A.2_-_BASE_BID_-_ENLARGED_FLOOR_PLANS.pdf
PDF 164 KB Posted
- Attached to
- Automatic Watering System Federal contract opportunity
- Solicitation number
- FDA_16-233-1163194
About this file
AutoCad Floor Plans for Building 5A effective rooms is attached (A.2)
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US
DEPA
RT
M
EN
T
OF
HEALT &H
HUMAN
SERV
ICES
A
C
E
A
5 1
9 9
C
E
A
Animal Rm.
Animal Rm.
Animal Rm.
Animal Rm.
Animal Rm.
Animal Rm.
Animal Rm.
Animal Rm.
Animal Rm.
Supply Corridor 138B
Return Corridor
20' - 0"
9 9 9
9 9
5'
- 6
5' - 6"
20' - 0"
5'
0"
5'
- 6
5' - 6"
20' - 0"5'
- 6
5' - 6"
20' - 0"
5'
0"
3/
4"
3/
4"
/4
2'
6" 2'
6"
2'
6" 2'
6"
2'
6" 2'
6"
2'
6" 2'
6"
16' - 2" 16' - 2"
Align partition with face of existing partition
Align partition with fac of existing partition
1'
5/
8" 1' - 8 5/8" typical
5' - 6
A.3
J6
J8
Supply Corridor 138A
2'
4" ty pi ca l
4'
8" 3'
6"
3'
2" 3'
2"
4'
6"
3'
2"
3'
/1 6"
3'
2" 3'
6"
Demolition Legend Demolition of an existing wall or partition
Demolition of an existing door and frame
Dust partition (Locate as req'd during construction as per NCTR request.)
E
F
Return Corridor
E
F
Remove existing concrete base
Hollow clay tile partition to be removed
VARIES
4'-0" above floor
Vinyl flake wall coating
Epoxy wall coating
Metal screed by vinyl flake coating mfgr
JEFFERSON, ARKANSAS 72079
SUBMITTED:
STUCK ASSOCIATES
DRAWING NO. SHEET:
CHECKED BY:DRAWN BY:DATE:SCALE:
DESCRIPTION BY CHECK
A
B
C
D
E
F
G
H
I
J
K
1 2 3 4 5 6 7 8 9
JEFFERSON LABORATORIES OF THE FDA
Sheet of
As indicated
7/31/2012 8:05:28 AM
100% Submittal AHJuly 6, 2012
Base Bid - Enlarged Floor Plans
Building 5A - Renovation of Animal Rooms
A.2
GC
2-3741-11
3 51 1/4" = 1'-0" A1 Base Bid Demo Plan
1/4" = 1'-0" A5 Base Bid Plan
Demoliton Key Notes - Base Bid 1 Remove hollow clay tile partition and associated mechanical and electrical items 2 Remove door and frame 3 Remove window and frame 4 Remove existing sensor panel 5 Remove existing sensor panel and infill to match adjacent construction 6 Remove plaster ceiling 7 Remove troweled-on flooring to concrete slab (no exceptions).
8 Dust partition 9 Concrete base to be removed. Refer to detail A3/A.2 10 If Bid Option #1 is not accepted, remove previous wall infill for construction access. infill to match existing upon completion of project.
11 Remove section of plaster ceiling as required for demolition of partitions, refer to ceiling plan.
12 Lock and seal doors 13 Remove temporary stud and gypsum board partition
Floor Plan Key Notes - Base Bid 1 Typical partition, re: E1/ A.8 2 Chase partition, re: E3/ A.8 3 2 hour partition, extend to deck, re: E2/ A.8 4 2 hour chase partition, extend to deck, re: E4/ A.8 5 Partition, re:E5/ A.8 6 Sensor panel. Refer to ME for exact locations.
7 Sink unit 8 Patch wall where sensor panel has been removed 9 Splayed base (vinyl flake flooring) 10 6" straight base (vinyl flake flooring) 11 No base this wall 12 Dust partition 13 If Bid Op[tion #1 is not accepted, remove previous wall infill for construction access.
Infill to match existing coursing upon completion of project.
14 2 hour partition above ceiling 15 New slope base on box curb. re: C9/ A.8
North
Scale: 1/4"=1'-0"
0' 4' 8' 16'
Demolition General Notes A Areas to be removed are shown only as an approximation. The General
Contractor is responsible for all demoltion or relocation on drawings.
B The Contractor shall verify information shown as existing and report any discrepancies.
C Prior to demolition, the General contractor will notify the Owner in sufficient time to salvage miscellaneous items before demolition work commences.
D All flooring (VCT, carpet, conductive tile, etc.) designated by note shall be removed to concrete slab or terrazzo flooring.
E The ceiling (gypsum board, acoustical tile, sprayed-on texture, etc.) including associated ceiling devices and fixtures (ceiling grid, mechanical, electrical, plumbing items, etc.) designated by noted shall be removed. See Mechanical, Electrical, and Plumbing demolition plans for more information.
F All walls (metal stud partitions, hollow clay tile, etc.) including associated devices and fixtures (windows, frames, finishes, toilet partitions & accessories, mechanical, electrical and plumbing fixtures, etc.) designated by note shall be removed. See Mechanical, Electrical, and Plumbing demolition plans for additional information.
G During demolition, if asbestos is found, notify Architect immediately & Asbestos removal will be provided by Owner (or separate Contractor.)
H Remove miscellaneous items (Architectural, Electrical, Mechanical, Plumbing, etc.) on walls designated to be moved.
I Provide dust barriers, both floor and ceiling, to isolate demolition and construction work from occupied portions of the building.
1/4" = 1'-0" C9 Base Bid Corridor Plan
1/4" = 1'-0" C3 Base Bid Ceiling Demo Plan
3" = 1'-0" A3 Base to be Removed
NOTE: Corner guards to be installed at all exterior corners on new partitions.
3" = 1'-0" J9 Wainscot @ Corridors
NCTR-805-3
NOTE: All dust partitions are to be removed prior to floor installations in areas where dust partitions are located.
Tbaioni Highlight
Tbaioni Highlight
Tbaioni Highlight
Tbaioni Highlight
Tbaioni Highlight
Tbaioni Highlight
Tbaioni Highlight
File details come from the government source that posted it. Updated .