contractor, giving the then revised estimate of the total amount of effort to be required under the contract.

(3) Ceiling price. The Government will not be obligated to pay the Contractor any amount in excess of the ceiling price in the Schedule, and the Contractor shall not be obligated to continue performance if to do so would exceed the ceiling price set forth in the Schedule, unless and until the Contracting Officer notifies the Contractor in writing that the ceiling price has been increased and specifies in the notice a revised ceiling that shall constitute the ceiling price for performance under this contract. When and to the extent that the ceiling price set forth in the Schedule has been increased, any hours expended and material costs incurred by the Contractor in excess of the ceiling price before the increase shall be allowable to the same extent as if the hours expended and material costs had been incurred after the increase in the ceiling price.

(4) Access to records. At any time before final payment under this contract, the Contracting Officer (or authorized representative) will have access to the following (access shall be limited to the listing below unless otherwise agreed to by the Contractor and the Contracting Officer):

(i) Records that verify that the employees whose time has been included in any invoice meet the qualifications for the labor categories specified in the contract;

(ii) For labor hours (including any subcontractor hours reimbursed at the hourly rate in the schedule), when timecards are required as substantiation for payment—

(A) The original timecards (paper-based or electronic);

(B) The Contractor's timekeeping procedures;

(C) Contractor records that show the distribution of labor between jobs or contracts; and

(D) Employees whose time has been included in any invoice for the purpose of verifying that these employees have worked the hours shown on the invoices.

(iii) For material and subcontract costs that are reimbursed on the basis of actual cost—

(A) Any invoices or subcontract agreements substantiating material costs; and

(B) Any documents supporting payment of those invoices.

(5) Overpayments/Underpayments. Each payment previously made shall be subject to reduction to the extent of amounts, on preceding invoices, that are found by the Contracting Officer not to have been properly payable and shall also be subject to reduction for overpayments or to increase for underpayments. The Contractor shall promptly pay any such reduction within 30 days unless the parties agree otherwise. The Government within 30 days will pay any such increases, unless the parties agree otherwise. The Contractor's payment will be made by check. If the Contractor becomes aware of a duplicate invoice payment or that the Government has otherwise overpaid on an invoice payment, the Contractor shall—

(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—

(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);

(B) Affected contract number and delivery order number, if applicable;

(C) Affected contract line item or subline item, if applicable; and

(D) Contractor point of contact.

(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.

(6)(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury, as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, and then at the rate applicable for each six month period as established by the Secretary until the amount is paid.

(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.

(iii) Final Decisions. The Contracting Officer will issue a final decision as required by 33.211 if—

(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt in a timely manner;

(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or

(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see FAR 32.607-2).

(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.

(v) Amounts shall be due at the earliest of the following dates:

(A) The date fixed under this contract.

(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.

(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on—

(A) The date on which the designated office receives payment from the Contractor;

(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or

(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.

(vii) The interest charge made under this clause may be reduced under the procedures prescribed in 32.608-2 of the Federal Acquisition Regulation in effect on the date of this contract.

(viii) Upon receipt and approval of the invoice designated by the Contractor as the "completion invoice" and supporting documentation, and upon compliance by the Contractor with all terms of this contract, any outstanding balances will be paid within 30 days unless the parties agree otherwise. The completion invoice, and supporting documentation, shall be submitted by the Contractor as promptly as practicable following completion of the work under this contract, but in no event later than 1 year (or such longer period as the Contracting Officer may approve in writing) from the date of completion.

(7) Release of claims. The Contractor, and each assignee under an assignment entered into under this contract and in effect at the time of final payment under this contract, shall execute and deliver, at the time of and as a condition precedent to final payment under this contract, a release discharging the Government, its officers, agents, and employees of and from all liabilities, obligations, and claims arising out of or under this contract, subject only to the following exceptions.

(i) Specified claims in stated amounts, or in estimated amounts if the amounts are not susceptible to exact statement by the Contractor.

(ii) Claims, together with reasonable incidental expenses, based upon the liabilities of the Contractor to third parties arising out of performing this contract, that are not known to the Contractor on the date of the execution of the release, and of which the Contractor gives notice in writing to the Contracting Officer not more than 6 years after the date of the release or the date of any notice to the Contractor that the Government is prepared to make final payment, whichever is earlier.

(iii) Claims for reimbursement of costs (other than expenses of the Contractor by reason of its indemnification of the Government against patent liability), including reasonable incidental expenses, incurred by the Contractor under the terms of this contract relating to patents.

(8) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.

(9) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.

(10) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date that appears on the payment check or the specified payment date if an electronic funds transfer payment is made.

(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:

(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or

(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.

(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.

(l) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid an amount for direct labor hours (as defined in the Schedule of the contract) determined by multiplying the number of direct labor hours expended before the effective date of termination by the hourly rate(s) in the contract, less any hourly rate payments already made to the Contractor plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system that have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor's records. The Contractor shall not be paid for any work performed or costs incurred that reasonably could have been avoided.

(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon written request, with adequate assurances of future performance. Subject to the terms of this contract, the Contractor shall be paid an amount computed under paragraph (i) Payments of this clause, but the ‘‘hourly rate’’ for labor hours expended in furnishing work not delivered to or accepted by the Government shall be reduced to exclude that portion of the rate attributable to profit. Unless otherwise specified in paragraph (a)(4) of this clause, the portion of the ‘‘hourly rate” attributable to profit shall be 10 percent. In the event of termination for cause, the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.

(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.

(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.

(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.

(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.

(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. chapter 37, Contract Work Hours and Safety Standards; 41 U.S.C. chapter 87, Kickbacks; 41 U.S.C. 4712 and 10 U.S.C. 2409 relating to whistleblower protections; 49 U.S.C. 40118, Fly American; and 41 U.S.C. chapter 21 relating to procurement integrity.

(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:

(1) The schedule of supplies/services.

(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, Compliance with Laws Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause;

(3) The clause at 52.212-5.

(4) Addenda to this solicitation or contract, including any license agreements for computer software.

(5) Solicitation provisions if this is a solicitation.

(6) Other paragraphs of this clause.

(7) The Standard Form 1449.

(8) Other documents, exhibits, and attachments

(9) The specification.

(t) System for Award Management (SAM).

(1) Unless exempted by an addendum to this contract, the Contractor is responsible during performance and through final payment of any contract for the accuracy and completeness of the data within the SAM database, and for any liability resulting from the Government's reliance on inaccurate or incomplete data. To remain registered in the SAM database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the SAM database to ensure it is current, accurate and complete. Updating information in the SAM does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.

(2)(i) If a Contractor has legally changed its business name, "doing business as" name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in FAR subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day's written notification of its intention to (A) change the name in the SAM database; (B) comply with the requirements of subpart 42.12; and (C) agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.

(ii) If the Contractor fails to comply with the requirements of paragraph (t)(2)(i) of this clause, or fails to perform the agreement at paragraph (t)(2)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the SAM information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the "Suspension of Payment" paragraph of the electronic funds transfer (EFT) clause of this contract.

(3) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the SAM record to reflect an assignee for the purpose of assignment of claims (see Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the SAM database. Information provided to the Contractor's SAM record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the "Suspension of payment" paragraph of the EFT clause of this contract.

(4) Offerors and Contractors may obtain information on registration and annual confirmation requirements via SAM accessed through https://www.acquisition.gov.

(u) Unauthorized Obligations.

(1) Except as stated in paragraph (u)(2) of this clause, when any supply or service acquired under this contract is subject to any End User License Agreement (EULA), Terms of Service (TOS), or similar legal instrument or agreement, that includes any clause requiring the Government to indemnify the…