Civil Engineer Lab Support Performance Work Statement
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Occupational_Listings_-SCA.pdf | ||
| Equipment_List_-_CE_Support_Bridge_Contract.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
CIVIL ENGINEER FACILITY AND EQUIPMENT
SUPPORT TO INTELLIGENCE AND RESEARCH
AND DEVELOPMENT ACTIVITIES
FA8601-16-R-0002
Attachment 1
WRIGHT-PATTERSON AIR FORCE BASE, OHIO
26 August 2015
TABLE OF CONTENTS
SECTION NUMBER & TITLE PAGE
I. Description of Services/General Information 04
1.1. Administration 04
1.2. Base Compliance 09
1.3. Maintenance 09
1.4. Equipment Repair/Replacement 16
1.5. Industrial Control System 18
1.6. Inventories 19
1.7. Equipment Labels 20
1.8. Environmental Requirements 20
1.9. Contractor Personnel 21
1.10. Quality Control 24
1.11. Hours of Operation 25
1.12. Records 25
1.13. Government Observations 26
1.14. Safety and Occupational Health Requirements 26
1.15. Fire Protection, Welding and Cutting 27
1.16. Material Disposal 29
1.17. Continuation of Essential Department of Defense (DoD) Contractor Services During Crisis Per DoD Instruction (DoDI) 3020.37 29
II. Services Summary 30
III. Government-Furnished Property and Services 31
3.1. Property 31
3.2. Services 32
3.3 Contractor Furnished Items and Services. 33
V. Appendices 34
A. Maps and Work Area Layout 34
B. Government Furnished Property Listing 35
C. Contract Data Requirements List 36
D. Applicable Publications and Forms 57
E. Acronyms and Definitions 65
F. Required Reports 71
G. Site Specific Spill Plan 72
H. Information Assurance Requirements 75
PERFORMANCE WORK STATEMENT
FOR
CIVIL ENGINEER (CE) FACILITY AND EQUIPMENT SUPPORT
TO
INTELLIGENCE AND RESEARCH AND DEVELOPMENT ACTIVITIES
I. DESCRIPTION OF SERVICES/GENERAL INFORMATION
The contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services to perform civil engineering support and maintenance/repair/replacement of government equipment as defined in this Performance Work Statement (PWS), (except as specified in Section III as Government Furnished Property and services), for organizations located at Wright-Patterson Air Force Base (WPAFB), Ohio. These organizations include, but are not limited to, Air Force Institute of Technology (AFIT), Air Force Research Laboratories, 88th Air Base Wing (ABW) organizations, National Air and Space Intelligence Center (NASIC), 711th Human Performance Wing (HPW), Naval Medical Research Unit (NAMRU), Air Force Petroleum Agency (AFPA), Air Force Test Center (AFTC) and their successors. Additional organizations may be included subject to the approval of the Contracting Officer (CO). The contractor shall perform to the standards in this contract. Services fall into the categories of equipment maintenance, equipment repair, equipment replacement, and obtaining the services of subcontractors for specialized work beyond the capability of on-base contractor personnel. The contractor shall accomplish services using limited or no plans, drawings, specifications, or sketches. The contractor shall provide recurring preventive maintenance, repair, replacement, and minor upgrades to equipment. The contractor shall provide water treatment and analysis.
1.1. ADMINISTRATION
1.1.1. Supply System. The contractor shall provide administrative tasks of ordering, receiving, verifying, tracking, inventorying, delivery to work site, and securing of materials and parts bought under this contract. This control shall apply to items in stock and on order. The controlled stock of items shall be maintained and accounted for by the contractor using a Management Information System (MIS) which is Microsoft Office 2013 software compatible. The contractor shall maintain an accurate and up-to-date inventory of all materials and parts on-hand or furnished by the government.
1.1.2. Purchasing Plan. For the purchase of items the contractor shall establish and maintain a Purchasing Plan to ensure the requirements of the contract are provided as specified. A finalized version of the Purchasing Plan shall be provided to the government. (Appendix C, Data Item No. A001). The Purchasing Plan is subject to non-acceptance by the CO and revision required by the contractor at no additional cost to the government to ensure quality service. Contractor compliance with the Purchasing Plan will be monitored by the government.
1.1.2.1. The monthly fixed price for recurring maintenance shall include the cost of all labor, parts, materials, consumables, equipment, subcontractor etc. for recurring maintenance and water treatment and analysis. For repair and replacement work requests the contractor shall provide all labor, parts, materials, sub-contractors and rental equipment required. For work requests that total less than $3,000 the contractor shall submit a purchase order, without exception, to the Civil Engineering Primary Contracting Officer Representative (CEPCOR) and CO for approval. These purchases will be charged to the Time & Material contract line item. For work requests that total $3,000 or greater, the contractor shall submit a bill of materials to the CEPCOR or his designee, without exception, for approval to purchase through the customer’s Government Purchase Card (GPC). The contractor shall follow its Purchasing Plan to obtain the required items/services at fair and reasonable pricing. When requirements for several Delivery Orders (DOs) are grouped together, invoices shall be prepared to itemize changes for each DO.
Competitive quotes shall not be required for items with a unit price of less than $2,500 as long as the price is determined to be fair and reasonable by the (CEPCOR) and the CO. Contractor shall submit justification for fair and reasonable pricing if requested. An approved work authorization (WA) does not constitute authorized approval for ordering parts, materials or subcontracted service.
1.1.2.2. Parts, materials, equipment rental, and subcontractor services not considered part of recurring maintenance shall have a minimum of three (3) quotes are required on unit purchases exceeding $2,500 for services and $3,500 for commodities. If three (3) quotes cannot be obtained, evidence of the reasonableness of the price shall be documented and submitted to CEPCOR. In the case of a "no quote" source, the contractor shall provide the name of manufacturer’s representative, company name;
date contacted, and telephone number. Unit purchases in excess of $2,500 must be approved by CEPCOR and the CO prior to purchase. Sole source, single source, and brand name purchases require a letter of justification from the contractor, approved by the CEPCOR and the CO. Specific item requests require a letter of justification from the user, approved by the CEPCOR and the CO. This requirement does not apply to unit purchases on tasks order costing $150,000.00 or greater as referenced in paragraph 1.4.9.
1.1.2.3. All purchase orders submitted to the government for approval shall be submitted electronically.
1.1.3. Records. The contractor shall maintain electronic (Microsoft Office 2013 compatible) records of all material, supplies, tools, and equipment used on this contract. Records shall identify the supplier, the price, the individual or the equipment (by Equipment Item Number) receiving the item or if supplied to bench stock, the Delivery Order (DO), and Work Authorization (WA) Number. The contractor shall provide the source documents for an audit trail for all expenditures under this contract, including original vendor invoices. The records shall be available for review and reproduction by the government at any time.
1.1.3.1. An electronic or manual written record of any maintenance/repair/replacement action that alters any portion of a facility shall be kept in applicable Field Maintenance Offices (Reference Appendix B) and be submitted to the government per paragraph 1.1.4. “Submittal Procedures”. These records shall include pertinent data which includes drawings and wiring diagrams.
1.1.4. Submittal Procedures.
1.1.4.1. Prior to purchasing any new equipment item exceeding $5,000.00 or as requested by the CO, the contractor shall submit for approval to the CO, the manufacturer’s current technical data (e.g., catalog cuts or brochures). All submittals required by paragraph 1.8, Environmental Requirements, shall be submitted to the CO for approval. All Operation & Maintenance (O&M) Manuals, wiring diagrams and warranty information shall be submitted to the CO for approval. A properly documented AF Form 3000 shall accompany all submittals. The submittal packages shall be submitted electronically by email to the CO for approval with the exception of O&M Manuals, wiring diagrams and warranty information. O&M Manuals, wiring diagrams and warranty information shall be submitted electronically by email and one hard copy provided. The contractor shall maintain and make available to the government as requested a record of all submittals. (Appendix C, Data Item No. A002)
1.1.4.2. The contractor shall provide to the government required material submittal packages for emergency work authorizations within three (3) days of the initiation of the work. (See Para. 1.4.2.)
1.1.4.3. The contractor shall provide to the government required material submittal packages for urgent work authorizations within five (5) days of the initiation of the work. (See Para. 1.4.3.)
1.1.4.4. The contractor shall provide to the government required material submittal packages for routine work authorizations within ten (10) days of the initiation of the work. (See Para. 1.4.4.)
1.1.5. Warranty/Guarantee. The contractor shall guarantee their work (including labor and material) and equipment for a period of one (1) year after acceptance by the government. All manufacturers’ warranties shall be exercised and enforced by the contractor before committing any labor or materials on an affected equipment item. The contractor shall check with equipment manufacturers to ensure any adjustment or repair action does not void warranties. The contractor shall make adjustments and repairs during this period at no charge to the government. The contractor shall obtain, on behalf of the government, a manufacturer’s warranty that begins at start-up of equipment and not the purchase date.
The contractor shall maintain originals and provide a copy of all warranty/guarantees to the Primary Contracting Officer Representative (CEPCOR) or designee per paragraph 1.1.4. Submittal Procedures.
1.1.6. Work Control. The contractor shall meet all the requirements of this contract, control schedule, and avoid excessive delays in transportation, waiting for material/supplies, etc.
1.1.6.1. Throughout the contract, the government-provided equipment list shall be modified by the government to delete equipment from the contract, to add equipment to the contract, or make changes to the equipment. Changes consist of modifying the equipment’s nomenclature/documentation, or annotating the equipment to receive maintenance or strictly repair/replacement work as requested. The government will post a new equipment list to a contract SharePoint Site at the beginning of every month.
1.1.7. Reporting System. The contractor shall provide all required reports to the government, using the contractor- furnished Management Information System (MIS). All required reports shall be in Microsoft Office 2013 compatible format with a minimum font size of 10. The system shall provide control over all work from inception to completion. The system shall integrate the functions of work generation, work control, work completed, reports, and invoices. All costs for services, materials, equipment or other costs associated with the preparation and distribution of required reports shall be included as part of direct contract cost. The reports shall be delivered to the government electronically to a contract SharePoint Site.
1.1.8. Funds Status Report for Repair/Replacement. The contractor shall provide a funds status report for repair/replacement activities for all customers on a Microsoft Office 2013 Excel spreadsheet.
This report shall also be segregated by customer (i.e. Lab) by individual tabs on the spreadsheet. The funds status report shall be at a minimum concurrent with the obligated dollars and expenditures within three (3) working days of the report date. The reports shall detail: (Appendix C, Data Item No. A004)
1.1.8.1. Delivery order number.
1.1.8.2. Contract line item number (CLIN) or GPC and designate whether the funds are for materials or labor
1.1.8.3. Element of expense investment code (EEIC)
1.1.8.4. Delivery order obligated funds.
1.1.8.5. Labor expenses.
1.1.8.6. Parts and material expenses. .
1.1.8.7. Subcontracting costs.
1.1.8.8. Equipment rental costs.
1.1.8.9. Total costs to date.
1.1.8.10. Balance of obligated funds.
1.1.8.11. Percent of funds expended.
1.1.8.12. Designate if the expended funds exceed 85% of obligated funds.
1.1.9. Funds Status Report for Maintenance. The contractor shall provide a funds status report for maintenance activities for all customers on a Microsoft Office 2013 Excel spreadsheet. This report shall also be segregated by customer (i.e. Lab) by individual tabs on the spreadsheet. The funds status report shall be at a minimum concurrent with the obligated dollars and expenditures within three (3) working days of the report date. The reports shall detail: (Appendix C, Data Item No. A005)
1.1.9.1. Delivery order number.
1.1.9.2. Element of expense investment code (EEIC)
1.1.9.3. Annual maintenance cost.
1.1.9.4. Monthly budget cost.
1.1.9.5. Obligated funds.
1.1.9.6. Balance of obligated funds.
1.1.9.7. % of funds expended.
1.1.10. Manning Reports for Repair/Replacement. The contractor shall provide manning reports for repair/replacement work showing all direct labor. The report shall show individual’s name, trade, the DO, building number, work authorization number and the man-hours charged. The report shall show a seven
(7) day week time frame with the current day’s man-hours being forecasted and any previous days of the week being actual man-hours. A final report for each week shall be submitted with the following week’s first day forecast. (Appendix C, Data Item No. A006)
1.1.11. Man-Hour Report. The contractor shall provide the total man-hours with labor category for maintenance work and repair/replacement work. The report shall also provide a breakdown of overtime hours by trade and man hours that received a Davis-Bacon Wage Rate. The report shall be for the periods 1 Jan. to 30 June and 1 July to 31 Dec. (six month periods can be approximated to the nearest week ending date). (Appendix C, Data Item No. A007)
1.1.12. Equipment Maintenance Plan. The contractor shall provide an Equipment Maintenance Plan generated from the MIS for each Lab. The plan shall be a listing of equipment under maintenance and the type of maintenance (monthly, quarterly, semi-annual, or annual) scheduled. The plan shall include a yearly schedule and a schedule for each month as required by paragraph 1.3.3. The plan shall detail the building number, equipment identification number (EIN), type of equipment, equipment description, equipment location, and total maintenance hours anticipated. The plan is revised per equipment additions, deletions and changes as described in paragraphs 1.1.6.1. and 1.3.3. (Appendix C, Data Item A008)
1.1.13. Summary of Completed Maintenance Work. The contractor shall provide a summary of maintenance work accomplished for each Lab. The summary shall detail the building number, EIN, type of equipment, equipment description, equipment location, date the maintenance was completed during the previous month, and actual hours expended. The summary should also include annotation of work not completed and overdue. The summary shall be generated from the contractor’s MIS. (Appendix C, Data Item No. A009)
1.1.14. Work Authorization Status Report for Repair/Replacement Activities. The contractor shall provide a weekly status report showing the current open work authorization activity for each lab. The report should include date the work authorization was called in, the date the contractor started work, work completion date and the status of the work. (Appendix C, Data Item No. A0010)
1.1.15. Open/Closed Work Authorization (WA) Report for Repair/Replacement. The contractor shall provide an open/closed WA report. This report shall also be segregated by customer (i.e. Lab) by individual tabs on the spreadsheet. The report shall be a record of all WA’s in an open status and WA’s closed during the previous month. The report shall detail the WA number, dates received and closed, building number, EIN, type of equipment, equipment description, equipment location, priority rating, and description of work to be performed. The report on closed WA’s shall detail DO number, building number, labor hours and cost by trade, and cumulative labor hours, labor cost, material costs, subcontractor costs, rental costs, and a total cost. (Appendix C, Data Item No. A011)
1.1.16. Inventory Report. The contractor shall provide an accurate and current report for each government inventory, i.e. critical parts and refrigerant, provided to the contractor for use on this contract. The inventory report shall include the description of item, quantity, and location. The report shall document any item used, the date the item was used, and the EIN of the equipment the item was used on. (Appendix C, Data Item No. A012)
1.1.17. Project Closeout. The contractor shall provide completed DD Form 250, Material Inspection and Receiving Report, for each individual DO to the CO within forty-five (45) days of final invoice being paid to contractor. The contractor shall process of all vendor bills to facilitate project closeout requirements. (Appendix C, Data Item No. A013)
1.1.18. Equipment Listing. The Equipment Listing is the government equipment the contractor is responsible for on this contract. The contractor shall obtain an updated equipment list from the CE Support SharePoint site on the 1st of every month. The updated list incorporates all additions, deletions, and changes of the past month. The equipment listing will display lab number, building number, equipment classification number, item number, location, description of the item as real property or user’s equipment, manufacturer’s name, model number, serial number and a designation on whether the equipment receives maintenance or strictly repair/replacement services. The listing will be sorted in numerical order by the lab number, building number, equipment classification number, and item number.
The contractor shall visit each piece of equipment on the listing at the onset of the contract and verify all data is correct on the equipment list. All discrepancies shall be documented and submitted to the CO along with the correct information within 90 days of the contract start date. Throughout the course of the contract, the contractor shall field verify equipment data for all new equipment added. This shall be accomplished on a monthly basis with discrepancies documented and changes submitted to the CO by the end of the month. (Reference Paragraph 1.7.2.)(Appendix C, Data Item No. A014)
1.1.18.1. The Equipment Listing includes some facility utility systems such as steam and condensate piping, compressed air piping, liquid nitrogen piping, etc. Where such systems are listed the contractor is responsible for the entire system. If the utility is not internal to the facility and is fed from an outside source, the contractor is responsible for the system from the service valve to the facility inward. In cases where the utility system is not on the Equipment Listing but a piece of equipment fed from the utility is, the contractor is responsible for the utility from the equipment back to the first shut off valve.
1.1.18.1.2. Steam & Condensate Piping Systems. The contractor shall be responsible for pressure regulating stations in the piping systems, to include the pressure regulating stations where the utility enters the facility and converts high pressure steam to low pressure.
1.1.18.1.2.1. Steam Traps. The maintenance instructions require servicing steam traps. The contractor shall also complete a steam trap survey at the end of each calendar year. The survey will require the contractor to annotate all traps checked and specify any repairs or replacements. The survey shall be on a website provided by the government and include a complete log of existing steam traps. A manual containing the steam trap listing and locations will be provided to the successful offeror. (Appendix C, Data Item No. A020)
1.1.18.2. All ancillary or associated items to a piece of equipment on the Equipment List shall be a part of the equipment for the purposes of this Performance Work Statement (e.g. electric service from the motor control center to the equipment, HVAC controls directly and indirectly controlling the equipment).
1.2. BASE COMPLIANCE
1.2.1. All work accomplished under this contract shall be in compliance with the current version of the Base Facility Standard.
1.2.2. All HVAC controls (Appendix E, definition) replaced under this contract shall be in compliance with the current versions of the Base Facility Standard and WPAFB Specification 23-09-23.
1.2.3. Information Assurance Compliance (IAC) pertaining to Industrial Controls Systems (ICS) and the Civil Engineering Virtual Local Area Network (CE VLAN)) remains the responsibility of 88 ABW CEOER.
All work accomplished under this contract requiring Information Technology (IT) access to ICS equipment and CE VLAN assets shall be vetted through the 88 ABW CEOER ICS Information Assurance Manager office. (See Appendix H; Information Assurance Requirements).
1.3. MAINTENANCE.
1.3.1. General. The contractor shall provide all labor, supervision, equipment, tools, materials, and all other services required for maintenance activities, including water treatment and water analysis. The majority of maintenance services shall be accomplished during normal work hours (para. 1.11.1.). A smaller amount of maintenance activities shall be required to be performed after normal hours. This is due to on-going testing and instances where equipment shut-down would impact the user’s mission. The contractor and government shall be required to work together to facilitate a maintenance schedule in these cases. After hours work requires prior approval of the CO and the cost shall be charged as overtime hours, where applicable.
1.3.2. Maintenance. The government shall provide an initial list of equipment to the contractor for maintenance and service activities. The list shall distinguish which equipment is to receive maintenance and which equipment is to receive service only. The contractor shall use this list to prepare the Equipment Maintenance Plan as required by paragraph 1.1.11. (Appendix C, Data Item No. A008).
Types of work to be performed within the maintenance category include, but are not limited to, the following:
1.3.3. Recurring Maintenance. The contractor shall perform recurring maintenance in accordance with the assigned UNIFORMAT II System designation per the latest version of the RS Means Maintenance Cost Data. For all equipment not assigned an UNIFORMAT II System designation per the RS Means Maintenance Cost Data the contractor shall perform recurring maintenance in accordance with the government provided Air Force Civil Engineer (AFCEC) Preventative Maintenance Task List (PMTL) or government provided manual with manufacturers recommended maintenance instructions. This maintenance is required on a periodic basis and includes tasks such as replacing filters and belts, greasing bearings, making oil changes, circuit breaker testing, checking alignment of components, and various other maintenance actions as identified in the instructions . This maintenance is also seasonal, such as winterizing cooling towers. Maintenance shall be identified on the government-provided instructions and manufacturers recommended maintenance instructions as daily, weekly, monthly, quarterly, semi-annual, or annual requirements. After contract award, the contractor shall submit their proposed calendar year maintenance plan (Appendix C, Data Item No. A008) to the CO for approval.
CO approval authorizes the contractor to perform maintenance in accordance with the proposed plan.
The maintenance actions are subject to revisions and CO approval must be secured for each revision.
When a change to the maintenance instructions is initiated by the government, the contractor shall include the change(s) in the next Equipment Maintenance Plan (see paragraph 1.1.12.). An Equipment Maintenance Plan is required at the beginning of each calendar year and a monthly plan each month.
(Appendix C, Data Item No. A015)
1.3.3.1. Generators. The contractor shall maintain and service generators in compliance with ETL 13-4 (Change 1), “Standby Generator Design, Maintenance, and Testing Criteria, AFI 32-1062, “ Electrical Power Plants and Generators” and AFI 32-1063, “Electrical Power Systems”. The contractor shall complete AFCESA Form 487, “Emergency Generator Operating Log” each time the generator is operated. , The contractor shall complete AF Form 719, “Historical Record –Diesel-Electric Generator & System” each time the generator is inspected or receives service. . The contractor shall maintain and manage the forms per the AFIs.
1.3.3.2. Materials and Supplies. The contractor shall provide all materials, supplies and consumables associated with maintenance to keep the equipment on this contract functioning properly. These materials include, but are not limited to, filters (air, water, & oil), belts, oils, grease, softener salt, carbon tanks and ion exchange resin tanks for water treatment systems, etc.
1.3.4. Water Analysis and Treatment. Furnish all labor, equipment, devices, appliances, and materials, and perform analysis and all other operations necessary to chemically treat condenser water systems, closed hot water loops and closed chilled water loops in connection with the operation and maintenance of the following existing equipment and any new equipment added at a later date:
LAB BLDG EQUIPMENT NO REMARKS
3 20837 20248 20838
1630-001 1631-001 1631-001
5 20851 20851
1630-001 1630-002
7 20651 20654 20655
1630-003
1630-004
8 20018 20018H 20018H 20018H 20023 20023 20045 20065 20071D 20145 20146 20490C 20490C 20490C
1630-001 1630-001 1630-002 1631-001 1630-001 1630-002 1631-001 1630-001 1632-002 1631-001 1631-005 1630-001
1630-003
Cells 1, 2, 3, 4
9 20600 20601 20602 20620 20620 20620 20622
1878-001
1878-001 1630-005 1630-006 1630-007
1.3.4.1. As part of the preventive maintenance program, the contractor shall provide water treatment and analysis.
1.3.4.2. Test and change chemical drums (using manufactures specifications) to insure adequate supply of treatment chemicals.
1.3.4.3. Maintenance and operation of all chemical feed pumps, controllers, strainers, water meters, bleed valves, flow switches, test coupons, test racks, and pH meters shall be checked in accordance with manufacturers specifications.
1.3.4.4. Clean baskets in supply line strainers at least once per month.
1.3.4.5. Inspect water distribution pans weekly. Clean and remove scale from holes in bottom of pan to insure uniform water flow over tower fill.
1.3.4.6, Check the nozzles in the spray distribution tower weekly. Report the number of nozzles not operating properly in writing to the COR, on the Water Treatment Report (Para. 1.3.9) and return the nozzles to operating condition.
1.3.4.7. Control the water level in tower sumps so that they do not overflow and the total dissolved solids (TDS) are controlled by the system bleed valve.
1.3.4.8. Insure operation of all cooling tower make-up water float valves and liquid level control assemblies.
1.3.4.9. Ensure operation of, and maintain (using manufactures specifications) condenser water pumps, cooling tower fans, fan motors, gearboxes, louvers, and other equipment related to chemical water treatment. Identify potential condenser water equipment operational problems, and notify the CEPCOR and the Lab COR.
1.3.4.10. Maintain corrosion and scaling limitations, per requirements identified in paragraphs 1.3.7.1 and 1.3.7.2.
1.3.4.11. Remove salt or precipitate that collects on the outside edges of closed packed plastic sheet fill towers, screens, or mist eliminators, and blocks airflow. The contractor shall provide a suction device for removing precipitate.
1.3.4.12. The contractor shall deactivate and clean cooling towers that do not operate continuously at the end of the cooling season. The cleaning operation shall consist of removing all precipitate from the tower surfaces. The contractor shall report all damage to the CEPCOR/COR, within one (1) day of occurrence.
1.3.4.13. The contractor shall perform all seasonal maintenance, per manufacturer specifications, during the period of inactivity for those cooling towers that do not operate continuously. The contractor shall activate the cooling towers commensurate with seasonal load conditions or as required by the mission of each Lab.
1.3.5. Equipment.
1.3.5.1. The contractor shall ensure the condenser water systems have been operating with chemical treatment and have chemical controls, water meters, bleed valves, pumps, strainers, flow switches, and flow regulators already installed. The contractor shall inspect all existing equipment for proper operation within one (1) month after starting maintenance responsibilities.
1.3.5.2. All condenser water treatment equipment installed by the contractor, other than government furnished equipment, shall be new and from a manufacturer regularly engaged in the manufacture of condenser water treatment equipment.
1.3.5.3. The contractor shall inspect cooling tower circulating water systems and provide automatic control of the bleed and chemical treatment based on the actual requirements of the cooling tower and in accordance with specified limits and dosage. Systems shall provide visual indication of chemical feed and bleed off.
1.3.5.4. Existing systems shall have a solid state controller, conductivity cell, water meter, electrical contact head, electrically controlled bleed valve, strainer, chemical feed pumps, flow switches, pH meter with electrical contacts where acid feed is required, and flow regulators as described below:
1.3.5.4.1. Chemical feed shall be controlled independently of bleed off by the controller. The chemical feed pumps shall require no lubrication, be easily calibrated, have no exposed moving parts, be of unit design construction, incorporate cartridge valve for easy priming, have variable stroke length, operate on 120/60/1 power, have isolated mechanical parts to prevent solution contamination, and be sized in accordance with the respective condenser water system.
1.3.5.4.2. The controller shall contain a conductivity cell constructed of material impervious to all water treatment chemicals. The cell shall contain temperature-compensating elements, which, in conjunction with the control circuits that will maintain constant water Total Dissolved Solids (TDS) regardless of temperature fluctuations. A removable clean-out plug shall be provided in the bottom of the cell. The cell shall withstand a pressure of 125 psi, have a characteristic pressure drop of 10-15 psi, and operate on 120/60/1 power.
1.3.5.4.3. The flow switch shall be installed to energize and de-energize the controller based on condenser water flow.
1.3.5.4.4. The pH meter shall have solid-state circuitry and have a capacity to control the hydrogen ion concentration between pH limits of 6 and 10. The meter shall have adjustable electrical contacts to start a feed pump motor at a high pH level and shut the feed pump motor off at a low pH level. A control light shall indicate when acid is being fed to the condenser water system. Reference limits above, per specifications, for high/low levels.
1.3.6. Treatment Chemicals.
1.3.6.1. The contractor shall furnish all chemicals required for water treatment on all condenser water systems covered by the contract. The contractor shall change chemical drums or fill tanks as required to insure continued chemical feed to all condenser water systems. All containers shall have secondary containment and be managed in accordance with paragraph 1.7. Environmental Requirements.
1.3.6.2. The contractor shall ensure chemicals are capable of inhibiting scale and corrosion and comply with Environmental Protection Agency (EPA) requirements. No heavy metals, chromates, sulfonates, lignin, or tannins shall be used. In addition, no molybdate-based corrosion inhibitors shall be used for cooling towers discharging to the sanitary sewer system.
1.3.6.3. The contractor shall ensure that the inhibitors control corrosion on the aqueous surfaces of ferrous and non-ferrous metals. The chemical supplier must supply data to demonstrate corrosion rate of 3.0 mils per year or less and corrosion pits of no more than 5.0 mils per year on mild steel. On copper, corrosion shall be limited to 0.5 mils per year and corrosion pits no deeper than 1.0 mil per year.
Data should include actual rate tests using American Society of Testing and Material (ASTM) methods.
1.3.6.4. The contractor shall ensure that the biocides provided for bio-fouling organism control can be 10% methylene bis (thiocyanate) alternated with sodium hypochlorite.
1.3.6.5. The contractor shall ensure that the inhibitor systems shall be compatible with chlorine or non-oxidizing biocides for control of algae in accordance with manufacturer’s specifications. An iron inhibitor containing a first generation polymer to control iron deposition throughout the condenser water system shall be used.
1.3.6.6. If an acid treatment is required, the contractor shall ensure acids (muriatic or sulphuric) used control the hydrogen ion concentrations between pH level of 7.2 and 7.8. The use of acid will not relax the corrosion requirements of paragraph 1.3.7.1.
1.3.6.7. The contractor shall purchase water treatment chemicals per paragraph 1.1.2.1. All chemical suppliers considered shall submit technical data sheets and description of the chemicals proposed. The contractor’s proposed selection of the chemical supplier shall be approved by the CO, based upon competitive pricing. The contractor shall obtain, track, maintain and update, as changes occur, all Material Safety Data Sheets (MSDS).
1.3.7. Performance Criteria.
1.3.7.1. Corrosion Rates. The contractor shall insure that the corrosion rate of all copper surfaces in contact with treated condenser water shall not exceed 0.5 mils per year and that the corrosion rate of all mild steel surfaces in contact with the treated condenser water shall not exceed 3.0 mils per year. The contractor shall demonstrate that these performance criteria have been satisfied on at least 85% of all the condenser water systems tested under the provision of this contract via results obtained through coupon testing as specified by paragraph 1.3.10. and performed in accordance with ASTM Standard No.
D2688-05,”Standard Test Methods for Corrosivity of Water in the Absence of Heat Transfer (Weight Loss Methods) www.astm.org.
1.3.7.2. Scale. All condenser water cooling towers shall be maintained to less than 1/4" sludge/scale in the bottom of the cold water reservoir. The contractor shall insure that no appreciable sludge/scale shall accumulate within the condenser tubes as per chiller manufacturer recommendations.
1.3.7.3. Algae. The condenser water systems maintained shall be free from visible accumulation of algae.
1.3.7.4. Pitting. The degree of pitting shall be evaluated in accordance with ASTM standards.
1.3.7.5. Control Ranges and Test Cycles. The contractor shall perform key tests, which are: pH, total alkalinity and calcium for corrosion and scale control; and conductivity and chlorides for blowdown control. The tests shall confirm the suitability of the formulation. The required ingredients and the approximate ratio (or multiple thereof) of each are total inorganic phosphate, total organic phosphate, and 2% for total polymeric dispersants, total polymeric antiscalants, and copper corrosion inhibitor.
Molybdate corrosion inhibitors shall not be used for cooling towers. All tests shall be documented and submitted to the government as indicated in the following table for review: (Appendix C, Data Item No.
A016).
PARAMETER LIMITS DAILY WEEKLY MONTHLY
Calcium Hardness 1 1/2 times makeup CaH X Total Alkalinity -600pm CaCO3 X Chloride 1 1/2 times makeup Cl X Conductivity 1 1/2 times micromhos X Total Hardness 1 1/2 times makeup as TH X
1.3.8. Operation and Maintenance. The contractor shall provide complete maintenance and operation of the condenser water and chemical treatment systems, including acid feed and pH control equipment as specified herein. Acid shall be fed to tower basin to assure complete dilution prior to metal contact.
This includes, but is not be limited to:
1.3.9. Water Treatment Reports. The contractor shall maintain records detailing all chemical analyses performed, personnel performing tests, and the date and time performed. The contractor shall provide reports that include the following: (Appendix C, Data Item No.A016)
1.3.9.1. Chemical determinations of circulating condenser water and make-up water.
1.3.9.2. Concentration of total dissolved solids.
1.3.9.3. Concentration of treatment chemical.
1.3.9.4. Documentation of algae formation and corresponding action.
1.3.9.5. pH of all condenser water systems and its calcium content (if an acid treatment is used).
1.3.9.6. The bicarbonate and carbonate alkalinity.
1.3.9.7. Documentation of condition of overall condenser water system.
1.3.9.8. Test coupon data required by paragraph 1.3.10.4.1-11.
1.3.10. Corrosion Controls.
1.3.10.1. The contractor shall provide copper and mild steel test coupons in accordance with the directives established in ASTM Standard No. D2688-05 . The contractor shall install two (2) copper and two (2) mild steel test coupons in accordance with ASTM Standard No. D2688-05 , in separate test coupon assemblies on all condenser water systems maintained under provisions of this contract. If any system is not presently per ASTM standards, the contractor shall notify the CO and CEPCOR. The mild steel test coupon assembly shall precede the copper test coupon assembly in the direction of condenser water flow.
1.3.10.2. Pipe used in fabricating or manufacturing the various corrosion coupon assemblies shall be chlorinated polyvinyl chloride (CPVC) or fiberglass reinforced plastic (FRP) pipe. All corrosion coupon assemblies shall be manufactured-fabricated in accordance with ASTM Standard No. D2688-05 The corrosion coupon assemblies shall be installed across the respective condenser water circulating pumps and incorporate globe or gate valves before and after the test coupons in the direction of water flow.
The corrosion coupon assemblies also incorporate a flow-regulating device to facilitate adjustment of the condenser water flow rate across the test coupons. The condenser water flow rate shall thereby be established for each and every corrosion coupon assembly commensurate with the flow rate through the respective condenser tubes as specified by ASTM Standard No. D2688-05.
1.3.10.3. The contractor shall follow the methods and procedures regarding corrosion testing described in ASTM Standard No. D2688-05.
1.3.10.4. The contractor shall initiate and maintain accurate update records detailing all coupons, testing, preparation, and operational procedures employed. The records shall include data with the water treatment report required by paragraph 1.3.7. The data shall be submitted to the CEPCOR and include, but not be limited to:
1.3.10.4.1. Coupon material, number, and installation location.
1.3.10.4.2. Coupon weight before installation.
1.3.10.4.3. Coupon weight after use.
1.3.10.4.4. Date coupon weighed.
1.3.10.4.5. Certifying laboratory approved by the Government.
1.3.10.4.6. Date coupon installed.
1.3.10.4.7. Date coupon removed.
1.3.10.4.8. Number of days coupon exposed.
1.3.10.4.9. Coupon corrosion rate.
1.3.10.4.10. Corrosion description.
1.3.10.4.11. Coupon maximum pit depth.
1.3.10.5. Prior to installing any test coupons, the contractor shall have an independent laboratory certify each individual test coupon’s weight and material with corresponding test coupon identification number.
Coupons shall be installed within one (1) month of contractor maintenance starting.
1.3.10.6. After approximately sixty days exposure, the contractor shall remove the one (1) copper test coupon and one (1) mild steel test coupon from each corrosion coupon assembly installed. The coupons shall immediately be replaced with properly identified new and different coupons. The contractor shall insure that the corrosion rates and degree of pitting derived for each test coupon are formulated in accordance with ASTM Standard No. D2688-05 The results shall be certified by the independent testing laboratory, and tabulated by individual system and building number and submitted to the government. The contractor shall take necessary precautions as stated by ASTM Standard No.
D2688-05 to ensure the integrity of test coupons used during all phases of operation.
1.3.10.7. The contractor shall insure that one (1) copper test coupon and mild steel test coupon shall remain in each corrosion coupon assembly undisturbed for the duration of the cooling season or for six months for those air conditioning systems, which operate continuously. After the completion of the cooling season, or every six months, whichever is appropriate, the contractor shall remove these test coupons. The contractor shall submit these coupons to the government from independent laboratory showing certification that the various corrosion rates and associated degree of pitting for each test coupon are established in accordance with ASTM Standard No. D2688-05. The contractor shall take all-necessary precautions as described by ASTM Standard No. D2688-05 to insure the integrity of all test coupons used during all phases of operations.
1.3.10.8. The CO reserves the option to independently evaluate, at no cost to the contractor, any or all of the test coupons after use on a random basis. The contractor shall be required to store all used test coupons for one (1) year after use. The contractor shall take all necessary precautions as described in ASTM Standard No. D2688-05 to insure the integrity of all test coupons during the period of storage following use.
1.3.10.9. As part of the preventive maintenance program, the contractor shall control corrosion, to include, but not limited to: application of protective coatings, maintenance of cathodic protection systems, consideration of corrosion problems when purchasing and installing replacement equipment and materials, and making recommendations for system modification to reduce corrosion problems and maintenance costs. Particular emphasis should be placed on galvanic corrosion resulting from dissimilar metals.
1.3.11. Identification of Impending Equipment Failure. During recurring maintenance inspections and actions, contractor personnel may encounter systems requiring repair/replacement. Such conditions shall be identified within two working days to the Lab COR and the assigned CE COR via written notification.
1.4. EQUIPMENT REPAIR/REPLACEMENT
1.4.1. General. The contractor shall provide all labor, supervision, equipment, tools, materials, and all other services required for the execution and completion of service calls, or as referred to from here on, work authorizations (WAs) to provide repair, replacement, and minor upgrades to equipment. The contractor shall perform restoration of equipment or components to a condition that the equipment may be used effectively for its designated purpose. Restoration includes overhaul, replacement, reprocessing, or replacement of constituent parts or materials that have deteriorated by the action of the elements or wear and tear and which cannot be corrected through maintenance. The requirement for equipment repair may be identified by the contractor. Within two working days, the contractor shall notify the applicable COR and Lab COR that repairs need to be made. Repair requirements may also be identified by government personnel. In both cases, personnel who are approved to place calls against the contract by the CO, will notify the contractor of the requirement and request they open a WA. The contractor shall prepare a WA, and the CO verbal or written approval of the WA shall constitute for the contractor to proceed. A small amount of repair and/or replacement activities shall be required to be performed after normal hours due to on-going testing and instances where equipment shut-down would impact the user’s mission. The contractor and government shall be required to work together to facilitate a repair and/or replacement schedule in these cases. After hours work requires prior approval of the CO and the cost shall be charged as overtime hours, where applicable.
Repair actions are classified as follows:
1.4.2. Emergency Work Request. A work request is an emergency when a piece of equipment, deemed as essential to the user’s mission, needs service due to failure. The contractor shall respond to emergency work requests within two (2) hours of verbal approval by the CO.
1.4.3. Urgent Work Request. A work request is urgent when a piece of equipment, deemed as critical to the user’s mission, needs service due to failure. The contractor shall respond to urgent work requests within twenty-four (24) hours of verbal approval by CO.
1.4.4. Routine Work Request. A work request is routine when a piece of equipment, deemed non-critical to the user’s mission, needs service due to failure. The contractor shall respond to routine work requests within three (3) workdays of a WA being approved by the CO.
1.4.5. Non-Duty Hours. The contractor shall receive non-duty calls through the CE Service Call Desk.
The contractor shall furnish the CO a list of personnel authorized to respond to emergency and urgent work requests and their phone numbers within five (5) workdays after contract start and update listing as required by contractor personnel changes. Following a response to a non-duty hours request the contractor shall submit a WA request to the CO the next workday.
1.4.6. Repair vs. Replacement. Repairs costing in excess of seventy-five (75%) percent of the replacement cost of the individual item of equipment or repairs that the contractor determines are uneconomical shall be referred to the CO for determination of what action is to be taken. The CO shall request the contractor repair, replace, or take no action on the equipment.
1.4.6.1. The government may choose to replace equipment when repairs cost less than seventy-five (75%) percent of the repair cost. Under such circumstances, the CO will request the contractor to replace the equipment in lieu of making repairs.
1.4.7. Repairs/Replacements Costing $5,000.00 or Less. The Lab COR will request the contractor prepare a WA for these requirements. The CO must approve the WA. The contractor shall make the required repairs/replacements and submit an itemized bill through his normal invoicing process charged to the firm fixed price labor CLIN and the Time & Material CLIN.
1.4.8. Repairs/Replacements Costing Greater Than $5,000.00, but Less Than $25,000.00. The Lab COR will request the contractor prepare a WA for these requirements. The CO must approve the WA. If the contractor determines a particular WA for minor repairs involves real property and meets the criteria specified in DFARS 222.402-70, the contractor may request Davis-Bacon Wage Rates by submitting a written proposal and cost estimate for the work to the CEPCOR. The CEPCOR shall review the request and forward it to the CO with recommendations. The CO shall make a determination if the criteria specified in DFARS 222.402-70 are met and Davis-Bacon wages apply. The contractor shall prepare an estimate detailing material costs, equipment rental costs, labor costs by trade and time. The estimate shall be presented to the Lab and CE COR for signed approval by both to authorize the work. Once an estimate is provided by the contractor and signed approval has been given the work shall proceed. The contractor shall make the required repairs/replacements and submit an itemized bill, through his normal invoicing process, for the labor hours. The labor hours shall be charged to the firm fixed price labor CLIN. The materials, parts, sub-contractor fees and rental costs shall be charged to the customer’s
GPC.
1.4.9. Repairs/Replacements Costing $25,000.00 or Greater, but Less Than $150,000.00. The Lab COR will request the contractor prepare a WA for these requirements. The CO must approve the WA. If the contractor determines a particular WA for minor repairs involves real property and meets the criteria specified in DFARS 222.402-70, the contractor may request Davis-Bacon Wage Rates by submitting a written proposal and cost estimate for the work to the CEPCOR. The CEPCOR shall review the request and forward it to the CO with recommendations. The CO shall make a determination if the criteria specified in DFARS 222.402-70 are met and Davis-Bacon wages apply. The contractor shall prepare an estimate detailing material costs, equipment rental costs, labor costs by trade and time. The estimate shall be presented to the CO for their review and approval authorizing the work. Once signed approval has been given the work shall proceed. The contractor shall make the required repairs/replacements and submit an itemized bill, through his normal invoicing process, for the labor hours. The labor hours shall be charged to the firm fixed price labor CLIN. The materials, parts, sub-contractor fees and rental costs shall be charged to the customer’s GPC.
1.4.10. Major Repairs/Replacements Costing $150,000.00 or Greater. Major Repair/Replacement requirements, costing $150,000.00 or greater, shall be fixed price tasks with fixed performance periods.
These tasks will be requested by the Lab CORs.