DRAFT_PWS_25_Oct_19.pdf
PDF 1 MB Posted
- Attached to
- Joint Terminal Control Training and Rehearsal System (JTC TRS) program Federal contract opportunity
- Solicitation number
- FA8621-20-R-0003
About this file
This is a draft Performance Work Statement (PWS) for the Joint Terminal Control Training and Rehearsal System (JTC TRS) Follow On 2021 contract. The PWS outlines requirements for procuring, fielding, and supporting upgradeable JTC TRS and Joint Theater Air Ground Simulation System (JTAGSS) mission simulation systems to provide realistic training for Joint Terminal Attack Controllers and Joint Fires Support personnel. Key requirements include program management, systems engineering, configuration management, testing and evaluation, quality assurance, cybersecurity, data management, system requirements, production, sustainment, and deficiency reporting. The contractor must operate a Training System Support Center to maintain system concurrency, distribute software and database updates, and provide logistics support, help desk services, and on-site maintenance for JTAGSS devices.
Draft PWS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Draft_RFP_Cover_Letter.pdf | ||
| SECTION_L_25_Oct_19.pdf | ||
| Draft_JTC_TRS_Price_Matrix.xlsx | XLSX spreadsheet | |
| JTC_TRS-DT_P-Spec_1.2_-_11_June_19.pdf | ||
| DRAFT_JTC_TRS_Follow-On_CLINs.pdf | ||
| SECTION_M_25_Oct_19.pdf | ||
| JTC-TRS_P-Spec_9.5_-_11_June19.pdf | ||
| JTC_TRS_Draft_RFP_Q&A_Matrix_Template.xlsx | XLSX spreadsheet | |
| H001_Trainer_Repair_Clause.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFT
Performance Work Statement (PWS) for
JTC TRS Follow On 2021 Contract No.: FA8621-20-R-0003
Prepared by:
Air Force Life Cycle Management Center (AFLCMC)
Agile Combat Support (ACS) Directorate
Simulators Division (WNS)
2300 D Street, Bldg. 32
Wright-Patterson Air Force Base (AFB), OH 45433-7249
25 October 2019
Performance Work Statement Change Matrix
Revision Date Description Paragraphs Contract
Modification
1.0 PROGRAM OVERVIEW / SCOPE
1.1 Overview
1.2 Scope
2.0 APPLICABLE DOCUMENTS
2.1 Government Documents…………………………………………………………………….7
3.0 REQUIREMENTS
3.1 Program Management
Integrated Product Team (IPT)
Reviews and Meetings
Database Working Group (DWG)
Contractor Labor Hour Reporting
Subcontractor Management
Associate Contractor Agreements (ACAs)
Integrated Master Schedule (IMS)
Integrated Master Plan (IMP)
50/50 Requirement Report
3.2 Systems Engineering (SE):
Modular Open Architecture Requirements
Database Design Description (DBDD)
Drawings
3.3 Configuration Management (CM)
Government Approval and Oversight
Configuration Management Plan (CMP)
Engineering Change Proposal (ECP)/Contract Change Proposal (CCP)
CM Tracking and Repository
Commercial Software Sustainment
3.3.6 Government Software Sustainment………………………………………………….15
Multiple CM Baselines
Change Incorporation
Item Unique Identification (IUID)
3.4 Test and Evaluation
Qualification Test and Evaluation (QT&E)
Acceptance Testing
Modification Testing
Operational Utility Evaluation (OUE)
Operational Assessment Support
Integrated Test Team (ITT)
Test Database
3.5 System Safety
Voluntary Protection Program (VPP)
3.6 Quality
3.7 Security and Access
Security Control
Program Protection Plan (PPP)
Technology Control
Industrial Security
Acquisition Systems Protection
3.8 Cybersecurity (CS)
CS Design for Assessment and Authorization (A&A)
System Security
Architecture Analysis
3.9 Data Management and Distribution
Data Accession List (DAL)
Electronic Data Management System (EDMS)
3.10 System Requirements
System Network Requirements
System/Subsystem Specification (SSS)
Design Data
Software Development
System Integration
Distributed Mission Operations (DMO)
Joint Deficiency Reporting System (JDRS)
Functional Configuration Audit (FCA)
Physical Configuration Audit (PCA)
Prototype System Integration Laboratory (SIL) Designation
3.11 Production
Factory Acceptance Tests (FATs)
Trainer Facilities Report
Site Surveys/Facility Interface
Delivery (Production)
Site Acceptance Tests (SATs)
Cybersecurity Tests
3.12 JTC TRS Device Transition…………………………………………………………... 27
3.12.1 Design Acceptance Tests (DATs)………………………………………………... 27
3.12.2 JTAGSS Device Transition ……………………………………………………… 27
3.13 Sustainment
System Supportability
Contractor Logistic Support (CLS)
Training System Support Center (TSSC)
Simulator Configuration Working Group (SCWG)
GFE/Government Furnished Property (GFP)
3.14 Deficiency Reporting
JDRS Requirements
3.14.2 Deficiency Report Initiation……………………………………………………… 39
3.14.3 Deficiency Tracking………………………………………………………………. 39
3.14.4 Deficiency Analyzing……………………………………………………………... 39
3.15 Contract Transition
Transition Planning
4.0 CONTRACTOR-PROVIDED TRAINING
4.1 Initial System Operations Training
4.2 Tier One Maintenance Training
4.3 Follow-On Operations & Maintenance Training
5.0 SERVICES SUMMARY (SS)
5.1 SS Requirement
5.2 Surveillance Methods
6.0 PRICED UPGRADE REQUIREMENT………………………………………………42
6.1 Digitally Aided Close Air Support (DACAS) Option………………………………….42
6.1.1 DACAS Overview…………………………………………………………………42
6.1.2 DACAS Design Requirements…………………………………………………….43
6.1.3 DACAS General Requirements……………………………………………………43
Appendix A: Acronyms
Appendix B: Database Development Requirements
Appendix C: Simulator Common Architecture Requirements and Standards (SCARS)..….. 53
1.0 Program Overview / Scope
1.1 Overview
The Joint Terminal Control Training and Rehearsal System (JTC TRS) Program will continue to acquire and sustain high fidelity training systems designed to provide realistic training for Terminal
Attack Control, Close Air Support (CAS), Call for Fire and Air to Ground Command and Control.
The JTC TRS Program consists of two separate simulation systems: a Joint Terminal Attack
Controller (JTAC) simulator, known as JTC TRS, which includes fixed dome, desktop, and portable systems, and an Air Support Operations Center (ASOC) simulator known as Joint Theater
Air Ground Simulation System (JTAGSS). The JTC TRS Program will continue to provide robust, interactive multimedia, High Level Architecture (HLA) and/or Distributed Interactive Simulation
(DIS) compliant systems. The systems will provide constructive entity control, realistic flight profiles, accurate ordnance delivery and effects, and support actual, simulated or emulated equipment used in combat operations including weapons, radio equipment, target marking equipment and global positioning systems. The systems are and must be capable of participating in distributed operations over Distributed Mission Operations (DMO) networks. Both simulator systems are critical to the training and mission readiness of the TACP Weapons System and
Combat Control JTAC qualifications, and therefore there can be no interruption of training capability during any transition or over the course of the system sustainment.
1.2 Scope
The JTC TRS Program will continue to procure, field and support upgradeable mission simulation systems (JTC TRS and JTAGSS) that have joint applicability for training personnel in all services.
JTC TRS and JTAGSS devices will be procured as production-ready systems or transitioned into the program to support JTAC training needs. For day-to-day training operations at the JTC TRS training sites, government and military personnel will conduct all training, perform minor maintenance, and offer limited upgrade support. Contractor instructors or technicians for JTC TRS will not be required on-site except during initial system installation or if unscheduled or scheduled maintenance is required. Contractor field support for JTC TRS will be conducted on an as needed and/or as scheduled basis. For day-to-day operations at the JTAGSS training sites, contractor personnel will operate the system for training events, perform maintenance, and offer upgrade support. The contractor will provide spare parts, system repair support, and maintain system concurrency via a logistics support process and through operation of a Training System Support
Center (TSSC) to meet the trainer repair time requirement (as defined in the H001 Clause), the
Performance Specification (P-Spec) and the contract.
2.0 Applicable Documents
The following documents form a part of this Performance Work Statement (PWS) to the extent specified herein. These documents are provided as reference material for the purpose of interpreting the tasks of the PWS, unless otherwise specified. The latest revision or date in effect at the time of contract award shall apply. In the event of conflict between the documents (other than those implementing Public Law) referenced herein and the contents of this PWS, the contents of this PWS shall be considered as superseding requirements.
Applicable Documents
Number Document Name Date
2.1 Government Documents
AFCD Standard, Version 2 Air Force Common Dataset (AFCD), Version 2 01 Dec 11
AFI 13-112, Vol 1 Joint Terminal Attack Controller Training (JTAC)
Program 29 Sep17
AFI 13-114V1 Air Support Operations Center (ASOC)Training Program 30 Apr 12
AFI 13-114V3
Air Support Operations Center (ASOC) Operations
Procedures 1 Jun 09
AFI 21-113
AF Metrology and Calibration (AFMETCAL)
Management
03 Jun 16
AFI 16-1406 Industrial Security Program Management 25 Aug 15
AFI 17-101
Risk Management Framework (RMF) for Air Force
Information Technology (IT) 23 Feb 17
AFI 36-2251 Management of Air Force Training Systems 05 Jun 09
AFI 63-101/
20-101
Integrated Life Cycle Management, Chapter 5 09 May 17
AFI 91-203
Air Force Occupational Safety, Fire, and Health Standards
11 Dec 18
AFI 99-103 Capabilities-Based Test and Evaluation 06 Apr 17
AFMAN 17-1301 Computer Security (COMPUSEC) 10 Feb 17
AFMAN 17-1302-o Communication Security (COMSEC) Operations 03 Feb 17
AFTTP 3-3
JTAC
Combat Fundamentals Joint Terminal Attack
Controller 24 Oct 12
ASD-TR-90-
Simulator Test 2000 (ASD Study) 12 Dec 90
CNSS
Instruction No.
Security Categorization and Control Selection
For National Security Systems 27 Mar 14
DFARS Department of Defense FAR Supplement
Part 252.245-7004 20 Aug 19
DoD 5200.1-M Acquisition Systems Protection Program, Chapter 5 15 Mar 94
DoD 5220.22-M National Industrial Security Program Operating
Manual (NISPOM)
18 May 16
DoD 8570.01-M Information Assurance Workforce
Improvement Program
19 Dec 05
(Chg 4, 11
Oct 15)
DoD Guide to
IPPD
DoD Guide to Integrated Product and Process
Development August 1998
DoD Guide to
IMP/IMS
Integrated Master Plan and Integrated Master
Schedule Preparation and Use Guide
(Version 0.9)
21 Oct 05
DoDD 5000.01 The Defense Acquisition System
12 May 03
(Chg 2, 31
Aug 18)
DoDD 5230.25 Withholding of Unclassified Technical Data
From Public Disclosure
6 Nov 84
(Chg 2, 15
Oct 18)
DoD FMR7000.14-
R
Department of Defense Financial Management Regulation
(DoD FMR) Jun 17
DoDI 5000.64 Accountability and Management of DoD Equipment and
Other Accountable Property 17 Apr 17
DoDI 5000.76 Accountability and Management of Internal use Software
(IUS)
2 Mar 17
DoDI 5200.39
Critical Program Information (CPI) Identification and
Protection Within Research, Development, Test, and
Evaluation (RDT&E)
28 May 15
(Chg 2, 15
Oct 18)
DoDI 5230.24 Distribution Statements on Technical Documents
23 Aug 12
(Chg 3, 15
Oct 18)
DoDI 8500.01 Cybersecurity 14 Mar 14
DoDI 8510.01 Risk Management Framework for DoD Information
Technology (IT)
12 Mar 14
Chg 2, 28 Jul
17)
DoDI 5000.02 Operation of the Defense Acquisition System 7 Jan 15 (Chg
4, 31 Aug 18)
FAR Federal Acquisition Regulation, Part 52.219-14 Nov 11
FIPS PUB 199
Standards for Security Categorization of Federal
Information and Information Systems Feb 04
JP3-09.3
Joint Tactics, Techniques, and Procedures for
Close Air Support 25 Nov 14
MIL-HDBK-61
A Configuration Management Guidance 07 Feb 01
MIL-STD-
130N(1)
Department of Defense Standard Practice, Identification Marking of U.S. Military Property 16 Nov 12
MIL-STD-882E
DoD Standard Practice for System Safety 11 May 2012
NIST Special
Publications (SP)
800-53, Rev 4
Security and Privacy Controls for Federal Information
Systems and Organizations Apr 13
NIST Special
Publications (SP)
800-53A, Rev 4
Assessing Security and Privacy Controls in Federal
Information Systems and Organizations Dec 14
Public Law 91-
Occupational Safety and Health Act (OSHA), as amended by Public Laws
29 Dec 70
(Amd thru 1
Jan 04)
Technical Order
00-20-14
Air Force Metrology and Calibration Program 30 Sep 17
Technical Order
00-35D-54
USAF Deficiency Reporting, Investigation, and Resolution 1 Sep 15
USC Title 10, Section 2466
Title 10, U.S. Code, Limitations on the Performance of Depot-Level Maintenance of Material
Number Document Name Date
2.2 Commercial Documents
ANSI/GEIASTD-
Reliability Program Standard for Systems Design, Development, and Manufacturing 20 Aug 09
ASTM-D3951-18 Standard Practice for Commercial Packaging 01 May 18
SAE AS5553C
Fraudulent/Counterfeit Electronic Parts; Avoidance, Detection, Mitigation, and Disposition
26 Mar 19
SAE EIA-649C
Configuration Management Standards 07 Feb 19
CDRL
Seq #
DID ID TITLE
2.3 Contract Data Requirements List (CDRL)
A001 DI-ADMN-81249A/T Conference Agenda
A002 DI-ADMN-81250A/T Conference Minutes
A003 DI-ADMN-81306/T Program Protection Implementation Plan (PPIP)
A004 DI-ADMN-81401B Contract Change Proposals (CCP)
A005 DI-IPSC-81431A/T System/Subsystem Specification (SSS)
A006 DI-IPSC-81433A Software Requirements Specification (SRS)
A007 DI-IPSC-81435A Software Design Description (SDD)
A008 DI-IPSC-81436A Interface Design Description (IDD)
A009 DI-IPSC-81437A Database Design Description (DBDD)
A010 DI-IPSC-81441A/T Software Product Specification (SPS)
A011 DI-IPSC-81442A/T Software Version Description (SVD)
A012 DI-MCCR-80700/T Computer Software Product End Items
A013 DI-MGMT-80004A/T Management Plan
A014 DI-MGMT-80259/T Physical Inventory Report
A015 DI-MGMT--80441C Government Property Inventory Report
A016 DI-MGMT-81238/T Contract Field Service Report
A017 DI-MGMT-81453A/T Data Accession List/Internal Data (DAL)
A018 DI-MGMT-81644B/T DOD Architecture Framework Documentation
A019 DI-MGMT-81749A/T The 50/50 Requirements Report
A020 DI-MGMT-81803/T IUID Marking Plan
A021 DI-MGMT-81804A/T
IUID Marking Activity, Validation and
Verification Report
A022 DI-MGMT-81836 Facilities Requirements Document (FRD)
A023 DI-MGMT-81845
Information Assurance Design Review
Information Package (DRIP)
A024 DI-MGMT-81861/T Integrated Program Management Report (IPMR)
A025 DI-MGMT-81947 A/T GFP Furnished Property Inventory and Forecasting Report
A026 DI-MGMT-82001/T
DOD Risk Management Framework (RMF) Package
Deliverables
A027 DI-MISC-80508B/T Technical Report-Study/Services
A028 DI-MISC-80748/T Engineering Services Memorandum (ESM)
A029 DI-MISC-81191 B/T Training Device Inventory Checklist
A030 DI-FACR-80966 Trainer Facilities Report (TFR)
A031 DI-NDTI-80566A/T Test Plan
A032 DI-NDTI-80603A/T Test Procedure
A033 DI-NDTI-80809B Test/Inspection Report
A034 DI-QCIC-81794 Quality Assurance Program Plan
A035 DI-SAFT-80102C/T Safety Assessment Report (SAR)
A036 DI-SESS-80639D Engineering Change Proposal (ECP)
A037 DI-SESS-80642D Notice of Revision (NOR)
A038 DI-SESS-80858C Supplier’s Configuration Management Plan
A039 DI-SESS-81000E/T Product Drawings/Models and Associated Lists
A040 DI-SESS-81656/T
Source Data for Forecasting Diminishing Manufacturing &
Material Shortage
A041 TM 86-01P/T Technical Manual Contract Requirements
3.0 Requirements
3.1 Program Management
The contractor shall be responsible for integrating all work relating to the performance of this contract. The contractor shall designate a Program Manager (PM) who will oversee the JTC TRS effort and be the focal point for all program management issues. The PM shall manage the JTC
TRS Program In Accordance With (IAW) the requirements outlined in the P-Spec and this document.
3.1.1 Integrated Product Team (IPT)
The contractor shall provide a structured IPT approach to requirements management IAW the
“DoD Guide to Integrated Product and Process Development (Version 1.0) February 5, 1996”. The
IPT shall include the contractor, users and JTC TRS Program Office participation to improve coordination within the IPT and ensure inputs from all program stakeholders and functional disciplines.
3.1.2 Reviews and Meetings
The contractor shall schedule and conduct meetings for the government. Unless otherwise specified, these meetings and reviews shall be held at the contractor’s facility, an alternate location or via teleconference with government coordination.
Contractor personnel and their subcontractors must identify themselves as contractors or subcontractors during meetings, telephone conversations, and in all electronic messages or correspondence related to this contract.
3.1.2.1 Post Award Conference (PAC)
The contractor shall conduct a PAC within 15 days after contract award. The purpose of the PAC is to discuss all parties’ understanding of the scope of work.
[DI-ADMN-81249A/T, Conference Agenda; DI-ADMN-81250A/T, Conference Minutes]
3.1.2.2 System Requirements Review (SRR)
The contractor shall conduct SRRs in conjunction with the PAC to confirm to the government that the contractor understands JTC-TRS and JTAGSS system/operational requirements and ensure that each requirement is traceable.
[DI-ADMN-81250A/T, Conference Minutes]
3.1.2.3 Guidance Conference
Also in conjunction with the PAC, the contractor shall present a briefing on their interpretation of the technical manual program requirements as reflected in the basic contract, PWS, CDRLs, DIDs, and the Technical Manual Contract Requirements (TMCR) as well as the planned preparation and delivery of the Technical Manuals (TMs) and related data.
[TM 86-01P/T, Technical Manual Contract Requirements]
3.1.2.4 IPT Meetings
The contractor shall co-chair, with the government, bi-weekly IPT teleconferences for contractor tracking of action items, schedule progress, and providing status updates. The entries for each action item shall include the originator, a detailed description of the problem or issue, responsibility, suspense date, status, actions required, actions taken and date closed, with closure agreement by the government. Access to action items shall be available to the government.
3.1.2.5 Program Management Reviews (PMRs)
PMRs shall be conducted as requested by the government but not more often than quarterly. The
PMRs shall provide details of program schedule, technical and financial status (to include compliance with Federal Acquisition Regulation (FAR) 52.219-14), action items, risk management, and other topics as needed. The PMRs will be held at a location directed by the government.
[DI-ADMN-81249A/T, Conference Agenda; DI-ADMN-81250A/T, Conference Minutes]
3.1.2.6 Technical Interchange Meetings (TIMs)
The contractor shall support TIMs as required through the life of the contract. A TIM may be called to address specific topics or issues, the status of development or test activities between PMRs, the functions of an established working group, or to coordinate and provide guidance for engineering data or technical manuals. TIMs may be combined with other meetings or held as a stand-alone meeting. Their estimated frequency will be twice per year.
[DI-ADMN-81249A/T, Conference Agenda; DI-ADMN-81250A/T, Conference Minutes]
3.1.2.7 Engineering Review Board (ERB)
The contractor shall co-chair, with the government, monthly IPT teleconferences for contractor tracking of test discrepancies (TDs)/deficiencies, Help Desk tickets, as well as concurrency and obsolescence issues. The contractor shall identify and brief new TDs, system deficiencies, and help desk tickets, and provide recommendation of priorities for government review. The contractor shall report on existing discrepancies and provide schedule, status, approach, engineering status, and TDP revisions needed to resolve the discrepancies. The contractor shall identify and brief concurrency candidates and potential obsolescence issues with recommended solutions.
[DI-ADMN-81250A/T, Conference Minutes]
3.1.3 Database Working Group (DWG)
The contractor shall form a DWG in conjunction with the JTC TRS Program Office. The contractor shall support DWGs as required through the life of the contract to discuss database and model requirements, work, progress and testing.
Responsibilities of the DWG include:
- Define and control modeling issues for each database
- Review and recommend approval of scenario data to be included in the scenario databases
- Acceptance of the Database Design Description (DBDD)
- Define the baseline for each database
The contractor shall use a product life cycle approach for the management of the database development process. The contractor shall discuss database requirements, schedule, status, approach, engineering status, and TDP revisions. The contractor shall note any potential impacts to training and identify possible impacts related to COTS software. The contractor shall provide reports for formal and informal database testing.
[DI-ADMN-81249A/T, Conference Agenda; DI-ADMN-81250A/T, Conference Minutes; DI-
IPSC-81437A, Database Design Description (DBDD); DI-NDTI-80809B, Test/Inspection
Report]
3.1.4 Contractor Labor Hour Reporting
The contractor shall report all contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Air Force via a secure data collection site. The contractor is required to completely fill in all required data fields at http://www.ecmra.mil.
Reporting inputs will be for the labor executed during the period of performance for each government Fiscal Year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar year. Contractors may direct questions to the Contractor Manpower Reporting Application
(CMRA) help desk at cmra@pentagon.af.mil.
3.1.5 Subcontractor Management
The contractor shall integrate subcontractor efforts into program management and tracking systems.
The contractor shall ensure all requirements of this contract and subsequent modifications are consistently applied to all subcontracts and teaming arrangements.
3.1.5.1 Subcontractor Compatibility and Performance
The contractor shall institute procedures to ensure subcontractors and vendors have incorporated necessary program elements to assure compatibility of supplied equipment or services. The contractor shall effectively manage and monitor subcontractor and supplier performance to ensure the quality of all acquired products and services. The contractor shall manage subcontractor compliance with all cybersecurity and Supply Chain Risk Management (SCRM) requirements.
http://www.ecmra.mil/ mailto:cmra@pentagon.af.mil
3.1.6 Associate Contractor Agreements (ACAs)
The contractor shall obtain ACAs or Letters of Intent to obtain data necessary to meet program requirements. In addition, the contractor shall enter into ACAs as required to exchange data and participate with manufacturers/data sources for the system. The government will sponsor ACA relationships as needed. The contractor shall make these agreements available to the government via the Data Accession List (DAL).
[DI-MGMT-81453A/T, Data Accession List/Internal Data (DAL)]
3.1.7 Integrated Master Schedule (IMS)
The contractor shall prepare an IMS IAW the “DoD Integrated Master Plan and Integrated
Master Schedule Preparation and Use Guide (Version 0.9, October 21, 2005)”. The IMS shall result in a fully detailed networked schedule capable of critical path analysis. The IMS must be consistent with other contract documents and plans, reflect a clear understanding of program requirements, and durations must be realistic and compatible with the contract scope of work.
[DI-MGMT-81861/T, Integrated Program Management Report (IPMR)]
3.1.8 Integrated Master Plan (IMP)
For modifications and Engineering Change Proposals (ECPs), the contractor shall prepare and deliver an IMP with their proposal based on a comprehensive product-oriented Work Breakdown
Structure (WBS) to meet and maintain program management cost, schedule, and performance requirements IAW the DoD “Integrated Master Plan and Integrated Master Schedule Preparation and Use Guide (Version 0.9, October 21, 2005)”. The contractor shall document all significant cybersecurity events, technical reviews and entrance/exit criteria in their IMP. The contractor shall include detailed descriptions of key milestones and supporting criteria in the IMP. The IMP shall include a clear and complete allocation of events necessary to successfully execute the modification or ECP. The IMP shall include event entrance and exit criteria with process integration. The contractor shall use a risk assessment management tool to monitor cost, schedule, and performance status.
[DI-MGMT-81861/T, Data Accession List/Internal Data (DAL)]
3.1.9 50/50 Requirement Report
The contractor shall provide depot data IAW Title 10 United States Code Section 2466 known as the “50/50” law, as amended by the National Defense Authorization Acts of FY98.
[DI-MGMT-81749A/T, The 50/50 Requirements Report]
3.1.10 Budgetary Estimates
The Contractor shall provide budgetary estimates as requested by the Government PMO. Budgetary estimates shall include estimated cost (labor, material, travel, courseware, etc.), schedule, and assumptions.
[DI-MISC-80748/T, Engineering Services Memorandum (ESM)]
3.2 Systems Engineering (SE):
The contractor shall develop, establish, deliver and maintain a SE process that is documented in their Systems Engineering Management Plan (SEMP). The SE process shall be a requirements driven, iterative design process that determines alternative design solutions, and conducts trade studies and analyses, to select the most cost-effective solution. The SE process shall include total system performance including quality, safety, security, human engineering, cybersecurity, reliability (using the system engineering practices of American National Standards Institute
(ANSI)/Government Electronics and Information Technology Association (GEIA)-Standard
(STD)-0009), maintainability, and availability. The contractor shall include features that support technology insertions and system evolution throughout the training system life cycle (reference
Air Force Instruction (AFI) 63-101/20-101, Chapter 5).
[DI-SESS-81785, System Engineering Master Plan (SEMP)]
3.2.1 Modular Open Architecture Requirements
The contractor should maintain a modular, open architecture design using Commercial Off-the-
Shelf (COTS) products to the maximum extent possible and follow the Simulator Common
Architecture Requirements and Standards (SCARS) Affiliate design approach. The SCARS
Affiliate design approach, delineated in Appendix C, shall produce a system that consists of hierarchical collections of software and hardware configuration items (components). These components shall be of a size that supports competitive acquisition as well as reuse. The SCARS
Affiliate design approach shall emphasize the selection of components that are available commercially or within the DoD, to avoid the need to redevelop products that already exist and that can be reused. The SCARS Affiliate rationale shall explicitly address any tradeoffs performed, particularly those that compromise the modular and open nature of the system.
The SCARS Affiliate architectural approach shall enable the rapid and affordable insertion and refreshment of technology through modular design, the use of open standards and open interfaces.
The SCARS Affiliate shall define the functional partitioning and the physical modularity of the system to facilitate future replacement of specific subsystems and components without impacting other parts of the system. The SCARS Affiliate shall design to minimize inter-component dependencies to enable future rapid development, replacement, or upgrade of simulator components.
The SCARS Affiliate shall use Commercial-off-the-Shelf (COTS) and Open Source software whenever possible.
The SCARS Affiliate shall use interface standards that are well defined, mature, widely used, and readily available. SCARS Affiliate shall provide documentation that clearly defines and describes all interfaces between the proprietary or vendor-unique components and any interdependent components within the simulator. For additional SCARS data, refer to Appendix C of this document.
SCARS capability shall will be integrated into and managed within the JTC TRS devices as delineated in Appendix C.
3.2.2 Database Design Description (DBDD)
The contractor shall generate, submit, and maintain a DBDD. The DBDD shall contain the specific details of delivered databases, models, and entity behaviors.
[DI-IPSC-81437A, Database Design Description (DBDD)] (Price Matrix for database items)
3.2.3 Drawings
The contractor shall develop and deliver engineering drawings defining the system baseline and all associated training system assets covered by this contract, including system drawings and schematics, mechanical assembly drawings, and instrument drawings. Drawings shall include all data necessary to modify and sustain the system and components.
[DI-SESS-81000E/T Product Drawings/Models and Associated Lists]
3.2.3.1 Drawing Updates
The contractor shall update the engineering baselines for all modifications performed under this contract. The contractor shall maintain the currency of each engineering drawing and document.
Whenever a contract tasking affects the content of existing drawings, the contractor shall revise, and shall ensure all subcontractors revise, the existing engineering data in accordance with their approved Configuration Management Plan (CMP).
[DI-SESS-80858C Supplier’s Configuration Management Plan]
3.3 Configuration Management (CM)
The contractor shall establish and institute an effective CM process. The contractor shall use
Military (MIL)-Handbook (HDBK)-61A and Society of Automotive Engineers (SAE) Electronic
Industries Alliance (EIA)-649B as a guide to all CM procedures.
3.3.1 Government Approval and Oversight
The contractor shall submit Class I configuration changes to be approved by the government through the ECP process. The contractor will make all Class II changes available to the government for review. The contractor shall perform CM and maintain CM documentation for software, hardware, engineering data, drawings, technical orders/manuals and databases. The contractor is subject to government oversight and inspections and shall provide CM documentation as required.
[DI-SESS-80639D, Engineering Change Proposal (ECP)]
3.3.1.1 Class I Changes
Class I changes, as defined in MIL-HDBK-61A, Table 6-2 and paragraph 6.1.1.2, shall be incorporated into engineering data and associated lists within 30 days after approval of the applicable change authorization documents.
3.3.1.2 Class II Changes
Class II changes, as defined in MIL-HDBK-61A, Table 6-2 and paragraph 6.1.1.2, shall be incorporated into engineering data and associated lists upon accumulation of five approved changes, or upon incorporation of subsequent Class I changes, whichever occurs first.
3.3.2 Configuration Management Plan (CMP)
The contractor shall submit a CMP which addresses the management of concurrency, obsolescence, technology refresh management, and process improvements.
[DI-SESS-80858C, Supplier’s Configuration Management Plan]
3.3.3 Engineering Change Proposal (ECP)/Contract Change Proposal (CCP)
The contractor shall prepare and execute all ECPs/CCPs upon direction of the Procuring
Contracting Officer (PCO). This effort may include, but is not limited to, systems modifications, reference documents collection, project communication plans, impact analyses, and feasibility studies. ECPs shall be accompanied by a Notice of Revision (NOR) when changes to the baselines are necessary. Potential configuration baseline waivers shall be presented to the PCO.
[DI-ADMN-81401B, Contract Change Proposals; DI-SESS-80639D, Engineering Change
Proposal (ECP); DI-SESS-80642D, Notice of Revision (NOR)]
3.3.4 CM Tracking and Repository
The contractor shall track and store all system baselines for hardware, software, firmware, supporting engineering and technical documentation. The computer software product end item baseline documentation shall be made available to the government (via electronic means to the maximum extent possible) for all system baselines.
[DI-MCCR-80700/T, Computer Software Product End Items]
3.3.5 Commercial Software Sustainment
The contractor shall document and sustain all procedural and operational changes made to commercial software, to include integration software to meld Commercial Off the Shelf (COTS) software/systems. The contractor shall deliver, maintain, and track all commercial vendor software and licenses used on all JTAGSS and JTC TRS versions through the life of the program.
The contractor shall identify and keep COTS software maintenance licenses current for all that require periodic renewal to add system functionality.
[DI-IPSC-81431A/T, System/Subsystem Specification (SSS); DI-IPSC-81441A/T, Software
Product]Specification (SPS); DI-IPSC-81442A/T, Software Version Description (SVD)]
3.3.6 Government Software Sustainment
The contractor shall manage and maintain all procedural and operational software code changes made to the government JTAGSS Execution Tool (JET) software application.
[DI-IPSC-81431A/T, System/Subsystem Specification (SSS); DI-IPSC-81441A/T, Software
Product]Specification (SPS); DI-IPSC-81442A/T, Software Version Description (SVD)]
3.3.7 Multiple CM Baselines
The contractor shall manage the configuration of multiple fielded system baselines. Baseline information shall be provided to the government as requested.
3.3.8 Change Incorporation
When a Physical Configuration Audit (PCA) is performed, all outstanding changes, (including those resulting from ECPs) shall be incorporated into engineering drawings and associated lists within 30 days after the PCA and prior to completion of this contract. Original Commercial and
Government Entity (CAGE) codes shall not be deleted.
[DI-SESS-81000E/T, Product Drawings/Models and Associated Lists]
3.3.9 Item Unique Identification (IUID)
The contractor shall follow the applicable IUID requirements in Section I, DFARS Clauses
252.211-7003, 252.211-7007, 252.211-7008 and MIL-STD-130N(1). The contractor shall manage and maintain an IUID program throughout the life of the contract. The contractor shall apply IUID to the training system only; spares and the imbedded components will not be marked.
The contractor shall propose and implement IUID on any items not previously marked, e.g., new or transitioned JTC TRS or JTAGGS devices, if the item meets the IUID requirement(s).
[DI-MGMT-81803/T, IUID Marking Plan; DI-MGMT-81804A/T, IUID Marking Activity, Validation and Verification Report]
3.4 Test and Evaluation
The contractor shall develop and deliver a comprehensive life cycle System Test Plan (STP) for
JTC TRS and JTAGSS.
The contractor shall prepare, submit, and update the STPs as required to reflect changes, additions and/or ECPs. The JTC TRS and JTAGSS STPs will document the overall test approach, schedule, entry/exit criteria and define roles and responsibilities for production and follow-on testing as necessary for program success. The STPs shall identify test events, test methods and analysis approaches as required, as well as resources required. The JTC TRS STP status will be reviewed during Integrated Test Team (ITT) meetings and approved by the government prior to conducting final site acceptance testing.
[DI-NDTI-80566A/T, Test Plan]
3.4.1 Qualification Test and Evaluation (QT&E)
The contractor shall support QT&E as requested by the Government. The contractor shall create
Design Acceptance Test (DAT) procedures to verify compliance with the P-Spec. The contractor shall conduct a Test Readiness Review (TRR) prior to this testing to ensure system, contractor, and government test team support readiness to conduct the test. The contractor shall support the testing as requested by the government.
[DI-NDTI-80603A/T, Test Procedures]
3.4.2 Acceptance Testing
The contractor shall develop an Acceptance Test Procedure (ATP) for government approval.
The ATP shall evolve to ensure each system, modification, or upgrade meets the P-Spec and current product baseline to include current database, model counts and model articulations. The
ATP will support Design Acceptance Tests (DAT), Factory Acceptance Tests (FAT) and Site
Acceptance Tests (SAT). The government reserves the right to observe all acceptance testing.
[DI-NDTI-80603A/T, Test Procedures]
3.4.2.1 Cybersecurity and Distributed Mission Operations (DMO) Acceptance Requirements
The contractor’s Cybersecurity assessment, to include a mitigation plan for non-compliant controls
(per para 3.8), must be received and approved by the Live, Virtual, Constructive (LVC)
Authorizing Official (AO) prior to the Program Office accepting JTAGSS and JTC TRS device modifications or new JTC TRS configurations. JTC TRS devices may be accepted prior to DMO certification; however, contractor is responsible to comply with specifications in paragraph 3.10.6 for all devices, even if previously accepted by the government.
[DI-MGMT-82001/T, DOD Risk Management Framework (RMF) Package Deliverables]
3.4.2.2 ATP Updates
The contractor shall update the ATP documentation as necessary to reflect the latest product baseline.
[DI-NDTI-80603A/T, Test Procedures]
3.4.3 Modification Testing
The contractor shall provide a fielded system modification and upgrade test plan using AFI 99-103, AFI 36-2251 and Aeronautical Systems Division (ASD)-TR-90-5000 (Simulator Test 2000) as guidelines. Software and database modifications shall be tested and accepted by the government at the TSSC or designated site prior to installation. Prior to fielding any major software changes, the contractor must ensure the system changes pass a new Operational Utility Evaluation, gain JFS
ESC Sim Accreditation, have a complete LVC AO approved ATO, and have completed CAF DMO
Federation Testing to be certified for operation on the CAF Distributed Mission Operations
Network to ensure no period exists where training cannot be accomplished in the simulators.
System changes must also be capable of using current created training and mission rehearsal scenarios at each simulator location. The contractor shall provide the required media, package, shipping, and installation (or instruction for on-site tier-1 install) of the software programs and data at the required sites. Documentation such as the Software Version Description (SVD) and user guide shall be delivered with the software (as applicable). All upgrades shall be subjected to acceptance testing at the fielded site.
[DI-IPSC-81442A/T, Software Version Description; DI-NDTI-80566A/T, Test Plan; DI-NDTI-
80603A/T, Test Procedures; DI-NDTI-80809B, Test/Inspection Report]
3.4.4 Operational Utility Evaluation (OUE)
The contractor will support independent government OUE testing as requested. The contractor will support a government-run TRR before OUE to ensure the system, contractor, government test team and support required by using organization is prepared prior to the OUE.
3.4.4.1 OUE Training
The contractor shall provide hands-on system operation and familiarization training for the government evaluators. Familiarization training will not exceed two business days.
3.4.5 Operational Assessment Support
The contractor shall provide support for the conduct of OUE, government certifications (e.g., SIMCERT), validations (e.g., SIMVAL) and other operational assessment activities by the government in order to verify the training devices provide accurate and effective training. The contractor shall provide technical consultation and support, including subcontractor personnel as required. Technical support may include but not be limited to:
- Test setup and establish initial conditions
- Operate instructor stations
- Record test results
- Maintain configuration control and management
- Report, process, and track test discrepancies
- Monitor maintenance of test articles
- Perform daily readiness checkout and otherwise jointly participate in the conduct of tests
3.4.6 Integrated Test Team (ITT)
The contractor shall participate in an ITT comprised of government and contractor representatives to lead the JTC TRS test program. The ITT will be responsible for tasks including developing and reviewing test plans, reports, and related program test documentation and organizing and scheduling test events. The contractor shall designate a Test Director to act as the Point of Contact
(POC) for all test-related matters and the Test Director or his representative shall participate in the
JTC TRS and JTAGSS ITT activities. ITT meetings shall be jointly led. ITT meetings shall be held as required.
[DI-NDTI-80566A/T, Test Plan; DI-NDTI-80603A/T, Test Procedures]
3.4.7 Test Database
The contractor shall develop a test database to capture, store, and retrieve all test results to include contractor and government-run tests. The contractor shall provide a status report of all open test results at the Engineering Review Board (ERB) or Database Working Group (DWG).
[DI-MGMT-81453A/T, Data Accession List/Internal Data (DAL)]
3.5 System Safety
The contractor shall deliver and maintain a safe, environmentally compliant system. The contractor shall evaluate the potential environmental safety and occupational health risks, propose hazard controls and mitigations, and design the system to reduce or eliminate risks IAW MIL-STD-882E, AFI 91-203, and Occupational Safety and Health Administration (OSHA) Public Law 91-596. The contractor shall clearly delineate all risks, their likelihood of occurring, mitigation plans, and recovery plans in case risk(s) are realized. The contractor shall conduct a safety review of the JTC
TRS and JTAGSS.
[DI-SAFT-80102C/T, Safety Assessment Report]
3.5.1 Voluntary Protection Program (VPP)
The contractor shall establish a safety and health plan and corresponding site safety checklist resulting in the promotion, investigation, correction and tracking of safety and health violations and/or uncontrolled hazards in contractor work areas. Installation-specific references and policies may be included (or attached) to the plan.
3.5.1.1 VPP Lifecycle Compliance
The contractor shall comply with the health and safety rules of each government installation. The contractor shall take reasonable steps and precautions to prevent accidents and preserve the health and safety of contractor and government personnel in performance of any tasks related to this contract. The contractor shall take additional immediate precautions identified by the contracting officer for health and safety purposes.
3.6 Quality
The contractor shall establish, implement and maintain a quality assurance program in support of the JTC TRS Program and TSSC operations. The contractor shall allow access to all program data, documentation, and records of inspection throughout the contract performance period, so that performance can be evaluated by the government. The contractor shall correct noted deficiencies and provide a mitigation strategy to correct deficiencies within an agreed-to timeframe coordinated with the government Program Office. The contractor shall develop a Quality Assurance Program
Plan (QAPP). At a minimum, the plan shall address compliance and implementation of the following items:
- A process to ensure the required trainer repair times are achieved on all training devices.
- A periodic audit process to ensure service delivery objectives as indicated in the Services
Summary (SS) Table in Section 5.1 are met.
[DI-QCIC-81794, Quality Assurance Program Plan]
3.7 Security and Access
The contractor shall provide a level of security (physical and information) that is commensurate with the security level of the information handled by JTC TRS and JTAGSS, and conform to DD-
Form 254 security requirements, (reference Committee on National Security Systems Instruction
(CNSSI) No. 1253). In the event of a conflict between requirements in the DD-254 and this PWS, the DD-254 shall take precedence. JTC TRS and JTAGSS data and equipment will be categorized up to the SECRET level of security classification.
3.7.1 Security Control
The contractor shall designate a Field Security Officer and establish a Joint Personnel
Adjudication System account with the Defense Security Service.
3.7.2 Program Protection Plan (PPP)
The contractor shall participate with the government in the development of a PPP. The contractor will participate with the government in recommending protection strategies/ countermeasures needed to safeguard the acquisition process at all fielded locations.
3.7.2.1 Program Protection Implementation Plan (PPIP)
The contractor shall develop a PPIP to include all requirements outlined in the government provided PPP.
[DI-ADMN-81306/T, Program Protection Implementation Plan]
3.7.3 Technology Control
The contractor shall implement protection standards and guidance described in DoD 5200.1-M, Chapter 5, to prevent foreign intelligence collection and/or the unauthorized disclosure of information governed by the International Traffic in Arms Regulation (ITAR) and/or the Export
Administration Regulation during JTC TRS Program execution. All such documents shall be properly marked in accordance with DoD Instruction (DoDI) 5230.24. Technical documents prohibited from distribution are defined in DoD Directive (DoDD) 5230.25.
3.7.4 Industrial Security
The contractor shall enter into a Visitor Group Security Agreement (VGSA) for service performed on a military installation. The contractor shall comply with the requirements of DoD 5220.22-M
(National Industrial Security Program Operating Manual (NISPOM) and AFI 31-601 in management of the contract. The contractor shall appoint an Industrial Security Manager/Specialist who shall oversee security operations IAW applicable DoD and Air Force instructions listed above.
3.7.5 Acquisition Systems Protection
The contractor shall ensure security program requirements are integrated into all areas of the JTC
TRS Program as required by DoDD 5000.01, DoDI 5200.39, and DoDI 5000.02. The contractor shall establish, implement and maintain the requirements IAW the provisions of DoD 5200.1-M.
The contractor shall protect the system against compromising security requirements in accordance with Assessment and Authorization (A&A), Information Security, Emulation Security, Communication Security, Operational Security, Computer Security, Physical Security, and
Procedural Security, as outlined in National Institute of Standards and Technologies (NIST) Special
Publication (SP) 800-53Ar4, Air Force Manual (AFMAN) 33-282, and AFMAN 33-283.
3.8 Cybersecurity (CS)
The contractor shall assess their system’s capability to meet the applicable CS Risk Management
Framework (RMF) controls as required by DoDI 8510.01, NIST SP 800-53, and CNSSI 1253 through the life of the contract, as required by guidance on RMF Knowledge Service website:
https://rmfks.osd.mil/rmf/general/securitycontrols/pages/controlsexplorer.aspx.
https://rmfks.osd.mil/rmf/general/securitycontrols/pages/controlsexplorer.aspx
The contractor’s assessment shall include the implementation of control compliance actions and technical measures recommended to meet or mitigate non-compliant controls to minimize identified and documented system vulnerabilities. The contractor shall provide system artifacts to support the A&A of the system. The contractor shall support CS evaluation/testing at fielded locations. The contractor shall support the execution and maintenance of RMF for the life of the program.
[DI-MGMT-82001/T, DOD Risk Management Framework (RMF) Package Deliverables; DI-
MGMT-81845, Information Assurance Design Review Information Package (DRIP)]
3.8.1 CS Design for Assessment and Authorization (A&A)
The contractor shall create, document and implement a Cybersecurity Program to ensure compliance with DoDI 8500.01, DoDI 8510.01 and AFI 33-210. The contractor shall support the execution and maintenance of RMF for Information Technology (IT) in accordance DoDI 8500.01, NIST SP 800-53, and CNSSI 1253. The contractor shall:
- Work with the government Program Office and the office LVC AO to tailor the applicable security controls listed in NIST SP 800-53 and CNSSI 1253 set to meet specific system needs.
- Support development of the government A&A documentation, such as the CS Strategy and
System Security Plan (SSP)
- Inform the government of the sensitivity of the data being processed
- Identify the system threats and vulnerabilities
- Identify existing and planned countermeasure
The contractor shall support the government development of the A&A packages by providing supporting documentation for, but not be limited to, the following items: (1) security requirements,
(2) security requirement Verification and Validation (V&V), (3) sensitivity of the data being processed, (4) identification of the system threats and vulnerabilities, projected likelihood of attack and exploitation, and (5) identification of existing and planned countermeasures. These supporting documents shall be to the level of detail to support obtaining the appropriate Authorities to Test and
Operate to meet program and integration timelines. The contractor shall route these packages through the program office for government approval.
[DI-MGMT-81845, Information Assurance Design Review Information Package (DRIP)]
3.8.1.1 Software Assurance
The contractor shall perform a Source Code Security Analysis on all JTC TRS and JTAGSS developed software to detect and report weaknesses that can lead to security vulnerabilities. The contractor shall provide the results of the scans and tests in a report which includes identified weaknesses with corresponding plans for mitigation.
[DI-MISC-80508B/T, Technical Report – Study/Services]
3.8.2 System Security
The contractor shall ensure security system plans, measures, controls, analyses, and designs support the routine operation and maintenance of JTC TRS and JTAGSS components at the SECRET classification level and below.
3.8.2.1 System Security Plan (SSP)
The contractor shall provide applicable documentation to support government completion of a CS
SSP for the JTC TRS and JTAGSS, IAW guidance provided at the RMF Knowledge Service website: (https://rmfks.osd.mil/rmf/general/securitycontrols/pages/controlsexplorer.aspx). System documentation will be coordinated with the Program Office prior to submittal to the LVC AO.
[DI-MISC-80508B/T, Technical Report – Study/Services]
3.8.2.2 System Security Testing
The contractor shall conduct CS System Security testing, including scans using approved tools for
JTC TRS and JTAGSS in accordance with the contractor’s test plan. The contractor shall ensure its security test plan includes V&V methods for each applicable CNSSI 1253 security control. The contractor shall report the results of testing for each applicable security control. The contractor shall identify and document all non-compliant security controls.
[DI-NDTI-80809B, Test/Inspection Report]
3.8.2.3 Ongoing Review and Reaccreditation
The contractor shall conduct ongoing CS System Security testing including scans using approved tools for the JTC TRS and JTAGSS on no less than a monthly schedule. The contractor shall report the results of testing for each applicable system security control. The contractor shall also identify all noncompliant security controls. The contractor shall provide updates to the government for CS
A&A documentation and security program documentation. The contractor shall support reaccreditation as required due to major upgrades affecting the CS posture of the system.
[DI-NDTI-80809B, Test/Inspection Report]
3.8.3 Architecture Analysis
The contractor shall complete an architecture analysis for JTC TRS and JTAGSS defining CS boundaries and data flows, and supporting the implementation of security controls and countermeasures…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .