2. CDRLs Final 26 Aug 2022.pdf

PDF 884 KB Posted

Attached to
Sustaining Engineering Support Federal contract opportunity
Solicitation number
FA8552-23-R-0001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to Sustaining Engineering Support, newest first.
File Type Posted
FA8552-23-R-0001 0003.pdf PDF
FA8552-23-R-0001 0002.pdf PDF
1. PWS Update NOV 2022.pdf PDF
FA8552-23-R-0001 0001.pdf PDF
1. PWS.pdf PDF
2. CDRLs Final.pdf PDF
4. QASP.pdf PDF
FA8552-23-R-0001.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, Feb 2001 Previous editions are obsolete Page 1 of 1 Pages

17. PRICE

GROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST Form Approved

(1 Data Item) OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract |PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0013/1013/2013/3013/4013

A/B/C/D/E TDP TM OTHER MISC

D. SYSTEM ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HH-60G Sustaining Engineering FD2060-22-30072 Sikorsky

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A/B/C/D/E001 Technical Report - Study/Services

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MISC-80508B

See BLK 16

AFLCMC/WIUBC

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT ASREQ See BLK 16

a. ADDRESSEE

b. COPIES

8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

DRAFT FINAL

N/A See BLK 16 See BLK 16 Reg Repr o

16. REMARKS See Block 16 for 1

BLKs A, B, and 1: The Contractor shall not generate data in support of an option period until receipt of a contract modification exercising the option period.

BLK 5: PWS paragraphs: 4.3.1, 4.3.2, 4.3.3, 4.3.4, 4.3.5.1, 4.3.5.2, 4.3.6, 4.3.9, 4.4.3.3, 4.6.1, 5.7

BLK 7: Submit final DD Form 250 for DoDAAC FA8552, via iRAPT (formally WAWF), to attention: aflcmc.wiub1.sust@us.af.mil, and meagan.monserrat@us.af.mil to collectively account for data previously submitted. The Government will approve/disapprove within 30 business days of receipt.

BLKs 8, 11-13: The Contractor shall submit technical reports after completion of analysis. The Government will provide comments, if applicable, NLT (3) three business days. The Contractor shall submit a final report NLT (3) three business days after receipt.

BLK 9: Distribution authorized to U.S. Government Agencies and their contractors (Administrative or Operational use) (15 March 2022). Other request for this document shall be referred to AFLCMC/WIUBC.

BLK 14: Submit a digital copy in Microsoft® Office® or an Adobe® Portable Document Format (PDF) format.

Email addresses:

aflcmc.wiub1.sust@us.af.mil meagan.monserrat@us.af.mil

Email Addresses

15. Total 1

G. PREPARED BY H. DATE I. ACCEPTED BY

WITTER.GARY.L.10 Digitally signed by

WITTER.GARY.L.1062900020

62900020 Date: 2022.08.26 14:23:38 -04'00'

J. DATE

Meagan Monserrat 15 March 2022 26 Aug 2022 mailto:aflcmc.wiub1.sust@us.af.mil mailto:meagan.monserrat@us.af.mil

GROUP

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract| PR No. listed in Block E.

A/B/C/D/E TDP TM OTHER MGMT

D. SYSTEM ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HH-60G Sustaining Engineering FD2060-22-30072 Sikorsky

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A/B/C/D/E002 Status Report

DI-MGMT-80368A

PWS Para 4.4.2, 4.4.3

LT See BLK 16 See BLK 16

8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

DRAFT FINAL

A See BLK 16 See BLK 16 Reg Repr o

16. REMARKS See Block 16 for 1 1 meagan.monserrat@us.af.mil to collectively account for data previously

BLKs 8, 10-13: The first draft monthly report shall be submitted on/by the 15th of the first full month following contract award. Subsequent monthly reports shall be submitted by the 15th of the following month. If the 15th falls on a holiday/weekend, the report is due the next business day. If corrections/changes are required, the Government will submit within (5) five business days of receipt. After receipt of corrections/changes from the Government, the Contractor shall incorporate comments and resubmit within (3) three business days.

contractors (Administrative or Operational use) (19 March 2022). Other

15. Total 1 1

WITTER.GARY.L.10 Digitally signed by

WITTER.GARY.L.1062900020

62900020 Date: 2022.08.26 14:23:59 -04'00'

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BEUSED PAGE 1 OF 7

17. PRICE GROUP

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any othe aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract / PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0013/1013/2013/3013AC/4013

B. EXHIBIT

A/B/C/D/E

C. CATEGORY:

TDP X TM OTHER

D. SYSTEM/ITEM

HH-60 Sustaining Engineering Support Services

E. CONTRACT/PR NO.

FD2060-22-30072

F. CONTRACTOR

Sikorsky

1. DATA ITEM NO.

A/B/C/D/E003

2. TITLE OF DATA ITEM

PRODUCT ENGINEERING DESIGN DATA AND ASSOCIATED LISTS

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81000F/T

5. CONTRACT REFERENCE

PWS Para 4.3.1, 4.6, 4.6.1

6. REQUIRING OFFICE

AFLCMC / WIUBC

7. DD 250 REQ

LT

9. DIST STATEMENT

SEE BLOCK 16

10. FREQUENCY

As Specified on ESTR

12. DATE OF FIRST SUBMISSION

As Specified on ESTR

14. DISTRIBUTION

8. APP CODE

N/A

11. AS OF DATE

As Specified on ESTR

13. DATE OF SUBSEQUENT SUBMISSION

As Specified on ESTR

Draft Final

Reg Repro

16. REMARKS

1. Product Data Specification 9579776 rev N (CAGE 98752) and

Clarification of Test Criteria for Electrical and Avionics Items 9579777 rev B (CAGE 98752) are a part of this CDRL. A copy of these drawings may be requested through the Procurement Contracting officer. Engineering data requirements will be defined on the Engineering Support Task Request (ESTR) form.

2. Metadata SHALL BE in accordance with Air Force document 9579776 rev N, option 1 when required by the ESTR.

PAPER COPY

DIGITAL 1

(CLASSIFIED)

DIGITAL

15. TOTAL 0 1 0

G. PREPARED BY

Steven Lamb

H. DATE

26 Aug 22

I. APPROVED BY

WITTER.GARY.L.1062900 Digitally signed by

WITTER.GARY.L.1062900020

Date: 2022.08.26 14:24:40 -04'00'

26 Aug 2022

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO

0013/1013/2013/3013/4013

B. EXHIBIT

A/B/C/D/E

C. CATEGORY:

TDP X TM OTHER

D. SYSTEM / ITEM

HH-60 Sustaining Engineering Support Services

E. CONTRACT / PR NO.

FD2060-22-30072

F. CONTRACTOR

16. REMARKS (Continued)

CONTINUATION OF DD FORM 1423-1 (DI-SESS-81000F/T) Dtd. 2022/07/19, EDATS 2022-76

BLOCK 4: DI-SESS-81000F is tailored as follows:

Requirements: (the below paragraph numbering corresponds with the numbering in the DID)

1. Reference Documents. Delete paragraph 1 in its entirety and replace with:

“1. Reference Documents. The documents apply as cited in the DD Form 1423-1 and continuation sheets. Unless otherwise noted, the latest revision of the ASME Standard at the time of solicitation shall apply.”

3. Format. Delete in its entirety and replace with:

“3. Format. Product Engineering Design Data and Associated Lists shall be in the format as specified on this DD Form 1423-1 and continuation sheets, and shall meet the requirements of ASME Y14.1."

4. Content. Delete in its entirety and replace with:

“4. Content. Product Engineering Design Data and Associated Lists shall conform to the requirements of ASME Y14.100-2017, Appendix B, sections B6 through B9.1 and Appendices C, D, E, and F in conjunction with ASME Y14.24-2012, ASME Y14.34, ASME Y14.35, ASME Y14.41, and ASME Y14.47. They shall document directly or by reference the following (items a through q), as applicable:”

6. CAGE code and document numbers.

Delete “TDP Option Selection Work Sheet incorporated in the contract or purchase order.” and replace with “DD Form 1423-1 and continuation sheets.”

7. Selection of design data.

Delete “The types of design data (e.g. drawings, models, 3Di viewables, etc.) required shall be as stated in the TDP Option Selection Worksheet incorporated in the contract or purchase order.” and replace with “The contractor shall comply with ASME Y14.24, Types and Applications of Engineering Drawings.”

DD Form 1423-1, FEB 2001 Page 2 of 7

A. CONTRACT LINE ITEM NO

0013/1013/2013/3013/4013

B. EXHIBIT

A/B/C/D/E

C. CATEGORY:

TDP X TM OTHER

D. SYSTEM / ITEM

HH-60 Sustaining Engineering Support Services

E. CONTRACT / PR NO.

FD2060-22-30072

F. CONTRACTOR

BLOCK 7:

“D”— Inspection is at destination and is to ensure this product meets this CDRL and its tasking document. Shipping list must accurately reflect the shipped product.

“D”— Acceptance is at destination. Acceptance of final data will be by approval of the Engineering Data Management Specialists.

BLOCK 9:

DISTRIBUTION STATEMENT. Distribution statements shall be in accordance with DoD Instruction

5230.24 and included on the first sheet of each drawing near the title block, and shall be as follows:

“DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DOD contractors only Critical Technology July 19 2022. Other requests shall be referred to AFLCMC /WIUBC.

EXPORT CONTROL WARNING LABEL. All engineering data shall be marked with Export Control Warning Labels in accordance with DoD Instruction 5230.24, dated August 23, 2012 as follows:

“WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App.

2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties.

Disseminate in accordance with provisions of DoD Directive 5230.25.”

DESTRUCTION NOTICE. Mark documents with one of the following:

a. For unclassified limited documents: “DESTRUCTION NOTICE. Destroy by any method that will prevent disclosure of contents or reconstruction of the document.”

b. For classified documents: “DESTRUCTION NOTICE. Follow the procedures in DoD 5220.22-

M, National Industrial Security Program Operating Manual, Chapter 5, Section 7, or DoD 5200.1R, Information Security Program, Chapter 6.”

BLOCK 10:

Drawings shall be delivered as coordinated on the Engineering Support Task Request (ESTR).

DD Form 1423-1, FEB 2001 Page 3 of 7

A. CONTRACT LINE ITEM NO

0013/1013/2013/3013/4013

B. EXHIBIT

A/B/C/D/E

C. CATEGORY:

TDP X TM OTHER

D. SYSTEM / ITEM

HH-60 Sustaining Engineering Support Services

E. CONTRACT / PR NO.

FD2060-22-30072

F. CONTRACTOR

Sikorsky

16. REMARKS (Continued)

BLOCK 16:

1. Contractor Activity and Part Identification:

The contractor shall use its own design activity identifier (CAGE) and shall assign its own design activity data set identifiers (i.e. drawing numbers). This number shall be or shall include the data set identifier on which the item is described. Where more than one item is described on a drawing, unique identification shall be provided by the addition of a suffixed dash number with the following limitations:

a. The total length of the part number including dash numbers and spaces shall not exceed 32 characters.

b. The dash number shall have the same characteristics as drawing numbers and may be composed of numbers, letters, or any combination thereof.

c. Part numbers shall not include the drawing revision letter, the contractor CAGE, or the drawing format size letter.

2. Content and format, and media requirements for delivery of Digital Engineering Data:

For content and format requirements, the contractor shall comply with Air Force data set identifier 9579776 (CAGE 98752) for Model-based TDPs. For media requirements, the contractor shall comply with Air Force data set identifier 9579776 (CAGE 98752) for both Model-based and non-Model-based TDPs. Only one submission is required. Physical media and/or a summary report is not required. Data requested on the ESTR can be delivered via Email, DoD Safe or contractor delivery method (DOCPAC) to the POC on the ESTR. Submit data to the Engineering POC located on the ESTR and the Program Manager. Format shall be contractor's format in view only PDF unless otherwise specified.

3. Engineering Drawing Practices:

The contractor shall use the practices described in ASME Y14.100-2017. For clarification, the documents listed in section 2 of ASME Y14.100-2017 shall be considered first tier and shall apply. The contractor may find it useful to incorporate the concepts of MIL-HDBK-288 into the preparation of the TDP. MIL- HDBK-288 refers to Engineering Drawing Package (EDP); this term shall be considered synonymous with TDP. In instances where the ASME standards do not fully define requirements concerning preparation of engineering drawings, the contractor may use the guidance provided in the Drawing Requirements Manual (DRM) 11th Edition available from IHS, Inc. copyright 2008.

DD Form 1423-1, FEB 2001 Page 4 of 7

A. CONTRACT LINE ITEM NO

0013/1013/2013/3013/4013

B. EXHIBIT

A/B/C/D/E

C. CATEGORY:

TDP X TM OTHER

D. SYSTEM / ITEM

HH-60 Sustaining Engineering Support Services

E. CONTRACT / PR NO.

FD2060-22-30072

F. CONTRACTOR

17. REMARKS (Continued)

4. Control Drawings:

Control drawings shall be created in accordance with DI-SESS-81000F/T and ASME Y14.24-2012 to depict engineering criteria used in selecting purchased or vendor developed items.

5. Contract Numbers:

For specifications, processes and standards when a TDP document is prepared under a Government contract, the Government contract number under which it is prepared shall appear on the first sheet of the document original. When a TDP document is delivered under a Government contract other than the one under which it was prepared, the Government contract number under which it is delivered shall also appear on the first sheet of each copy submitted. If the document is prepared and submitted under the same contract, only the entry for the contract under which it is prepared is required.

6. Traceability:

The contractor shall prepare the TDP in such a manner to insure that all applicable documents and part or identifying numbers (PIN) i.e., Artwork, Schematics, Software/Programming Data, Test Criteria, etc. are referenced within the TDP for traceability.

6.1 If the contractor is the original equipment manufacturer (OEM), impacted engineering data that are part of the effort as defined in the tasking document (SOW, PWS, etc.) shall be revised to include changes to reflect the delivered item’s configuration.

6.2 If the contractor is not the OEM, the contractor shall ensure impacted engineering data that are part of the effort as defined in the tasking document (SOW, PWS, etc.) are updated and delivered to reflect the delivered items configuration.

7. Preparation Method:

American English language shall be used in the preparation of this TDP. Dimensioning and Tolerancing shall be Decimal Inch in accordance with ASME Y14.5-2018. Size and format of drawings shall be Decimal Inch per ASME Y14.1. All drawings shall be prepared using Third Angle Orthographic Projection method of presentation. The symbol for angle of projection shall be delineated in the Title Block of newly prepared or revised engineering data. (ASME Y14.3-2003 figure 2)

8. TDP Validation:

The contractor shall validate that the TDP conforms to the contractual requirements, and that they accurately depict the item(s) developed, modified, or produced under the contract.

9. Clarification of Detailed Test Criteria for Electrical and Avionics Items:

Test criteria for items designed or developed with Government funds under this contract is an inherent part of the TDP. Test criteria shall be incorporated, either directly on each TDP document or by reference, for each end item, top assembly item, configured item, and lowest assembled item IAW Air Force data set identifier 9579777 (CAGE 98752), titled “Clarification of Detailed Test Criteria for Electrical and Avionics Items.”

DD Form 1423-1, FEB 2001 Page 5 of 7

A. CONTRACT LINE ITEM NO

0013/1013/2013/3013/4013

B. EXHIBIT

A/B/C/D/E

C. CATEGORY:

TDP X TM OTHER

D. SYSTEM / ITEM

HH-60 Sustaining Engineering Support Services

E. CONTRACT / PR NO.

FD2060-22-30072

F. CONTRACTOR

10 Associated Lists:

Parts Lists per ASME Y14.34 are required. Parts Lists are required at assembly level. Parts Lists for Contractor Activity identifier CAGE code may be an integral part of a document or it may be a separate document. The identification and quantity of parts shown on the assembly drawing shall agree with the parts list.

11 Marking:

Drawings shall specify requirement for marking part number identification on items as required by MIL- STD-130N and other applicable documents referenced therein. Item unique identification (IUID) marking is mandatory for applicable items as determined by the Program Office. (See DFARS 252.211- 7003 Item Identification and Valuation) The drawings shall identify the content, method of application, material and location of marking on the part.

12 Legacy Stable Base Media (Mylars, un-dimensioned drawings, master patterns, etc.).

Per 9579776 paragraph 6, data originally produced on stable base drawing media that has been redrawn/converted/reproduced in a digital format or developed on a CAD platform shall be delivered as specified on the ESTR. In cases where Mylars are the master engineering data source the contractor shall negotiate the delivery method with the POC on the ESTR.

13 Legibility and Reproducibility:

All documents prepared or submitted shall meet the legibility and reproducibility requirements of the specification or standard controlling the media in which the data is to be delivered. As a minimum, all lines, symbols, letters, and numerals shall be readable.

14 Protecting Classified Information:

TDPs or parts thereof, containing classified information shall be protected and marked in accordance with the Department of Defense National Industrial Security Program Operating Manual for Safeguarding Classified Information, DoD Manual 5220.22-M. When 3D TDP data is used, the solid models shall display classification marking clearly visible when the solid model is first opened.

15. Contractor Quality Control System: The contractor shall develop and maintain a quality control system for the detailed examination and technical review of the TDP, to be supplied under the terms of the contract or purchase order. The quality control system shall assure conformance of the TDP to all requirements specified herein. The quality control system shall be documented and subject to review by the Air Forces representative. If the contractor’s methods and procedures do not comply with the quality control system or do not attain their objectives, the quality control system shall be subject to disapproval by the Air Force.

DD Form 1423-1, FEB 2001 Page 6 of 7

A. CONTRACT LINE ITEM NO

0013/1013/2013/3013/4013

B. EXHIBIT

A/B/C/D/E

C. CATEGORY:

TDP X TM OTHER

D. SYSTEM / ITEM

HH-60 Sustaining Engineering Support Services

E. CONTRACT / PR NO.

FD2060-22-30072

F. CONTRACTOR

16. Inspection of TDP: The TDP shall be inspected for the following:

a. Compliance with the requirements of this contract.

b. Inclusion of all documents, including sub-tier references, required to meet the design disclosure requirements of the TDP.

c. Accuracy of the assignment and identification of security markings, restriction statements (for example distribution statements), export control notices, rights-in-data legends, and other special markings.

d. Inclusion of contract numbers and contractor identifications.

e. Legibility and reproducibility.

f. TDP components have not been prepared for requirements, which could be met by existing standardization documents.

g. Completeness and accuracy of the TDP documents, including required quality assurance information, in describing design of the item, its subassemblies, and component parts. The design to be described by the TDP documents is that configuration of the item the Government has approved, tested, or accepted.

h. Both Type 2D and Type 3D TDPs shall open in the appropriate software without regeneration errors or warnings.

DD Form 1423-1, FEB 2001 Page 7 of 7

GROUP

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer

A/B/C/D/E TDP TM OTHER FNCL

D. SYSTEM ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HH-60G Sustaining Engineering FD2060-22-30072 Sikorsky

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A/B/C/D/E004 Funds and Man-Hours Expenditure Report

DI-FNCL-80331A

PWS Para 4.4.2

8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

DRAFT FINAL

A See BLK 16 See BLK 16 Reg Repr o

16. REMARKS See Block 16 for 1 1 meagan.monserrat@us.af.mil to collectively account for data previously

BLKs 8, 10-13: A draft report shall be on the 15th of every month. If the 15th falls on a holiday/weekend, the report is due the next business day.

The initial report is due the 15th of the month after contract award. The Government will review and approve or disapprove within (5) five business days. Contractor shall have (3) three business days to incorporate comments and resubmit.

WITTER.GARY.L.10 Digitally signed by

WITTER.GARY.L.1062900020

62900020 Date: 2022.08.26 14:25:12 -04'00'

GROUP

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer

A/B/C/D/E TDP TM OTHER ADMN

D. SYSTEM ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HH-60G Sustaining Engineering FD2060-22-30072 Sikorsky

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A/B/C/D/E005 Conference Agenda

DI-ADMN-81249C

8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

DRAFT FINAL

A See BLK 16 See BLK 16 Reg Repr o

16. REMARKS See Block 16 for 1 1

BLK 5: See PWS Paragraphs: 4.4.3, 4.4.3.1, 4.4.3.2, 4.6.2, 4.6.3.

meagan.monserrat@us.af.mil to collectively account for data previously

BLKs 8, 10-13: A draft agenda shall be submitted (5) five business days prior to the meeting/conference. The Government will review and approve or disapprove within (2) two business days. The Contractor shall have (2) two business days to incorporate comments and resubmit the final agenda.

WITTER.GARY.L.106 Digitally signed by

WITTER.GARY.L.1062900020

2900020 Date: 2022.08.26 14:25:33 -04'00'

GROUP

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

D. SYSTEM ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HH-60G Sustaining Engineering FD2060-22-30072 Sikorsky

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A/B/C/D/E006 Conference Minutes

DI-ADMN-81250C

8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

DRAFT FINAL

A See BLK 16 See BLK 16 Reg Repr o

16. REMARKS See Block 16 for 1 1 meagan.monserrat@us.af.mil to collectively account for data previously

BLKs 8, 10-13: A draft Conference Minutes shall be submitted within (5) five business days after the meeting/conference. The Government will review and approve or disapprove within (5) five business days. The Contractor shall have (3) three business days to incorporate comments/corrections and resubmit the final agenda.

WITTER.GARY.L.10 Digitally signed by

WITTER.GARY.L.1062900020

62900020 Date: 2022.08.26 14:25:54 -04'00'

GROUP

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer

D. SYSTEM ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HH-60G Sustaining Engineering FD2060-22-30072 Sikorsky

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A/B/C/D/E007 Presentation Material

DI-ADMN-81373

8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

DRAFT FINAL

A See BLK 16 See BLK 16 Reg Repr o

16. REMARKS See Block 16 for 1 1 meagan.monserrat@us.af.mil to collectively account for data previously

BLKs 8, 10-13: Presentation Material shall be submitted at or within (5) five business days after the meeting/conference. The Government will review and approve or disapprove with (5) business days, Contractor shall have (3) three business days to incorporate comments/corrections and resubmit.

WITTER.GARY.L.10 Digitally signed by

WITTER.GARY.L.1062900020

62900020 Date: 2022.08.26 14:26:14 -04'00'

GROUP

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer

D. SYSTEM ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HH-60G Sustaining Engineering FD2060-22-30072 Sikorsky

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A/B/C/D/E008 Trip/Travel Report

DI-MISC-81943

8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

DRAFT FINAL

A See BLK 16 See BLK 16 Reg Repr o

16. REMARKS See Block 16 for 1 1

BLK 5: See PWS Paragraphs: 4.4.3, 4.4.3.1, 4.4.3.2, 4.4.3.3, 4.5, 4.6.2, 4.6.3.

meagan.monserrat@us.af.mil to collectively account for data previously

BLKs 8, 10-13: Draft trip/travel report shall be submitted within (5) five business days after the completion/return from travel. The Government will review and approve or disapprove within (5) five business days. Contractor shall have (3) three business days to incorporate comments/corrections and resubmit.

WITTER.GARY.L.10 Digitally signed by

WITTER.GARY.L.1062900020

62900020 Date: 2022.08.26 14:26:37 -04'00'

GROUP

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer

A/B/C/D/E TDP TM OTHER MGMT

D. SYSTEM ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HH-60G Sustaining Engineering FD2060-22-30072 Sikorsky

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A/B/C/D/E009 Engineering and Technical Services Accomplishment Report

DI-MGMT-80061A

PWS Para 4.4.3, 4.4.3.2, 4.4.3.3 AFLCMC/WIUBC

8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

DRAFT FINAL

A See BLK 16 See BLK 16 Reg Repr o

16. REMARKS See Block 16 for 1 1 meagan.monserrat@us.af.mil to collectively account for data previously

BLKs 8, 10-13: The Contractor shall submit the draft report no later than (NLT) (20) twenty business days after completion of review, study, analysis, etc. The Government will approve/disapprove within (5) five business days after receipt. Contractor shall have (3) three business days to incorporate comments/corrections and resubmit.

contractors (Administrative or Operational use) (17 June 2022). Other

WITTER.GARY.L.10 Digitally signed by

WITTER.GARY.L.1062900020

62900020 Date: 2022.08.26 14:27:01 -04'00'

Meagan Monserrat 17 June 2022 26 Aug 2022

GROUP

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer

D. SYSTEM ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HH-60G Sustaining Engineering FD2060-22-30072 Sikorsky

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A/B/C/D/E00A Accident/Incident Report

DI-SAFT-81563

PWS Para 5.5.2

LT ASREQ ASREQ

8. APP CODE B 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

DRAFT FINAL

N/A See BLK 16 ASREQ Reg Repr o

16. REMARKS See Block 16 for 1

BLKs A, B, and 1: The Contractor shall not generate data in support of an option period until receipt of a contract modification exercising the option period.

meagan.monserrat@us.af.mil to collectively account for data previously

BLK 11: Contractor shall submit a report on ALL mishaps, damage to DoD property, and employee injury, to the Government Program Manager telephonically within (4) four hours after initial notification. Written report shall be submitted within 24 hours of the mishap. Electronic submissions are acceptable.

BLK 9: Distribution authorized to U.S. Government Agencies only (Adminstrative or Operational Use) (15 Mar 2022). Other request for this document shall be referred to AFLCMC/WIUBC.

aflcmc.se.mishap@robins.af.mil aflcmc.wiub1.sust@us.af.mil meagan.monserrat@us.af.mil erica.carter.3@us.af.mil

15. Total 1

WITTER.GARY.L.106 Digitally signed by

WITTER.GARY.L.1062900020

2900020 Date: 2022.08.26 14:30:56 -04'00' mailto:aflcmc.se.mishap@robins.af.mil mailto:aflcmc.wiub1.sust@us.af.mil mailto:erica.carter.3@us.af.mil

GROUP

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer

A/B/C/D/E TDP TM OTHER IPSC

D. SYSTEM ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HH-60G Sustaining Engineering FD2060-22-30072 Sikorsky

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A/B/C/D/E00B Software Development Plan (SDP)

DI-IPSC-81427B

PWS Para 4.6

8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

DRAFT FINAL

A See BLK 16 See BLK 16 Reg Repr o

16. REMARKS See Block 16 for 1 1

BLKs A, B, and 1: The Contractor shall not generate data in support of an

BLK 7: Submit final DD Form 250 for DoDAAC FA8522 via iRAPT to attention: walter.seefeld.1@us.af.mil and shundrenic.zanders@us.af.mil to collectively account for data previously submitted. The Government will approve/disapprove within 30 business days of receipt.

BLK 8, 10-13: The Contractor shall submit the draft plan NLT (20) twenty business days after contract award. The Government will review and approve/disapprove within (5) five business days after receipt. If corrections/changes are required, the Government will submit within (5) five business days of review. After receipt of corrections/changes from the Government, the Contractor shall incorporate comments/corrections and resubmit final plan within (3) three three business days.

contractors (Administrative or Operational use) (17 June 2022). Other

WITTER.GARY.L.106 Digitally signed by

WITTER.GARY.L.1062900020

2900020 Date: 2022.08.26 14:28:00 -04'00' mailto:walter.seefeld.1@us.af.mil mailto:shundrenic.zanders@us.af.mil

GROUP

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer

D. SYSTEM ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HH-60G Sustaining Engineering FD2060-22-30072 Sikorsky

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A/B/C/D/E00C Software Requirements Specification (SRS)

DI-IPSC-81433A

8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

DRAFT FINAL

A See BLK 16 See BLK 16 Reg Repr o

16. REMARKS See Block 16 for 1 1

BLKs A, B, and 1: The Contractor shall not generate data in support of an meagan.monserrat@us.af.mil to collectively account for data previously

BLKS 8, 10-13: The Contractor shall submit the draft specification NLT twenty (20) business days after contract award. The Government will approve/disapprove within (5) five business days after receipt. If corrections/changes are required, the Government will submit within (5) five business days of review. After receipt of corrections/changes from the Government, the Contractor shall incorporate comments and resubmit final plan within (3) three business days.

contractors (Administrative or Operational use) (17 Jun 2022). Other

WITTER.GARY.L.10 Digitally signed by

WITTER.GARY.L.1062900020

62900020 Date: 2022.08.26 14:29:01 -04'00'

GROUP

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer

D. SYSTEM ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HH-60G Sustaining Engineering FD2060-22-30072 Sikorsky

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A/B/C/D/E00D Software Test Plan (STP)

DI-IPSC-81438A

8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

DRAFT FINAL

A See BLK 16 See BLK 16 Reg Repr o

16. REMARKS See Block 16 for 1 1

BLKs A, B, and 1: The Contractor shall not generate data in support of an meagan.monserrat@us.af.mil to collectively account for data previously

BLK 8, 10-13: The Contractor shall submit the draft plan NLT twenty (20) business days after contract award. The Government will approve/disapprove within (5) five business days after receipt. If corrections/changes are required, the Government will submit within (5) five business days of review. After receipt of corrections/changes from the Government, the Contractor shall incorporate comments and resubmit final plan within (3) three business days.

WITTER.GARY.L.10 Digitally signed by

WITTER.GARY.L.1062900020

62900020 Date: 2022.08.26 14:29:35 -04'00'

GROUP

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer

D. SYSTEM ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HH-60G Sustaining Engineering FD2060-22-30072 Sikorsky

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A/B/C/D/E00E Software Test Report (STR)

DI-IPSC-81440A

8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

DRAFT FINAL

A See BLK 16 See BLK 16 Reg Repr o

16. REMARKS See Block 16 for 1 1

BLKs A, B, and 1: The Contractor shall not generate data in support of an meagan.monserrat@us.af.mil to collectively account for data previously

BLK 8, 10-13: The Contractor shall submit the draft report NLT (20) twenty business days after completion of review, study, or analysis. The Government will approve/disapprove within five (5) business days after receipt. If corrections/changes are required, the Government will submit within five (5) business days of review. After receipt of corrections/changes from the Government, the Contractor shall incorporate comments and resubmit final plan within five (5) business days.

WITTER.GARY.L.10 Digitally signed by

WITTER.GARY.L.1062900020

62900020 Date: 2022.08.26 14:30:13 -04'00'

File details come from the government source that posted it. Updated .