FCI LEWISBURG SOLICITATION PACKET PROJECT 26Z2BC4 REPLACE ROOFING.pdf

PDF 370 KB Posted

Attached to
FCI LEWISBURG - REPLACE ROOFING Federal contract opportunity
Solicitation number
15B20726Q00000016
Issued by
Department of Justice Bureau of Prisons United States Penitentiary Lewisburg

About this file

This is a Request for Quote (RFQ) solicitation packet issued by the Federal Bureau of Prisons for a firm-fixed-price construction contract to replace roofing at Federal Correctional Institution (FCI) Lewisburg in Lewisburg, Pennsylvania.

Solicitation Details and Requirements: Solicitation number 15B20726Q00000016 is a 100% small business set-aside requiring offerors to be registered in SAM.gov with the applicable NAICS code 236220 and meet the size standard of $45 million or less. The project involves complete replacement of the existing metal roof of the institution's RDAP gym with a new roof as specified in the Statement of Work. The contractor must provide all necessary equipment, labor, materials, and incidentals. The performance period is 118 calendar days from issuance of the notice to proceed, with work expected to begin within 10 days of that notice. The estimated project magnitude ranges between $100,000 and $250,000. All offers must include an offer guarantee and provide a minimum 90-calendar-day acceptance period following the offer due date of August 21, 2026 at 3:00 PM ET.

Evaluation and Submission Requirements: Award will be made using a best-value tradeoff approach evaluating both price and non-price factors in descending order of importance: Technical/Management Approach, Specialized Experience, Schedule, Past Performance, and Price. An organized pre-bid site visit is scheduled for August 11, 2026 at 9:00 AM EST at the institution's front lobby entrance; criminal history checks must be completed and submitted by August 6, 2026 for all attendees. All submissions, including proposals, questions and answers, and the site visit criminal history forms, must be emailed as PDF files to Matthew Adler at m2adler@bop.gov with a deadline of August 21, 2026 at 3:00 PM EST. The contract includes standard federal construction clauses, requires performance and payment bonds at 100% of contract price, workers' compensation insurance of $100,000, comprehensive general liability of $500,000, and comprehensive automobile liability with limits of $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage.

View the file

Other files for this federal contract opportunity

Other files attached to FCI LEWISBURG - REPLACE ROOFING, newest first.
File Type Posted
FCI LEWISBURG SOLICITATION PACKET PROJECT 26Z2BC4 REPLACE ROOFING AMENDMENT 0001.pdf PDF
Wage Determinations DBA PA20260069 Building Mod 3.pdf PDF
Bid Bond SF24.pdf PDF
Criminal History Check Form.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FCI LEWISBURG

SOLICITATION PACKET

PROJECT 26Z2BC4

REPLACE ROOFING

2400 ROBERT F. MILLER DR.,

LEWISBURG PA 17837

PLEASE REVIEW AND COMPLETE ALL

SECTIONS OF THE PACKET

CONTRACTOR INFORMATION SHEET

PLEASE COMPLETE ALL SECTIONS

CONTRACTOR NAME: _________________________

CONTRACTOR ADDRESS: _________________________

CONTRACTOR PHONE NUMBER: _________________________

TAX IDENTIFICATION NUMBER: _________________________

UNIQUE ENTITY INDENTIIER: _________________________

(FORMERLY DUNS)

CAGE CODE: _________________________

CONTRACTOR SIGNATURE: _________________________

Dear Offeror:

Please review all sections of this solicitation packet, the solicitation, and all attachments. This information is essential to submit a valid and complete offer.

The Federal Bureau of Prisons (FBOP) is issuing solicitation 15B20726Q00000016 for the award of a firm-fixed-price construction contract for a project entitled REPLACE ROOFING at the Federal Correctional Institution (FCI Lewisburg), located in Lewisburg, PA.

FCI LEWISBURG is a federal correctional facility located at 2400 Robert F. Miller Dr., Lewisburg PA 17837. The Work of Project is defined by the Contract Documents and consists of the following:

All offers must come with an offer guarantee. All offers are also subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference. Offers must provide a minimum of 90 calendar days for Government acceptance after the date that offers are due. Offers that do not provide this minimum acceptance timeframe may be rejected. Should the offer be accepted within 90 calendar days following the date offers are due, offerors must also perform the work at the prices they specify on the attached SF-1449 solicitation document in strict accordance with the solicitation. The contractor will provide all necessary equipment, labor, materials, and incidentals unless stated otherwise in the Statement of Work to perform a complete replacement of the existing metal roof of the institution RDAP gym with a new roof as specified in the Statement of Work. See the Statement of Work included with the solicitation posting for the complete requirements list.

The contractor is expected to begin work within 10 days of receiving the notice to proceed. The performance period for the project will be 118 Calendar Days from issuance of the notice to proceed.

The NAICS code for this requirement is 236220. Pursuant to Justice Acquisition Regulation (JAR) 2836.204, the estimated magnitude of the project lies between $100,000.00 and $250,000.00. (NOTE: This range is one of 5 available ranges from JAR 2836.204 and is not meant to imply that the project has necessarily been estimated/budgeted to the maximum of the selected range. It merely conveys that the estimate/budget lies somewhere within that range.)

The solicitation will be distributed solely through the Contract Opportunity website at https://www.sam.gov . Hard copies of the solicitation will not be made available. The website provides download instructions.

The "Sensitive /Secure package Upload" option will be selected for this procurement. All secure/locked documents uploaded, to include the solicitation, will require an active SAM vendor registration to obtain access. In addition, only those vendors who have been issued a valid Marketing Partner Identification Number (MPIN) from www.sam.gov will be granted access. If your firm does not have the NAICS code listed in www.sam.gov required for this solicitation, an email may be forwarded to your firm requesting an explanation as to why your firm should be granted access.

https://www.sam.gov/

If you encounter problems accessing these documents, please contact the Federal Service Desk at 866-606-8220. All future information about this solicitation, including any amendments, will also be distributed solely through this website. Interested parties are responsible for continuously monitoring this website to ensure that they have the most recent information about this proposed contract action.

IMPORTANT: Any contractor interested in obtaining a contract award with the Federal Bureau of Prisons must be registered in https://www.sam.gov. In order to qualify for award, your business size metrics information entered in your www.sam.gov SAM registration must be less than or equal to the size standard specified above.

Each offeror’s www.sam.gov registration will be reviewed by the Government to confirm that your business size meets the small business size standard requirement. All offerors are urged to double-check their www.sam.gov registration and update as necessary, including the size metrics information.

This is a 100 percent small business set-aside. You must be registered in www.sam.gov as a small business for the applicable NAICS code (see FAR provision 52.219-1 in the Representations & Certifications section of your www.sam.gov registration).

System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include:

• 52.222-25, Affirmative Action Compliance, and

• 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services, paragraph (d).

• 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals— Representation, and

• paragraph (t) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services.

Contracting officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM

Pre-Bid Site Visit

(a) An organized site visit has been scheduled for Tuesday, August 11, 2026, at 9:00 A.M. EST

(b) Participants will meet at 2400 Robert F. Miller Dr., Lewisburg PA 17837 at the front lobby entrance to the institution.

(c) A criminal history check must be completed for all site visit attendees, and all site visit attendees must pass the criminal history check. For convenience, the applicable form has been included to the attachments of this solicitation named “Criminal History Check Form”. Forms must be submitted to Matthew Adler at (m2adler@bop.gov). All documents must be sent in PDF format. No call, fax, or other forms of correspondence for submission will be accepted. Forms must be submitted by August 6, 2026, at 3:00 PM EST.

mailto:m2adler@bop.gov

Q&A

All Q&A submissions must be sent by email to Matthew Adler at (m2adler@bop.gov). No call or fax submissions will be accepted. All documents must be sent in PDF format. All Q&A submissions must be turned into this email no later than August 12, 2026, at 3:00 PM EST. Any late submissions are subject to not being accepted.

Evaluation Factors

This acquisition will be utilizing FAR policy 15.103-1, Tradeoff approach. Therefore, the award will be made based on an evaluation of both price and non-cost and non-price factors to determine the best value to the government.

Best Value Tradeoff

Under this method, the Government will evaluate quotes using the best value trade-off approach. The following evaluation factors that will be used are listed in descending order of importance:

Factor I – Technical / Management Approach: Evaluation of the Offeror’s understanding of the work, construction phasing, site coordination, staffing plan, safety and quality control approach, and ability to perform while the facility remains operational. Offerors are required to provide a technical proposal addressing ability to perform all sections of the statement of work (SOW).

Factor II – Specialized Experience: Evaluation of the relevance and depth of experience on projects of similar size, scope, complexity, and security environment.

Factor III – Schedule: Evaluation of the realism, completeness, and feasibility of the proposed construction schedule, including identification of critical path activities.

Factor IV – Past Performance: Evaluation of prior performance information obtained from CPARS, PPQs, and other Government sources for similar construction projects.

Factor V – Price: Evaluation of price for reasonableness and consistency with the proposed technical approach.

Proposal Submission

All submissions must be emailed to Matthew Adler at (m2adler@bop.gov). No call or fax submissions will be accepted for this acquisition. All documents must be sent in PDF format. No call, fax, or other forms of correspondence for submission will be accepted. All proposal submissions must be turned into this email no later than August 21, 2026, at 3:00 PM EST. Any late submissions are subject to not being accepted.

15B20726Q00000016 Page 1 of 24

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24 AND 30.

1. REQUISITION NUMBER

15B20726PR000379

PAGE 1 OF

5. SOLICITATION NUMBER

15B20726Q00000016

2. CONTRACT NUMBER 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 6. SOLICITATION ISSUE

DATE

07/31/2026

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

Matthew Adler m2adler@bop.gov

b. TELEPHONE NUMBER (No collect calls) 8. OFFER DUE DATE / LOCAL

TIME

08/21/2026 15:00 ET

CODE 15B207

USP LEWISBURG

2400 ROBERT F MILLER DRIVE

LEWISBURG, PA 17837

9. ISSUED BY UNRESTRICTED OR X SET ASIDE:100.00 % FOR

X SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

WOMEN-OWNED SMALL

BUSINESS (WOSB)

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL BUSINESS

(EDWOSB)

8(A)

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

236220

SIZE STANDARD:

45000000

10. THE ACQUISITION IS

SEE SCHEDULE

11. DELIVERY FOR FREE ON BOARD

(FOB) DESTINATION UNLESS

BLOCK IS MARKED

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER THE

DEFENSE PRIORITIES AND

ALLOCATIONS SYSTEM -

DPAS (15 CFR 700)

13b. RATING

X REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

14. METHOD OF SOLICITATION

15B207CODE15. DELIVER TO

USP LEWISBURG

2400 ROBERT F MILLER DRIVE

LEWISBURG, PA 17837

CODE 15B20716. ADMINISTERED BY

USP LEWISBURG

2400 ROBERT F MILLER DRIVE

LEWISBURG, PA 17837

Matthew Adler m2adler@bop.gov

FACILITY

CODE

CODE

TELEPHONE NUMBER

17a. CONTRACTOR/

OFFEROR

15B207CODE18a. PAYMENT WILL BE MADE BY

USP LEWISBURG

2400 ROBERT F MILLER DRIVE

LEWISBURG, PA 17837

Nickole Zak

(O) 570-522-7644 nzak@bop.gov

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER SEE ADDENDUM

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

FCI LEWISBURG

REPLACE ROOFING #26Z2BC4

OFFERORS MUST READ AND COMPLETE ALL

SECTIONS OF THE SOLICITATION PACKET

Firm Fixed Price

See Continuation Sheet(s) (Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

ARE ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

X 28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1 COPIES TO

ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH

OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE

TERMS AND CONDITIONS SPECIFIED.

29. AWARD OF CONTRACT: REFERENCE _____________________________

OFFER DATED _________________ . YOUR OFFER ON SOLICITATION (BLOCK

5) INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED 31b. NAME OF THE CONTRACTING OFFICER (Type or print)

Matthew L Adler

31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

15B20726Q00000016 Page 2 of 24

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: _________________________________

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

PARTIAL FINAL

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

COMPLETE PARTIAL FINAL

36. PAYMENT 37. CHECK NUMBER

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 42a. RECEIVED BY (Print)

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 11/2021) BACK

15B20726Q00000016 Page 3 of 24

Table of Contents

Section Description Page Number

Solicitation/Contract Form 1 Commodity or Services Schedule 2 Contract Clauses

52.202-1 Definitions (Jun 2020) 52.203-3 Gratuities (Apr 1984) 52.203-5 Covenant Against Contingent Fees (May 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government (Jun 2020) 52.203-7 Anti-Kickback Procedures (Jun 2020) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (May 2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (May 2014) 52.203-12 Limitation On Payments to Influence Certain Federal Transactions (Jun 2020) 52.203-17 Contractor Employee Whistleblower Rights (Nov 2023) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) 52.204-9 Personal Identity Verification of Contractor Personnel (Jan 2011) 52.204-13 (DEV) System for Award Management-Maintenance (Oct 2018) (DEVIATION NOV 2025) 52.204-14 (DEV) Service Contract Reporting Requirements (Oct 2016) (DEVIATION NOV 2025) 52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014) 52.209-6 (DEV) Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded (Jan 2025)

(DEVIATION NOV 2025)

52.209-9 (DEV) Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) (DEVIATION NOV 2025) 52.209-10 (DEV) Prohibition on Contracting With Inverted Domestic Corporations (Nov 2015)

(DEVIATION NOV 2025)

52.211-12 Liquidated Damages-Construction (Sept 2000) 52.212-4 (DEV) Terms and Conditions-Commercial Products and Commercial Services (Nov

2023) (DEVIATION NOV 2025)

52.215-21 Alt IV (DEV) Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data-Modifications (Nov 2021) - Alternate IV (DEVIATION DEC 2025) 52.219-14 (DEV) Limitations on Subcontracting (Oct 2022) (DEVIATION DEC 2025) 52.222-1 (DEV) Notice to the Government of Labor Disputes (Feb 1997) (DEVIATION DEC 2025) 52.222-3 (DEV) Convict Labor (June 2003) (DEVIATION DEC 2025) 52.222-4 (DEV) Contract Work Hours and Safety Standards--Overtime Compensation (May

2018) (DEVIATION DEC 2025)

52.222-7 (DEV) Withholding of Funds (May 2014) (DEVIATION DEC 2025) 52.222-8 (DEV) Payrolls and Basic Records (Jul 2021) (DEVIATION DEC 2025) 52.222-9 (DEV) Apprentices and Trainees (July 2005) (DEVIATION DEC 2025) 52.222-10 (DEV) Compliance with Copeland Act Requirements (Feb 1988) (DEVIATION DEC 2025) 52.222-11 (DEV) Subcontracts (Labor Standards) (May 2014) (DEVIATION DEC 2025) 52.222-12 Contract Termination - Debarment (May 2014) 52.222-14 (DEV) Disputes Concerning Labor Standards (Feb 1988) (DEVIATION DEC 2025) 52.222-15 Certification of Eligibility (May 2014) 52.222-35 (DEV) Equal Opportunity for Veterans (Jun 2020) (DEVIATION DEC 2025) 52.222-37 (DEV) Employment Reports on Veterans (Jun 2020) (DEVIATION DEC 2025) 52.222-40 (DEV) Notification of Employee Rights Under the National Labor Relations Act (Dec

2010) (DEVIATION DEC 2025)

52.222-50 (DEV) Combating Trafficking in Persons (Oct 2025) (DEVIATION DEC 2025) 52.222-54 (DEV) Employment Eligibility Verification (Jan 2025) (DEVIATION DEC 2025)

15B20726Q00000016 Page 4 of 24

52.222-55 (DEV) Minimum Wages for Contractor Workers Under Executive Order 14026 (Jan

2022) (DEVIATION DEC 2025)

52.222-62 (DEV) Paid Sick Leave Under Executive Order 13706 (Jan 2022) (DEVIATION

DEC 2025)

52.222-90 Addressing DEI Discrimination by Federal Contractors (APR 2026) 52.223-5 Pollution Prevention and Right-to-Know Information (May 2024) 52.223-23 (DEV) Sustainable Products (May 2024) (DEVIATION DEC 2025) 52.226-7 Drug-Free Workplace (May 2024) 52.226-8 Encouraging Contractor Policies To Ban Text Messaging While Driving (May 2024) 52.227-1 Authorization and Consent (Jun 2020) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (Jun 2020) 52.228-2 Additional Bond Security (Oct 1997) 52.228-5 Insurance-Work on a Government Installation (Jan 1997) 52.228-11 Individual Surety-Pledge of Assets (Feb 2021) 52.228-12 Prospective Subcontractor Requests for Bonds (Dec 2022) 52.228-14 Irrevocable Letter of Credit (Nov 2014) 52.229-3 (DEV) Federal, State, And Local Taxes (Feb 2013) (DEVIATION AUG 2025) 52.229-12 (DEV) Tax on Certain Foreign Procurements (Feb 2021) (DEVIATION AUG 2025) 52.232-17 Interest (May 2014) 52.232-23 Assignment of Claims (May 2014) 52.232-33 Payment by Electronic Funds Transfer-System for Award Management (Oct 2018) 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) 52.233-1 Alt I (DEV) Disputes (May 2014) - Alternate I (Dec 1991) (DEVIATION NOV 2025) 52.233-3 (DEV) Protest after Award (Aug 1996) (DEVIATION NOV 2025) 52.233-4 (DEV) Applicable Law for Breach of Contract Claim (Oct 2004) (DEVIATION NOV 2025) 52.236-2 (DEV) Differing Site Conditions (Apr 1984) (DEVIATION AUG 2025) 52.236-5 (DEV) Material and Workmanship (Apr 1984) (DEVIATION AUG 2025) 52.236-6 (DEV) Superintendence by the Contractor (Apr 1984) (DEVIATION AUG 2025) 52.236-7 (DEV) Permits and Responsibilities (Nov 1991) (DEVIATION AUG 2025) 52.236-8 (DEV) Other Contracts (Apr 1984) (DEVIATION AUG 2025) 52.236-9 (DEV) Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984) (DEVIATION AUG 2025) 52.236-10 (DEV) Operations and Storage Areas (Apr 1984) (DEVIATION AUG 2025) 52.236-11 (DEV) Use and Possession Prior to Completion (Apr 1984) (DEVIATION AUG 2025) 52.236-12 (DEV) Cleaning Up (Apr 1984) (DEVIATION AUG 2025) 52.236-13 Alt I (DEV) Accident Prevention (Nov 1991) - Alternate I (Nov 1991) (DEVIATION

AUG 2025)

52.236-14 (DEV) Availability and Use of Utility Services (Apr 1984) (DEVIATION AUG 2025) 52.236-17 (DEV) Layout of Work (Apr 1984) (DEVIATION AUG 2025) 52.242-13 Bankruptcy (July 1995) 52.243-4 (DEV) Changes (June 2007) (DEVIATION JUL 2025) 52.244-6 (DEV) Subcontracts for Commercial Products and Commercial Services (Jan 2025)

(DEVIATION APR 2026)

52.249-2 Alt I Termination for Convenience of the Government (Fixed-Price) (Apr 2012) - Alternate I (Sept 1996) 52.252-6 Authorized Deviations in Clauses (Nov 2020) 52.253-1 (DEV) Computer Generated Forms (Jan 1991) (DEVIATION NOV 2025) DOJ-01 Whistleblower Information Distribution (Oct 2021) DOJ-02 Contractor Privacy Requirements (JAN 2022) DOJ-03 Personnel Security Requirements For Contractor Employees (Nov 2021)

15B20726Q00000016 Page 5 of 24

DOJ-05 Security of Department Information and Systems (APR 2026) DOJ-08 Continuing Contract Performance During a Pandemic Influenza or other National Emergency (OCT 2007) FAO-0001 Bonds FAO-0002 Magnitude FAO-0003 Required Insurance FAO-0004 Pre-Construction Conference FAO-0005 Submittals FAO-0006 Contractor Use of Premises FAO-0007 Payment Services FAO-0008 Request for Final Inspection FAO-0009 Contract Security (Program Statement 3000.03 Human Resource Management Manual) FAO-0010 Assignment of Contract Administration Office and Functions FAO-0011 Schedule of Values FAO-0012 Progress Meetings FAO-0013 Contract Closeout Procedures (for construction contracts exceeding $150,000) FAO-0015 Changes FAO-0016 Equitable Adjustments: Waiver and Release of Claims

3 List of Attachments 4 Solicitation Provisions

52.233-2 (DEV) Service of Protest (Sep 2006) (DEVIATION NOV 2025) 52.236-27 Alt I Site Visit (Construction) (Feb 1995) - Alternate I (Feb 1995)

15B20726Q00000016 Page 6 of 24

Section 1 - Commodity or Services Schedule

SCHEDULE OF SUPPLIES/SERVICES

CONTINUATION SHEET

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 The selected contractor shall provide all materials, labor, and equipment to complete the project "REPLACE ROOFING" at FCI Lewisburg in accordance with the attached Statement of Work.

PSC: Z2FF

Delivery Schedule:

Delivery Description:

Delivery Number: 1 Delivery Required On:

Quantity: 194,750.000000

Place of Performance Address:

USP LEWISBURG

2400 ROBERT F MILLER DRIVE

LEWISBURG, PA 17837

194,750 EA $________ $_________________

The selected contractor shall provide all materials, labor, and equipment to complete the project "REPLACE ROOFING" at FCI Lewisburg in accordance with the attached Statement of Work.

15B20726Q00000016 Page 7 of 24

Section 2 - Contract Clauses

A.1 ADDENDUM TO FAR 52.212-4, Terms and Conditions-Commercial Products and Commercial Services (Nov

2023) (DEVIATION NOV 2025)

The terms and conditions for the following clauses are hereby incorporated into this solicitation and resulting contract as an addendum to FAR clause 52.212-4.

Clauses By Reference

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.acquisition.gov

Clause Title Fill-ins (if applicable)

52.202-1 Definitions (Jun 2020)

52.203-3 Gratuities (Apr 1984)

52.203-5 Covenant Against Contingent Fees (May 2014)

52.203-6 Restrictions on Subcontractor Sales to the Government

(Jun 2020)

52.203-7 Anti-Kickback Procedures (Jun 2020)

52.203-8 Cancellation, Rescission, and Recovery of Funds for

Illegal or Improper Activity (May 2014)

52.203-10 Price or Fee Adjustment for Illegal or Improper Activity

(May 2014)

52.203-12 Limitation On Payments to Influence Certain Federal

Transactions (Jun 2020)

52.203-17 Contractor Employee Whistleblower Rights (Nov 2023)

52.203-19 Prohibition on Requiring Certain Internal Confidentiality

Agreements or Statements (Jan 2017)

52.204-9 Personal Identity Verification of Contractor Personnel

(Jan 2011)

15B20726Q00000016 Page 8 of 24

Clause Title Fill-ins (if applicable)

52.204-13 (DEV) System for Award Management-Maintenance (Oct 2018)

(DEVIATION NOV 2025)

52.204-14 (DEV) Service Contract Reporting Requirements (Oct 2016)

(DEVIATION NOV 2025)

52.204-19 Incorporation by Reference of Representations and

Certifications (Dec 2014)

52.209-6 (DEV) Protecting the Government's Interest When

Subcontracting with Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded (Jan

2025) (DEVIATION NOV 2025)

52.209-9 (DEV) Updates of Publicly Available Information Regarding

Responsibility Matters (Oct 2018) (DEVIATION NOV

2025)

52.209-10 (DEV) Prohibition on Contracting With Inverted Domestic

Corporations (Nov 2015) (DEVIATION NOV 2025)

52.211-12 Liquidated Damages-Construction (Sept 2000) (a): "$1041.77"

52.212-4 (DEV) Terms and Conditions-Commercial Products and

Commercial Services (Nov 2023) (DEVIATION NOV

2025)

52.215-21 Alt IV (DEV) Requirements for Certified Cost or Pricing Data and

Data Other Than Certified Cost or Pricing Data-

Modifications (Nov 2021) - Alternate IV (DEVIATION

DEC 2025)

52.219-14 (DEV) Limitations on Subcontracting (Oct 2022) (DEVIATION

DEC 2025)

(f)(1) End of Base Term: "X"

52.222-1 (DEV) Notice to the Government of Labor Disputes (Feb 1997)

(DEVIATION DEC 2025)

52.222-3 (DEV) Convict Labor (June 2003) (DEVIATION DEC 2025)

52.222-4 (DEV) Contract Work Hours and Safety Standards--Overtime

Compensation (May 2018) (DEVIATION DEC 2025)

15B20726Q00000016 Page 9 of 24

52.222-7 (DEV) Withholding of Funds (May 2014) (DEVIATION DEC

2025)

52.222-8 (DEV) Payrolls and Basic Records (Jul 2021) (DEVIATION

DEC 2025)

52.222-9 (DEV) Apprentices and Trainees (July 2005) (DEVIATION DEC

2025)

52.222-10 (DEV) Compliance with Copeland Act Requirements (Feb

1988) (DEVIATION DEC 2025)

52.222-11 (DEV) Subcontracts (Labor Standards) (May 2014)

(DEVIATION DEC 2025)

52.222-12 Contract Termination - Debarment (May 2014)

52.222-14 (DEV) Disputes Concerning Labor Standards (Feb 1988)

(DEVIATION DEC 2025)

52.222-15 Certification of Eligibility (May 2014)

52.222-35 (DEV) Equal Opportunity for Veterans (Jun 2020) (DEVIATION

DEC 2025)

52.222-37 (DEV) Employment Reports on Veterans (Jun 2020)

(DEVIATION DEC 2025)

52.222-40 (DEV) Notification of Employee Rights Under the National

Labor Relations Act (Dec 2010) (DEVIATION DEC

2025)

52.222-50 (DEV) Combating Trafficking in Persons (Oct 2025)

(DEVIATION DEC 2025)

52.222-54 (DEV) Employment Eligibility Verification (Jan 2025)

(DEVIATION DEC 2025)

52.222-55 (DEV) Minimum Wages for Contractor Workers Under

Executive Order 14026 (Jan 2022) (DEVIATION DEC

2025)

52.222-62 (DEV) Paid Sick Leave Under Executive Order 13706 (Jan

2022) (DEVIATION DEC 2025)

15B20726Q00000016 Page 10 of 24

52.222-90 Addressing DEI Discrimination by Federal Contractors

(APR 2026)

52.223-5 Pollution Prevention and Right-to-Know Information

(May 2024)

52.223-23 (DEV) Sustainable Products (May 2024) (DEVIATION DEC

2025)

52.226-7 Drug-Free Workplace (May 2024)

52.226-8 Encouraging Contractor Policies To Ban Text

Messaging While Driving (May 2024)

52.227-1 Authorization and Consent (Jun 2020)

52.227-2 Notice and Assistance Regarding Patent and Copyright

Infringement (Jun 2020)

52.228-2 Additional Bond Security (Oct 1997)

52.228-5 Insurance-Work on a Government Installation (Jan

1997)

52.228-11 Individual Surety-Pledge of Assets (Feb 2021)

52.228-12 Prospective Subcontractor Requests for Bonds (Dec

2022)

52.228-14 Irrevocable Letter of Credit (Nov 2014)

52.229-3 (DEV) Federal, State, And Local Taxes (Feb 2013)

(DEVIATION AUG 2025)

52.229-12 (DEV) Tax on Certain Foreign Procurements (Feb 2021)

(DEVIATION AUG 2025)

52.232-17 Interest (May 2014)

52.232-23 Assignment of Claims (May 2014)

52.232-33 Payment by Electronic Funds Transfer-System for

Award Management (Oct 2018)

52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013)

52.232-40 Providing Accelerated Payments to Small Business

Subcontractors (Mar 2023)

15B20726Q00000016 Page 11 of 24

52.233-1 Alt I (DEV) Disputes (May 2014) - Alternate I (Dec 1991)

(DEVIATION NOV 2025)

52.233-3 (DEV) Protest after Award (Aug 1996) (DEVIATION NOV 2025)

52.233-4 (DEV) Applicable Law for Breach of Contract Claim (Oct 2004)

(DEVIATION NOV 2025)

52.236-2 (DEV) Differing Site Conditions (Apr 1984) (DEVIATION AUG

2025)

52.236-5 (DEV) Material and Workmanship (Apr 1984) (DEVIATION

AUG 2025)

52.236-6 (DEV) Superintendence by the Contractor (Apr 1984)

(DEVIATION AUG 2025)

52.236-7 (DEV) Permits and Responsibilities (Nov 1991) (DEVIATION

AUG 2025)

52.236-8 (DEV) Other Contracts (Apr 1984) (DEVIATION AUG 2025)

52.236-9 (DEV) Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984)

(DEVIATION AUG 2025)

52.236-10 (DEV) Operations and Storage Areas (Apr 1984) (DEVIATION

AUG 2025)

52.236-11 (DEV) Use and Possession Prior to Completion (Apr 1984)

(DEVIATION AUG 2025)

52.236-12 (DEV) Cleaning Up (Apr 1984) (DEVIATION AUG 2025)

52.236-13 Alt I (DEV) Accident Prevention (Nov 1991) - Alternate I (Nov 1991)

(DEVIATION AUG 2025)

52.236-14 (DEV) Availability and Use of Utility Services (Apr 1984)

(DEVIATION AUG 2025)

52.236-17 (DEV) Layout of Work (Apr 1984) (DEVIATION AUG 2025)

52.242-13 Bankruptcy (July 1995)

52.243-4 (DEV) Changes (June 2007) (DEVIATION JUL 2025)

52.244-6 (DEV) Subcontracts for Commercial Products and Commercial

Services (Jan 2025) (DEVIATION APR 2026)

15B20726Q00000016 Page 12 of 24

52.249-2 Alt I Termination for Convenience of the Government (Fixed-

Price) (Apr 2012) - Alternate I (Sept 1996)

52.252-6 Authorized Deviations in Clauses (Nov 2020)

52.253-1 (DEV) Computer Generated Forms (Jan 1991) (DEVIATION

NOV 2025)

DOJ-01 Whistleblower Information Distribution (Oct 2021)

DOJ-02 Contractor Privacy Requirements (JAN 2022)

DOJ-03 Personnel Security Requirements For Contractor

Employees (Nov 2021)

DOJ-05 Security of Department Information and Systems (APR

2026)

DOJ-08 Continuing Contract Performance During a Pandemic

Influenza or other National Emergency (OCT 2007)

Clauses By Full Text

52.252-2 Clauses Incorporated by Reference (Feb 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

https://www.acquisition.gov https://www.acquisition.gov/far-overhaul [Insert one or more Internet addresses]

(End of clause)

FAO-0001 Bonds

(a) Bid Guarantee. Each bidder shall submit with his bid a Bid Bond (Standard Form 24) with good and sufficient surety or sureties acceptable to the Government, or other security as provided in provision 52.228-1, in the form of twenty percent (20) of the bid price or not to exceed $3,000,000. The bid bond penalty may be expressed in terms of a percentage of the bid price or may be expressed in dollars and cents. A bid bond is not required for bids of $150,000 or less. (FAR 28.102-1)

(b) Performance and Payment Bonds. Within 10 days after award the contractor shall execute and submit to the Contracting Officer two bonds, each with good and sufficient surety or sureties acceptable to the Government, as follows;

a Performance Bond (Standard Form 25) and a Payment Bond (Standard Form 25A). The penal sums of such bonds will be as follows: (Not required for contracts of $150,000 or less)

15B20726Q00000016 Page 13 of 24

(1) Performance Bond: The penal sum of performance bonds at the time of contract award shall be 100 percent of the original contract price.

(2) Payment Bond: The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.

(c) For construction contracts greater than $35,000 but not greater than $150,000, the Contracting Officer shall select two or more of the following payment protections, giving particular consideration to inclusion of an irrevocable letter of credit as one of the selected alternatives (FAR 28.102-1(b)(1)):

(1) A Payment Bond;

(2) An irrevocable letter of credit (ILC);

(3) A tripartite escrow agreement;

(4) A Certificate of Deposit; or

(5) A deposit of the types of security listed in 28.204-1 and 28.204-2.

(d) Individual Sureties.

(1) Bidders may elect to furnish individual surety bonds. If individual surety bonds are furnished for bid guarantees, payment or performance bonds, the individual sureties must submit their bonds proof of ownership and value of the assets which they claim in their net worth at time of bid opening. The Government's preferred method of proof is to have a statement of net worth prepared by a Certified Public Accountant (CPA) in accordance with Generally Accepted Accounting Principles (GAAP). Statements from a CPA that contain disclaimers are not acceptable. The statement of net worth on the Standard Form 28, Affidavit of Individual Surety, is insufficient and will not be accepted without additional proof of value and ownership.

(2) Bidders are cautioned that individual sureties must provide complete and detailed information in Block 9 of Standard Form 28 concerning other contracts on which they have provided bonds. This information shall include contract number, contract location, amount, and type of bond and telephone number of the involved contracting office. Failure to provide the proof and information required may result in rejection of the bid or termination of the contract for failure to provide adequate bonds.

FAO-0002 Magnitude

The magnitude of this project is between $100,000.00 and $250,000.00.

FAO-0003 Required Insurance

See FAR 52.228-5, Insurance - Work on a Government Installation.

The Contractor shall, at its own expense, provide and maintain during the entire performance period of this contract, at least the kinds and minimum amounts of insurance required in the

Schedule or elsewhere in the contract.

TYPE AMOUNT

(1) WORKERS COMPENSATION & EMPLOYER'S LIABILITY $100,000

15B20726Q00000016 Page 14 of 24

The required Workmen's Compensation Insurance shall extend to cover employee's liability for accidental bodily injury or death and for occupational disease with a minimum liability of $100,000.

(2) COMPREHENSIVE GENERAL LIABILITY with a minimum limit of:

PER ACCIDENT OR

OCCURRENCE FOR BODILY INJURY $500,000

This insurance shall include contractor's protective and contractual liability.

(3) COMPREHENSIVE AUTOMOBILE LIABILITY with the following minimum limits:

PER PERSON $200,000

PER OCCURRENCE FOR BODILY INJURY $500,000

PER OCCURRENCE FOR PROPERTY DAMAGE $ 20,000

FAO-0004 Pre-Construction Conference

(a) Prior to the start of construction, Contracting Officers shall call a conference with the contractor, subcontractor(s), Warden, Controller/Business Administrator, Safety Manager, Facilities Administrator, Project Representative, A&E firm, Captain and other interested personnel to discuss the statutory labor standards, prevailing wage requirements, submission of the contractor's payrolls, subcontractor's responsibilities, institution work schedules, local policies, contraband, parking, storage of vehicles and equipment, etc.

Minutes of the conference shall be recorded, listing the names and titles of all attendees, and the subject matter of all items covered. The minutes shall be signed by the contractor and the Contracting Officer, and a signed copy placed in the contract file.

(b) The Contractor shall familiarize himself/herself with all procedures involved in normal institution routines. Any requirements which may constitute a problem or result in conflict, will be brought to the attention of the Contracting Officer or his representative for determination.

FAO-0005 Submittals

Within 10 calendar days after commencement of work or as otherwise established by the Contracting Officer, all materials and articles requiring approval, as contemplated by the Materials and Workmanship clause, shall be submitted by the contractor.

The submittal process is in place to allow the Government the opportunity to determine whether materials or procedures used by the contractor are in accordance with contract requirements. It is ultimately the Contractor's responsibility via the quality control process to ensure submittal items installed under the contract and work performed on site are in accordance with industry standards and general practices.

(a) The types of submittal requirements specified in this contract may include, but is not limited to; shop drawings, product data, samples, certificates of conformance or compliance, certified test or inspection reports, equipment, 15B20726Q00000016 Page 15 of 24 materials, and miscellaneous work related submittals for construction. Individual submittal requirements are generally specified in applicable sections for each unit of work in the specifications and/or as a whole in one section in the statement of work.

(b) The Bureau of Prisons (BOP) Contracting Officer’s Representative (COR) shall act for the Contracting Officer in the review and acceptance of all submittals. The Contractor shall submit submittals as required by the contract/specificat ions to the COR for transmittal to the Contracting Officer. Fabrication of any work or purchase or use of any submittals (such as materials for which samples are required or equipment, etc.) shall not take place until written acceptance is given by the COR, except at the Contractor's own risk.

(c) The Contractor shall submit all shop drawings and submittals sufficiently in advance (unless otherwise specified in the specifications) of the construction requirements to allow ample time for checking, re-submitting, and re-checking.

(d) Failure of any materials to pass their specified tests shall be sufficient cause for refusal to consider, under this contract, any further samples of the same brand or make of that material. The Government reserves the right to disapprove any material or equipment which has previously proven unsatisfactory in service.

(e) The Contracting Officer’s or designee’s approval or acceptance of submittals is not to be construed as a complete check. Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor is responsible for the satisfactory construction of all work. The Contractor is responsible for delivering a final product/system that is operational as intended by the contract requirements, regardless of any Government approvals or acceptance of submittals. The Government assumes no liability during the submittal approval/acceptance process. It is the sole responsibility of the Contractor to deliver a properly functioning product or system.

FAO-0006 Contractor Use of Premises

Work Hours The project schedule is based on a normal forty (40) hour work week, eight (8) hours per day, Monday through Friday, excluding Federal holidays. The Contracting Officer’s Representative (COR) shall establish the work hour time frames for the duration of the project, subject to the approval of the Contracting Officer. Work hours and work days may be altered only with a 48 hour advance approval of the Contracting Officer.

NOTE: Access to the site will be available during normal working hours except during emergencies. It shall be the responsibility of the Contractor to familiarize himself, his employees, and his subcontractors of the working hours and conditions in the correctional facility, as working hours may not constitute a full eight hour day. The Government assumes no responsibility to the Contractor, nor to any of his subcontractors, for shorter hours due to institutional emergencies or entry and/or exit of workers necessitated by normal institution routines. The procedures and institutional entrance/ exit routines applicable to this project will be explained at both the pre-bid conference/site visit and the pre-construction meeting.

Contraband The Contractor shall inform his employees that intoxicating beverages, drugs, weapons, etc., will not be allowed on the site. Introduction of contraband shall be subject to the penalties prescribed by Title 18 USC-1791.

Explosives The use of explosives is absolutely forbidden without written authorization from the Contracting Officer.

Parking and Temporary Office Parking will be available at the site to the extent it does not interfere with construction activities. Otherwise, parking shall be provided for by the Contractor, at his expense, off the site for workmen employed on the project. Any temporary field office used by the Contractor shall be located in an area approved by the COR.

Safety and Accident Prevention In performing work under this contract the contractor shall:

(a) Conform to the specific safety requirements established by this contract;

(b) Comply with the safety rules of the Government institution that concern related activities not directly addressed in this contract;

15B20726Q00000016 Page 16 of 24

(c) Take all reasonable steps and precautions to prevent accidents and preserve the life and health of contractor and Government personnel performing or in any way coming in contact with the performance of this contract; and

(d) Take such additional immediate precautions as the Contracting Officer and/or COR may reasonably require for safety and accident prevention purposes.

FAO-0007 Payment Services

(a) Original application for payment shall be prepared on AIA (American Institute of Architects) Form G-702 "Application and Certificate for Payment" and submitted to the Contracting Officer. The contractor may use another form;

however, it shall contain similar information as the AIA Form G-702. The Contracting Officer’s Representative (COR) will approve the amount of payment by signing. The approved application for payment shall be forwarded as follows: Original to Accounting; Copy for Contract Award File.

(b) All small business contractors are required to self-certify on all invoices their small business status.

(c) The following information is required with each application for payment:

• Name and address of contractor

• Contract number

• Contractor invoice/application for payment number

• Description, price, and quantity of construction completed/rendered

• Payment terms (reference the contract payment clause)

• Other substantiating documentation or information required by the contract

• Name, title, and phone number of official to be notified in the event of a defective invoice

• Contractor TIN (Tax ID Number)

FAO-0008 Request for Final Inspection

The Contractor shall give the Contracting Officer’s Representative (COR) a minimum of ten (10) working days advanced written notice of the date on which the work will be fully completed and ready for the Government’s final inspection.

FAO-0009 Contract Security (Program Statement 3000.03 Human Resource Management Manual)

In addition to the information contained in clause “DOJ-03 Personnel Security Requirements For Contractor Employees (Nov 2021); (Alt. I) -- Classified Information –

Cleared

Contractors”, the following additional security is required to be completed and submitted for all contract employees who will be working under the terms of the contract:

Criminal History Check – BP-A0660

CJIS Name Check Request Form

BOP Contractor Pre-employment Questionnaire

BOP Authority for Release of Information

FAO-0010 Assignment of Contract Administration Office and Functions

Pursuant to FAR 42.201 and 42.202, the assigned Contract Administration Office is listed in Block 26 of the Standard Form 1442 Back. This assignment carries with it the authority to perform all of the contract administration functions listed in FAR 42.302(a) and 42.302(b) to the extent that those functions apply to the contract.

The Contract Administration Office is required, however, to obtain written authorization from the Procuring Contracting Officer (PCO) to perform any function listed under 42.302(b). Specifically, the Administrative Contracting Officer (ACO) is required to obtain written authorization to perform the below referenced functions FOR CONSTRUCTION CONTRACT

AWARDS:

15B20726Q00000016 Page 17 of 24

(1) Negotiate or negotiate and execute supplemental agreements incorporating contractor proposals resulting from change orders issued under the Changes clause. Before completing negotiations, coordinate any delivery schedule change with the contracting office.

(2) Negotiate prices and execute priced exhibits for unpriced orders issued by the contracting officer under basic ordering agreements.

(3) Negotiate or negotiate and execute supplemental agreements changing contract delivery schedules.

(4) Complete Contractor Performance Assessment Report System (CPARS) evaluations of contractor performance in accordance with FAR Subpart 42.15.

Should any other function under FAR Subpart 42.15 not listed above be required, the ACO is required to contact the PCO for authority.

FAO-0011 Schedule of Values

The Contractor shall prepare a Schedule of Values (SOV) for the project and submit to the Contracting Officer for approval prior to submitting the first application for payment. The SOV shall be correlated with the construction schedule.

The SOV shall be formatted per the Construction Specification Institute Master Format structure. The Contractor may propose an alternate organizational format to the Contracting Officer for approval.

(a) The SOV shall include:

(1) Project name, location, and contract number;

(2) Contractor’s name and address;

(3) Date of submittal.

(b) The SOV shall be arranged in a tabular form with separate columns to indicate the following for each item listed:

(1) Description of Work or Material;

(2) Related specification section, if applicable;

(3) Name of subcontractor, if applicable;

(4) Name of manufacturer or fabricator, if applicable;

(5) Name of supplier, if applicable;

(6) Change orders (modifications) that have affected value, if applicable;

(7) Dollar value;

(8) Percentage of Contract sum rounded to the nearest percent, adjusted to total 100 percent.

(c) The SOV shall breakdown the contract sum in sufficient detail to facilitate continued evaluation of applications for payment and progress reports. The contractor should separate principal subcontract amounts down into several line items.

(d) SOV amounts shall be rounded to the nearest whole dollar. The total of all SOV amounts shall equal the total contract amount.

(e) The contractor shall progress the percentage of completion, with the concurrence of the Contracting Officer’s Representative, for each value in conjunction with the preparation of each monthly application for payment. The progressed value percentages shall directly correlate to the calculated total amount due for each monthly progress payment.

15B20726Q00000016 Page 18 of 24

(f) The SOV shall remain fixed for the duration of contract performance. Any revisions to the SOV must be requested in writing, with justification, for approval by the Contracting Officer.

FAO-0012 Progress Meetings

The Administrative Contracting Officer (ACO) shall conduct progress meetings at the project site on a monthly basis, or at intervals as determined by the ACO.

(a) At a minimum, the attendees shall include but is not limited to:

(1) FBOP: Administrative Contracting Officer, Contracting Officer’s Representative (COR), Facility Administr ator/Manager, Architect/Engineer (if applicable), Other Personnel (Executive Staff, Captain, Safety Manager, etc.).

(2) Contractor: Project Manager, Superintendent, and technical support disciplines as appropriate (Subcontractors, Manufacturers, Suppliers, etc.).

(b) The meeting should include, but is not limited to issues such as:

Administrative Contracting Officer:

(1) Old business from previous progress meeting(s);

(2) Status of modifications, certified payrolls, submittals, requests for information (RFI);

(3) Review of payments made to date and review/approve current payment request;

(4) Status of modification proposal requests;

(5) Discuss new business.

COR:

(1) Status of escort coverage;

(2) Review gate or sallyport entrance/exit issues;

(3) Discuss other delays contractor may be experiencing;

(4) Discuss performance/quality issues.

Contractor:

(1) Review/discuss updated progress schedule;

(2) Provide 30 day outlook;

(3) Discuss other issues affecting performance.

FAO-0013 Contract Closeout Procedures (for construction contracts exceeding $150,000)

Contract Closeout must be completed within six (6) months of physical completion of the work.

Prior to payment of final invoice:

The contractor shall submit the following documents:

(1) Contractor’s Affidavit of Release of Liens (AIA Document G706A);

(2) Contractor’s Affidavit of Payment of Debts and Claims (AIA Document G706);

15B20726Q00000016 Page 19 of 24

(3) All as-built drawings/shop drawings, if applicable;

(4) Contractor’s final invoice;

(5) Release of Claims (GSA Form 1142);

(6) Consent of Surety to Final Payment (AIA Document G707);

(7) Letter establishing warranty dates;

(8) Complete list of subcontractors with telephone numbers and points of contact;

(9) Guarantees and warranties;

(10) All balance and test reports;

(11) All operation/maintenance manuals;

(12) All permits and certifications.

AIA forms can be obtained from The American Institute of Architects at www.aiabookstore.com.

GSA forms can be obtained from the General Services Administration at www.gsa.gov (click on the “Forms Library” link).

FAO-0015 Changes

(a) Changes will be in accordance with the Changes clause 52.243-4 or Changes and Changed Conditions clause 52.243-5 whichever applies to this contract.

(b) When changes are made in the work that requires an equitable adjustment to the contract, the Contractor shall submit to the Contracting Officer, through the Contracting Officer’s Representative (COR), a written proposal for adjustment of the amount of increase or decrease. With the proposal, the Contractor shall submit an itemized breakdown in at least the following detail:

(1) Material quantities and unit cost

(2) Labor costs by material item

(3) Construction equipment cost

(4) Workmen's compensation and public liability insurance

(5) Overhead

(6) Profit or commission

(7) Employment taxes (FICA and FUTA)

(c) The maximum allowable overhead, profit and commission percentages are contained below. The percentages for overhead, profit and commission shall be negotiated and may vary according to the nature, extent and complexity of the work involved, but in no case shall exceed the following:

(1) To the Contractor, on work performed by other than his own forces. The commission is 10% in the first $20,000, 7 1/2% on the next $30,000, 5% on the balance over $50,000.

(2) To the Contractor, and/or the Subcontractors for that portion of the work performed with their respective forces. The commission is 10% overhead and 10% profit on the first $20,000, 7 1/2% overhead and 7 1/2% profit on the next $30,000, and 5% overhead and 5% profit on the balance over $50,000.

Not more than three (3) percentages, not to exceed the maximum percentage amounts shown above, will be allowed regardless of the number of Subcontractors (i.e., the mark up on work subcontracted by the Subcontractor will be limited to the overhead percentage and one profit percentage in addition to the prime Contractor's

15B20726Q00000016 Page 20 of 24 commission percentage). On proposals covering both increases and decreases in the amount of…