SIMPLIFIED ACQUISITON PROCEDURES (SAP)
Justification for Brand Name and or Sole Source Acquisitions Over $3,500 but not Exceeding The Simplified Acquisition Threshold (SAT)
SOLICITATIONS MAY BE LIMITED TO ONE SOURCE ONLY IF THE CONTRACTING OFFICER DETERMINES THAT ONLY ONE SOURCE IS REASONABLE AVAILABLE. THIS DETERMINATION MUST BE SUPPORTED WITH FULL JUSTIFICATION FOR SOLE SOURCE FROM THE CUSTOMER. WHEN THE CUSTOMER DESCRIBES AN ITEM WITH A PURCHASE DESCRIPTION, WHICH LIMTS THE AVAILABILITY TO ONE SOURCE, THE JUSTIFICATION MUST EXPLAIN WHY THE ITEM IS THE ONLY ONE THAT WILL MEET THE GOVERNMENTS REQUIREMENT. STATEMENTS SUCH AS “ONLY KNOWN SOURCE” OR “ONLY SOURCE WHICH CAN MEET THE REQUIRED DELIVERY DATE “ARE INADEQUATE TO SUPPORT A SOLE SOURCE PURCHASE THE
CUSTOMER SHALL PROVIDE THE FOLLOWING INFORMATION:
1. PURCHASE REQUEST OR REQUISITION NUMBER
2. PROJECT/TASK NUMBER
4354113
3. ESTIMATED AMOUNT
4. BRIEF DESCRIPTION OF SUPPLIES OR SERVICES REQUIRED AND THE INTENDED USE.
Requesting a 2500A 480V three phase panel for use in building 567. This panel is custom built, with different size breakers and dead front covers.
5. UNIQUE CHARACTERISTIC THAT LIMIT AVIALIABILITY TO ONLY ONE SOURCE, WITH THE REASON NO OTHER SUPPLIES OR SERVICES CAN BE USED. MOST RECENT MARKET RESEARCH CONDUCTED (INCLUDE DATES & DETAILS). IF MARKET RESEARCH WAS NOT
CONDUCTED, EXPLAIN.
This is an Eaton brand panel that has specific breakers and custom a can to accommodate the specific breakers needed.
6. REASON THAT SUGGESTED SOURCE IS THE ONLY SOURCE WHICH CAN PROVIDE THE SUPPLIES OR SERVICES. COMPATIBILITY WITH EXISTING SYSTEM, IF APPLICABLE, & NON-CONPATIBILITY COULD RESULT IN EXCESSIVE ADDITIONAL MANUFACTURING AND/OR
RESEARCH AND DEVELOPMENT COSTS.
This panel is custom built and engineered to meet the needs of our customers. Using a different brand panel could lead to size issues and prevent us from using the necessary breakers that it takes to install the proper equipment.
7. EXPLAIN WHY AN ADEQUATE PURCHASE DESCRIPTION OR OTHER INFORMATION SUITABLE TO SOLICIT BY FULL AND OPEN
COMMPETITION HAS NOT BEEN DEVELOPED OR ARE NOT AVAILABLE.
Request Eaton panel to be purchased, no substitutions.
8. PROVIDE A STATEMENT OF ACTIONS, IF ANY THE GOVERNMENT MAY TAKE TO REMOVE OR OVERCOME ANY BARRIER TO COMPETITION BEFORE FUTURE ACQUISITIONS ARE REQUIRED. IF THIS IS A FOLLOW-ON ACTION TO A PREVIOUSLY COMPETED ACTION, SO STATE.
MCAAP FORM 715-24, February 2016 PREVIOUS EDITIONS ARE OBSOLETE
SOLICITATIONS MAY BE LIMITED TO ONE SOURCE ONLY IF THE CONTRACTING OFFICER DETERMINES THAT ONLY ONE SOURCE IS REASONABLE AVAILABLE. THIS DETERMINATION MUST BE SUPPORTED WITH FULL JUSTIFICATION FOR SOLE SOURCE FROM THE CUSTOMER. WHEN THE CUSTOMER DESCRIBES AN ITEM WITH A PURCHASE DESCRIPTION, WHICH LIMTS THE AVAILABILITY TO ONE SOURCE, THE JUSTIFICATION MUST EXPLAIN WHY THE ITEM IS THE ONLY ONE THAT WILL MEET THE GOVERNMENTS REQUIREMENT. STATEMENTS SUCH AS “ONLY KNOWN SOURCE” OR “ONLY SOURCE WHICH CAN MEET THE REQUIRED DELIVERY DATE “ARE INADEQUATE TO SUPPORT A SOLE SOURCE PURCHASE THE
4367940
Requesting 208V three phase panels for use in building 567. qty 8 panels custom built, all with different size breakers
5. UNIQUE CHARACTERISTIC THAT LIMIT AVIALIABILITY TO ONLY ONE SOURCE, WITH THE REASON NO OTHER SUPPLIES OR SERVICES CAN BE USED. MOST RECENT MARKET RESEARCH CONDUCTED (INCLUDE DATES & DETAILS). IF MARKET RESEARCH WAS NOT
CONDUCTED, EXPLAIN.
These are all Eaton brand panels that have specific breakers and custom cans to accommodate the specific breakers needed.
6. REASON THAT SUGGESTED SOURCE IS THE ONLY SOURCE WHICH CAN PROVIDE THE SUPPLIES OR SERVICES. COMPATIBILITY WITH EXISTING SYSTEM, IF APPLICABLE, & NON-CONPATIBILITY COULD RESULT IN EXCESSIVE ADDITIONAL MANUFACTURING AND/OR
RESEARCH AND DEVELOPMENT COSTS.
These panels are custom built and engineered to meet the needs of our customers. Using a different brand panel could lead to size issues and prevent us from using the necessary breakers that it takes to install the proper equipment.
7. EXPLAIN WHY AN ADEQUATE PURCHASE DESCRIPTION OR OTHER INFORMATION SUITABLE TO SOLICIT BY FULL AND OPEN
COMMPETITION HAS NOT BEEN DEVELOPED OR ARE NOT AVAILABLE.
Request Eaton panels to be purchased, no substitutions.
8. PROVIDE A STATEMENT OF ACTIONS, IF ANY THE GOVERNMENT MAY TAKE TO REMOVE OR OVERCOME ANY BARRIER TO COMPETITION BEFORE FUTURE ACQUISITIONS ARE REQUIRED. IF THIS IS A FOLLOW-ON ACTION TO A PREVIOUSLY COMPETED ACTION, SOLICITATIONS MAY BE LIMITED TO ONE SOURCE ONLY IF THE CONTRACTING OFFICER DETERMINES THAT ONLY ONE SOURCE IS REASONABLE AVAILABLE. THIS DETERMINATION MUST BE SUPPORTED WITH FULL JUSTIFICATION FOR SOLE SOURCE FROM THE CUSTOMER. WHEN THE CUSTOMER DESCRIBES AN ITEM WITH A PURCHASE DESCRIPTION, WHICH LIMTS THE AVAILABILITY TO ONE SOURCE, THE JUSTIFICATION MUST EXPLAIN WHY THE ITEM IS THE ONLY ONE THAT WILL MEET THE GOVERNMENTS REQUIREMENT. STATEMENTS SUCH AS “ONLY KNOWN SOURCE” OR “ONLY SOURCE WHICH CAN MEET THE REQUIRED DELIVERY DATE “ARE INADEQUATE TO SUPPORT A SOLE SOURCE PURCHASE THE
4367940
Requesting 480V three phase panels for use in building 567. qty 7 panels custom built, all with different size breakers
5. UNIQUE CHARACTERISTIC THAT LIMIT AVIALIABILITY TO ONLY ONE SOURCE, WITH THE REASON NO OTHER SUPPLIES OR SERVICES CAN BE USED. MOST RECENT MARKET RESEARCH CONDUCTED (INCLUDE DATES & DETAILS). IF MARKET RESEARCH WAS NOT
CONDUCTED, EXPLAIN.
These are all Eaton brand panels that have specific breakers and custom cans to accommodate the specific breakers needed.
6. REASON THAT SUGGESTED SOURCE IS THE ONLY SOURCE WHICH CAN PROVIDE THE SUPPLIES OR SERVICES. COMPATIBILITY WITH EXISTING SYSTEM, IF APPLICABLE, & NON-CONPATIBILITY COULD RESULT IN EXCESSIVE ADDITIONAL MANUFACTURING AND/OR
RESEARCH AND DEVELOPMENT COSTS.
These panels are custom built and engineered to meet the needs of our customers. Using a different brand panel could lead to size issues and prevent us from using the necessary breakers that it takes to install the proper equipment.
7. EXPLAIN WHY AN ADEQUATE PURCHASE DESCRIPTION OR OTHER INFORMATION SUITABLE TO SOLICIT BY FULL AND OPEN
COMMPETITION HAS NOT BEEN DEVELOPED OR ARE NOT AVAILABLE.
Request Eaton panels to be purchased, no substitutions.
8. PROVIDE A STATEMENT OF ACTIONS, IF ANY THE GOVERNMENT MAY TAKE TO REMOVE OR OVERCOME ANY BARRIER TO COMPETITION BEFORE FUTURE ACQUISITIONS ARE REQUIRED. IF THIS IS A FOLLOW-ON ACTION TO A PREVIOUSLY COMPETED ACTION,