B430_Sewage_Pumps_Single_Source_Justification-Signed_FBO_Redacted.pdf
PDF 99 KB Posted
- Attached to
- Sewage Ejector Pumps Federal contract opportunity
- Solicitation number
- FA9101-19-Q-0009
About this file
Single Source Justification
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sewage_Ejector_Pump_Site_Visit_Information.pdf | ||
| Solicitation_Amendment.pdf | ||
| B430_Sewage_Ejector_Pump_Statement_of_Work_11-6-18.pdf | ||
| Sewage_Ejector_Pump_Combined_Synopsis.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Single Source Justification (Simplified Acquisition)
FOR OFFICIAL USE ONLY
November 2018 FOR OFFICIAL USE ONLY Page 1 of 2
Section A: General Contract Information
Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan? Yes No
Contracting Activity: AEDC White Oak
Project/Program Name: Building 430 Sewage Ejector Pump Project
Purchase Request / Local ID Number:
Estimated Contract Cost (including Options):
Section B: Description of the Supplies/Services Required
The contractor shall supply all labor, equipment and materials to demo and remove and dispose of 2 existing vertical sewage pumps, and replace with 2 WEIL 2228 Vertical Sewage Pumps w/4” ANSI Discharge, 230/460 volt, intermediate bearings, 950 Series Iron Impellers, and 15hp motors.
Section C: Justification for Soliciting from a Single Source or Brand Name
The existing WEIL sewage pump system has several components which consist of pumps, control panel, wiring and piping. The specified WEIL 2228 vertical sewage pumps are direct replacements for the existing WEIL pumps. A direct replacement is recommended to cut cost. If a different pump manufacturer is selected the existing wiring, control panel and piping will have to be demolished and replaced which will increase the cost of the project . Therefore replacing the pumps with the same brand and type will be more cost effective.
Section D: Efforts to Obtain Competition
Market research did not reveal any alternative brands that will satisfy the requirement. Due to the circumstances stated above, the proposed brand name is the only known brand compatible with existing equipment.
Section E: Steps to Preclude Future Single Source or Brand Name Awards
AEDC will continue to engage with industry to ensure that all sewage pumps are considered for future awards.
Single Source Justification (Simplified Acquisition)
FOR OFFICIAL USE ONLY
November 2018 FOR OFFICIAL USE ONLY Page 2 of 2
Section F: Contracting Officer's Determination
I have determined, in accordance with FAR 13.106-1(b)(1), that the circumstances of this contract action deem only a single source is reasonably available.
Date
05-Feb-2019
Typed Name and Rank/Grade of Contracting Officer
Robert T. Mosley, NH-03
Signature of Contracting Officer
File details come from the government source that posted it.