CDRL 2840-01-619-5780NZ.pdf

PDF 98 KB Posted

Attached to
FD2030-20-00400 Federal contract opportunity
Solicitation number
FD2030-20-00400
Issued by
Department of the Air Force Materiel Command

View the file

Other files for this federal contract opportunity

Other files attached to FD2030-20-00400, newest first.
File Type Posted
12_PWA11_77445_NULL_CE_0006_CE_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
274_PWA79360_77445_NULL_C_0045_C_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
260_PWA79360_77445_NULL_C_0031_C_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
242_PWA79360_77445_NULL_C_0013_C_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
21_PWA11_77445_NULL_CE_0015_CE_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
EDL 2840-01-619-5780NZ_REV 1.pdf PDF
281_PWA79360_77445_NULL_C_0052_C_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
187_PWA360_77445_NULL_U_0150_U_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
165_PWA360_77445_NULL_U_0128_U_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
77_PWA360_77445_NULL_U_0040_U_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
170_PWA360_77445_NULL_U_0133_U_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
63_PWA360_77445_NULL_U_0026_U_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
31_PWA11_77445_NULL_CE_0025_CE_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
295_PWA79360_77445_NULL_C_0066_C_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
131_PWA360_77445_NULL_U_0094_U_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
124_PWA360_77445_NULL_U_0087_U_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
10_PWA11_77445_NULL_CE_0004_CE_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
MQR-PSD-1 2840-01-619-5780NZ.pdf PDF
262_PWA79360_77445_NULL_C_0033_C_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
226_PWA388_77445_NULL_E_0002_E_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
67_PWA360_77445_NULL_U_0030_U_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
45_PWA360_77445_NULL_U_0008_U_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
37_PWA310_77445_NULL_BG_0001_BG_NULL_0001_29_U_N_Y_N_N_Y_D.PDF PDF
144_PWA360_77445_NULL_U_0107_U_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
111_PWA360_77445_NULL_U_0074_U_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
91_PWA360_77445_NULL_U_0054_U_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
47_PWA360_77445_NULL_U_0010_U_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
292_PWA79360_77445_NULL_C_0063_C_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
227_PWA388_77445_NULL_E_0003_E_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
209_PWA373_77445_NULL_G_0003_G_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
182_PWA360_77445_NULL_U_0145_U_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
160_PWA360_77445_NULL_U_0123_U_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
94_PWA360_77445_NULL_U_0057_U_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
25_PWA11_77445_NULL_CE_0019_CE_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
259_PWA79360_77445_NULL_C_0030_C_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
257_PWA79360_77445_NULL_C_0028_C_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
105_PWA360_77445_NULL_U_0068_U_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
99_PWA360_77445_NULL_U_0062_U_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
59_PWA360_77445_NULL_U_0022_U_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
5_QAD4088463_77445_NULL_NULL_0002_NULL_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
284_PWA79360_77445_NULL_C_0055_C_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
239_PWA79360_77445_NULL_C_0010_C_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
193_PWA360_77445_NULL_U_0156_U_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
180_PWA360_77445_NULL_U_0143_U_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
310_PWA79360_77445_NULL_C_0081_C_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
230_PWA79360_77445_NULL_C_0001_C_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
211_PWA373_77445_NULL_G_0005_G_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
203_PWA367_77445_NULL_R_0004_R_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
121_PWA360_77445_NULL_U_0084_U_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
90_PWA360_77445_NULL_U_0053_U_NULL_0001_8_U_N_Y_N_N_Y_D.PDF PDF
Show all 50

FD2030-20-00400 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F100 / P/N: 4088463

E. CONTRACT / PR NO.

FD20302000400

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

First Article Qualification Test Plan and Procedures

3. SUBTITLE

NSN: 2840-01-619-5780NZ NOUN: LOCKRING,

TURBINE N

4. AUTHORITY

DI-NDTI-81307A

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

AFLCMC/LPSAA

7. DD 250 REQ

SD

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

1 XTIME

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Wynn, Aaron FNAME: 19 MAR 2019DATE:

Block 9: DIST STATEMENT REQUIRED: Distribution Statement A: Approved for public release; distribution is unlimited. Controlling DoD office is 848 SCMG/421 GUEA.

Disposal and destruction notices: Dispose of by putting it in a recycle container or regular trash receptacle.

Block 14: Deliveries shall be submitted on ISO-10149 compliant CD-ROM in Adobe Acrobat Portable Document Format.

Contractor must provide a plan to ensure that all drawing requirements are met on each first article. The plan should include the equipment and facilities utilized to verify all drawing requirements. As a minimum, the following information is required.

a. A list of all drawing dimension, tolerances and the equipment utilized to verify each dimension. An actual drawing should be submitted to correlate with the dimension list.

b. A plan to verify that all non-destructive inspections are met.

c. A plan to verify that all visual inspection requirements are met.

d. A plan to verify material properties to include mechanical properties, metallurgical properties and chemical compositions.

e. A plan to verify that all significant manufacturing processes are performed by sources that are currently approved/certified by the OEM (P&W) or the CEA (AFLCMC/LPSAA).

f. A plan to verify that all forging or casting sources are currently approved/certified by the OEM (P&W) or the CEA (AFLCMC/LPSAA) if applicable. Guidelines for first article test plans are contained within LPF-QAR-003, attached. A government representative must coordinate on the first article test plan. The first article test plan shall be received 30 calendar days from the date of contract.

COORDINATORS:

Ulrich, Scott C AFLCMC / LPSEA 405-734-8798 / 884-8798 18 OCT 2019

AFLCMC/LZPED

3001 Staff Dr, Ste 1AB 85A Tinker AFB, OK 73145-3041 Attn: FA Monitor

0 2 0

0 2 015. TOTAL

G. PREPARED BY

Wynn, Aaron F

421 SCMS / GUMA

405-582-6863

H. DATE

18 OCT 2019

I. APPROVED BY

//DIGITALLY SIGNED//

ZILAR.DALE.N.1221047407

424 SCMS / GUBAB 405-736-7976 / 336-7976

J. DATE

18 OCT 2019

Page 1 of 2DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 18 Nov 2019

PREVIOUS EDITION MAY BE USED.

CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F100 / P/N: 4088463

E. CONTRACT / PR NO.

FD20302000400

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Test/Inspection Report

3. SUBTITLE

NSN: 2840-01-619-5780NZ NOUN: LOCKRING,

TURBINE N

4. AUTHORITY

DI-NDTI-80809B/T

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

AFLCMC/LPSAA

7. DD 250 REQ

SD

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

1 XTIME

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Wynn, Aaron FNAME: 19 MAR 2019DATE:

Block 9: Distribution Statement A: Approved for public release; distribution is unlimited. Controlling DoD office is 848

SCMG/421 GUEA.

Disposal and destruction notices: Dispose of by putting it in a recycle container or regular trash receptacle.

Block 14: Deliveries shall be submitted on ISO-10149 compliant CD-ROM in Adobe Acrobat Portable Document Format.

Contractor format acceptable unless otherwise defined by applicable Data Item Description (DID).

The first article test report shall satisfy all requirements in the first article test plan. All drawing requirements must be satisfied including dimensions, visual inspections, non-destructive inspections (NDIs), manufacturing processes and material requirements. The test report shall indicate that any sources used to perform significant manufacturing processes are approved/certified by the OEM (P&W) or the CEA (AFLCMC/LPSAA).

A copy of the part process sheets shall be provided also. A government representative must coordinate on the test report.

Guidelines for the test reports are contained within LPF-QAR-003 Rev E, attached.

The first article test reports shall be received at OC-ALC/ENRS 120 calendar days from the date of government approval of test plan.

Contractor will include any QAR findings relative to the test report with the final test report submitted to

AFLCMC/LZPED.

COORDINATORS:

Ulrich, Scott C AFLCMC / LPSEA 405-734-8798 / 884-8798 18 OCT 2019

AFLCMC/LZPED

3001 Staff Dr, Ste 1AB 85A Tinker AFB, OK 73145-3041 Attn: FA Monitor

0 2 0

0 2 015. TOTAL

G. PREPARED BY

Wynn, Aaron F

421 SCMS / GUMA

405-582-6863

H. DATE

18 OCT 2019

I. APPROVED BY

//DIGITALLY SIGNED//

ZILAR.DALE.N.1221047407

424 SCMS / GUBAB 405-736-7976 / 336-7976

J. DATE

18 OCT 2019

Page 2 of 2DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 18 Nov 2019

PREVIOUS EDITION MAY BE USED.

File details come from the government source that posted it. Updated .