SOW_-_Multifunction_Calibrator.docx
DOCX document 13 KB Posted
- Attached to
- Multifunction Calibrator Federal contract opportunity
- Solicitation number
- FA8601-18-R-0104
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA8601-18-R-0104_PD2_SOL.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Multifunction Calibrator in Support of High Impact Technology Fan and Compressor Research
16 August 2018
Description of the Need The Compressor Research Facility (CRF) of the Fan & Compressor Experimental Branch (AFRL/RQTX) has begun to see failures in its 27-year-old multifunction calibrator and is in need of a replacement. This hardware will serve as an in-house laboratory standard for voltage, current, and resistance measurements used to evaluate fan and compressor performance of turbine engines powering our fighter and bomber fleets. Furthermore, the hardware will be used for daily calibrations during test programs.
Requirements Qty: 1 – Multifunction Calibrator
1. The hardware must be able to supply each of the following outputs:
a. DC Voltage up to at least +/- 10V
b. AC Voltage up to at least +/- 10V; Up to at least 500kHz
c. DC Current up to at least 1A
d. AC Current up to at least 1A; Up to at least 10kHz
e. Resistance up to at least 1MΩ
2. The hardware outputs accuracies must fall within the following:
a. DC Voltage accuracy of +/- 9.0 ppm of the output or better for 1 year (up to 10V)
b. AC Voltage accuracy of +/- 75.0 ppm of the output or better for 1 year (at 10V, 1kHz)
c. DC Current accuracy of +/- 100.0 ppm of the output or better for 1 year (up to 1A)
d. AC Current accuracy of +/- 900.0 ppm of the output or better for 1 year (at 1A, 1kHz)
e. Resistance accuracy of +/- 13.0 ppm of the output or better for 1 year (at 1kΩ)
3. The hardware shall be capable of interfacing with a host computer using an RS232 and/or Ethernet interface
4. The hardware shall be powered with a 120V, 60 Hz power source
Date Needed 8 Wks ADC
File details come from the government source that posted it.