Purchase Description

View the file

Other files for this federal contract opportunity

Other files attached to Reconfigurable Host Aircraft Simulator, newest first.
File Type Posted
FA8571-15-R-0003-FBO.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PURCHASE DESCRIPTION

FOR

RECONFIGURABLE HOST AIRCRAFT SIMULATOR

28 October 2014

1.0 DESCRIPTION OF SERVICES.

The purpose of this acquisition is to purchase one Reconfigurable Host Aircraft Simulator (RHAS), P/N Z2090B-372 and one Upgrade Kit, P/N 2090B-373. The RHAS is an updated version of the existing Government owned Z2090B-313 Mobile Electronic Warfare (EW) Rack.

The Upgrade Kit will upgrade the existing Mobile EW Rack to an RHAS, satisfying the Government requirement for two RHASs. In addition, the Contractor will provide pertinent documentation such as an acceptance test plan, upgrade kit instructions, the final data package/wiring diagram of the RHAS, and one-time supplies and incidental services associated with delivering the equipment to Robins Air Force Base.

1.1 Requirements for First Bay, RHAS P/N Z2090B-372. Performance, content, and layout of the first bay shall be identical to the existing Z2090B-313, except for the following:

1.1.1 The new system shall include a second bay physically joined to the first bay.

1.1.2 The first bay will include all rack-mounting hardware and cables required for installation of the Government furnished PSG Analog Signal Generators (P/N E8257D)

(GFE).

1.1.3 The first bay of the new system shall include a power distribution unit (PDU) identical to the existing Z2090B-313.

1.1.4 The first bay of the new system shall include rack cooling identical to the existing Z2090B-313.

1.2 Z2090B-313 RHAS Equipment List.

The information below will be finalized at Critical Design Review (CDR).

Standard Hardware

Part Number Qty Description

6653A-220-909 1 DC Power Supply, 500W, 35V, 15A with options: 191- 233VAC, 50/60Hz Input, Rack mount kit

6813B-0B0-1CM-200-

1 AC source/analyzer, 0-300 Vrms, 1750 VA, single-phase.

GPIB, RS-232 with options: Rack mount kit; 174-220VAC operation, 50/60Hz

81150A-002-1CP 1 2 Channel Pulse Function Arbitrary Noise Generator with options: 2 Channel; rack mount kit;

81570A 1 Optical attenuator high power, straight 81634B 1 Optical Power Sensor Module 8163B-1CM-903 1 Lightwave Multimeter, Mainframe with options: Rack Mount

Kit (5063-9240); Power cord - United States and Canada (120V);

E3661B 2 1.6m Standard Rack Configuration Various a/r Rack Tie Kit, PDU, Fan Assys, Work Surfaces, Rails, Filler &

Feed thru Panels, Accessory Drawer, Cables, Connectors, Custom Hardware

Part Number Qty Description

Z2091B-264 1 Attenuator Chassis Z2091B-265 1 RF Combiner Chassis TBD 17 RF Semi-Rigid Cables

1.3 Requirements for Second Bay, RHAS. The Contractor shall provide:

1.3.1 A work surface installed at the same height as the existing system, with at least two 5U and three 3U slots with additional pass-through and blank panels.

1.3.2 The space above the work surface shall accommodate Government-installed assets 8.75”, 5”, and 7.5” high with unallocated space to be filled with a single panel.

1.3.3 The space below the work surface shall accommodate Government-installed assets 7.5”, 2.5”, 3.75,” and 5” high with unallocated space to be filled with a single panel.

1.3.4 Support rails shall be included with each blank panel.

1.3.5 Accommodate Government-installed flight LRUs and instruments. The detailed layout requirements shall be finalized at CDR.

1.3.6 The second bay shall include cooling capability the same as the first bay.

1.3.7 Fiber Optic accessories as follows:

1.3.7.1 Agilent 81000FI, Connector interface, FC/PC/SPC, quantity of 6

1.3.7.2 Agilent 81000SI, Connector interface, DIN 47256/4108, quantity of 3

1.3.8 Basic standard rack hardware to include:

1.3.8.1 Work surface

1.3.8.2 Blank filler panels

1.3.8.3 One set of rails for each blank filler

1.3.9 Power strip that can be connected to facility power independent of the first bay in lieu of PDU.

1.3.10 Rack cooling identical to the existing Z2090B-313.

1.4 Development Process. The development process will include a Kickoff Meeting, Critical Design Review (CDR) and Acceptance Test Plan (ATP). (CDRL A001, Design Review Information Package (DRIP), DI-SESS-81757A) (CDRL A002, Acceptance Test Plan

(ATP), DI-QCIC-80553A)

1.5 Requirements for Z2090B-373 Upgrade Kit. The Contractor shall provide a Z2090B-373 Upgrade Kit that includes all material necessary to convert the existing Z2090B-313 (as delivered) to a 2-bay system identical to the Z2090B-372. Contents will include:

1.5.1 Second rack bay with installed cooling, power strip, support rails and filler panels

1.5.2 Work surface.

1.5.3 Hardware for attaching the second bay to the existing Z2090B-313

1.5.4 Instructions. (CDRL A003, Commercial Off-The-Shelf (COTS) Manuals, DI-

TMSS-81815)

2.0 DELIVERY. The Contractor shall provide delivery no later than 16 weeks after contract award to the following address:

Eric Persson / Ben Goff 579th Software Maintenance Squadron / Flight C Building 229 South 280 Byron Street, Robins AFB, GA 31098 478-926-4896 / 478-222-7856 eric.persson.2@us.af.mil / benjamin.goff@us.af.mil

2.1 The Government POC(s) will be responsible for meeting and escorting personnel delivering the RHAS to Robins Air Force Base, and/or receiving delivered equipment.

3.0 GENERAL INFORMATION

3.1 Place of Performance. Contract end items will be manufactured or assembled at the Contractor’s facility.

3.2 Government Primary Point of Contact. The following individuals will serve as the Government points of contact for Agilent:

Primary Alternate Name: Eric Persson Name: Ben Goff Organization: 579 SMXS / Flight C Organization: 579 SMXS / Flight C Phone: 478-926-4896 Phone: 478-222-7856 Email: eric.persson.2@us.af.mil Email: benjamin.goff@us.af.mil

3.2 Green Procurement Program (GPP). The Contractor shall comply with the Green Procurement Program in accordance with Federal (EO 13423) and DoD and AF (GPP) policy.

Green Procurement is the purchase of environmentally preferable products and services. These products are preferred because they conserve resources, create less pollution and waste, or eliminate health and safety risks. The Green Procurement Program (GPP) includes these mandatory components:

(1) Recycled content products, also known as Comprehensive Procurement Guideline (CPG) Items http://www.epa.gov/cpg/products.htm

(2) Energy Star® and energy-efficient products; energy efficient standby power devices http://www.eere.energy.gov/

(3) Bio-based products http://www.biobased.oce.usda.gov/fb4p/