Question_Set_2.pdf
PDF 326 KB Posted
- Attached to
- Storage Aids Systems at Eglin AFB, FL Federal contract opportunity
- Solicitation number
- FA8604-18-R-8116
About this file
Question Set #2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA8604-18-R-8116_0002.pdf | ||
| LEG701-01_REV_A.dwg | DWG drawing | |
| Question_Set_1.pdf | ||
| FA8604-18-R-8116_0001.pdf | ||
| Proposal_Checklist-Pricing_Summary_Sheet.docx | DOCX document | |
| Proposal_Checklist-Pricing_Summary_Sheet.docx | DOCX document | |
| FA8604-18-R-8116.pdf | ||
| LEG701-01.dwg | DWG drawing |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
16 May 2018
Question Set 2
Question 1: The TPQ for Eglin Appendix A asks if footers are required and is a yes no question.
Are you wanting an engineer to survey the concrete and do calculations on the mezzanine? And if the engineer determines footers are required - do you want footer and concrete work to be quoted in the proposal?
How would an engineer get paid to answer the question yes or no in the TPQ?
Answer 1: The Revision for Appendix A eliminates the question in the TPQ regarding whether or not footers are required.
Question 2: Our manufacturer saw that section 3.2.5. of Appendix B requires a lift/lower speed for the vertical lift of 20 ft/second. Our manufacturer's standard speed is 17 ft/second. Is 20 ft/second necessary or is 20ft/second a nominal speed?
Answer 2: Revision for Appendix B changes lift speed from 20 fpm to 18 +/- 2 fpm.
Question 3: Is the overall installation to be included in the price? Or should it be a separate line item?
Answer 3: All of the information is contained with the RFP. Please refer to the RFP for guidance.
Question 4: The submission of the proposal is to be sent to the Ohio address? And it is submitted using the checklist and solicitation document? Should I also include our formal quote?
Answer 4: All of the information is contained with the RFP. Please refer to the RFP for guidance.