About this file
PWS dated 30 Mar 2016
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CDRL_A001-QP_Accident_Incident_Report-SIGNED.pdf | ||
| Appendix_C.pdf | ||
| FA8571-16-T-0016_Effective_14_Apr.pdf | ||
| CDRL_A004-QP-_Technical_Report-SIGNED.pdf | ||
| CDRLA002-QP_-_SIGNED_-_Safety_Plan.pdf | ||
| Wage_Determination_Rev_2_(29_Dec_2015).pdf | ||
| CDRL_A003-QP-_Status_Report-SIGNED.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement
Environmental and Engineering Support
Robins Air Force Base, Georgia
30 March 2016
1.0 Description of Services
1.1 The contractor shall provide Environmental and Engineering Support services to support
Warner Robins Air Logistics Complex (WR-ALC). This Performance Work Statement (PWS) defines requirements for Environmental and Engineering Support to support the WR-ALC
Environmental and Ergonomics Office (402 MXSG/MXDEU) at Robins Air Force Base, Georgia. The contractor will provide services to ensure pollution prevention (P2), energy, occupational health and environmental compliance objectives are identified, sustained and enhanced at WR-ALC.
1.2 Statement of Contractor Services and Responsibilities
The Contractor will provide the respective 402 MXSG/MXDEU Program Manager (PM) with general technical support for project activities and related information, attend meetings on behalf of the government, develop, update and/or present technical information, and provide logistical support.
In carrying out the work assignment, the Contractor shall furnish the personnel, services, equipment, materials, facilities, and other requirements necessary for, or incidental to, the performance of work set forth herein either directly or through sub-contractor support, unless provided by the Government as government furnished equipment. The PWS consists of the following major services described below.
1.3 Basic Services
1.3.1 Project Management
1.3.1.1 Kick-Off Meeting
The Contractor shall attend a kick-off meeting with the 402 MXSG/MXDEU PM. The meeting will be held at Robins AFB or a location chosed by the 402 MXSG/MXDEU PM after the award of the contract. The purpose of this meeting will be to review the project Performance Work
Statement (PWS), ensure mutual understanding of work, schedule, and deliverables, and identify special requirements for interviews, documents, and other information.
1.3.1.2 Periodic Project Meetings
The Contractor shall attend regular progress review meetings as directed by the PM.
1.3.2 Work Plan
The Contractor shall prepare a draft Work Plan (WP) for the anticipated projects as needed. The plans shall identify issues, tasks, and approach for successful completion of the work, logical interaction, and points of contact list, project team, schedule, and deliverables. (CDRL A004, DI-MSC-80508B, Technical Report Study/Service)
1.3.3 Project Closeout Meeting and Report
The Contractor shall attend a project closeout meeting with the 402 MXSG/MXDEU PM. The
PM will ensure all technical reports have been submitted and all tasks have been completed. The
PM will provide feedback for the Contractor and discuss project performance. The PM will also provide information regarding necessary follow up work.
A Project Closeout Report will be generated following the Project Closeout Meeting as part of the Technical Report Study/Service (CDRL A004, DI-MSC-80508B, Technical Report
Study/Service). The report should detail methods and results of the work that was executed under the contract. The report should also include a compilation of the technical reports in electronic format.
1.4 Technical Support The contractor will perform technical services will no more than 2 customer complaints per month related to basic services for performing technical services.
1.4.1 The contractor will provide engineering services to identify new technologies (based upon shop risk assessments) and perform technology evaluations that incorporate cost, performance, human health, the environment, public acceptance and technical risk. Conducting risk assessments include attending meetings, performing field assessments to identify potential environmental and health (EH) impacts to production processes, recommending solutions, and providing design services needed to implement those recommendations. The contractor will:
(1) Provide engineering assessments for WR-ALC locations to identify and design modifications to operations to improve EH and production efficiencies.
(2) Engineer EH solutions identified during assessments.
(3) Assess and recommend modern and emerging technologies for applicability across WR-
ALC.
(4) Evaluate EH related items for inclusion in lending library for issuance to individuals as recommended solutions.
(5) Provide recommendations for any areas identified needing to be improved.
(6) Provide written technical reports and recommendations after completion of assessments.
(CDRL A004, DI-MSC-80508B, Technical Report Study/Service)
1.4.2 The contractor will provide engineering services, including environmental compliance, pollution prevention, and energy efficiency enhancements relating to HazMat and HazWaste reduction or elimination, environmental benefits, human health/well-being, energy and process improvements, and technologies integration and insertion incorporating cost, performance, human health, the environment, acceptance and technical risk benefits.
The contractor will complete tasks associated with 402 MXSG/MXDEU environmental and pollution prevention (P2). This includes attending meetings, performing field surveys, conducting evaluations and assessments (e.g. developing process specific opportunity assessments (PSOAs)) to identify potential environmental or P2 concerns, impacts, and potential solutions and recommendations relating to, or as a result of, projects and other maintenance wing activities. Specific tasks may include but not limited to the following:
(1) Evaluation of Non-Chrome Primer(s) and Surface Treatments for EMXG Operations.
(2) Hazardous Waste Stream Evaluation for Elimination to lower TRI, Ozone and VOC chemicals.
(3) Solvent Distillation and Recovery.
(4) Hot Dip Tank Depaint MIL-PRF-83936 Enhancements.
(5) Refine Pre-Heating and Cure Times for Low Temperature Powder Coatings (LTPC).
(6) Integration of an Alternate MIL-PRF-680 Degreaser Compound (Navsolve) into WR-
ALC Operations.
(7) Assessment of LTPC Depaint Methods.
(8) Other projects as directed by the 402 MXSG/MXDEU PM.
1.4.3 The contractor will complete tasks associated with 402 MXSG/MXDEU environmental and pollution prevention (P2). This includes attending meetings, performing field surveys, conducting evaluations and assessments to identify potential environmental concerns, impacts, and potential solutions and recommendations relating to, or as a result of, projects and other maintenance wing activities. Specific tasks may include but not limited to the following:
(1) Development of System Peculiar Corrosion Control Specific Process Orders (PO)
Incorporating ESOH Requirements, not to exceed 22 POs.
(2) Coordinate and Assist Integration of System Peculiar Corrosion Control Specific Process
Orders into WR-ALC Operations.
(3) Other Projects as Directed by the 402 MXSG/MXDEU PM.
The contractor will provide technical support for project activities by attending meetings on behalf of 402 MXSG/MXDEU, developing, updating and presenting technical information, and providing logistical support. Upon notification from the government on-siste COR, the contractor will respond to customer requests for technical evaluations in one business day.
2.0 Services Summary (SS)
1.0 Performance Objectives PWS Para. 2.0 Performance Threshold
Submission of technical reports 1.4.1 Provide technicial reports within 5 days of completion IAW A004
Perform Basic Services 1.4 No more than 2 customer complaints per month related to basic services for performing technical services
3.0 Government Furnished Equipment and Services
3.1 The Government will provide cubicle space, desk, chair, desktop computer, access to copier, fax and networked printer. In addition, the Government shall provide telephone service consisting of Class 3 (formerly referred to as Class C) and Class 1 (formerly referred to as Class
A) service, to include the Defense Switched Network (DSN). Telephone service classes are defined in AFI 33-111, 24 March 05, Voice Systems Management, Section B, Chapter 31. The contractor shall ensure use of all Government provided equipment/facilities is limited to performance of contract related official Government business. Upon completion or termination of the contract or expiration of employee identification passes, the prime contractor shall ensure that all GFE to include base ID passes, desktop computer, laptop computers, peripherals, and other software/hardware is returned to the on-site COR and each individual is processed through the directed out-processing checklist.
3.2 The Government will provide Personal Protective Equipment (PPE) for hearing/ear protection, eye protection, and reflective belts to ensure visibility during darkness.
3.3 The contractor shall be responsible for safeguarding all government property used for contractor performance.
3.4 The Government will provide access to Government Furnished Information (GFI) through the following systems: TD-PDM Gateway. For a listing of what the acronyms stand and the purpose of the specific system see Appendix 2. Training on these systems will be provided by the Government as on-the-job, classroom, or Computer Based Training (CBT).
3.5 Training
3.5.1 Any specialized training required to perform an identified task will be defined in Table 2 below. The Government may provide training to contractor personnel if required by individual projects. The type of training referenced is not general in nature but that which is specialized or unique to the project supported
3.5.2 When notified to maintain computer network access, the contractor shall adhere to all government training requirements when notified to maintain computer network access. Once trained in the performance of duties perform and assist in the subsequent training of newly hired personnel.
3.5.3 The contractor shall ensure employees complete Government training identified in Table
2 before performing any services requiring this training. The contractor shall also ensure that annual training is completed within three days of expiration and that new mandatory training is complete within time frames designated by the Air Force.
Table 2 - Government Provided Security Training
Course
Name
Course
Length
Personnel
Category
Initial Quarterly Annual Type of
Training
Security
Briefings
0.5 hrs All
Contractor
Personnel
X Classroom or
On-The-Spot
Security
Training
1 hr All
Contractor
Personnel
X Classroom
Privacy Act
Training
0.5 hrs All
Contractor
Personnel
X X Internet Web
EIMC
IAAP
Training
0.5 hrs All
Contractor
Personnel requiring computer access
X X Internet Web
EIMC
Semi-
Annual
Security
Training
0.5 hrs All
Contractor
Personnel requiring computer access
X Internet Web
EIMC
OPSEC
Training
1.0 hr All
Contractor
Personnel requiring computer access
X X Internet Web
EIMC
3.5.3 Required EIMC Training
3.5.3.1 First Half of the Year: WR-ALC Installation Security Training, WR-ALC Operations
(OPSEC) Training WR-ALC Controlled Area Training, WR-ALC Safe Custodian Training, Secure Voice Responsibility (SVRO) and User Training.
3.5.3.2 Every Two Years: WR-ALC Derivative Training
3.5.3.3 Every Three Years: AFOSI Counterintelligence Training AND Protection of the
President Training
3.5.4.4 One Time Initial Training: North Atlantic Treaty Organization (NATO) Training, Initial
Security Education Orientation for Cleared Personnel
3.5.4.5 The contractor must possess a valid driver's license and vehicle insurance for driving privileges on the flight line. The contractor shall contact the Vehicle Control Officer (VCO),
(478) 222-2929 or (478) 954-1064, Building 155, AMXG Visitor Control Center, to have the
PM/lead employee (1) trained on “Airfield Driver’s Training”and issued an AF Form 483, Certificate of Competency, to obtain Industrial Area driving privileges.
4.0 General Information
4/1 Hours of Operation
4.1.1 Normal Hours of Operation. Standard work hours are from 7:00 a.m. to 3:30.
4.1.2 Recognized Holidays. Unless otherwise required by the Government, the contractor shall not have access to Government facilities to work on the following federal holidays/days:
Furlough days, New Year’s Day, Martin Luther King Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Days, Thanksgiving Day and
Christmas Day. If the holiday falls on Saturday, it is observed on Friday. If the holiday falls on a Sunday, it is observed on Monday.
4.2 Security Requirements
4.2.1 Actual knowledge and/or generation of classified information and/or Controlled
Unclassified Information (CUI) are not expected to be necessary for performance of the contract.
Contractor personnel are required to comply with security requirements to preclude potential security incidents or violations. If a change in the security classification of the contract becomes necessary after contract award, the Contractor shall make a reasonable effort (as defined by the
COR with consultation with the CO) to continue performance under the contract in compliance with the change in security classification in accordance with FAR 52.204-2, Security
Requirements.
4.2.2 Government Security Regulations: The Contractor shall ensure personnel, information, system, property, facility and security requirements are met. The Contractor shall comply with
Government security regulations including, but not limited to, Department of Defense (DoD)
5200.2-R, Personnel Security Program; DoD Directive (DoDD) 5205.02E, DoD Operations
Security (OPSEC) Program; DoD Manual 5205.02-M, DoD Operations Security (OPSEC)
Program Manual.
4.2.3 Operations Security (OPSEC): The purpose of OPSEC is to reduce the vulnerability of
USAF missions to adversary collection and exploitation of critical information. The Contractor shall ensure compliance with DoDD 5205.02E and DoD Manual 5205.02-M to protect U.S.
Government interests. The Contractor shall ensure Contractor personnel who perform work on a
Government facility comply with the OPSEC procedures of the facility.
4.2.4 Security Clearance: It is not expected Contractor personnel will require security clearances for proper accomplishment of contract/order requirements. Contractor personnel shall not be authorized access to classified information and/or CUI and classified items or be permitted to work on classified projects and/or programs without a valid security clearance and a need-to-know. If security clearances become necessary after contract/order award, the
Contractor shall ensure applicable Contractor personnel obtain valid security clearances appropriate to the access required for proper accomplishment of contract/order requirements.
4.2.5 Security Incident orViolation: The Contractor shall immediately notify the Government
Security Office of any potential or actual security incident or violation including potential or actual unauthorized disclosure or compromise of classified information and/or CUI.
4.2.6 Access to Government System(s): The Government will provide Contractor personnel access to system(s) necessary to perform tasks under the contract/order. The Contractor shall ensure Contractor personnel who require access to an unclassified or classified Government AIS have the appropriate background check or security investigation conducted. The Government will provide system access subject to approval of the DD Form 2875, System Authorization
Access Request (SAAR). Upon completion/termination of the contract/order or transfer/termination of Contractor personnel, the system account(s) will be closed.
4.2.7 Access to Government Facility: The Contractor shall ensure Contractor personnel who require access to a Government facility comply with the security requirements of the facility.
4.2.8 Common Access Card (CAC): The Contractor shall ensure applicable Contractor personnel complete a DD Form 1172-2 (Application for Department of Defense Common
Access Card – DEERS Enrollment) to obtain a CAC required for performance of tasks under the contract/order. The DD Form 1172-2 shall be submitted to Security, Cheryl Danielly-Horne, 402
MXSG/OB, E-mail: Cheryl.danielly-horne@us.af.mil. Upon completion of specified task(s), completion/termination of the contract/order, or transfer/termination of the Contractor personnel, the CAC shall be returned to Security, Cheryl Danielly-Horne, 402 MXSG/OB, E-mail:
Cheryl.danielly-horne@us.af.mil.
4.2.9 Access to Robins Air Force Base (AFB)
4.2.9.1 Background Check: In accordance with AFI 31-113, Installation Perimeter Access
Control, all non-DoD personnel requiring frequent or recurring access to Robins AFB must have a background check completed by the 78 SFS/S5P 78 SFS/S5P Visitor Control Center (VCC) or
Base Defense Operations Center (BDOC) before they will be granted qualified base access.
4.2.9.2 Entry to Robins AFB: In accordance with RAFB IDP 31-101, Contractor personnel granted qualified base access may receive installation entry and circulation privileges under limited circumstances or conditions. They do not have the authority to sponsor anyone for access to Robins AFB or vouch for anyone to enter Robins AFB.
4.2.9.3 Identification of Contractor Personnel Requiring Access: In accordance with RAFB
IDP 31-101, a Contractor awarded a contract/order that requires services to be performed on
Robins AFB shall provide Security, Cheryl Danielly-Horne, 402 MXSG/OB, E-mail:
Cheryl.danielly-horne@us.af.mil a list of all contractor/subcontractor personnel requiring access to Robins AFB, the applicable contract number and the period of performance. The Contractor shall also provide, if possible, the location of the work site and the days/hours during which the contractor/subcontractor personnel will require access to Robins AFB.
mailto:Cheryl.danielly-horne@us.af.mil
4.2.10 Contractor Identification:
4.2.10.1 All contractor management staff and personnel shall clearly be identified as such at
ALL times and from a distance. Contractor identification shall include conversations, mail, email, teleconferences, video teleconferences, faxes, and/or other electronic communication whether with government personnel, other contractor personnel, or with the public when supporting this contract where their status as contractor employees might not otherwise be apparent or where they might be mistaken for civil service employees. As a minimum, contractor management staff and personnel shall clearly identify themselves using the label
“contractor” in email addresses in accordance with Federal Acquisition Regulation (FAR)
37.114, Special Acquisition Requirements; opening ALL phone conversations with a statement materially the same as, [office name], I am [employee name], a [prime contractor’s company name] employee” including the employing contractor’s name in the letterhead and/or signature block of any written correspondence; and any other means necessary. Any contractor-supplied badges shall be worn by contractor management staff and personnel, will be visible at all times, and at a minimum, will state: CONTRACTOR, the employee’s full name, employing company’s name, and position (i.e., CONTRACTOR, Jane A. Doe, XYZ Company, Job Title). Air Force issued identification badges and any contractor badges shall be worn above the waistline during the individual’s duty hours.
4.2.10.2 All government identification shall be surrendered to WR-ALC Security manager when no longer required.
4.3 Environmental Management System (EMS)
4.3.1 Executive Order (E.O.) 13423, Strengthening Federal Environmental, Energy, and
Transportation Management, and E.O. 13514, Federal Leadership in Environment, Energy, and
Economic Performance, establish the requirement for an EMS.
4.3.2 In accordance with the Assistant Secretary of the Air Force (SAF) Policy Letter, Conformance with Air Force Environmental Management System (EMS) Requirements for
Contracts Performed on Air Force Installations, dated 11 Dec 06, and the Air Force Materiel
Command/Vice Commander (AFMC/CV) Policy Letter, Conformance with Air Force
Environmental Management System (EMS) Requirements for Contracts Performed on Air Force
Installations, dated 1 Aug 07, Contractor personnel who perform work on any USAF installation shall comply with the EMS requirements established by the installation.
4.3.3 Contractor personnel shall complete EMS training prior to beginning work on any USAF installation.
The EMS training requirement may be satisfied by any of the following means:
1) If the Contractor is International Organization for Standardization (ISO) 14000
(Environmental management) certified, Contractor personnel do not have to complete
EMS training; however, the Contractor must provide documentation of ISO 14000 certification to the PCO.
2) If Contractor personnel possess CACs, they may complete EMS - General Awareness
Training at the Advanced Distributed Learning Service (ADLS) site below. The
Contractor shall provide their certificate(s) to the PCO.
https://golearn.csd.disa.mil/kc/login/login.asp?kc_ident=kc0001
3) If Contractor personnel do not possess CACs, the Contractor may request a copy of
Robins EMS Awareness Training via the Environment Management Workflow below.
The Contractor shall notify the COR that EMS training has been completed.
78ceg.cev.FrontOfc@robins.af.mil
4.3.4 The prime Contractor shall ensure subcontractors comply with the EMS requirement.
4.4 Green Procurement Program (GPP)
4.4.1 Under Secretary of Defense (USD) Memorandum, Establishment of the DoD Green
Procurement Program, dated August 27 2004, establishes the requirement for a GPP. The GPP is a mandatory federal acquisition program that focuses on the purchase and use of environmentally-preferable products and services. In accordance with FAR 23.404, Agency
Affirmative Procurement Programs, the GPP requires 100% of purchases of Environmental
Protection Agency (EPA)-designated products, included in the Comprehensive Procurement
Guidelines (CPG) list, contain recovered materials unless the item cannot be acquired competitively within a reasonable timeframe, meet appropriate performance standards, and/or be acquired at a reasonable price. In accordance with FAR 23.101, Sustainable Acquisition Policy /
Definition, the GPP requirement applies to all acquisitions, including services, using U.S.
Government appropriated funds.
4.4.2 The prime Contractor shall ensure subcontractors comply with the GPP requirement.
4.5 Safety Requirements
4.5.1 Contractor Compliance: The Contractor shall comply with Government Safety and
Health regulations including, but not limited to, Public Law 91-596, Occupational Safety and
Health Act (OSHA), and DoDD 4715.1E, Environmental, Safety, and Occupational Health
(ESOH). OSHA and ESOH requirements shall be incorporated into the Contractor’s safety program.
4.5.2 Voluntary Protection Program (VPP): The USAF is a participant in the OSHA VPP.
Contractor personnel performing work on a USAF installation shall participate in the local VPP.
Additional information regarding VPP is available at the site below.
http://www.osha.gov/dcsp/vpp/index.html
4.5.3 Mishap Notification/Investigation
https://golearn.csd.disa.mil/kc/login/login.asp?kc_ident=kc0001 mailto:78ceg.cev.FrontOfc@robins.af.mil http://www.osha.gov/dcsp/vpp/index.html
4.5.3.1 In accordance with AFI 91-204, Safety Investigations and Reports, paragraph 2.4.6.1.1, the Contractor shall report mishaps involving damage or injury to USAF interests. In accordance with AFI 91-204, paragraph 1.3.1.1, damage or injury includes: damage to DoD property;
occupational illness to DoD military or civilian personnel; injury to on- or off-duty DoD military personnel; injury to on-duty DoD civilian personnel; and damage to public or private property or injury or illness to non-DoD personnel caused by USAF operations.
4.5.3.2 In accordance with AFI 91-204, paragraph 2.4.6.1.1, the Contractor shall ensure the WR-
ALC Complex Safety Office at 478-926-1708 during normal business hours or AMOC at 478-
926-3567 and the applicable contract management authority are notified of mishaps. The
Contractor shall contact Ruben Branch, 402 MXSG/OB (CSMO), Contracting Officer’s
Representative (COR), at 478-926-8808, if available, or the alternate COR, Eric Lester, at 478-
327-4746 by telephone within 4 business hours.
4.5.3.3 Mishap/Incident Reporting. The contractor shall report all mishaps/incidents in accordance with the contract Appendix C. The contractor shall immediately secure the mishap scene and damaged property and impound pertinent maintenance and training records until released by the Government’s Safety Office (WR-ALC/SEG). Such release shall be accomplished through the CO. The contractor shall cooperate and assist Government personnel in the investigation of the incident and submit an Accident/Incident Report within 3 calendar days of the accident/incident. The Contractor shall require all subcontractors to comply with required safety, health and fire standards. (CDRL A001, Accident/Incident Report, DI-SAFT-
81563/T)
4.5.3.4 In accordance with AFI 91-204, paragraph 2.4.6.1.2, the Contractor shall cooperate with
USAF safety investigations.
4.5.4 Safety and Health Plan
4.5.4.1 Safety and Health Plan. Within 10 calendar days after contract award, the contractor shall provide a copy of the company's Safety Plan that is required to ensure compliance with the
Occupational Safety and Health Act (OSHA) (Public Law 91-596). A copy shall be provided to the CO and the COR. The COR will provide the Safety and Health Plan and the PWS to the
WR-ALC Complex Safety Office. In accordance with Air Force Pamphlet (AFPAM) 91-210, Contract Safety, paragraph 6.4, the WR-ALC Complex Safety Office will review the plan and this PWS to determine if safety requirements are correctly addressed. The WR-ALC SEG Safety
Office will provide acceptance or non-acceptance within five workings days of receipt to the
COR who will notify the CO. The Contractor shall establish and maintain a safety program in accordance with OSHA, ESOH, the contract/order Appendix C (Industrial Safety Requirements), and the Safety and Health Plan.
(CDRL A002, DI-MGMT-81580/T, Environmental Health and Safety Plan)
4.5.4.2 Safety Requirements. The contractor shall comply with safety provisions, i.e., technical specifications, technical publications, Federal Occupational Safety and Health Administration
(OSHA) standards, and other nationally or locally recognized sources of safety, health, and fire prevention standards and practices. The contractor shall be responsible for the safety and accountability of all their personnel and the Government facilities/property and are subject to enforcement authority by federal and state safety and health officials. The AF is not responsible for ensuring that contractors comply with "personal" safety requirements that do not present the potential to damage Government resources (safety shoes etc.). The contractor shall provide all personal protective equipment unless specifically stated otherwise in this PWS. In addition, the
Government is not responsible for medical examinations, hearing testing, and substance abuse testing for contractor employees.
4.5.4.3 The contractor Safety Plan shall address in detail the items listed in the Contract
Appendix C, Part II through Part IV as applicable. For task specific procedures identified in the
Contract Appendix C, the contractor’s internal procedures for those tasks must be identifiable within the submitted Safety Plan or shall be provided in an amendment or addendum to the company’s Safety Plan. If task specific procedures identified in the Contract Appendix C, are not submitted with the contractor’s Safety Plan, the submitted Safety Plan will be returned as
NOT ACCEPTED. The contractor will have 5 working days to resubmit the Safety Plan, amendment or addendum to address or correct issues identified for non-acceptance. The WR-
ALC Complex Safety Office will provide acceptance or non-acceptance of the resubmission within 5 workings days of receipt to the COR who will notify the CO.
4.6 Monthly Status Report The Contractor will submit a Monthly Status Report no later than the th of the following month.(A003, Monthly Status Report, DI-MGMT-80368A/T)
4.7 Contract Data Requirements Lists (CDRLs)- DD Form 1423s
Paragraph Description CDRL Requirement/Due Date
4.5.3.3 Accident/Incident Report
DI-SAFT-81563/T
A001 See applicable DD Form 1423
4.5.4.1 Environmental Health and
Safety Plan
DI-MGMT-81580/T
A002 See applicable DD Form 1423
4.6 Monthly Status Report
DI-MGMT-80368A/T IAW
DD Form 1423
A003 Shall be delivered no later than the 15 th of the following month
1.3.2, 1.3.3, 1.4.1
Technical Report –Study/Service A004 See applicable DD Form 1423
4.8 Travel
Travel may be required. In the event contractor travel is required in support of these services, it shall be authorized in advance by the Contracting Officer. Costs will be negotiated as a firm fixed price and authorized before travel ensues. Travel costs will be paid in accordance with the
Joint Travel Regulation. Receipts must be presented with the invoice for payment of the firm fixed price travel. .
5.0 Appendices Note: It is the responsibility of the contractor to remain current on updates/ revisions to referenced AFI’s, OIs, etc. Any updates which impact contract requirements/costs must be brought to the attention of the Contracting Officer.
5.1 Appendix 1, References
Publication Title of
Publication
Date of Publication Section(s) that Apply
AFI 91-204 Safety
Investigations and
Reports
9 August 2012 reissued 8 April 2013 http://www.e-publishing.af.mil/
Paragraphs
1.3.1.1, 2.4.6.1.1-
2.4.6.1.2
AFPAM 91-210 Contract Safety 14 February 1994 certified current 6 January 2012
Pages 7-9
Assistant
Secretary of the
Air Force Policy
Letter
Conformance with
Air Force
Environmental
Management
System (EMS)
Requirements for
Contracts
Performed on Air
Force Installations
11 Dec 06 Entire
None Defense
Contingency COR
Handbook
Version 2
September 2012 http://www.acq.osd.mil/dpap/ccap/cc/corhb/Fi les/DCCOR_Handbook_2012.pdf
Section on
Combating
Trafficking in Persons in
Chapter 8, Monitoring the
Contractor
DoD 5200.2-R Personnel Security
Program
1/1/87
Change 1 - 2/12/1990
Change 2 - 7/14/1993
Change 3 - 2/23/1996 http://www.dtic.mil/whs/directives/corres/pub
1.html
Entire
DoDD 4715.1E Environmental, Safety, and
Occupational
March 19, 2005 http://www.e-publishing.af.mil/ http://www.e-publishing.af.mil/ http://www.acq.osd.mil/dpap/ccap/cc/corhb/Files/DCCOR_Handbook_2012.pdf http://www.acq.osd.mil/dpap/ccap/cc/corhb/Files/DCCOR_Handbook_2012.pdf http://www.dtic.mil/whs/directives/corres/pub1.html http://www.dtic.mil/whs/directives/corres/pub1.html http://www.dtic.mil/whs/directives/corres/pub1.html
Health (ESOH) 1.html
DoDD 5205.02E DoD Operations
Security (OPSEC)
June 20, 2012
DoD Manual
5205.02-M
DoD Operations
Security (OPSEC)
Program Manual
November 3, 2008
E.O. 13423 Strengthening
Federal
Environmental, Energy, and
Transportation
Management
January 24, 2007 http://www.gpo.gov/fdsys/pkg/FR-2007-01-
26/pdf/07-374.pdf
E.O. 13514 Federal
Leadership in
Environment, Energy, and
Economic
Performance
5 October 2009 http://www.whitehouse.gov/assets/documents/
2009fedleader_eo_rel.pdf
FAR and supplements
Federal
Acquisition
Regulation http://farsite.hill.af.mil
Sections applicable to contract and
PWS
OSD
Memorandum
Enterprise-wide
Contractor
Manpower
Reporting
Application
Nov 28 2012 http://www.acq.osd.mil/dpap/policy/policyvault/Enterprise-wide_Contractor_Manpower_Reporting_Application_memoran dum.pdf
Public Law 91-
Occupational
Safety and Health
Act of 1970
December 29, 1970 as amended through January 1, 2004 http://www.osha.gov/pls/oshaweb/owadisp.show_ document?p_id=2743&p_table=OSHACT
SAF/AQ
Memorandum
Implementation of
FY11 NDAA
Section 8108, contractor
Inventory
Nov 12 2012 Entire
USD
Memorandum
Establishment of the DoD Green
August 27 2004 http://www.wbdg.org/pdfs/dod_gpp_082704.pdf http://www.dtic.mil/whs/directives/corres/pub1.html http://www.dtic.mil/whs/directives/corres/pub1.html http://www.dtic.mil/whs/directives/corres/pub1.html http://www.dtic.mil/whs/directives/corres/pub1.html http://www.dtic.mil/whs/directives/corres/pub1.html http://www.gpo.gov/fdsys/pkg/FR-2007-01-26/pdf/07-374.pdf http://www.gpo.gov/fdsys/pkg/FR-2007-01-26/pdf/07-374.pdf http://www.whitehouse.gov/assets/documents/2009fedleader_eo_rel.pdf http://www.whitehouse.gov/assets/documents/2009fedleader_eo_rel.pdf http://farsite.hill.af.mil/ http://www.acq.osd.mil/dpap/policy/policyvault/Enterprise-wide_Contractor_Manpower_Reporting_Application_memorandum.pdf http://www.acq.osd.mil/dpap/policy/policyvault/Enterprise-wide_Contractor_Manpower_Reporting_Application_memorandum.pdf http://www.acq.osd.mil/dpap/policy/policyvault/Enterprise-wide_Contractor_Manpower_Reporting_Application_memorandum.pdf http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_id=2743&p_table=OSHACT http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_id=2743&p_table=OSHACT http://www.wbdg.org/pdfs/dod_gpp_082704.pdf
5.2 Appendix 2, System References
TD-PDM Gateway - Single Gateway access (recently combined/standardized across all Depots), for access to ETOL and IHS for Robins AFB Technical
Users/Engineers, including:
- ETOL - Electronic Technical Order (T.O.) Library (provided
Technical Order information, latest changes, etc.) (form 2875)
- IHS - A depository of information available to Robins AFB technical users, and includes Specification Expert (technical document reference) and Haystack Gold (parts/assets information)
Procurement
AFI 31-113 Installation
Perimeter Access
Control
26 Jan 2012
RAFB IDP
31-101
Robins Integrated
Defense Plan
January 2012 Entire
File details come from the government source that posted it. Updated .